This is a Price Schedule for a federal contract opportunity (Project GJKZ1149058) at Fairchild Air Force Base, Washington, focused on replacing dormitory boilers. The document outlines two primary Contract Line Items (CLINs): CLIN 0001 involves replacing heating water and domestic water heating systems in Buildings 2256, 2257, 2258, and 2259, which includes installing two parallel boilers, a single domestic water boiler, new piping and gas systems, and an electric panel. CLIN 0002 covers asbestos-containing material (ACM) abatement from equipment and piping insulation and gaskets. Both CLINs require comprehensive tasks including hazardous materials surveying, cleaning, preparation, disposal, coordination, testing, equipment start-up, and generating as-built records to meet the Statement of Work requirements. The pricing details are left blank in this document, with quantities specified as 1 JOB for each CLIN and its associated project closeout line item.

View the file

Other files

File Type Posted
25R0001_Amend0006-SF30-20250509.pdf PDF
SOWAtchF_Amend0005ExistingB2256Drwgs.pdf PDF
25R0001_Amend0005-SF30-20250508.pdf PDF
25R0001_Amend0004-SF30-20250508.pdf PDF
25R0001_Amend0003-SF30-20250501.pdf PDF
25R0001_Amend0002-SF30-20250428.pdf PDF
25R0001_PreProposalSiteVisitSignIn-20250428.pdf PDF
25R0001_Amend0001-SF30-20250417.pdf PDF
25R0001_SF1442-20250414.pdf PDF
25R0001_Atch7A-WA20250114-Building20250214.pdf PDF
25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf PDF
SOWAtchC-15PcntConceptDemoPlan.pdf PDF
SOWAtchF-ExistingB2256Drwgs.pdf PDF
25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf PDF
25R0001_Atch11_FOPR_GJKZ1149058.pdf PDF
SOWAtchD1-15PcntConceptPlan.pdf PDF
SOWAtchE-BasisofDesignEqpmnt.pdf PDF
25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf PDF
SOWAtchD2-15PcntConcept Plan.pdf PDF
25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf PDF
25R0001_Atch7C-WA20250001-Highway20250321.pdf PDF
SOWAtchB-PhotosB2256_2257_2258_2259.pdf PDF
25R0001_Atch9-PastPerformanceInfo.pdf PDF
25R0001_Atch7D-WA20250095-Residential20250207.pdf PDF
25R0001_Atch7B-WA20250130-Heavy20250207.pdf PDF
25R0001_Atch12-OrientationSmnrSOW.pdf PDF
25R0001_Atch2-2025BDGSpecs11MAR2025.pdf PDF
25R0001_Atch4-2018FAFBIFS26JUN2018.pdf PDF
25R0001_Atch3-2025BDGDataSheets.pdf PDF
SOWAtchA-SiteHaulRoute.pdf PDF
25R0001_Atch6-RealIDActPamphlet.pdf PDF
25R0001_Atch5-FAFBClimateWeatherData.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY

PRICE SCHEDULE

GJKZ1149058

REPLACE DORMITORY BOILERS, MULTI

Fairchild Air Force Base, Washington

CLIN DESCRIPTION QTY UNIT UNIT

PRICE

AMOUNT

0001 BASE PRICE ITEM:

Buildings 2256, 2257, 2258, 2259 – Replace the heating water boiler and domestic water heating systems with new, including two (2) boilers in parallel, single domestic water boiler, piping systems, gas systems, and new electric panel.

Conduct hazardous materials survey. All cleaning, preparation, and disposal necessary to accomplish said tasks;

all required testing and start-up of equipment, all coordination necessary to accomplish said tasks; as-built records; General Requirements associated with the above listed work to meet the requirements of this Statement of

Work.

0001AA PROJECT GJKZ1149058:

All work necessary to provide effort and closeout described in CLIN 0001 above, complete.

1 JOB N/A $

0002 BASE PRICE ITEM:

Buildings 2256, 2257, 2258, 2259 – Abatement of ACM present in equipment insulation, piping insulation, piping gaskets. All cleaning, preparation, and disposal necessary to accomplish said tasks; all coordination necessary to accomplish said tasks; General Requirements associated with the above listed work to meet the requirements of this

Statement of Work.

0002AA PROJECT GJKZ1149058:

All work necessary to provide effort and closeout described in CLIN 0002 above, complete.

1 JOB N/A $

TOTAL BASE, CLIN0001 & CLIN0002 TOTAL $

FA462025R0001, Attachment 11A

FOPR_GJKZ1149058

Attachment 1 - Price Schedule