Questions_and_Answers_--_SAQMMA17R0168.docx

DOCX document 40 KB Posted

Attached to
Global Security Engineering & Supply Chain
Solicitation number
SAQMMA17R0168
Issued by

View the file

Other files

File Type Posted
SAQMMA17R0168_Amendment_0002.pdf PDF
Att_31_-_Evaluation_factors...0002.docx DOCX document
Att_32_-_Projected_Annual_Catalog_Qty_0001.xlsx XLSX spreadsheet
Att_31_-_Evaluation_factors...0001.docx DOCX document
Att_40_-_Summary_of_Prof_Emp_Benefits.docx DOCX document
Att_28_-_Addl_instructions_conditions...0001.docx DOCX document
SAQMMA17R0168_Amendment_0001.pdf PDF
Att_08_-_Catalog_items_0001.xlsx XLSX spreadsheet
Att_03_-_ST_Organization.pdf PDF
Att_01_-_Performance_Work_Statement_2017-12-19.pdf PDF
Att_31_-__Evaluation_factors_for_award.pdf PDF
Att_09_-_OY2_PRs.xlsx XLSX spreadsheet
Att_02_-_Bidders_DD_Form_254_with_supplements.pdf PDF
Att_08_-_Catalog_items.xlsx XLSX spreadsheet
Att_36_-_Equipment_List_for_Scenario_3.pdf PDF
Att_22_-_Secure_Key_Systems_SOP.pdf PDF
Request_for_Proposals_SAQMMA17R0168.pdf PDF
Att_04_-_Historical_Order_Volume.pdf PDF
Att_10_-_OY3_PRs.xlsx XLSX spreadsheet
Att_14_-_Current_SCM_Facilities.pdf PDF
Att_27_-_Acctng_and_Approp_Data.pdf PDF
Att_06_-_PR_Approval_Process.pdf PDF
Att_07_-_HOV_By_Fullfillment.pdf PDF
Att_28_-_Addl_Instructions,_Conditions,_Notices.pdf PDF
Att_19_-_ACA_Facilities.pdf PDF
Att_37_-_Scenario_4,_La_Paz_TSU.pdf PDF
Att_29_-_Past_Performance_Customer_Satisfaction_Survey.docx DOCX document
Att_26_-_Consolidated_Warehouse.pdf PDF
Att_15_-_CRP_Security_Procedures.pdf PDF
Att_13_-_PRs_by_Shipping_Method.xlsx XLSX spreadsheet
Att_33_-_Scenario_1,_Field_Support.pdf PDF
Att_18_-_Repairable_Items.xlsx XLSX spreadsheet
Att_24_-_Lock_and_Core_SOP.pdf PDF
Att_30_-_Service_Level_Agreement_Template.docx DOCX document
Att_32_-_Projected_Annual_Catalog_Order_Quantities.xlsx XLSX spreadsheet
Att_05_-_TDB_Projected_FY18_Projects.pdf PDF
Att_21_-_STEP.pdf PDF
Att_39_-_La_Paz_Post_Information_for_Scenario_4.pdf PDF
Att_23_-_GSA_Container_SOP.pdf PDF
Att_34_-_Scenario_2,_Security_Engineering.pdf PDF
Att_25_-_RMC_Workload.pdf PDF
Att_20_-_ACA_CCR_Facilities.pdf PDF
Att_12_-_Physical_Addresses.xlsx XLSX spreadsheet
Att_35_-_Scenario_3,_Rapid_Response.pdf PDF
Att_17_-_GOCM_Inventory.xlsx XLSX spreadsheet
Att_11_-_OY4_PRs.xlsx XLSX spreadsheet
SAQMMA17R0168_Industry_Day_Q&As_Final.pdf PDF
PostEventIndustryDayCompanyList.pdf PDF
Industry_Day_Brief_Final.pdf PDF
IndustryDaySignInSheet.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of State Solicitation SAQMMA17R0168 Global Security Engineering and Supply Chain Solicitation Questions and Answers

Note to prospective Offerors: The Contracting Officer notes that where duplicate or similar questions were received, they have been consolidated or revised for efficiency and clarity.

QUESTION
ANSWER
1
11” x 17” paper is allowed for Phase I submissions, as well as the Cost/Price Proposal submission in Phase II.

Will the Government accept 11” x 17” paper for the Phase II Technical Proposal, on a limited basis (for key graphics), to allow for detailed graphics or process description where needed?

Yes. See amended RFP Attachment 28, which reflects this change.

