S06 36C25223R0026 0004 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf

PDF 98 KB Posted

Attached to
Z2NZ--578-17-027 Replace Steam Pipe South Leg at Hines
Solicitation number
36C25223R0026
Issued by

About this file

This document includes an offer schedule and related federal contract opportunity notice. The offer schedule solicits pricing for replacing steam lines at the Edward Hines, Jr. VA Hospital in Hines, Illinois. Offerors are to provide lump sum pricing for tasks including constructing vaults and conduit, replacing sump pump panels and controls, and constructing rooftop pipe racks and overhead pipe racks. Unit pricing is also requested for line items such as underground steam and condensate lines, above-ground condensate lines, and concrete tunnel construction. The related federal contract opportunity is a pre-solicitation notice for project 578-17-027 to replace steam pipes in the south leg of the Hines VA campus. The projected value is between $10-20 million. The solicitation will be set aside for verified service-disabled veteran-owned small businesses. The Department of Veterans Affairs is the contracting agency. The response is due on or around May 22, 2023 as the solicitation will be posted to SAM.gov at that time.

View the file

Other files

File Type Posted
36C25223R0026 0007.docx DOCX document
36C25223R0026 0006.docx DOCX document
S02 SOL 0026 AttG Wage Rate.Rev2 IL20230009_mod7 2023.06.30 current as of 2023.07.13.pdf PDF
S06 36C25223R0026 0005 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf PDF
36C25223R0026 0005.docx DOCX document
S06 36C25223R0026 0004 Att Q6.12.b Spec 028213.13 Glovebag Abatement.pdf PDF
36C25223R0026 0004.docx DOCX document
S06 36C25223R0026 0004 Att Q6.12.a Spec 028211 Asbestos Abatement.pdf PDF
S06 36C25223R0026 0004 Att SOW.R2 578-17-027 2023.07.07.pdf PDF
S06 36C25223R0026 0004 Att Q6.10 Photo Stockpile_Trailer.pdf PDF
S06 36C25223R0026 0004 Att Q5.5 Photos.pdf PDF
S06 36C25223R0026 0004 Att Q7.3 Spec 014500 Quality Control.pdf PDF
S06 36C25223R0026 0003.pdf PDF
S06 0003_Att1 36C25223R0026_SOL AttG.R1 Wage Rate Update IL20230009_06.09.2023.pdf PDF
36C25223R0026 0002.docx DOCX document
S06 001 Att1_2 S04 Site Visits Sign-In Sheets 578-17-027 Steam Line-South Leg.pdf PDF
36C25223R0026 0001.docx DOCX document
S02 SOL 0026 AttA-SOW.12) Contractor Parking.pdf PDF
S02 SOL 0026 AttF Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0026 AttA.0 SOW 2023. 578-17-027 2023.04.26.kk.docx DOCX document
S02 SOL 0026 AttA-SOW.19.2) 578-17-027 Replace Steam Pipe South Leg SPECS Volume 2 of 2 Div 22_33 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.18.1b) 578-17-027 Replace Steam Pipe South Leg DWGS Vol 1Bof2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.13) OIT Horizontal Cable Requirements.pdf PDF
S02 SOL 0026 AttA-SOW.03) Pre-Construction Checklist Rev 07.27.2021.pdf PDF
S02 SOL 0026 AttA-SOW.02) Hines Underground Utility Plan.pdf PDF
S02 SOL 0026 AttA-SOW.20) 578-17-027 Replace Steam Pipe South Leg UNCONTAMINATED SOIL REPORT.pdf PDF
S02 SOL 0026 AttA-SOW.17) NOT APPLICABLE.docx DOCX document
S02 SOL 0026 AttB VAAR 852.219-75 Certification 578-17-027.docx DOCX document
36C25223R0026_1.docx DOCX document
S02 SOL 0026 AttA-SOW.16) Hines COVID-19 Guidelines.pdf PDF
S02 SOL 0026 AttA-SOW.01b) Hines VA Campus Site Plan-Building Directory.pdf PDF
S02 SOL 0026 AttD Contractor EMR Safety Info 578-17-027.docx DOCX document
S02 SOL 0026 AttA-SOW.04) Safety and Health During Construction Activities.pdf PDF
S02 SOL 0026 AttC Contractor Info 578-17-027.docx DOCX document
S02 SOL 0026 AttG Wage Rates IL20230009 2023.04.07 current as of 2023.04.25.pdf PDF
S02 SOL 0026 AttA-SOW.18.1a) 578-17-027 Replace Steam Pipe South Leg DWGS Vol 1Aof2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.05) Cutting Welding and Other Hot Work.pdf PDF
S02 SOL 0026 AttA-SOW.18.2) 578-17-027 Replace Steam Pipe South Leg DWGS Vol2of2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.08) Pre-Construction Risk Assessment (PCRA).pdf PDF
S02 SOL 0026 AttA-SOW.06) Dig Permit SOP Form.pdf PDF
S02 SOL 0026 AttA-SOW.15) Infection Control Barrier Sample.pdf PDF
S02 SOL 0026 AttA-SOW.10) Interim Life Safety Measures (ILSM).pdf PDF
S02 SOL 0026 AttA-SOW.07) Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 SOL 0026 AttA-SOW.14) No Smoking Policy 10-1-19.pdf PDF
S02 SOL 0026 AttA-SOW.11) Contractor PIV Instructions and Form.pdf PDF
S02 SOL 0026 Att.A-SOW.01a) Hines VA Campus Site Plan.pdf PDF
S02 SOL 0026 AttE Financial Disclosure 578-17-027.docx DOCX document
S02 SOL 0026 AttA-SOW.19.1) 578-17-027 Replace Steam Pipe South Leg SPECS Volume 1 of 2 Div 00_21 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.09) Infection Control Risk Assessment (ICRA).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFER SCHEDULE

