SOWAtchD2-15PcntConcept Plan.pdf
PDF 831 KB Posted
- Attached to
- FY25 Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA462025R0001
- Issued by
- Department of the Air Force
About this file
This document is a 15% Concept Plan for a hydronic piping system, part of the Statement of Work (SOW) Attachment D2 for the FA462025R0001 federal contract opportunity. The technical diagram details a multiple boiler configuration with multiple temperature loops, providing a comprehensive schematic for boiler and pump installation.
The plan specifies detailed technical requirements for boiler piping, including pipe size recommendations based on the number of units (ranging from 2-8 units) and boiler models (400-1000). Key technical specifications include: boiler circulation pumps must pump THROUGH the boilers, mixing valves are required for low temperature loop protection, and careful attention must be paid to indirect water heater Btu transfer capabilities. The diagram includes a legend of components such as air separators, circulation pumps, flow check valves, pressure gauges, and various sensors and valves, emphasizing the complexity of the hydronic piping system design.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7 (continued)
Figure 7-6 Multiple Boilers - Multiple Temperatures
Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment. The installer must follow all manufacturer’s instructions for each system component. The installer is responsible for compliance with local codes.
NOTICE
CAUTION Mixing valves are required for the protection of low temperature loops.
CAUTION Indirect water heaters are capable of transferring a limited number of Btu’s into the water. Ensure boiler output does not not exceed indirect water heater transfer capabilities.
Model Number of Units
2 3 4 5 6 7 8 Required Pipe Sizes in NPT (Based on 30° )
400 2.5 3 4 4 6 6 6 500 3 4 4 4 6 6 6 650 3 4 4 6 6 6 6 800 4 4 6 6 6 6 8
1000 4 6 6 6 8 8 8
Installation & Operation Manual
2000808395 00
INDIRECT
DHW
TANK BOILER 1
T P
MAKE UP
WATER
P
TO
SYSTEM
MULTI TEMP.
LOOP CNTL
(OPTIONAL)
FROM
SYSTEM
TEMP
LOOP 3
TEMP
LOOP 2
TEMP
LOOP 1
24VAC SIGNAL TO
MIXING VALVESSHEILDED CABLE
TO BOILER
120VAC
TO PUMPS
WIRES TO
LOOP SENSORS
SENSOR 1
PUMP 1
VALVE 1
SENSOR 3
SENSOR 2
PUMP 3
PUMP 2
VALVE 3
VALVE 2
SENSOR 1 SENSOR 2 SENSOR 3
PUMP 1 PUMP 2 PUMP 3
VALVE 1 VALVE 2 VALVE 3
BOILER 2
T P
COLD
WATER IN
DWH HOT
WATER OUT
LEGEND
AIR SEPARATOR
CIRCULATION
PUMP
FLOW CHECK VALVE
PRESSURE GAUGE
P
TEMPERATURE &
PRESSURE GAUGE
T P
SYSTEM SUPPLY
SENSOR
BACKFLOW
PREVENTER
MAGNETIC SEPARATOR WATER METER
STRAINER / FILTER2 WAY VALVE
PRESSURE RELIEF
VALVE
BALL VALVE EXPANSION TANK
PIPING
DRAIN PORT
DIFFERENTIAL
PRESSURE
BYPASS VALVE
2 WAY MOTORIZED
VALVE (OPTIONAL)
MIXING VALVE
ANTI SCALD
FLOW SWITCH
WIRING
12 inches
15% CONCEPT PLAN -
Components shown are minimum design requirements in dashed outline. Design shall incorporate boiler circulation pumps that pump THROUGH the boilers
FA462025R0001
FOPR_GJKZ1149058
SOW Attachment D2 - 15% Concept Plan