About this file

This document is a Past Performance Evaluation Questionnaire for the Department of the Air Force's Multiple Award Construction Contract (MACC) solicitation FA462025R0001 at Fairchild Air Force Base. The questionnaire is designed to collect detailed performance feedback from previous project evaluators, focusing on a contractor's past performance across seven key evaluation areas: customer satisfaction, quality, timeliness, responsiveness, subcontracts and management, design, and change/cost control.

The solicitation seeks contractors for an indefinite delivery/indefinite quantity (IDIQ) design-build contract covering multiple construction disciplines, including maintenance, repair, alteration of real property, and new construction of base infrastructure, facilities, roads, and airfields. Evaluators are asked to rate the contractor's performance on a 1-5 scale for each evaluation area, with options to provide narrative explanations for low ratings. The completed questionnaire will become part of the official Source Selection records and will be critical in assessing a contractor's capability to perform on future projects at Fairchild AFB, Washington.

View the file

Other files for this federal contract opportunity

Other files attached to FY25 Multiple Award Construction Contract (MACC), newest first.
File Type Posted
25R0001_Amend0006-SF30-20250509.pdf PDF
SOWAtchF_Amend0005ExistingB2256Drwgs.pdf PDF
25R0001_Amend0005-SF30-20250508.pdf PDF
25R0001_Amend0004-SF30-20250508.pdf PDF
25R0001_Amend0003-SF30-20250501.pdf PDF
25R0001_Amend0002-SF30-20250428.pdf PDF
25R0001_PreProposalSiteVisitSignIn-20250428.pdf PDF
25R0001_Amend0001-SF30-20250417.pdf PDF
25R0001_SF1442-20250414.pdf PDF
25R0001_Atch7B-WA20250130-Heavy20250207.pdf PDF
25R0001_Atch7C-WA20250001-Highway20250321.pdf PDF
25R0001_Atch9-PastPerformanceInfo.pdf PDF
25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf PDF
25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf PDF
25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf PDF
SOWAtchB-PhotosB2256_2257_2258_2259.pdf PDF
SOWAtchD2-15PcntConcept Plan.pdf PDF
25R0001_Atch7D-WA20250095-Residential20250207.pdf PDF
25R0001_Atch11_FOPR_GJKZ1149058.pdf PDF
SOWAtchD1-15PcntConceptPlan.pdf PDF
SOWAtchE-BasisofDesignEqpmnt.pdf PDF
SOWAtchF-ExistingB2256Drwgs.pdf PDF
25R0001_Atch3-2025BDGDataSheets.pdf PDF
25R0001_Atch5-FAFBClimateWeatherData.pdf PDF
25R0001_Atch6-RealIDActPamphlet.pdf PDF
25R0001_Atch7A-WA20250114-Building20250214.pdf PDF
SOWAtchA-SiteHaulRoute.pdf PDF
SOWAtchC-15PcntConceptDemoPlan.pdf PDF
25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf PDF
25R0001_Atch2-2025BDGSpecs11MAR2025.pdf PDF
25R0001_Atch4-2018FAFBIFS26JUN2018.pdf PDF
25R0001_Atch12-OrientationSmnrSOW.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 92D AIR REFUELING WING (AMC)

FAIRCHILD AIR FORCE BASE WASHINGTON

MEMORANDUM FOR PROSPECTIVE EVALUATORS

FROM: 92d Contracting Squadron

110 West Ent Street

Fairchild AFB, WA 99011-8568

SUBJECT: Solicitation FA462025R0001, Multiple Award Construction Contract (MACC) Past Performance Questionnaire

1. The 92d Contracting Squadron of the Air Mobility Command (AMC) is in the process of selecting a contractor for the

Multiple Award Task Order Contract program for Fairchild AFB WA. The MATOC is a multiple award, competitive design-build indefinite delivery/indefinite quantity (IDIQ) design/construction acquisition based upon a general statement of work. The work will consist of multiple disciplines in general construction and design categories to include maintenance, repair, and alteration of real property as well as new construction of base infrastructure, facilities, roads and airfields.