2
A 52.219-9 compliant Small Business Subcontracting Plan requires robust page allocation to ensure all associated requirements are addressed. Will the Government accept the Small Business Subcontracting Plan as an attachment to the Technical Proposal, excluded from the page count?
No.
3
Attach 31 (Evaluation Factors for Award) Phase I – Performance Confidence Assessment states that evaluation will consider "...The percentage of effort the prime and each subcontractor is contributing to the effort" but the instructions do not require Offerors to include a breakout of workshare percentages by team members. Please indicate how the percentage of effort will be evaluated in Phase I.

If percentages are required, please include instructions for submission.

See amended RFP Attachment 28, which now requires percentages of participation for proposed subcontractors/teaming partners.

4
Attachment 28 states, "The Offeror shall include in its proposal a binding bilateral employment agreement for each proposed key personnel that is not at time of proposal submission an employee of the Offeror". That current language only applies to the Offeror.

Please add language to the requirement to indicate “employee of the Offeror or proposed subcontractor”.

RFP Attachment 28 as issued states, "Offeror shall include in its proposal a binding bilateral employment agreement for each proposed key personnel that is not at time of proposal submission an employee of the Offeror (or a proposed subcontractor, which the Offeror shall identify)."

5
Attachment 31 sets forth how the Government intends to conduct the cost/price evaluation, including cost realism, of the Offerors submitted Cost Price Proposal and include examining all cost/price elements including:

• Target Cost (less costs of Catalog and Non-Catalog Items)

• Target Cost of required Catalog items

• Target Fee Pool

• Maximum Fee Pool

• Minimum Fee Pool

• Cancellation ceiling

• Contractor's Participation for Cost Underruns

• Contractor's Participation for Cost Overruns

• The second paragraph states that for the purpose of determining the total (target) evaluated price the Government will only consider the following elements:

• The proposed Target Cost (less direct cost of Accepted materials); plus

• The proposed Target Cost for each Catalog item multiplied by the estimated catalog purchase quantities in RFP Attachment 32 - Projected Annual Catalog Order Quantities; plus

• A “plug” number of $100,000,000.00 per annum which shall represent the estimated direct cost of required non-catalog items; plus the proposed Target Fee Pool.

Please explain how, Maximum Fee Pool, Minimum Fee Pool, Cancellation ceiling, Offeror’s Participation for Cost Underruns, Offeror’s Participation for Cost Overruns will be used/weighted in the Government’s overall evaluation of the Cost/Price Factor.

As stated in RFP Attachment 31, the Government will evaluate those cost/price elements for fair and reasonableness (i.e. are the proposed cost elements too high) and for realism (i.e. are the proposed cost elements too low).

6
Based on guidance as contained in the FAR 52.228-7 Insurance Liability to Third Persons should apply to the procurement. Request the provision be added back into this section.

In the absence of adding the clause, please explain the basis for its exclusion.

Clause 52.228-7 Insurance Liability to Third Persons was removed from the final solicitation (and will remain omitted from the solicitation and resultant contract) at the insistence of agency counsel because there is no agency regulation permitting its use.

7
Can Offerors propose an alternate incentive mix without changing the total amount of incentive dollars tied to delivery?
No. The incentive mix communicates the Government's priorities among Delivery, Performance, and Cost, to incentivize the Contractor to make tradeoffs in those areas during performance in accordance with the Government's priorities.
8
Clause 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan requires the successful Offeror submit a certification prior to award. Will the Government request the certification upon notice of award? Or are Offerors to submit the certification with the proposal? If the certification should be submitted with the proposal, please specify where it should be submitted.
As stated in RFP Attachment 28, "The Offeror shall include along with its Cost/Price Proposal all completed Representations and Certifications required by RFP Section K."
9
Due to the volatility of an ever-changing contract where the Government will be potentially increasing order volume while the contractor is striving to reduce costs, how does the Government envision the execution of change requests?

If the requirements increase over what is stated in the solicitation, what is the process to adjust the target cost?

How does the Government plan to provide ongoing projections for program needs (e.g. project/task orders, TDB projects, and additional facility requirements) so that the contractor may determine if an adjustment is needed to the target cost and associated fee pools?

While we recognize that the FAR provision for changes permits contractors to request a contract change as a result of increases in scope of work, the process would be lagging. Please explain the process the Government will implement to proactively manage the ever-changing environment that is contemplated under the resulting contract?

The quantities and historical information in the solicitation is for background or evaluation purposes only and creates no obligation on the part of the Government, nor any contractor entitlement to adjustment in the event those quantities are not realized during performance. Changes and Disputes shall be handled in accordance with the applicable RFP clauses.