(rev 7/11/2023)

SOLICITATION: 36C25223R0026

PROJECT: 578-17-057 Replace Steam Line – South Leg LOCATION: Edward Hines, Jr. VA Hospital in Hines, IL Price Range Between $10,000,000 - $20,000,000

Contractor shall furnish all labor, materials, equipment, and supervision in accordance with contract documents, scope of work, drawings, and specifications to provide for Project 578-17- 057 Replace Steam Line – South Leg at the Edward Hines, Jr. VA Hospital in Hines, IL

CLIN 0001 Construct vaults and box conduit from Vault 9 to Building 217 (Task 2): $______________________ LUMP SUM

CLIN 0002/ Construct vaults and box conduit CLIN 0002A from Vault 9 to Pit 5 near Building 37 (Task 5) $______________________ LUMP SUM

CLIN 0003 Replace existing sump pump panels and controls (Task 1): $______________________ LUMP SUM

CLIN 0004 Construct rooftop pipe rack on

Building 217 (Task 3) $______________________ LUMP SUM

CLIN 0005 Construct pipe rack spanning outer corridor to Vault 7 tunnel (Task 4) $______________________ LUMP SUM

NET TOTAL (CLINs 0001 – 0005) $_______________________ LUMP SUM

(continued on next page)

Unit Rate Pricing:

CLIN 0006 12-inch dia. underground steam line cost per ft with insulation $___________________ per Linear Foot

CLIN 0007 6-inch dia. underground condensate line cost per ft with insulation $___________________ per Linear Foot

CLIN 0008 6-inch dia. above-ground condensate line cost per ft with insulation $___________________ per Linear Foot

CLIN 0009 1.5-inch dia. above-ground steam line cost per ft with insulation $___________________ per Linear Foot

CLIN 0010.a Concrete tunnel (CLIN 1) 7’-0” x 6’-0” constructed typical per design without the cost of steam and condensate cost.

Shown on Detail SB502 $___________________ per Linear Foot

CLIN 0010.b Concrete tunnel, (CLIN 2A) 7’-6” x 6’-0” constructed typical per design without the cost of steam and condensate cost.

Shown on Detail SB502 $___________________ per Linear Foot

CLIN 0011 Cost of excavation and fill for non-contaminated soil $___________________ per Cubic Foot

CLIN 0012 Cost of excavation and fill for contaminated soil (where discovered) $___________________ per Cubic Foot

File details come from the government source that posted it. Updated .