This document is a 15% Concept Plan for a hydronic piping system, part of the Statement of Work (SOW) Attachment D2 for the FA462025R0001 federal contract opportunity. The technical diagram details a multiple boiler configuration with multiple temperature loops, providing a comprehensive schematic for boiler and pump installation.

The plan specifies detailed technical requirements for boiler piping, including pipe size recommendations based on the number of units (ranging from 2-8 units) and boiler models (400-1000). Key technical specifications include: boiler circulation pumps must pump THROUGH the boilers, mixing valves are required for low temperature loop protection, and careful attention must be paid to indirect water heater Btu transfer capabilities. The diagram includes a legend of components such as air separators, circulation pumps, flow check valves, pressure gauges, and various sensors and valves, emphasizing the complexity of the hydronic piping system design.

View the file

Other files for this federal contract opportunity

Other files attached to FY25 Multiple Award Construction Contract (MACC), newest first.
File Type Posted
25R0001_Amend0006-SF30-20250509.pdf PDF
SOWAtchF_Amend0005ExistingB2256Drwgs.pdf PDF
25R0001_Amend0005-SF30-20250508.pdf PDF
25R0001_Amend0004-SF30-20250508.pdf PDF
25R0001_Amend0003-SF30-20250501.pdf PDF
25R0001_Amend0002-SF30-20250428.pdf PDF
25R0001_PreProposalSiteVisitSignIn-20250428.pdf PDF
25R0001_Amend0001-SF30-20250417.pdf PDF
25R0001_SF1442-20250414.pdf PDF
25R0001_Atch7B-WA20250130-Heavy20250207.pdf PDF
25R0001_Atch7C-WA20250001-Highway20250321.pdf PDF
25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf PDF
25R0001_Atch9-PastPerformanceInfo.pdf PDF
25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf PDF
25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf PDF
25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf PDF
SOWAtchB-PhotosB2256_2257_2258_2259.pdf PDF
25R0001_Atch7D-WA20250095-Residential20250207.pdf PDF
25R0001_Atch11_FOPR_GJKZ1149058.pdf PDF
SOWAtchD1-15PcntConceptPlan.pdf PDF
SOWAtchE-BasisofDesignEqpmnt.pdf PDF
SOWAtchF-ExistingB2256Drwgs.pdf PDF
25R0001_Atch3-2025BDGDataSheets.pdf PDF
25R0001_Atch5-FAFBClimateWeatherData.pdf PDF
25R0001_Atch6-RealIDActPamphlet.pdf PDF
25R0001_Atch7A-WA20250114-Building20250214.pdf PDF
SOWAtchA-SiteHaulRoute.pdf PDF
SOWAtchC-15PcntConceptDemoPlan.pdf PDF
25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf PDF
25R0001_Atch2-2025BDGSpecs11MAR2025.pdf PDF
25R0001_Atch4-2018FAFBIFS26JUN2018.pdf PDF
25R0001_Atch12-OrientationSmnrSOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7 (continued)

Figure 7-6 Multiple Boilers - Multiple Temperatures

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment. The installer must follow all manufacturer’s instructions for each system component. The installer is responsible for compliance with local codes.

NOTICE

CAUTION Mixing valves are required for the protection of low temperature loops.

CAUTION Indirect water heaters are capable of transferring a limited number of Btu’s into the water. Ensure boiler output does not not exceed indirect water heater transfer capabilities.

Model Number of Units

2 3 4 5 6 7 8 Required Pipe Sizes in NPT (Based on 30° )

400 2.5 3 4 4 6 6 6 500 3 4 4 4 6 6 6 650 3 4 4 6 6 6 6 800 4 4 6 6 6 6 8

1000 4 6 6 6 8 8 8

Installation & Operation Manual

2000808395 00

INDIRECT

DHW

TANK BOILER 1

T P

MAKE UP

WATER

P

TO

SYSTEM

MULTI TEMP.

LOOP CNTL

(OPTIONAL)

FROM

SYSTEM

TEMP

LOOP 3

TEMP

LOOP 2

TEMP

LOOP 1

24VAC SIGNAL TO

MIXING VALVESSHEILDED CABLE

TO BOILER

120VAC

TO PUMPS

WIRES TO

LOOP SENSORS

SENSOR 1

PUMP 1

VALVE 1

SENSOR 3

SENSOR 2

PUMP 3

PUMP 2

VALVE 3

VALVE 2

SENSOR 1 SENSOR 2 SENSOR 3

PUMP 1 PUMP 2 PUMP 3

VALVE 1 VALVE 2 VALVE 3

BOILER 2

T P

COLD

WATER IN

DWH HOT

WATER OUT

LEGEND

AIR SEPARATOR

CIRCULATION

PUMP

FLOW CHECK VALVE

PRESSURE GAUGE

P

TEMPERATURE &

PRESSURE GAUGE

T P

SYSTEM SUPPLY

SENSOR

BACKFLOW

PREVENTER

MAGNETIC SEPARATOR WATER METER

STRAINER / FILTER2 WAY VALVE

PRESSURE RELIEF

VALVE

BALL VALVE EXPANSION TANK

PIPING

DRAIN PORT

DIFFERENTIAL

PRESSURE

BYPASS VALVE

2 WAY MOTORIZED

VALVE (OPTIONAL)

MIXING VALVE

ANTI SCALD

FLOW SWITCH

WIRING

12 inches

15% CONCEPT PLAN -

Components shown are minimum design requirements in dashed outline. Design shall incorporate boiler circulation pumps that pump THROUGH the boilers