10
For evaluation purposes, please confirm that Offerors are required to propose the exact part and model number as identified in Attachments 8 and 32 (i.e., no substitutions).
That is incorrect. See RFP provision 52.211-6 Brand Name or Equal (1999).
11
For the 5-year base period and the 5-year Award Term the Contractor is to provide the Target Cost (less cost for Catalog and Non-catalog items) and the Target Cost of required Catalog items. Further, the contractor is to provide the Target Fee, Maximum Fee and Minimum Fee Pools stated as a percentage of the Target Costs.

Please clarify whether “Target Cost” as used in this section refers to the “Target Cost (less cost for Catalog and Non-catalog items)”, the “Target Cost of required Catalog items”, the “Target Cost of required Non-catalog items”, all of these or some combination thereof.

The "Target Cost" on which the fee percentage shall be based is the sum of the Target Cost (less cost of Catalog and Non-Catalog Items), the Target Cost of required Catalog Items, and the Target Cost of required Non-catalog Items, (i.e. the combination of all target cost elements).

12
Given the short response time that the Government is requesting for the Past Performance phase of this RFP, will the Government consider revising the delivery method from 15 hand carried hardcopy binders to an electronic submittal?
No.
13
How will the bidder’s proposed cost underruns and cost overruns be evaluated as part of the Cost/Price Evaluation?
Cost underruns and cost overruns occur during performance and are not part of source selection evaluation. However, the Government will evaluate the Contractor’s proposed participation for Cost Underruns and the Contractor’s proposed participation for Cost Overruns. As stated in RFP Attachment 31, the Government will evaluate those (and other) cost/price elements for fair and reasonableness (i.e. are the proposed cost elements too high) and for realism (i.e. are the proposed cost elements too low).
14
If the target costs are established at the $100M level as specified in the evaluation criteria, will the target costs be adjusted in performance relative to actual orders and will the contractor’s cost incentives be similarly revised?
The RFP does not state that the Target Cost of required Non-catalog items is established at $100M. The Schedule line items show that the Target Cost of required Non-catalog Items is a Fair and reasonable market unit price times the quantity required during performance. In that way, the fee amount will automatically vary based on quantities actually required for meeting the mission. Because the quantities of non-catalog items required to meet the mission is unknown at time of proposal submission, RFP Att 31 states that the Government will use a “plug” number of $100,000,000.00 per annum to represent the estimated direct cost of required non-catalog items. This amount is for evaluation purposes only and does not become part of the contract.
15
In a typical cost plus contract, the Offeror is provided a set of requirements to fulfill. The contractor proposes the cost estimate for the Government’s acceptance and during performance the contractor controls cost expenditures. In this solicitation the Government is determining both the cost estimate and controlling the expenditures for materials. Order volume and items ordered are controlled by the Government. Therefore any incentive based on cost reduction is largely outside the control of the contractor. Please explain how changes to the target costs and associated incentive fees will be proactively managed?
As the RFP is written, the Government is neither determining "the cost estimate" nor "controlling the expenditures for materials". The quantity of items required to perform the contract may fluctuate based on evolving mission needs, but the contractor proposes the Target Cost (less costs of Catalog and Non-Catalog Items), the Target Cost of required Catalog Items (per unit), the Target Fee Pool, the Maximum Fee Pool, the Minimum Fee Pool, the Cancellation Ceilings, the Contractor’s participation for Cost Underruns, and the Contractor’s participation for Cost Overruns. Although the contractor cannot completely control during contract performance the quantities of catalog or non-catalog items required to meet the mission, it can control the costs of each of those catalog and non-catalog items as well as all other costs of the contract (e.g. logistics and warehousing services, engineering, program management services, indirect costs, etc.). Changes to the contract cost/price amounts may only occur pursuant to the Changes clause of the contract or by other applicable contract clauses or law.
16
In the event a Catalog part is a single or sole source, what is the process for an equitable adjustment to the target cost for that item when the change is outside of the Offeror's control?
The contractor has no entitlement to adjustment on the basis of an item of supply being available only from one source, nor is pricing of such items considered outside the control of the contractor. Unlike a retail or wholesale company that occupies a position near the consumer-end of the supply chain, the Government seeks a partner with the capability to negotiate costs with manufacturers and distributors closer to the supplier end of the chain, so that the final price (including the negotiated direct cost from the manufacturer, the GSE&SC contractor's indirect costs and other operating costs, and the GSE&SC contractor's fee) is a fair and reasonable price. (This role combined with the other PWS requirements is sometimes described as a "third-party" or "fourth-party" logistics provider).
17
Please clarify how cost incentives for single source or sole source Catalog items (approximately one-third of the Catalog items) can be achieved.

Any potential cost incentive tied to the procurement of a single source or sole source Catalog item is based upon the price of a single vendor. No alternative pricing is available and there is no incentive for the vendor/manufacturer to reduce their price since they are the only source. Further, the Offeror cannot substitute alternate items as they are not approved for use within the DS security architecture.

