Att_19_-_ACA_Facilities.pdf

PDF 248 KB Posted

Attached to
Global Security Engineering & Supply Chain
Solicitation number
SAQMMA17R0168
Issued by

About this file

Att 19 - ACA Facilities

View the file

Other files

File Type Posted
SAQMMA17R0168_Amendment_0002.pdf PDF
Att_31_-_Evaluation_factors...0002.docx DOCX document
Att_40_-_Summary_of_Prof_Emp_Benefits.docx DOCX document
SAQMMA17R0168_Amendment_0001.pdf PDF
Att_08_-_Catalog_items_0001.xlsx XLSX spreadsheet
Att_32_-_Projected_Annual_Catalog_Qty_0001.xlsx XLSX spreadsheet
Att_31_-_Evaluation_factors...0001.docx DOCX document
Att_28_-_Addl_instructions_conditions...0001.docx DOCX document
Questions_and_Answers_--_SAQMMA17R0168.docx DOCX document
Att_14_-_Current_SCM_Facilities.pdf PDF
Att_10_-_OY3_PRs.xlsx XLSX spreadsheet
Att_06_-_PR_Approval_Process.pdf PDF
Att_13_-_PRs_by_Shipping_Method.xlsx XLSX spreadsheet
Att_15_-_CRP_Security_Procedures.pdf PDF
Att_18_-_Repairable_Items.xlsx XLSX spreadsheet
Att_33_-_Scenario_1,_Field_Support.pdf PDF
Att_21_-_STEP.pdf PDF
Att_05_-_TDB_Projected_FY18_Projects.pdf PDF
Att_03_-_ST_Organization.pdf PDF
Att_01_-_Performance_Work_Statement_2017-12-19.pdf PDF
Att_23_-_GSA_Container_SOP.pdf PDF
Att_11_-_OY4_PRs.xlsx XLSX spreadsheet
Att_20_-_ACA_CCR_Facilities.pdf PDF
Att_25_-_RMC_Workload.pdf PDF
Att_35_-_Scenario_3,_Rapid_Response.pdf PDF
Att_12_-_Physical_Addresses.xlsx XLSX spreadsheet
Att_34_-_Scenario_2,_Security_Engineering.pdf PDF
Att_17_-_GOCM_Inventory.xlsx XLSX spreadsheet
Att_09_-_OY2_PRs.xlsx XLSX spreadsheet
Att_31_-__Evaluation_factors_for_award.pdf PDF
Request_for_Proposals_SAQMMA17R0168.pdf PDF
Att_04_-_Historical_Order_Volume.pdf PDF
Att_27_-_Acctng_and_Approp_Data.pdf PDF
Att_37_-_Scenario_4,_La_Paz_TSU.pdf PDF
Att_29_-_Past_Performance_Customer_Satisfaction_Survey.docx DOCX document
Att_26_-_Consolidated_Warehouse.pdf PDF
Att_39_-_La_Paz_Post_Information_for_Scenario_4.pdf PDF
Att_22_-_Secure_Key_Systems_SOP.pdf PDF
Att_07_-_HOV_By_Fullfillment.pdf PDF
Att_28_-_Addl_Instructions,_Conditions,_Notices.pdf PDF
Att_24_-_Lock_and_Core_SOP.pdf PDF
Att_32_-_Projected_Annual_Catalog_Order_Quantities.xlsx XLSX spreadsheet
Att_30_-_Service_Level_Agreement_Template.docx DOCX document
Att_02_-_Bidders_DD_Form_254_with_supplements.pdf PDF
Att_36_-_Equipment_List_for_Scenario_3.pdf PDF
Att_08_-_Catalog_items.xlsx XLSX spreadsheet
SAQMMA17R0168_Industry_Day_Q&As_Final.pdf PDF
Industry_Day_Brief_Final.pdf PDF
PostEventIndustryDayCompanyList.pdf PDF
IndustryDaySignInSheet.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOS Request for Proposals No. SAQMMA17R0168, Attachment 19

Contractor-Provided Facility Requirements for ACA-Related Activities

Unless otherwise noted, all office space furniture, telephones, tools, equipment and supplies are GFE. The Contractor must provide sufficient facilities, utilities, security, cleaning, and maintenance services to meet or exceed the requirements detailed below.

The Security Systems Integration Division (DS/C/ST/SSI) requires Contractor-provided facilities that meet or exceed the following requirements to integrate protective technologies into DS vehicles:

Combined square footage is 52,100 with 38,000 of that being warehouse space with 20+ ceiling height for the warehouse area. (For movement of tall vehicles/ forklift and storing pallets.)

o Warehouse space requires loading docks and ramps for easy access for receiving and shipping.

o The Contractor is required to provide a forklift and hand trucks to move pallets in the warehouse.

o Warehouse space must accommodate 6 seats with desks, chairs and OpenNet drops for logistical personnel.

Office spaces - 4,320 Sq. Ft. to accommodate 30 seats with desks and chairs and 30 OpenNet drops.

Lab - 25 seats with cabinets with table work space and chairs (approximately 1,800 Sq.

Ft.)

Fabrication cage (900 Sq. Ft.) to accommodate government-owned MIG welder, plasma cutting table, plasma cutting machine, iron worker machine, drill press, metal chop saw, band saw, disk and belt sander, vacuum forming machine. (Hot work permit is required for the fabrication cage).

Eight (8) service bays/stations with easy access for vehicles (electric roll up doors) that accommodate large SUVs (Suburbans). The bays should be big enough to house a DOD MRAP and or DoS Bear (10’ wide X 12’ high X30’ long). The floor must support heavy vehicles up to 10 tons. The facility must accommodate the following government-owned equipment:

o A vehicle exhaust system (for running vehicles in the shop, and for the plasma and welding station in the fabrication cage).

o A heavy duty vehicle lift (20000 pound)

Conference room that accommodates up to 40 people for meetings.

Parking for 35+

DOS Request for Proposals No. SAQMMA17R0168, Attachment 19

SSI also requires the facilities used to configure Security Management System enterprise (SMSe) workstations and servers and high definition video systems (HDVS):

Minimum 3000 Sq. Ft mixed configuration and office space with at least 40 20-Amp circuits (mostly 110volt with 2 – 220volt)

Minimum of 6 OpenNet drops

Easy access to the ground floor entrances for rack movement

Equipment currently in operation in the space:

o 18 SMSe workstations o 1 DL320 (COM016) deployment server. This deployment server is for workstation/server imaging.

o 5 HDVS Servers o 8 HDVS Switches o 2 Palo Alto Firewalls o 1 iSTAR o 16 IP cameras o 5 SMSeNet switches o 4 Raritan IP KVMs o 2 Junipers

Current workload in the space:

o HDVS configurations: currently 3 HDVS builds in place.

o SMSe workstation configurations: shipping 20 configured workstations per month, on average.

SSI also requires Contractor-provided facilities to support the Contingency Communications and

Radio (CCR) program and the System Integration and Monitoring (SIM) program. Facility requirements for CCR are presented in Attachment J-17; SIM requires a minimum of 15,000 Sq.

Ft. of secure indoor, high-bay space for staging and contingency equipment/materials storage.

The Security Infrastructure Directorate (DS/SI) requires Contractor-provided facilities that meet or exceed the following requirements to meet its vital national security responsibilities:

Minimum 500 Sq. Ft. of space for staging and operational use.

Doors capable of receiving and shipping of boxes 36” wide.

Power to operate 15 Dell R730s (or equivalent) simultaneously.

Power to operate 1 Movincool Office Pro36.

3 OpenNet connection drops within this space.

Minimum of 1 phone drop.

Security system to control access and secure space.