One of the considerations in proposal evaluation is the verification of the offerors’ past and present performance on contracts, which reflect the offeror’s ability to perform on the proposed effort. We depend on information received from agencies such as yours, which have had first-hand experience with an offeror, for the evaluation of the offeror’s performance on those contracts.

Our areas of interest in the offeror are summarized in the enclosed questionnaire. Please complete this questionnaire and return your written response no later than the proposal response deadline in accordance to Block 10 of the SF1422. This schedule will allow us sufficient time to analyze the data within the proposal evaluation period.

2. To assist you in preparing your response and expediting your reply, the questionnaire may be filled out by hand and emailed to tuyen.nguyen.2@us.af.mil or tristian.ellenson@us.af.mil. Please call Tuyen Nguyen at 509-247-2072 prior to transmission or if you have any questions. Your completed questionnaire will become a part of the official Source

Selection records.

3. When filled in this document is “Source Selection Sensitive Information” IAW FAR 3.104. Your help is greatly appreciated, and your prompt response will be one of the keys to the successful and timely completion of this

Source Selection.

Attachment:

Past Performance Questionnaire (3 pages)

FA462025R0001

Attachment 8 - Past Performance Cover Letter / Questionnaire mailto:tuyen.nguyen.2@us.af.mil mailto:tristian.ellenson@us.af.mil

Past Performance Evaluation Questionnaire Solicitation

FA46202500001, Fairchild AFB WA

Multiple Award Construction Contract (MACC)

SECTION 1: CONTRACTOR INFORMATION (to be completed by the contractor requesting evaluation prior to mailing)

SECTION 2: RESPONDENT INFORMATION (to be completed by respondent)

EVALUATED BY:

A. Contractor’s name and address:

B. Point of Contact:

C. Phone Number (with area code):

D. Contract Number:

E. Project Title or Description of Work performed under this project:

F. Contract Type: ☐ Firm Fixed ☐ Indefinite Delivery/Indefinite Quantity Task Order ☐ Cost Reimbursement

G. Project Award Date:

H. Schedule Completion Date:

I. Estimated / Actual Completion Date:

J. Total Dollar Value:

K. Current/Final Project Amount:

I. Contractor being evaluated performed as the Prime Contractor Subcontractor

M. Authorization is hereby granted to provide the information requested in SECTION B of this Questionnaire.

(Signature)

(Name and Title of Authorizing Official) (Date)

(Date)

Address:

(Signature)

(Typed or Printed Name)

(Title) Phone Number:

Number of years evaluator worked on subject contract:

FA462025R0001

Attachment 8 - Past Performance Cover Letter / Questionnaire

SECTION 3: PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 5 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2.

1 2 3 4 5

Unsatisfactory Marginal Satisfactory Very Good Exceptional

Performance does not Performance does not meet Performance meets Performance meets Performance meets meet most contractual some contractual contractual contractual requirements contractual requirements and requirements and recovery requirements. The contractual requirements. The and exceeds some to the exceeds many to the is not likely in a timely performance of the element or contractual performance Government’s benefit. The Government’s benefit. The manner. The contractual sub-element being evaluated of the element or sub- contractual performance of contractual performance of performance of the reflects a serious problem for element contains some the element or sub-element the element or sub-element element or sub-element which the contractor has not minor problems for being evaluated was being evaluated was contains a serious yet identified corrective which corrective actions accomplished with some accomplished with few problem(s) for which the actions. The contractor’s taken by the contractor minor problems for which minor problems for which contractor’s corrective proposed actions appear only appear or were corrective actions taken by corrective actions taken by actions appear or were marginally effective or were satisfactory the contractor was the contractor were highly ineffective. not fully implemented. effective. effective.

