SOWAtchF-ExistingB2256Drwgs.pdf

PDF 11 MB Posted

Attached to
FY25 Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA462025R0001
Issued by
Department of the Air Force

About this file

The document is a set of six technical drawings (As-Built drawings) for Existing B2556, labeled as SOW Attachment F, associated with the FA462025R0001 solicitation for Fairchild AFB. The drawings include detailed architectural and engineering plans covering multiple levels and systems:

Page 1 contains floor plans for Utility, First, Second, and Third levels with grid coordinates and architectural details. Page 2 features a power riser diagram with panel bus/breaker schedules and room configurations. Page 3 shows the main electrical room layout, main switchboard elevation, and one-line electrical diagram. Page 4 displays exterior stairs lighting controls with panel schedules. Page 5 provides utility level floor plans with grid measurements and structural details. Page 6 includes a comprehensive steam diagram showing steam supply lines, valves, traps, and mechanical room layout, marked as "Not to Scale" but providing a detailed schematic of the steam infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to FY25 Multiple Award Construction Contract (MACC), newest first.
File Type Posted
25R0001_Amend0006-SF30-20250509.pdf PDF
SOWAtchF_Amend0005ExistingB2256Drwgs.pdf PDF
25R0001_Amend0005-SF30-20250508.pdf PDF
25R0001_Amend0004-SF30-20250508.pdf PDF
25R0001_Amend0003-SF30-20250501.pdf PDF
25R0001_Amend0002-SF30-20250428.pdf PDF
25R0001_PreProposalSiteVisitSignIn-20250428.pdf PDF
25R0001_Amend0001-SF30-20250417.pdf PDF
25R0001_SF1442-20250414.pdf PDF
25R0001_Atch7B-WA20250130-Heavy20250207.pdf PDF
25R0001_Atch7C-WA20250001-Highway20250321.pdf PDF
25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf PDF
25R0001_Atch9-PastPerformanceInfo.pdf PDF
25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf PDF
25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf PDF
25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf PDF
SOWAtchB-PhotosB2256_2257_2258_2259.pdf PDF
SOWAtchD2-15PcntConcept Plan.pdf PDF
25R0001_Atch2-2025BDGSpecs11MAR2025.pdf PDF
25R0001_Atch4-2018FAFBIFS26JUN2018.pdf PDF
25R0001_Atch12-OrientationSmnrSOW.pdf PDF
25R0001_Atch7D-WA20250095-Residential20250207.pdf PDF
25R0001_Atch11_FOPR_GJKZ1149058.pdf PDF
SOWAtchD1-15PcntConceptPlan.pdf PDF
SOWAtchE-BasisofDesignEqpmnt.pdf PDF
25R0001_Atch3-2025BDGDataSheets.pdf PDF
25R0001_Atch5-FAFBClimateWeatherData.pdf PDF
25R0001_Atch6-RealIDActPamphlet.pdf PDF
25R0001_Atch7A-WA20250114-Building20250214.pdf PDF
SOWAtchA-SiteHaulRoute.pdf PDF
SOWAtchC-15PcntConceptDemoPlan.pdf PDF
25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA462025R0001

FOPR_GJKZ1149058

SOW Attachment F - Existing B2556 Drawings (includes B2257, B2258, B2559)

A-2 B2256
E-5
E-13
E-21
M-5 B2256
M-10 B2256

File details come from the government source that posted it. Updated .