Attachment 12 -Quality Assurance and Surveillance Plan Escalation Matrix

View the file

Other files

File Type Posted
A006_SAQMMA16R0004.pdf PDF
A005_SAQMMA16R0004.pdf PDF
Attachment_51_Additional_Questions_with_Answers_-_April_7_2016_.xlsx XLSX spreadsheet
A004_SAQMMA16R0004.pdf PDF
Attachment_49-Questions_and_Answers_from_Site_Visit_U.S._Embassy_Kabul.xlsx XLSX spreadsheet
Attachment_50_Revised_list_of_Key_Personnel_and_Qualifications_3-29-2016.pdf PDF
A003_SAQMMA16R0004.pdf PDF
Amendment_A002_SAQMMA16R0004_U.S._Embassy_Kabul.pdf PDF
Attachment_42_-Contractor_requirements_for_Mitigation_Plan_in_RFP_SAQMMA16R0004.pdf PDF
Attachment_39_AEK_Government_Furnished_Equipment_List.PDF PDF
Attachment_40_Kabul_Preventive_and_Unscheduled_Maintenance_Work_Order__Reports.pdf PDF
Attachment_46_Answers_to_Questions_submitted_on_3-18-2016.xlsx XLSX spreadsheet
Attachment_43__Revised__List_of_Key_Personnel_and_Qualifications_(Kabul_3-7-2016).pdf PDF
Attatchment_48__Kabul_Site_Survey_March_14-17_Powerpoint_Presentation.pptx PPTX presentation
Attachment_47-_Revised_SECTION_J_Table_of_Contents__Kabul.docx DOCX document
Attachment_45_Revised_SOW_-3-22-2016.pdf PDF
Attachment_41-_Updated_AEK_-Camp_Sullivan-Villas_Equipment_List.pdf PDF
Amendment_A001_SAQMMA16R0004_U.S._Embassy_Kabul.pdf PDF
Attachment_14_Deliverables_Matrix.docx DOCX document
Attachment_3-_Kabul_OM_RFP_Attachment_3_MRPT_Procedures_Sept_4_2015.pdf PDF
Attachment_6_List_of_Codes.docx DOCX document
Attachment_19_SHEM_Guidelines.docx DOCX document
Attachment_16_O M_Service_Matrix.docx DOCX document
Attachment_17_Camp_Sullivan_description.pdf PDF
SECTION_J_Table_of_Contents__Kabul.docx DOCX document
Attachment_9_SOW_Elevator_Maintenance_.doc DOC document
Attachment_7_List_of_Key_Personnel_and_Qualifications.docx DOCX document
Attachment_36-_Sample_Visit_Request__Site_Survey.pdf PDF
Attachment_25-__Camp_Alvarado.pdf PDF
Attachment_22_QASP_Surveillance_Matrix_with_latest_AQL's_june_9_2015.xlsx XLSX spreadsheet
Attachment_28_Acceptable_Quality_Level_General_Requirements_12-14-2015.xlsx XLSX spreadsheet
Attachment_33-_General_Services_Administrator_-_Bagram.pdf PDF
Attachment_30_-Facilities_Management_Assistant.pdf PDF
Attachment_24_Final_Kabul_recompete_SOW_Revised_12.12.15_.pdf PDF
Attachment_35-_Site_Survey_Instructions_2-08-2016_SAQMMA16R0004Ver2.pdf PDF
Attachment_29_Passenger_Services_Coordinator_SOW.pdf PDF
Attachment_11_15_FAM_950.docx DOCX document
Attachment_5_Reliability_Centered_Maintenance_Manual.pdf PDF
Attachment_26_PAST_PERFORMANCE_SURVEY_Attachment_A.doc DOC document
Attachment_32_-SOW_for_Security_Escort_Oct_2015.pdf PDF
Attachment_23_Performance_Assessment_Report_6-9-2015.docx DOCX document
Attachment_4_Kabul_Equipment_List.pdf PDF
Attachment_10_U.S.Department_of_State_Drinking_Water_Program.pdf PDF
Attachment_34_-General_Services_Administrator_-_AEK.pdf PDF
Attachment_1_Definitions_Glossary.docx DOCX document
Attachment_13_Security_Classification_Guide.pdf PDF
Attachment_37-_RFP_SAQMMA16R0004_2-8-2015_Ver.1.pdf PDF
Attachment_31_Work_Order_Clerk_SOW.pdf PDF
Attachment_2_Acronyms_Abbreviations.docx DOCX document
Attachment_27_Kabul_O_ _M_Contract_Administration_Structure.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J -- EXHIBIT 6

Problem Escalation and Remediation Process The Escalation and Remediation Process is based on AQM’s standard approach and has 3 levels The process is designed to resolve issues at the lowest level possible -- Starting at the local GTM level Operational chain of command should be informed throughout the process -- especially before the issue is escalated from one level to the next The process should be considered a formal contract compliance proceeding:

Issues must address quantifiable gaps in contractually obligated delivery of services The maintenance of thorough documentation throughout the process is required Its important to maintain a GTM “issues log” to capture performance concerns GTMs are encouraged to:

Resolve issues with the contractor at the local level (Level 1 GTM Problem Remediation) before escalating to the COR (VMO) and CO Reach out to and know your contractor’s counterpart and communicate with them Escalation rule of thumb:

1st and 2nd occurrences of the same problem should be handled at the local GTM level (Level 1) 3rd occurrences and persistent problems should be escalated to the COR (VMO) (Level 2) Security violations are an exception to the 3 times rule for escalating issues beyond Level 1 *VMO- Vendor Management Office image1.png