Please explain how the Government envisions that the Offeror will be able to recognize a cost incentive in this scenario?

Unlike a retail or wholesale company that occupies a position near the consumer-end of the supply chain, the Government seeks a partner with the capability to negotiate costs with manufacturers and distributors closer to the supplier end of the chain, so that the final price (including the negotiated direct cost from the manufacturer, the GSE&SC contractor's indirect costs and other operating costs, and the GSE&SC contractor's fee) is a fair and reasonable price. (This role combined with the other PWS requirements is sometimes described as a "third-party" or "fourth-party" logistics provider). With that said, even for the most highly qualified company, it is possible that cost savings may not be achievable for all items.

18
Please confirm Catalog target cost also excludes the contractor’s indirect costs and the contractor’s direct costs other than the cost of the deliverable end items.
Confirmed. As stated in RFP section B-096 (emphasis added), "Target Cost of required Catalog Items”, as used in this contract, means the estimated cost of this contract as initially negotiated for the contractor’s direct costs of the supply items required for delivery by DOS that are pre-priced in the Catalog at the time they are required. This amount excludes the contractor’s indirect costs, the contractor’s direct costs other than the cost of the deliverable

end items, and the contractor’s profit/fee. (The contractor’s direct costs of the deliverable end items may include subcontractors’ direct costs, subcontractors’ indirect costs, and subcontractors’ profit/fee, as applicable, subject to other clauses of this contract.)"

19
Please confirm if the stated goals per 652.219-70 (b) are for total subcontracted dollars for services, materials or direct labor hours; or if the State Department requires the goals be stated as a percentage of the contract per the Program Management Plan.
RFP provision 652.219-70 identifies the Department's small business set-aside goals as a percentage of total subcontracting dollars. RFP clause 52.219-9 Alt II requires, among other things, "[s]separate goals, expressed in terms of total dollars subcontracted, and as a percentage of total planned subcontracting dollars...". Clause 52.219-9 Alt II also states, "For individual subcontracting plans, and if required by the Contracting Officer, goals shall also be expressed in terms of percentage of total contract dollars, in addition to the goals expressed as a percentage of total subcontract dollars." For this RFP, the CO has required that, "[t]he Plan shall indicate each firm’s socioeconomic/size status and, for each, what percentage (estimated) of the contract their participation represents." [RFP Att 28, p. 9] Therefore, as stated by the RFP clauses, the subcontracting plan required by 52.219-9 Alt II, (which, as stated in RFP Att. 28 is to be included as part of the Program Management Plan within the Technical Proposal), must express goals in terms of total dollars subcontracted, as percentages of total planned subcontracting dollars, and as percentages of total contract dollars.
20
Please confirm that a letter of commitment or offer letter will be compliant as an alternative to a binding bilateral employment agreement for states that have at-will employment law.

Accordingly, please include the following language in the referenced section to state: A letter of commitment or offer letter is acceptable for States with at-will employment laws?

The RFP requires a binding bilateral employment agreement; that is, an agreement binding both parties in the event the contract is won by the Offeror. Of course no agreement may compel a person to work (specific performance amounting to a violation of the Thirteenth Amendment to the Constitution), but it could provide for remedies in the event the individual decides not to abide by his/her promise (i.e. damages for breach). So the agreement need only, in the event of the contract being won by the Offeror, bind the Offeror to offer employment to the individual (at specified terms) and bind the individual to accept that Offer, the breach of either action giving some legal remedy. In other words, it may be binding in that it offers remedies (e.g. suit for damages) in the event of breach. The Offeror should comply with all applicable laws.

21
Please confirm that for the Phase II submission, the file format for the Technical Proposal may be PDF, and the file formats for the Cost/Price Proposal is Excel for spreadsheets and PDF for cost/price narrative.
Those formats are acceptable.
22
Please confirm that PDF is an acceptable format for documents on the CD for the Phase I submission?
Confirmed.
23
Please confirm that the cost component of the minimum fee pool will be earned by the contractor provided all costs are deemed allowable.
It is unclear what is meant by "the cost component of the minimum fee pool". The minimum fee pool is fee; it includes no costs. As defined in RFP section B-096, "Minimum Fee Pool" means the total available fee (including cost, delivery,

and performance incentives) under maximum cost variation above target cost. At that point, cost overruns are so high that the fee does not continue to decrease based on the share ratio; instead, the Government pays the minimum fee (and all allowable costs).

