Attachment_21_Corrective_Action_Report_(1)_june_9_2015.docx

DOCX document 26 KB Posted

Attached to
Operations and Maintenance Services -U. S. Embassy Kabul, Afghanistan
Solicitation number
SAQMMA16R0004
Issued by

About this file

Attachment 21- Corrective Action Report

View the file

Other files

File Type Posted
A006_SAQMMA16R0004.pdf PDF
A005_SAQMMA16R0004.pdf PDF
Attachment_51_Additional_Questions_with_Answers_-_April_7_2016_.xlsx XLSX spreadsheet
A004_SAQMMA16R0004.pdf PDF
Attachment_49-Questions_and_Answers_from_Site_Visit_U.S._Embassy_Kabul.xlsx XLSX spreadsheet
Attachment_50_Revised_list_of_Key_Personnel_and_Qualifications_3-29-2016.pdf PDF
A003_SAQMMA16R0004.pdf PDF
Amendment_A002_SAQMMA16R0004_U.S._Embassy_Kabul.pdf PDF
Attachment_42_-Contractor_requirements_for_Mitigation_Plan_in_RFP_SAQMMA16R0004.pdf PDF
Attachment_39_AEK_Government_Furnished_Equipment_List.PDF PDF
Attachment_40_Kabul_Preventive_and_Unscheduled_Maintenance_Work_Order__Reports.pdf PDF
Attachment_46_Answers_to_Questions_submitted_on_3-18-2016.xlsx XLSX spreadsheet
Attachment_43__Revised__List_of_Key_Personnel_and_Qualifications_(Kabul_3-7-2016).pdf PDF
Attatchment_48__Kabul_Site_Survey_March_14-17_Powerpoint_Presentation.pptx PPTX presentation
Attachment_47-_Revised_SECTION_J_Table_of_Contents__Kabul.docx DOCX document
Attachment_45_Revised_SOW_-3-22-2016.pdf PDF
Attachment_41-_Updated_AEK_-Camp_Sullivan-Villas_Equipment_List.pdf PDF
Amendment_A001_SAQMMA16R0004_U.S._Embassy_Kabul.pdf PDF
Attachment_14_Deliverables_Matrix.docx DOCX document
Attachment_3-_Kabul_OM_RFP_Attachment_3_MRPT_Procedures_Sept_4_2015.pdf PDF
Attachment_6_List_of_Codes.docx DOCX document
Attachment_19_SHEM_Guidelines.docx DOCX document
Attachment_16_O M_Service_Matrix.docx DOCX document
Attachment_17_Camp_Sullivan_description.pdf PDF
SECTION_J_Table_of_Contents__Kabul.docx DOCX document
Attachment_9_SOW_Elevator_Maintenance_.doc DOC document
Attachment_7_List_of_Key_Personnel_and_Qualifications.docx DOCX document
Attachment_36-_Sample_Visit_Request__Site_Survey.pdf PDF
Attachment_25-__Camp_Alvarado.pdf PDF
Attachment_22_QASP_Surveillance_Matrix_with_latest_AQL's_june_9_2015.xlsx XLSX spreadsheet
Attachment_12_Escalation_and_Remediation_Process.pptx PPTX presentation
Attachment_28_Acceptable_Quality_Level_General_Requirements_12-14-2015.xlsx XLSX spreadsheet
Attachment_33-_General_Services_Administrator_-_Bagram.pdf PDF
Attachment_30_-Facilities_Management_Assistant.pdf PDF
Attachment_24_Final_Kabul_recompete_SOW_Revised_12.12.15_.pdf PDF
Attachment_35-_Site_Survey_Instructions_2-08-2016_SAQMMA16R0004Ver2.pdf PDF
Attachment_29_Passenger_Services_Coordinator_SOW.pdf PDF
Attachment_11_15_FAM_950.docx DOCX document
Attachment_5_Reliability_Centered_Maintenance_Manual.pdf PDF
Attachment_26_PAST_PERFORMANCE_SURVEY_Attachment_A.doc DOC document
Attachment_32_-SOW_for_Security_Escort_Oct_2015.pdf PDF
Attachment_23_Performance_Assessment_Report_6-9-2015.docx DOCX document
Attachment_4_Kabul_Equipment_List.pdf PDF
Attachment_10_U.S.Department_of_State_Drinking_Water_Program.pdf PDF
Attachment_34_-General_Services_Administrator_-_AEK.pdf PDF
Attachment_1_Definitions_Glossary.docx DOCX document
Attachment_13_Security_Classification_Guide.pdf PDF
Attachment_37-_RFP_SAQMMA16R0004_2-8-2015_Ver.1.pdf PDF
Attachment_31_Work_Order_Clerk_SOW.pdf PDF
Attachment_2_Acronyms_Abbreviations.docx DOCX document
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY |_| MAJOR |_| MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (QAP)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. QAP RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. QAP DETERMINATION

