DOS Request for Proposals No. SAQMMA17R0168, Attachment 05
DS/TDB Project Tracking FY18 (19Sep2017) Page 1
TDB FY18 Projected Technology Development Projects
Projects
R eq u ir em en ts
C O
N O
P S
M ar ke t
Su rv ey an d
P ro d u ct
C o m p ar is n
P ro d
Ev al u at io
(A lp h a)
B et a Te st in g
Fi al D
D P o r
D o cu m en ta ti
G
Ty p e o f P ro je
TDB12 – Camera and Alarm Program
Baseline High Definition Video System (HDVS) Configuration – switches, fire wall, Video Management software and components, endpoints and provide physical and application schematics
Done Done X X X Successful Penetration Testing
Major
Virtualization Done Done X X X Successful Beta Testing
Major
POE for Cameras/Sensors X X X Medium
Under Car Camera X X X Successful Alpha testing
Medium
End of Life Cameras, Switches, Alarm Sensors, fiber converters, etc.
On-going
On-going
On-going Medium in total – tech bulletin or new product announcement
Encoder for Analog PTZ Done Done X X X Deliver dual stream PTZ capable encoder
Minor – creates new product announcement
Low Light Testing/Lab Equipment and camera evals
Done X X N/A X Testing usually done every other qtr.
Medium
IP Over Coax Solution X X X Medium
Perimeter Standard Level Alarms Done X X X Medium
Enhanced Alarm Intrusion Detection System and 2nd Beta Site on HDVS
X X X Successful connection to digital backbone
Medium
Wireless Cameras and IDS Systems and Concepts
X X Planning and idea gathering
Minor
DS/TDB Project Tracking FY18 (19Sep2017) Page 2
R e q u ir e m e n ts
C O
N O
P S
M ar ke t
Su
P ro d m p ar is d u at e ta T es ti al D
D P o r
D o cu m e n ta ti e o f P ro
Next Generation Door Control X X X Successful concept that leverages digital platform
Medium
TDB14 – Emergency Notification System (ENS) and Power Systems Program
ER/EU Consolidation Guidelines and three site assistance
X X Removal of regulator and install of new UPS – training for independent field installs.
Medium
Next Gen Door Control Power Supplies X X X Reduction in number of power supplies
Medium
Surge Protection for low voltage devices X X Check if surge protection is required
Minor
End of Life Power and ENS Equipment and Alternate UPS
On-going
On-going Power supplies are not changing often and easy to spec.
Minor in total – tech bulletin or new product announcement
ENS Install with DoS speakers Done X Emergency Notification Hybrid deployment
Major
ENS Back-up Controller X X X Extra controller for high threat posts
Medium
Next Generation ENS Evaluation X X X IP based system Major
Fly-Away Trouble Shooting Power Kit X X Electric trouble shooting kit for field
Minor
DS/TDB Project Tracking FY18 (19Sep2017) Page 3
R e q u ir e m e n ts
C
O N
O P
S
M ar ke t
Su
P ro d m p ar is d u at e ta T es ti al D
D P o r
D o cu m e n ta ti e o f P ro
TDB15 – Access Denial and Control Program
Acoustic Deterrent System (ADS) Install X X X Installation of ADS Major
ADS Controller Phase 2 X X Create SOW for networking controller
EOL Access Controller Replacement Pilot Done N/A X X X Controller EOL replacement
Medium
Next Generation Door Controls X X X Improved locking hardware for door control + travel
Major
Barrier Controls X X X Better barrier controls Medium
Locks Program
Next Generation Door Control Locking Hardware X X X X Major
Neutralization Safe/Vaults Document X DDP for neutralization Minor
Evaluation of Locking Hardware X X New and End of life with new product announcement or tech bulletin.
DS/TDB Project Tracking FY18 (19Sep2017) Page 4
Total DS/TDB Level of Effort
Section Major Projects Medium Projects Minor Projects
TDB12 2 8 2
TDB14 2 3 2
TDB15 2 3 0
Locks 1 1 1
Total 7 15 5
Total -20% 6 12 6
Note: Total -20% assumes that some projects will not transition to the next STEP.