24
Please confirm that the Government will accept a Past Performance Customer Satisfaction Survey (Attachment 29) for a Classified Federal Contract as a CPARS from PPIRS may not be available.
Yes. See amended RFP Attachment 28, which reflects this change.
25
Please confirm that the past performance of an affiliate may be used as a prime past performance citation as long as the affiliate is being proposed to provide services under the awarded contract.
The prime Offeror is the unique legal entity submitting the proposal. The Federal government currently uses the Dun and Bradstreet Number (DUNS) as the unique entity identifier (see RFP provision 52.204-7 System for Award Management). If the "affiliate" is a distinct legal entity from the prime Offeror (i.e. has a different DUNS number than the prime Offeror) then it would be considered a proposed subcontractor (as definition of "subcontract" and "subcontractor" at FAR 44.101) and its past performance would therefore be considered proposed subcontractor past performance.
26
Please confirm that the term “divisions” includes “affiliate” legal entities within the Offeror’s corporate organization, provided that the affiliate is being proposed to provide services under the awarded contract.
Confirmed.
27
Please confirm the SBU RFP attachments are to be returned, along with Phase II written proposal.
See amended Att 28 instructions. The SBU attachments, including all approved reproductions, shall be returned upon notification of the Offeror’s exclusion from the Competitive Range or failure to be selected for award, whichever is sooner.
28
Please describe how Offerors are expected to adjust their proposed target costs associated with services in support of order fulfillment (ordering, receiving, packaging, labor, etc.) of Catalog and Non-catalog items in performance as it relates to all other costs (e.g. labor, warehouse, etc.).

Bidders will build their target costs associated with supporting the Government provided quantities for Catalog and Government-provided value of $100M per year for Non-catalog forecasted procurement amounts.

Please explain the basis for the contractor to proactively adjust the target costs' associated with order fulfillment in this ever changing environment?

The Target Cost (less costs of Catalog and Non-Catalog Items) is not subject to adjustment on the basis of catalog or non-catalog items actually delivered for mission fulfillment.

29
Please elaborate on how the Government envisions realization of cost incentives for Non-catalog items can be achieved.

For Non-catalog items, the contractor provides a quote to the Government Purchase request. Federal Procurement generally requires that the contractor provide a quote to the Government that represents the best value which is typically the lowest available cost.

If the target cost is established at the time the item is quoted and the quote represents the lowest available price, how will the contractor recognize any cost incentive?

As stated in the RFP, the Target Cost of required Non-catalog Items is derived from a fair and reasonable market unit price. "Fair and reasonable" does not necessarily mean the lowest price; and although there is no standard definition for the concept, it may be generally understood as the price that a prudent and competent buyer would be willing to pay given available knowledge of the market conditions and the terms of the purchase. In understanding how "fair and reasonable" may be determined, Offerors should consider published Government guidance on Contractor Purchasing System Review (CPSR) Guides as well as the content at FAR subpart 15.4 Contract Pricing. With that said, even for the most highly qualified company, it is possible that cost savings may not be achievable for all items.