Evaluation Areas

1. CUSTOMER SATISFACTION:

Customer would have no reservations in awarding another contract to the Contractor. 1 2 3 4 5 N/A

2. QUALITY:

a Contractor provided effective quality control and/or inspection procedures to meet contract requirements 1 2 3 4 5 N/A b Contractor provided well researched and clearly identified submittals that matched contract requirements 1 2 3 4 5 N/A c Contractor completed all work with good workmanship and in conformance with the specifications 1 2 3 4 5 N/A d Contractor corrected deficiencies in a timely manner and pursuant to their quality control plan 1 2 3 4 5 N/A

3. TIMELINESS:

a Contractor met established project schedules to complete the project on time 1 2 3 4 5 N/A b Contractor provided timely cost/design proposals 1 2 3 4 5 N/A c Contractor submitted the progress schedule and progress reports as required 1 2 3 4 5 N/A d Contractor provided on-time submittals as required 1 2 3 4 5 N/A e Contractor provided timely resolution of all punch list items 1 2 3 4 5 N/A

4. RESPONSIVENESS:

a Contractor acted promptly to resolve problems, ensuring compliance with contract requirements and safety regulations

1 2 3 4 5 N/A b Contractor was reasonable and cooperated to resolve problems, attended meetings as needed, and maintained communication with the government to keep the project on schedule or minimize the delay

1 2 3 4 5 N/A c Contractor identified problems as the occurred; suggested approaches to the problems; displayed initiative to solve problems; and performed as a Team Member

1 2 3 4 5 N/A d Contractor responded to warranty issues within the time frames specified in the contract 1 2 3 4 5 N/A

5. SUBCONTRACTS AND MANAGEMENT:

a Contractor provided experienced/qualified managers and supervisors with the technical and administrative abilities needed to meet contract requirements

1 2 3 4 5 N/A b Contractor hired quality subcontractors and effectively managed and coordinated their work 1 2 3 4 5 N/A c Contractor hired, maintained, and replaced as necessary, qualified personnel and subcontractors/suppliers 1 2 3 4 5 N/A d Contractor ensured site superintendent and quality control representative were consistently present on site when work was performed

1 2 3 4 5 N/A

6. DESIGN:

a Contractor provided complete, supportable, technically sound designs for the project 1 2 3 4 5 N/A b Contractor demonstrated the ability to incorporate user’s requirements into the design 1 2 3 4 5 N/A c Contractor completed designs that were constructed in the same manner as they were designed 1 2 3 4 5 N/A

7. CHANGE/COST CONTROL:

a Contractor responsive to contract changes and provided accurate, reasonable and supportable cost proposals

1 2 3 4 5 N/A b Contractor demonstrated the ability to control costs and/or design projects or modifications within the magnitude specified

1 2 3 4 5 N/A c Contractor validated subcontractor cost proposals prior to submission to the Government 1 2 3 4 5 N/A

FA462025R0001

Attachment 8 - Past Performance Cover Letter / Questionnaire

REMARKS:

SECTION 4: NARRATIVE SUMMARY

1. What were the contractor’s greatest strengths in the performance of the contract?

2. What were the contractor’s greatest weaknesses in the performance of the contract?

3. Please provide any additional comment concerning the contractor’s performance, as desired.

4. GOVERNMENT CONTRACTS ONLY: Has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?

No Yes Default Convenience Pending Terminations

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules, etc.)

5. GOVERNMENT CONTRACTS ONLY: Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “Remarks”. No Yes

Thank you for your prompt response and assistance!

Please return this completed questionnaire to:

Mailing address:

Or Email:

Mr. Tuyen Nguyen or SSgt Tristian Ellenson

Contracting Squadron 110 West Ent Street

Fairchild AFB WA 99011-8568 tuyen.nguyen.2@us.af.mil / tristian.ellenson@us.af.mil

FA462025R0001

Attachment 8 - Past Performance Cover Letter / Questionnaire mailto:tuyen.nguyen.2@us.af.mil mailto:tristian.ellenson@us.af.mil

File details come from the government source that posted it. Updated .