S02 SOL 0026 AttD Contractor EMR Safety Info 578-17-027.docx

DOCX document 25 KB Posted

Attached to
Z2NZ--578-17-027 Replace Steam Pipe South Leg at Hines
Solicitation number
36C25223R0026
Issued by

About this file

This notice provides details for an upcoming federal construction solicitation. The solicitation will replace existing steam pipes between vaults and pits located on the campus of the Edward Hines, Jr. VA Hospital in Hines, Illinois. The project has a magnitude between $10-20 million and is set aside 100% for verified Service-Disabled Veteran-Owned Small Businesses. Offerors must be SDVOSB eligible, small businesses under NAICS 238220 with less than $19.5 million in average annual receipts, and certified in the VA's VIP database. The solicitation containing specifications and drawings will be posted to SAM.gov on May 22, 2023. A pre-bid conference will also be held after posting. Offerors should monitor SAM.gov for the solicitation and any amendments, which will be awarded before 730 calendar days from notice to proceed.

View the file

Other files

File Type Posted
36C25223R0026 0007.docx DOCX document
36C25223R0026 0006.docx DOCX document
S02 SOL 0026 AttG Wage Rate.Rev2 IL20230009_mod7 2023.06.30 current as of 2023.07.13.pdf PDF
S06 36C25223R0026 0005 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf PDF
36C25223R0026 0005.docx DOCX document
S06 36C25223R0026 0004 Att Q6.12.b Spec 028213.13 Glovebag Abatement.pdf PDF
36C25223R0026 0004.docx DOCX document
S06 36C25223R0026 0004 Att Q6.12.a Spec 028211 Asbestos Abatement.pdf PDF
S06 36C25223R0026 0004 Att SOW.R2 578-17-027 2023.07.07.pdf PDF
S06 36C25223R0026 0004 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf PDF
S06 36C25223R0026 0004 Att Q6.10 Photo Stockpile_Trailer.pdf PDF
S06 36C25223R0026 0004 Att Q5.5 Photos.pdf PDF
S06 36C25223R0026 0004 Att Q7.3 Spec 014500 Quality Control.pdf PDF
S06 36C25223R0026 0003.pdf PDF
S06 0003_Att1 36C25223R0026_SOL AttG.R1 Wage Rate Update IL20230009_06.09.2023.pdf PDF
36C25223R0026 0002.docx DOCX document
S06 001 Att1_2 S04 Site Visits Sign-In Sheets 578-17-027 Steam Line-South Leg.pdf PDF
36C25223R0026 0001.docx DOCX document
S02 SOL 0026 AttA-SOW.12) Contractor Parking.pdf PDF
S02 SOL 0026 AttF Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0026 AttA.0 SOW 2023. 578-17-027 2023.04.26.kk.docx DOCX document
S02 SOL 0026 AttA-SOW.19.2) 578-17-027 Replace Steam Pipe South Leg SPECS Volume 2 of 2 Div 22_33 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.18.1b) 578-17-027 Replace Steam Pipe South Leg DWGS Vol 1Bof2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.13) OIT Horizontal Cable Requirements.pdf PDF
S02 SOL 0026 AttA-SOW.03) Pre-Construction Checklist Rev 07.27.2021.pdf PDF
S02 SOL 0026 AttA-SOW.02) Hines Underground Utility Plan.pdf PDF
S02 SOL 0026 AttA-SOW.20) 578-17-027 Replace Steam Pipe South Leg UNCONTAMINATED SOIL REPORT.pdf PDF
S02 SOL 0026 AttA-SOW.17) NOT APPLICABLE.docx DOCX document
S02 SOL 0026 AttB VAAR 852.219-75 Certification 578-17-027.docx DOCX document
36C25223R0026_1.docx DOCX document
S02 SOL 0026 AttA-SOW.16) Hines COVID-19 Guidelines.pdf PDF
S02 SOL 0026 AttA-SOW.01b) Hines VA Campus Site Plan-Building Directory.pdf PDF
S02 SOL 0026 AttA-SOW.04) Safety and Health During Construction Activities.pdf PDF
S02 SOL 0026 AttC Contractor Info 578-17-027.docx DOCX document
S02 SOL 0026 AttG Wage Rates IL20230009 2023.04.07 current as of 2023.04.25.pdf PDF
S02 SOL 0026 AttA-SOW.18.1a) 578-17-027 Replace Steam Pipe South Leg DWGS Vol 1Aof2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.05) Cutting Welding and Other Hot Work.pdf PDF
S02 SOL 0026 AttA-SOW.18.2) 578-17-027 Replace Steam Pipe South Leg DWGS Vol2of2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.08) Pre-Construction Risk Assessment (PCRA).pdf PDF
S02 SOL 0026 AttA-SOW.06) Dig Permit SOP Form.pdf PDF
S02 SOL 0026 AttA-SOW.15) Infection Control Barrier Sample.pdf PDF
S02 SOL 0026 AttA-SOW.10) Interim Life Safety Measures (ILSM).pdf PDF
S02 SOL 0026 AttA-SOW.07) Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 SOL 0026 AttA-SOW.14) No Smoking Policy 10-1-19.pdf PDF
S02 SOL 0026 AttA-SOW.11) Contractor PIV Instructions and Form.pdf PDF
S02 SOL 0026 Att.A-SOW.01a) Hines VA Campus Site Plan.pdf PDF
S02 SOL 0026 AttE Financial Disclosure 578-17-027.docx DOCX document
S02 SOL 0026 AttA-SOW.19.1) 578-17-027 Replace Steam Pipe South Leg SPECS Volume 1 of 2 Div 00_21 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.09) Infection Control Risk Assessment (ICRA).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOL 36C25223R0026 Page 1 of 1 ATTACHMENT D – Safety Information

ADDITIONAL PRIME CONTRACTOR INFORMATION - Safety or Environmental Violations and Experience Modification Rating Information Information provided below shall be applicable to Solicitation 36C25223R0026 1.) All Bidders/Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

2.) All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Bidder’s/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, Bidder/Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.

3.) Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.

4.) If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, Bidder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Bidder/Offeror a Unity Rating of 1.0.

5.) The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.

6.) This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

PRE-AWARD CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM

Company Name: ______________________________________________ Address: _____________________________________________________ Telephone: ______________________ Fax: ________________________ Email: _______________________________________________________ DUNS Number: ________________________________________________ Contact: ______________________________________________________

1. Utilizing your OSHA 300 Forms, please complete the following information:

Category
2019
2020
2021
2022

Number of man hours (jobsite and office).

Number of cases involving days away from work, restricted activity, or both (Column H and I of OSHA 300).

Days away, restricted, or transferred rate (# of days away, restricted, or transferred cases x 200,000/# of man hours) (DART Rate).

Number of serious, willful, or repeat violations from OSHA within the last 4 years. Please attach explanation for any violations.

Please attach copies of the following documents: OSHA 300 and 300a Forms. These forms can be accessed through the OSHA publications search page: http://www.osha.gov/pls/publications/publication.html.

Provide your six-digit North American Industrial Classification System (NAICS) Code for this acquisition:

Who administers your company’s Safety and Health Program?

Company’s Insurance Experience Modification Rate (EMR): _____________

Project 578-17-027 Replace Steam Pipe – South Leg