30
Please explain how VECPs apply to the procurement of Catalog and Non-catalog items?
VECPs may propose to reduce costs in many ways, whether or not related to catalog or non-catalog items. There could be many opportunities for Value Engineering Changes within this program, in any number of areas, that may affect costs of catalog items, costs of non-catalog items, costs of overhead, logistics, shipping, or other operating expenses, etc.
31
Please identify the contract type as either completion or term.
The terms "completion" and "term" only appear in the FAR in relation to cost-plus-fixed-fee contracts to determine the basis upon which the contractor earns the fixed-fee amount. A completion form cost-plus-fixed-fee contract provides for payment of the fixed-fee upon delivery of a completed product or service. A term form cost-plus-fixed-fee contract provides for payment of the fixed-fee upon the delivery of a specified level of effort. A cost-plus-incentive-fee contract, by contrast, provides for a variable fee payable based on costs incurred against a target. As stated in the RFP, the contractor of this CPIF contract shall be paid a fee amount for contract performance as described by RFP clause 52.216-10 and related sections.
32
Please include the requirement to provide evidence of an approved estimating system by the Offeror’s cognizant Government audit agency IAW FAR 52.215.
The question seems to have a truncated FAR reference, as "FAR 52.215" is an incomplete citation. Nonetheless, there is no FAR requirement requiring that offerors have an estimating system approved by the Offeror’s cognizant Government audit agency. The contracting officer is aware that such a requirement exists in the DFARS, but those regulations apply to the Department of Defense and not to the Department of State.
33
Please provide a definition of "maximum cost variation above target cost” as used in RFP section B-096?
"Maximum cost variation above target cost", in a CPIF arrangement, is the point at which the contractor's actual costs have risen so high above the target cost that, based on the share ratio for overruns at clause 52.216-10, the earned fee has hit the minimum fee established in the contract. At that point, the fee can be reduced no further despite potentially higher cost overruns. It is the bottom of the "range of incentive effectiveness".
34
Please verify that the contract estimated value will be based on the final negotiated contract award value? If not, please identify the contract ceiling?
Neither "contract estimated value" nor "ceiling" appear in regulations relating to CPIF contract types. All cost/price elements of the CPIF pricing arrangement (e.g. Target Cost, Target Fee, etc.) that will become part of the contract are defined and identified within the RFP (with amounts to be proposed where indicated). The independent government cost estimate is not publicly available information.
35
Please verify the missing sections (e.g. B-001 to B-009, B-011 to B-014 and B-016 to B-093) are intentionally omitted. Similar inconsistencies in numbering are also noted in all other sections.
Most local (i.e. contracting activity or solicitation-specific) solicitation provisions and clauses are pulled from a catalog of standard provisions and clauses, mirroring the procedures for codified solicitation provisions and clauses (e.g. FAR, DOSAR, etc.). Only those provisions and clauses applicable to the solicitation are included, resulting in numerical sequencing "gaps", similar to the numbering "gaps" that appear between some FAR and DOSAR clauses. The content of the RFP is complete as it appears (and a Table of Contents and page numbers are provided to ensure no page is omitted by clerical error without becoming obvious).
36
RFP stated, "DS/C has engaged industry supply chain and logistics experts to gain a greater understanding of the current state of the art." Will DS/C share the results of the industry supply chain and logistics expert’s findings prior to submission of the Phase II Technical Volume and Pricing?
The understanding gained by DOS from engaging industry supply chain and logistics experts is for the Government's benefit in planning and conducting this acquisition. The Government expects Offerors to demonstrate in their proposals their own level of expertise in the current supply chain and logistics state of the art.
37
RFP states that 20% of the maximum fee pool is for delivery of supplies. The remaining 20% is for delivery of services. Please define the services to which these incentives are associated.
The definition is based on the contractual deliverable. For the purposes of this contract, if the deliverable does not fall under the FAR definition of supplies or information technology, it is a service.
38
Section (a) of FAR clause 52.222-46 Evaluation of Compensation for Professional Employees requires Offerors to submit a total compensation plan as part of their proposal. Please specify where the Government wants this documentation included in the proposal submission.
See amended RFP Attachment 28, to provide specific instructions for submission of the Offeror’s Professional Services Compensation Plan. New RFP Attachment 40, Summary of Professional Employee Benefits is provided for the Offeror to complete and submit.
39
Section H-016 states (2) All key personnel designated as “engineers” must have, at a minimum, a Bachelor’s degree in engineering from an accredited university

Will the Government accept 8 years of directly relevant experience in lieu of a Bachelor’s degree?

No.

40
Section H-5 – Contractor Commitments, Warranties, and Representations as written creates unquantified liability to the contractor. The concern is that the Contractor may not be in a position to control the time of delivery of Catalog or Non-catalog items based on OEM production and delivery. Please revise the provision to exclude situations that are immaterial or beyond the control of the Contractor. Accordingly, it is requested that the following language be added: The contractor shall not be liable for consequential or other indirect damages that occur due to acts of war or loss of life or for events that are beyond the reasonable control of the contractor such as delivery of items from manufacturers, and there are no intended third party beneficiaries under the contract.
This RFP section is a "Local" (contracting activity) clause approved by agency counsel and remains unchanged.
41
Since actual quantities for Catalog items (or any insight into Non-catalog purchases) to be procured are unknown, there is little to no opportunity to recognize cost or Value Engineering Change Proposal (VECP) incentives. It is recommended that this element be revised to a Cost Plus Award Fee contract type.
The Government disagrees with the statement and this aspect of the RFP remains unchanged. There could be many opportunities for Value Engineering Changes within this program, in areas such as warehouse management or organization, improved systems (e.g. a replacement for CMMS), alternative shipping method procedures, and many more.
42
The current pricing instructions provide limited detail to ensure consistent price evaluation. Please provide additional pricing instructions (e.g., basis for rates, escalation factor, cognizant audit agency, etc.) and a comprehensive pricing template to ensure consistent proposals among Offerors.
RFP Attachment 28 requires Offerors to provide, "...a cost/price proposal for all work required by the solicitation. The cost/price proposal shall include the lowest level of granularity showing all proposed direct costs, indirect costs, facilities capital cost of money (as applicable) and profit/fee data, unit prices, quantities, extended totals to reach the following cost/price elements..." RFP Attachment 31 explains how the prices will be evaluated. Offerors may use any format and submit whatever content they believe to be responsive to the RFP instructions to provide a comprehensive proposal.
43
The FAR clauses applicable to Task or Delivery Orders are not included in the RFP. Please provide the terms under which these orders will be implemented.
This is not an indefinite-delivery indefinite-quantity contract, and so those clauses are inapplicable, and this contract will not involve the issuance of Task or Delivery Orders. Notwithstanding the potential unknown or variation in quantity of specific items necessary to meet the evolving mission during performance (the uncertainty of which lends itself to a cost reimbursement contract type, as structured here), the contract is for the definite delivery of 5 years (with one 5-year award term) of turn-key service spanning the length of the supply chain as described in the PWS.
44
The Government has incorporated the Service Contract Act clause FAR 52.222-41 into the solicitation; however, no wage determination schedules have been included. It is anticipated that the PWS requires support from one (1) or more wage determined labor categories.