|_| ACCEPTED |_| REJECTED

12. CLOSE DATE

Corrective Action Report (CAR) Template, Feb 05 (SAF/AQCP)

CORRECTIVE ACTION REPORT (CAR)

Continuation Sheet (Number to correspond with applicable Item Number on reverse)

Corrective Action Report (CAR) Template, Feb 05 (SAF/AQCP)

Corrective Action Report (CAR) Instructions

Block 1. Enter Contractor Name.

Block 2. Enter Contract Number.

Block 3. Enter Contract Name or Type of Services.

Block 4. Enter Functional Area of the Contract.

Block 5. Enter the assigned suspense date given the contractor to provide a response to the CAR. A date must be entered for a Major CAR. A date is optional at the discretion of the Quality Assurance Personnel (QAP) initiating the CAR if the finding is Minor.

Block 6. All CARs will be tracked with a Control Number. The Contracting Officer Representative (COR) is the Issuing Authority for his/her contract Quality Assurance Evaluators (QAPs) generating CARs. By providing the control number to the QAP originating the CAR, the Issuing Authority demonstrates concurrence with the finding. The control number will be made up of the first two letters of the name of the site or contract, the last two digits of the calendar year, and a three digit number starting with 001 and progressing upward throughout the calendar year (e.g., WP04-001).

Block 7.

1. Check the block that indicates whether the identified deficiency is assigned as a Major or Minor finding. See Performance Plan (PP), paragraph 6.1.4, for the definitions of Major and Minor findings and associated explanations.

2. Finding: Clearly state the details of the finding followed by a reference to the stated contractual requirement. The reference must state the portion of the contract, part, section, paragraph and subparagraph and must make a complete brief quotation of the contract reference.

3. State the impact that the finding has or could have on the accomplishment of the mission that the contract provides.

4. When determining how long to give the contractor to respond to the identified finding, the normal is 10 working days. The suspense date should reflect this unless the finding requires a greater amount of time to come to solution. Major findings require a contractor response. Minor findings may require a contractor response at the discretion of the QAP initiating the CAR and/or the Issuing Authority.

Blocks 8 and 9. Contract QAPs initiating a CAR must sign in Block 8 and the Issuing Authority signs in Block 9. Each annotates the date at the time of signature.

Block 10. Upon review of the contractor’s reply, the originator of the CAR will enter comments regarding acceptance or rejection of the contractor’s response. This block may also contain any comments regarding follow-on inspections conducted or needed at a later date to validate that the finding has not reoccurred.

Block 11. The QAP selects Accept or Reject after reviewing the contractor’s response.

Block 12. The QAP enters a close date after advising the Issuing Authority that the contractor’s response is acceptable and the Issuing Authority concurs. The Issuing Authority will then forward the closed CAR to the contractor and report accordingly in the monthly report. This routing remains the same if the contractor response is unacceptable and the CAR remains open until an acceptable response is received except that the Issuing Authority forwards the open CAR back to the contractor for additional information.

Continuation Sheet. The Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.

File details come from the government source that posted it. Updated .