S06 36C25223R0026 0004 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf
PDF 98 KB Posted
- Solicitation number
- 36C25223R0026
About this file
This document includes an offer schedule and related federal contract opportunity notice. The offer schedule solicits pricing for replacing steam lines at the Edward Hines, Jr. VA Hospital in Hines, Illinois. Offerors are to provide lump sum pricing for tasks including constructing vaults and conduit, replacing sump pump panels and controls, and constructing rooftop pipe racks and overhead pipe racks. Unit pricing is also requested for line items such as underground steam and condensate lines, above-ground condensate lines, and concrete tunnel construction. The related federal contract opportunity is a pre-solicitation notice for project 578-17-027 to replace steam pipes in the south leg of the Hines VA campus. The projected value is between $10-20 million. The solicitation will be set aside for verified service-disabled veteran-owned small businesses. The Department of Veterans Affairs is the contracting agency. The response is due on or around May 22, 2023 as the solicitation will be posted to SAM.gov at that time.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFER SCHEDULE
(rev 7/11/2023)
SOLICITATION: 36C25223R0026
PROJECT: 578-17-057 Replace Steam Line – South Leg LOCATION: Edward Hines, Jr. VA Hospital in Hines, IL Price Range Between $10,000,000 - $20,000,000
Contractor shall furnish all labor, materials, equipment, and supervision in accordance with contract documents, scope of work, drawings, and specifications to provide for Project 578-17- 057 Replace Steam Line – South Leg at the Edward Hines, Jr. VA Hospital in Hines, IL
CLIN 0001 Construct vaults and box conduit from Vault 9 to Building 217 (Task 2): $______________________ LUMP SUM
CLIN 0002/ Construct vaults and box conduit CLIN 0002A from Vault 9 to Pit 5 near Building 37 (Task 5) $______________________ LUMP SUM
CLIN 0003 Replace existing sump pump panels and controls (Task 1): $______________________ LUMP SUM
CLIN 0004 Construct rooftop pipe rack on
Building 217 (Task 3) $______________________ LUMP SUM
CLIN 0005 Construct pipe rack spanning outer corridor to Vault 7 tunnel (Task 4) $______________________ LUMP SUM
NET TOTAL (CLINs 0001 – 0005) $_______________________ LUMP SUM
(continued on next page)
Unit Rate Pricing:
CLIN 0006 12-inch dia. underground steam line cost per ft with insulation $___________________ per Linear Foot
CLIN 0007 6-inch dia. underground condensate line cost per ft with insulation $___________________ per Linear Foot
CLIN 0008 6-inch dia. above-ground condensate line cost per ft with insulation $___________________ per Linear Foot
CLIN 0009 1.5-inch dia. above-ground steam line cost per ft with insulation $___________________ per Linear Foot
CLIN 0010.a Concrete tunnel (CLIN 1) 7’-0” x 6’-0” constructed typical per design without the cost of steam and condensate cost.
Shown on Detail SB502 $___________________ per Linear Foot
CLIN 0010.b Concrete tunnel, (CLIN 2A) 7’-6” x 6’-0” constructed typical per design without the cost of steam and condensate cost.
Shown on Detail SB502 $___________________ per Linear Foot
CLIN 0011 Cost of excavation and fill for non-contaminated soil $___________________ per Cubic Foot
CLIN 0012 Cost of excavation and fill for contaminated soil (where discovered) $___________________ per Cubic Foot
File details come from the government source that posted it. Updated .