Att_24_-_Lock_and_Core_SOP.pdf

PDF 262 KB Posted

Attached to
Global Security Engineering & Supply Chain
Solicitation number
SAQMMA17R0168
Issued by

About this file

Att 24 - Lock and Core SOP

View the file

Other files

File Type Posted
Att_31_-_Evaluation_factors...0002.docx DOCX document
SAQMMA17R0168_Amendment_0002.pdf PDF
Att_40_-_Summary_of_Prof_Emp_Benefits.docx DOCX document
SAQMMA17R0168_Amendment_0001.pdf PDF
Att_32_-_Projected_Annual_Catalog_Qty_0001.xlsx XLSX spreadsheet
Att_31_-_Evaluation_factors...0001.docx DOCX document
Att_28_-_Addl_instructions_conditions...0001.docx DOCX document
Questions_and_Answers_--_SAQMMA17R0168.docx DOCX document
Att_08_-_Catalog_items_0001.xlsx XLSX spreadsheet
Att_14_-_Current_SCM_Facilities.pdf PDF
Att_10_-_OY3_PRs.xlsx XLSX spreadsheet
Att_06_-_PR_Approval_Process.pdf PDF
Att_13_-_PRs_by_Shipping_Method.xlsx XLSX spreadsheet
Att_15_-_CRP_Security_Procedures.pdf PDF
Att_18_-_Repairable_Items.xlsx XLSX spreadsheet
Att_33_-_Scenario_1,_Field_Support.pdf PDF
Att_21_-_STEP.pdf PDF
Att_05_-_TDB_Projected_FY18_Projects.pdf PDF
Att_03_-_ST_Organization.pdf PDF
Att_01_-_Performance_Work_Statement_2017-12-19.pdf PDF
Att_04_-_Historical_Order_Volume.pdf PDF
Att_27_-_Acctng_and_Approp_Data.pdf PDF
Att_19_-_ACA_Facilities.pdf PDF
Att_37_-_Scenario_4,_La_Paz_TSU.pdf PDF
Att_29_-_Past_Performance_Customer_Satisfaction_Survey.docx DOCX document
Att_26_-_Consolidated_Warehouse.pdf PDF
Att_39_-_La_Paz_Post_Information_for_Scenario_4.pdf PDF
Att_22_-_Secure_Key_Systems_SOP.pdf PDF
Att_07_-_HOV_By_Fullfillment.pdf PDF
Att_28_-_Addl_Instructions,_Conditions,_Notices.pdf PDF
Att_32_-_Projected_Annual_Catalog_Order_Quantities.xlsx XLSX spreadsheet
Att_30_-_Service_Level_Agreement_Template.docx DOCX document
Att_02_-_Bidders_DD_Form_254_with_supplements.pdf PDF
Att_36_-_Equipment_List_for_Scenario_3.pdf PDF
Att_08_-_Catalog_items.xlsx XLSX spreadsheet
Att_23_-_GSA_Container_SOP.pdf PDF
Att_11_-_OY4_PRs.xlsx XLSX spreadsheet
Att_20_-_ACA_CCR_Facilities.pdf PDF
Att_25_-_RMC_Workload.pdf PDF
Att_35_-_Scenario_3,_Rapid_Response.pdf PDF
Att_12_-_Physical_Addresses.xlsx XLSX spreadsheet
Att_34_-_Scenario_2,_Security_Engineering.pdf PDF
Att_17_-_GOCM_Inventory.xlsx XLSX spreadsheet
Att_09_-_OY2_PRs.xlsx XLSX spreadsheet
Att_31_-__Evaluation_factors_for_award.pdf PDF
Request_for_Proposals_SAQMMA17R0168.pdf PDF
SAQMMA17R0168_Industry_Day_Q&As_Final.pdf PDF
PostEventIndustryDayCompanyList.pdf PDF
Industry_Day_Brief_Final.pdf PDF
IndustryDaySignInSheet.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOS Request for Proposals No. SAQMMA17R0168, Attachment 24

UNCLASSIFIED

1 SOP Lock and Core Inspection Version 1.0

SOP for Lock/Core Inspection

1. Notification will be received via email, telephone, or in-person, that a shipment of Lock Program related materials has arrived. The receiving location is prescribed in OBO’s contract language and is currently SA-24. The Lock Program technician(s) will take possession of the shipment within 24 hours of notification.

2. Create CMMS work order

3. Create Receiving Log Book entry

4. Make copy of Packing Slip and any accompanying documentation (i.e. - bitting lists, emails, etc.)

5. Highlight and write relevant details on the retained copy of the Packing Slip

6. Inventory package(s), making note of Core/Lock and/or Key quantities on retained copy of

Packing Slip (totals only)

- If the manufacturer sends the Master/Control Keys separately, package them with the cores for shipping

- Count Keys and mark quantity totals for each type on the retained copy of the Packing

Slip: Change Keys, Control Keys, Master Keys

- If Bitting/Pinning List is obtained, match Core/Key count with physical count

- In the absence of any Cores and/or Keys that should be included in the shipment, contact the supplier and/or manufacturer , inform DS/TDB government representative

- Check operation of all Keys with all Cores (Master, Change, Control, etc.)

7. If the order is an addition to a previous shipment, make note of the Core Designations and the

Record Number of the previous shipment on the retained copy of the Packing Slip

8. Include a Storage of Paperwork Letter and a Control & Master Key Location Letter with each shipment

9. Create a New Entry for the shipment in the Classified Lock Core Database, marking the Record

Number on the retained copy of the Packing Slip

10. Check Pouch Restrictions

11. Pack and wrap for pouch shipment in accordance with required shipping method.

12. Provide a DPM Transfer/Receipt Form along with a Hazmat Letter

13. Update the Receiving Log Book, Lock Core Database and Drop Ship Item Tracking Workbook

14. Complete/close CMMS work order

File details come from the government source that posted it.