Please confirm that offerors are to map to the appropriate DOL WD labor categories for their location and that the Government will incorporate the appropriate WD Schedule(s) upon award.

RFP clause 52.222-49 Service Contract Labor Standards - Place of Performance Unknown (MAY 2014) states the following:

"(a) This contract is subject to the Service Contract Labor Standards statute, and the place of performance was unknown when the solicitation was issued. In addition to places or areas identified in wage determinations, if any, attached to the solicitation, wage determinations have also been requested for the following: ________ [insert places or areas]. The Contracting Officer will request wage determinations for additional places or areas of performance if asked to do so in writing by 15 days from the date of issuance of the solicitation [insert time and date].

(b) Offerors who intend to perform in a place or area of performance for which a wage determination has not been attached or requested may nevertheless submit bids or proposals. However, a wage determination shall be requested and incorporated in the resultant contract retroactive to the date of contract award, and there shall be no adjustment in the contract price."

45
The instructions require the Offeror to enter target costs (per unit) for Catalog items, yet the text in Attachment 32 indicates these will not be part of the resultant contract. How will the target costs (per unit) for Catalog items be incorporated into the resulting contract?
See amended RFP Attachment 32 and amended RFP Attachment 8, which will include the proposed costs in Attachment 8, which becomes part of the resultant contract (for purposes of calculating the Target Cost of required Catalog Items, during performance), as well as amended RFP Attachment 28 and amended RFP Attachment 31 Attachment reflecting this change.
46
The invoicing instructions do not address how fees are to be billed or reflected. Please revise this section to address the instructions as contained in Section B-94, Payment of Incentive Fee.

Further, please include language that addresses the payment of the Minimum Fee Pool.

RFP section B-094 addresses invoicing and payment of fee.

47
The Target Fee Pool is established based partially on target costs established by the Government for Catalog and Non-catalog items (quantities and dollars respectively). The costs associated with Catalog and Non-catalog purchases make up a large percentage of the value of the contract. The Maximum and Minimum Fee Pools are established based on the contractor below or above the target cost.

Portions of the RFP imply that the target costs will be established (and therefore any available cost incentive) at the Part level for Catalog items (Attachment 32) and the Purchase Order level for Non-catalog items (Attachment 31, Page 8). This appears to be inconsistent with the language in section B-096 that indicates that both the cost estimates and fee pools are established annually. Please clarify if the target costs and any associated Cost Incentive will be managed/recognized and the Part number or PO level or at the annual Target Cost for Catalog and Non-catalog items. Is it the Government’s intent to manage the fee pools as a percent of the target cost (less cost of Catalog and Non-catalog items) plus the associated percentages for target costs for required Catalog and Non-catalog as the costs for Catalog and Non-catalog items are incurred?

If so, will this apply at the Purchase Order (PO) Level, the PO Line level, or at the individual item (unit) level for Catalog and Non-catalog items?

Please see amended RFP Att. 32 that clarifies the purpose of the unit costs. The proposed unit costs in Att. 32 are used for evaluation purposes as well as in the calculation of Target Cost for catalog items. Cost overruns and underruns are not assessed at the unit (or project) level, but for the contract overall. (The CO did not identify anywhere in Attachment 31 that indicated Target Cost would be calculated or assessed at the "Purchase Order" or project level for non -catalog items.) The Target Cost and Fee apply to the entire 5-year contract period (with a separate Target Cost and Fee for the 5-year Award Term Period). The fee is paid with each invoice at the Target rate pursuant to RFP clause 52.216-10(c)(1) and RFP section B-094(b). At the end of every six months (revised from one per year to once per 6 months in response to another RFP Question) during the 5-year contract, the Target Cost is calculated (calculation being necessary due to the fluctuation of quantities needed to meet the mission), the cost incentive trend to-date is calculated based on Target Cost and actual costs incurred to-date, and the Delivery and Performance incentives are calculated to-date based on their respective contract sections. These semi-annual calculations are cumulative throughout the 5-year base period but to not carry over into the Award Term period, which has its own semi-annual cycle and 5-year period. See amended RFP section B-094 to reflect that this now semi-annual calculation does not result in actual payment or credit of fee for overruns or underruns to-date. (Final payment or credit of fee for overruns or underruns happens at the end of the 5-year contract period.) However, the fee payment rate during performance may be increased or decreased from the Target rate, based on overrun/underrun trends identified semi-annually, as provided by RFP clause 52.216-10(c)(1).

