Att_23_-_GSA_Container_SOP.pdf

PDF 189 KB Posted

Attached to
Global Security Engineering & Supply Chain
Solicitation number
SAQMMA17R0168
Issued by

About this file

Att 23 - GSA Container SOP

View the file

Other files

File Type Posted
Att_31_-_Evaluation_factors...0002.docx DOCX document
SAQMMA17R0168_Amendment_0002.pdf PDF
Att_28_-_Addl_instructions_conditions...0001.docx DOCX document
Questions_and_Answers_--_SAQMMA17R0168.docx DOCX document
Att_40_-_Summary_of_Prof_Emp_Benefits.docx DOCX document
SAQMMA17R0168_Amendment_0001.pdf PDF
Att_32_-_Projected_Annual_Catalog_Qty_0001.xlsx XLSX spreadsheet
Att_31_-_Evaluation_factors...0001.docx DOCX document
Att_08_-_Catalog_items_0001.xlsx XLSX spreadsheet
Att_22_-_Secure_Key_Systems_SOP.pdf PDF
Att_07_-_HOV_By_Fullfillment.pdf PDF
Att_28_-_Addl_Instructions,_Conditions,_Notices.pdf PDF
Att_24_-_Lock_and_Core_SOP.pdf PDF
Att_32_-_Projected_Annual_Catalog_Order_Quantities.xlsx XLSX spreadsheet
Att_30_-_Service_Level_Agreement_Template.docx DOCX document
Att_02_-_Bidders_DD_Form_254_with_supplements.pdf PDF
Att_36_-_Equipment_List_for_Scenario_3.pdf PDF
Att_08_-_Catalog_items.xlsx XLSX spreadsheet
Att_14_-_Current_SCM_Facilities.pdf PDF
Att_10_-_OY3_PRs.xlsx XLSX spreadsheet
Att_06_-_PR_Approval_Process.pdf PDF
Att_13_-_PRs_by_Shipping_Method.xlsx XLSX spreadsheet
Att_15_-_CRP_Security_Procedures.pdf PDF
Att_18_-_Repairable_Items.xlsx XLSX spreadsheet
Att_33_-_Scenario_1,_Field_Support.pdf PDF
Att_21_-_STEP.pdf PDF
Att_05_-_TDB_Projected_FY18_Projects.pdf PDF
Att_03_-_ST_Organization.pdf PDF
Att_01_-_Performance_Work_Statement_2017-12-19.pdf PDF
Att_04_-_Historical_Order_Volume.pdf PDF
Att_27_-_Acctng_and_Approp_Data.pdf PDF
Att_19_-_ACA_Facilities.pdf PDF
Att_37_-_Scenario_4,_La_Paz_TSU.pdf PDF
Att_29_-_Past_Performance_Customer_Satisfaction_Survey.docx DOCX document
Att_26_-_Consolidated_Warehouse.pdf PDF
Att_39_-_La_Paz_Post_Information_for_Scenario_4.pdf PDF
Att_11_-_OY4_PRs.xlsx XLSX spreadsheet
Att_20_-_ACA_CCR_Facilities.pdf PDF
Att_25_-_RMC_Workload.pdf PDF
Att_35_-_Scenario_3,_Rapid_Response.pdf PDF
Att_12_-_Physical_Addresses.xlsx XLSX spreadsheet
Att_34_-_Scenario_2,_Security_Engineering.pdf PDF
Att_17_-_GOCM_Inventory.xlsx XLSX spreadsheet
Att_09_-_OY2_PRs.xlsx XLSX spreadsheet
Att_31_-__Evaluation_factors_for_award.pdf PDF
Request_for_Proposals_SAQMMA17R0168.pdf PDF
SAQMMA17R0168_Industry_Day_Q&As_Final.pdf PDF
PostEventIndustryDayCompanyList.pdf PDF
Industry_Day_Brief_Final.pdf PDF
IndustryDaySignInSheet.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOS Request for Proposals No. SAQMMA17R0168, Attachment 23

UNCLASSIFIED

1 SOP Inspection of GSA Approved Containers Version 1.0

SOP for Inspecting GSA-Approved Safe File Containers

1. Take assignment of the CMMS work order created by STAC.

2. Coordinate with A/LM to arrange for date to perform the inspection(s).

3. Travel to warehouse.

4. Unpack the container(s) if not already unpacked.

5. Unlock the container(s) if not already unlocked.

6. Inspect the exterior of the container for damage.

7. Inspect the interior of the container for damage.

8. Check the operation of the lock and every drawer, adjust if necessary.

9. If the container is damaged or needs warranty repair, note details of problem(s), mark container appropriately.

10. Verify all of the equipment detailed on packing slip is included.

11. Supply/leave a blank SF-700 in each drawer with a combination lock installed.

12. Complete the TDB container Inspection Sheet for EACH container for entry into TDB database.

13. Change combination on all locks of the container to a unique and random shipping combination.

14. Ensure combination is entered correctly on the TDB container inspection sheet.

15. Enter shipping combination on each lock a MINIMUM of 3 times to make sure the lock operates properly.

16. Perform final inspection before locking and closing container.

17. Fill out the DS Lock Support Shipping Combination/Contact Card and attach to all completely inspected containers.

18. Place Inspection Sticker on box/crate/pallet indicating the container is inspected and ready for shipment.

19. Return to office.

20. Enter TDB container Inspection Sheet information into Lock Program Database on the classified computer system, ClassNet.

21. Place TDB container Inspection Sheet into inspection binder.

22. Close CMMS work order.

If step 9 problem condition exists:

1. Create new CMMS work order

2. Inform government representative of issues

3. Coordinate resolution with A/LM and manufacturer/vendor.

4. If repairable, continue to step 2 of SOP

5. If non-repairable, close CMMS work order.

COMBINATION REQUEST FULFILLMENT PROCESS

1. Monitor the DS Lock Program common email on a daily basis,

2. Create new CMMS work order upon receipt of a new container shipping combination request,

3. Respond to email informing of classified system email to follow with shipping combination(s),

4. Look up container in Lock Program Database on classified computer system, ClassNet,

5. Update database with information of receiving post,

6. Draft and send email to requesting Posts’ responsible RSO/SEO/STS/CB as appropriate,

7. Close CMMS work order