About this file

This document is a 15% Concept Plan for mechanical room renovations, specifically focusing on boiler and water heater system reconfiguration at Fairchild Air Force Base. The plan details the replacement and repositioning of multiple mechanical systems, including new boilers (Lochinvar KBX0500N for heating water and Armor AWH0500NPM for domestic hot water), a new DHW storage tank, glycol make-up feed tank, and associated expansion tanks. The design includes routing new gas lines from a new exterior gas meter, creating new concrete housekeeping pads, installing a new electrical Panel M2 fed from an existing switchboard, and repositioning combustion air and flue exhaust routes in an area well approximately 15 feet below grade. The concept plan also indicates multiple points of connection (POC) for reconnecting domestic cold water (DCW), return hot water (RHW), domestic hot water (DHW), and heating water systems to existing infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to FY25 Multiple Award Construction Contract (MACC), newest first.
File Type Posted
25R0001_Amend0006-SF30-20250509.pdf PDF
SOWAtchF_Amend0005ExistingB2256Drwgs.pdf PDF
25R0001_Amend0005-SF30-20250508.pdf PDF
25R0001_Amend0004-SF30-20250508.pdf PDF
25R0001_Amend0003-SF30-20250501.pdf PDF
25R0001_Amend0002-SF30-20250428.pdf PDF
25R0001_PreProposalSiteVisitSignIn-20250428.pdf PDF
25R0001_Amend0001-SF30-20250417.pdf PDF
25R0001_Atch2-2025BDGSpecs11MAR2025.pdf PDF
25R0001_Atch4-2018FAFBIFS26JUN2018.pdf PDF
25R0001_Atch12-OrientationSmnrSOW.pdf PDF
25R0001_SF1442-20250414.pdf PDF
25R0001_Atch7B-WA20250130-Heavy20250207.pdf PDF
25R0001_Atch7C-WA20250001-Highway20250321.pdf PDF
25R0001_Atch8-PastPerfCvrLtrQuestionnaire.pdf PDF
25R0001_Atch9-PastPerformanceInfo.pdf PDF
25R0001_Atch10-SubKTRTeamingArrngmntRelease.pdf PDF
25R0001_Atch11A_FOPR_GJKZ1149058-Atch1-PriceSchedule.pdf PDF
25R0001_Atch11B_FOPR_GJKZ1149058-Atch2-SOW20DEC2024.pdf PDF
SOWAtchB-PhotosB2256_2257_2258_2259.pdf PDF
SOWAtchD2-15PcntConcept Plan.pdf PDF
25R0001_Atch7D-WA20250095-Residential20250207.pdf PDF
25R0001_Atch11_FOPR_GJKZ1149058.pdf PDF
SOWAtchE-BasisofDesignEqpmnt.pdf PDF
SOWAtchF-ExistingB2256Drwgs.pdf PDF
25R0001_Atch3-2025BDGDataSheets.pdf PDF
25R0001_Atch5-FAFBClimateWeatherData.pdf PDF
25R0001_Atch6-RealIDActPamphlet.pdf PDF
25R0001_Atch7A-WA20250114-Building20250214.pdf PDF
SOWAtchA-SiteHaulRoute.pdf PDF
SOWAtchC-15PcntConceptDemoPlan.pdf PDF
25R0001_Atch1-FY25MACCSpecs12FEB2025.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Area well approximately 15 feet below grade -route boiler and water heater combustion air here

Design team to reconfigure piping this outline for domestic water boiler and heating water boiler systems

DCW

(15% CONCEPT)

Make-Up Air unit (remains) -approximate location. Removal of fan motor may be necessary to bring new equipment into MER.

(E) DCW service entry

New gas line serving boilers and domestic water heater from new gas meter outside

- see Page 2. Design team to confirm size of new gas pipe with connected load.

Area well approximately 15 feet below grade - route boiler flue exhaust here. Domestic water boiler flue exhaust may also be routed here if flue length / arrangement allows. Otherwise, existing DHW boiler flue exhaust pipe may be re-used if design team calculations prove exisring flue size and arragement work with new design.

Concrete wall separator

New boilers

New DHW boiler

New DHW storage tank

New DHW expansion tank

(E) Concrete housekeeping pad

Add new concrete housekeeping pad to existing

Add new concrete housekeeping pad to existing

POC - Reconnect new DCW to (E) DCW service

POC - Reconnect new RHW, DHW, DCW to (E)

POC - Reconnect new HWR to (E) HWR

POC - Reconnect new HWS to (E) HWS

This drawing represents only a concept plan for the work in the MER. Design team to provide design using this as a guide. Equipment shown on housekeeping pad is to scale using basis-of-design heating boilers and domestic hot water boilers. Heating water boiler representation based on "Lochinvar KBX0500N". DHW boiler representation based on "Lochinvar Armor AWH0500NPM". DHW storage tank based on 48-inch diameter tank.

DHW expansion tank based on 24-inch diameter tank. Not show are space requirements for electrical disconnects, boiler circulation pumps, thermostatic mixing valves, domestic water recirculation pump, etc. It is preferable to have these items located near the equipment and accessible.

New electrical Panel M2 for DHW and heating water systems. Feed from existing switchboard.

Existing electrical Panel M

Existing switchboard

New glycol make-up feed tank

FA462025R0001

FOPR_GJKZ1149058

SOW Attachment D1 - 15% Concept Plan

Provide new gas meter and gas piping to boilers and water heater. Coordinate with Avista for meter installation. Install new gas energy meter and use with new gas sytem.

(DEMO - 15% CONCEPT)

(E) Mechanical area wells

FA462025R0001