48
This section defines the Target Fee Pool to be the total available fee based on the assumption that the contract will be performed for a cost equal to the estimated cost initially negotiated. The estimated direct cost associated with the procurement of Non-catalog items is estimated by the Government to be $100M and the estimated direct cost associated with the procurement of Catalog items is significantly influenced by the estimated quantities provided in Attachment 32 and is constant for the entire performance period.

The actual direct costs associated with Catalog and Non-catalog items will be driven primarily by the types and quantities of these items ordered by the Government and may vary significantly over the course of the contract.

Will the Government proactively ensure that the Target Fee Pool remains consistent with Target Costs associated with Catalog and Non-catalog items?

The $100M figure for non-catalog items is for evaluation purposes only, as are the evaluation quantities for catalog items in RFP Attachment 32. The Target Cost will be calculated based on actual quantities delivered, as shown in the RFP Schedule Line Items and as explained in the definitions at RFP section B-096. The Target Cost of required Catalog Items and the Target Cost of required Non-catalog Items will both fluctuate with the quantities of items actually delivered to meet the mission. (The Target Cost (less cost of Catalog and Non-Catalog Items does not fluctuate.) Therefore, both the total Target Cost and the Target Fee Pool will fluctuate until the end of the contract at which time the final Target Cost can be calculated. Despite the fluctuations based on quantities delivered, the Target Cost is independently calculable from the estimated costs initially negotiated.

49
To help support the selection of Past Performances, can the Government provide details regarding the methods currently employed in the execution of the current contract to help define complexity i.e. CONOP, description and / or details of all CDRLS and Government owned SOPs for the current effort?
Any methods employed in the execution of the current contract that are dictated by the Government and required for performance of the new contract are identified in the RFP. Any methods employed in the execution of the current contract that are not dictated by the Government are proprietary/protected information relating to the current contractor's solution and also may not reflect the significant differences between the current contract requirements and the requirements of the RFP.
50
To improve readability of text within tables, graphics, and figures, will the Government accept alternate font types for non-narrative text (tables, graphics, and figures) such as Arial Narrow for Phase I and Phase II submissions?
No.
51
To provide evaluators with an overview of the referenced past performance, will the Government accept a brief introduction (e.g. not to exceed three pages) to Phase I information summarizing the past performance references being cited?
No.
52
To provide the contractor timely feedback on performance, will the Government consider reducing the incentive evaluation period from once per year to every 6 months?
Yes. See amended RFP section B-094.
53
What is the anticipated number of companies that will be down-selected at each phase i.e. what is the maximum number of offerors the State Department plans to retain at each phase?
There is no pre-determined, anticipated, or maximum number. As stated in RFP clause 52.215-1 Alt I, paragraph (f)(4), "[t]he Government intends to evaluate proposals and award a contract after conducting discussions with offerors whose proposals have been determined to be within the competitive range. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Therefore, the offeror's initial proposal should contain the offeror's best terms from a price and technical standpoint."
54
Will the government accept Catalog target costs with conditions, i.e. Minimum Order Quantity (MOQ) requirements?
No.
55
Will the Government allow Offerors to submit resumes as attachments that are not included in the page allocation?

Similarly, will the Government also allow Offerors to submit bilateral agreements as attachments that are not included in the page allocation?

No. All such content will count toward the page limitations.

56
Will the Government please confirm that the ACA requirements in Attachment 19 and 20 are in addition to the facility requirements in Attachment 14?
Confirmed.
57
Will the GSE&SC program provide all the Support for Technology Development and Technology Insertion during the life of the DoS/DS GSE&SC program? If not, how are these efforts allocated?
No. The GSE&SC contract will provide technology development and technology insertion for approved DS Countermeasures-related projects and solutions.
58
Will the GSE&SC program provide all the Testing of Products, Systems and Solutions for DoS during the life of the DoS/DS GSE&SC program? If not, how are these efforts allocated?
No. The GSE&SC contract will provide testing for approved DS Countermeasures-related projects and solutions.