This document provides answers to industry questions regarding solicitation SP3300-21-R-5002 for Chemical Management Services and Third Party Logistics services in support of Fleet Readiness Centers at multiple CONUS locations. The Defense Logistics Agency Distribution is seeking these services as a follow-on effort to an existing contract. One question asked about missing sub-CLINs for equipment replacement in ordering periods four and five of the solicitation, to which the government responded that no replacements are planned for those periods based on the identified equipment and timelines.

View the file

Other files

File Type Posted
Amendment-0008-SP330021R5002.pdf PDF
Amendment-0007-SP330021R5002.pdf PDF
SP330021R5002-FINAL conformed through amendment 0007.pdf PDF
QA Document-Amendment 0006 FINAL.pdf PDF
Amendment-0006-SP330021R5002.pdf PDF
QA Document-Amendment 0005 FINAL.pdf PDF
Amendment-0005-SP330021R5002.pdf PDF
SP330021R5002 Attachment J.36 TE 5.10 - Site Information - Cherry Point conformed through Amendment 0005.xlsx XLSX spreadsheet
SP330021R5002-FINAL conformed through amendment 0005.pdf PDF
Attachment J1 PWS Revisions-Amendment 0004.pdf PDF
QA Document-Amendment 0004 FINAL.pdf PDF
SP330021R5002 Attachment J1 - PWS conformed through amendment 0004.pdf PDF
SP330021R5002-FINAL conformed through amendment 0004.pdf PDF
Amendment-0004-SP330021R5002.pdf PDF
SP330021R5002 Attachment J.28 - TE 5.2 - Government's Initial Inventory Plan - Jacksonville -Conformed through Amendment 0004.xlsx XLSX spreadsheet
CDRL A013 - Material Support Costs-Conformed through Amendment 0004.pdf PDF
SP330021R5002 Attachment J.11 - TE 1.5 - Risk Assessment Worksheet conformed through Amendment 0004.xlsx XLSX spreadsheet
SP330021R5002 Attachment J.34 - TE 5.8 - Never Out List - Jacksonville-Conformed through Amendment 0004.xlsx XLSX spreadsheet
SP330021R5002 Attachment J.44 TE 5.18 - Cylinder Storage Area - 101X.pdf PDF
SP330021R5002 Attachment J1 - PWS conformed through amendment 0003.pdf PDF
CDRL A028 - Request for Reimbursement-Disposal of Never Out HM conformed through amendment 0003.pdf PDF
SP330021R5002 Attachment J.7 TE 1.1 - Performance Standards and APLS conformed through amendment 0003.pdf PDF
CDRL A033 - Weekly Order Status Report conformed through amendment 0003.pdf PDF
Amendment-0003-SP330021R5002.pdf PDF
CDRL A030 - Monthly Backorder Report Non-recurring Demand HM conformed through amendment 0003.pdf PDF
SP330021R5002-FINAL conformed through amendment 0003.pdf PDF
CDRL A036 - Weekly Replenishment Report.pdf PDF
SP330021R5002 Attachment J.9 TE 1.3 - Key Personnel Requirements conformed through amendment 0003.pdf PDF
SP330021R5002 Attachment J.8 TE 1.2 - Mandatory Reports and Plans conformed through amendment 0003.pdf PDF
SP330021R5002 Attachment J.12 TE 1.6 - Technical Exhibits and Figures conformed through amendment 0003.pdf PDF
QA Document-Amendment 0003 FINAL.pdf PDF
Attachment J1 PWS Revisions-Amendment 0003.pdf PDF
SP330021R5002-FINAL conformed through amendment 0002.pdf PDF
Amendment-0002-SP330021R5002.pdf PDF
SP330021R5002-FINAL conformed through amendment 0001.pdf PDF
QA Document-Amendment 0001 FINAL.pdf PDF
Amendment-0001-SP330021R5002.pdf PDF
Attachment J1 PWS Revisions - Amendment 0001.pdf PDF
SP330021R5002 Attachment J1 - PWS conformed through amendment 0001.pdf PDF
PPC Attendees (1-15-21).xlsx XLSX spreadsheet
CMS Site Visit Instructions SP330021R5002 REVISED (1-14-21).docx DOCX document
Fillable Travel Questionnaire_FRCSE.pdf PDF
CMS Site Visit Instructions SP330021R5002 (1-11-21).docx DOCX document
SP330021R5002-FINAL 1-6-2021.pdf PDF
SP330021R5002 Attachment J1 - PWS.pdf PDF
SP3300-21-R-5002 Attachment J.6 DD254.pdf PDF
SP330021R5002 Attachment J.4 - Small Business Participation Commitment Document Template revised via AT 11-12-2020.docx DOCX document
SP330021R5002 Attachment J.3 Performance Risk Assessment Questionnaire.docx DOCX document
SP330021R5002 Attachment J.2 Department of Labor Wage Determinations.pdf PDF
SP330021R5002 Attachment J.5 - Subcontracting Plan Template.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-21-R-5002

Amendment 0008

QUESTIONS & ANSWERS DOCUMENT

The following questions have been submitted from industry regarding solicitation SP3300-21-R-5002. Each question has been redacted to ensure anonymity. The Government response is provided in the far right-hand column for each question.

Question RFP Page OR Pre- Proposal

Conference OR Site Visits

RFP Para Reference (if question relates to RFP)

Government Response

1 Section B is missing sub-CLINs and dollar values for equipment replacement at North Island, CA (FRCSW) in Ordering Periods 4 and 5, i.e. no sub-CLIN 3009AC or 4009AC.

Was this an oversight, since at least some equipment replacement can be expected in Ordering Periods 4 and 5?

RFP Pgs. 19 & 23 RFP Section L-28 The Government did not plan for equipment replacement in periods 4 and 5. The majority of the equipment identified for potential replacement is planned for the first 3 ordering periods. There are no known requirements for periods 4 & 5. Hence it is not an error that subclins 3009AC and 4009AC are not reflected in either section B or L of the RFP.