This document provides a pre-solicitation notice for solicitation number 36C25223R0026 to replace steam pipes at the Edward Hines, Jr. VA Hospital in Hines, Illinois. The project includes replacing existing steam pipes between Vaults 9 and 7 and between Vault 9 and Pit 5. Objectives are to replace sump pump controls, construct new concrete box conduit steam tunnels and pipe racks, and perform the work with minimal hospital operations impacts. The contractor must complete all work within 730 calendar days of the Notice to Proceed. This project is classified under NAICS code 238220 with a small business size limit of $19.5 million. The solicitation value is estimated between $10-20 million and is 100% set aside for verified Service-Disabled Veteran-Owned Small Businesses. The solicitation will post to SAM.gov on May 22, 2023, with a pre-bid conference after. Interested parties must register in SAM and represent SDVOSB eligibility, small business status, and SBA certification.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION
PROJECT
N
PIT 5
Lot Tennessee
Parking Bldg 16
P a rk in g
B ld g
S o u th
Lot J South Parking
TH
S
TR
E E
T
LOT
OKLAHOMA
5TH AVENUE
TRIPP AVENUE
THE
AB
HOUSE
McDONALD
RONALD
HINES BOULEVARD
C
VAULT7
TH
S T.
TH
S T.
X
X
X
221A
21715
FR
EE
D O
M 'S
P
AT
H H
O U
SI
N
G
Basketball Court
FR
EE
D O
M 'S
P
AT
H
H O
U
SI
N G
GARAGE
5TH AVENUE
VAULT 9
PIT 5
VAULT#10
VAULT#1
VAULT#11
VAULT#6
VAULT 8
BLDG 1
LOCATION
PROJECT
VAULT 9
LOCATION
PROJECT
STEAM TUNNEL
Lot G South Parking
CLIN 2A
LOCATION
PROJECT
CLIN 2A
LOCATION
PROJECT
CLIN 2B
Loyola Property
VAULT 9.1
VAULT 9.2
VAULT 5.1
VAULT 5.3
VAULT 5.2
LOCATION
PROJECT
BLDG 221
LOCATION
PROJECT
BLDG 217
CLIN 1
CLIN 1
CLIN 1Lot Tennessee
Lot Iowa (SCI)
North
Lot B Parking
Parking Bldg 16
Lot F
Parking Visitor
South
Parking
Bldg 2 South
Parking
Bldg 2 East
East Lot D
East Lot E
Lot J
South Parking
Lot G South Parking
North Lot C
17TH STREET
S H
O P
P A
R K
IN
G
INDIANA LOT
LOT
TEXAS
L O
T
O K
L A
H O
M A
LOT
FLORIDA
AIR MAIL ROAD
5TH
A
VE
N
U E
5TH
A
VE
N
U E
5TH
A
VE
N
U E
TR
IP
P A
VE
N
U E
TR
IP
P A
VE
N
U E
TH
E
A B
D E
F G
FIR
S
T A
VE
N U
E
SCOTT DRIVE
CROSSMAN CIRCLE
CROSSMAN CIRCLE
FE
A
R S
D R
IVE
WEST "B"STREET
ROOSEVELT RD.
H
IN
ES BO
U
LEVARD
H O
U S
E M cD O
N A
LD
R
O N
A
LD
AIR MAIL ROAD
S
TO
R
A G
E M
A S
O N
R Y
B
LD
G . 1
N
IN
TH
A
VE
N
U E
S C
O
TT D
R
IVE
13TH ST.
TR
IP
P A
VE
N
U E
M cC
O Y D
R
IVE
C
IR
C
LE
C R
O S
S M
A N
H
IN
E S
B O
U
LE
VA
R
D
C
17TH ST.
16TH ST.
15TH ST.
14TH ST.
XX
X X
X
X
P U
M P
H O
U S
E
A T&
T
C O
N
TR
A C
TO
R
P A
R K
IN
G
S
TO
R
A G
E
221A
Lot H
South Parking
U N
D E
R G
R O
U N
D S
TO
R
A G
E
TA
N K
U N
D E
R G
R O
U N
D S
TO
R
A G
E
TA
N K
FREEDOM'S PATH HOUSING 240
B asketball
C ourt
FREEDOM'S PATH 2 HOUSING 242
E
S
TA
TIO
N
G A
R A
G E
5TH
AVEN
U E
D E
TE
N
TIO
N
P O
N D
D E
TE
N
TIO
N
P O
N D
FEARS DRIVE
Loyola Property
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID
LOCATION MAP
COVER SHEET, INDEX OF DRAWINGS AND
LOCATION PLAN
G001
General Drawings
G001 TITLE SHEET
G101 PHASING AND CONSTRUCTION SITE SHEET
Civil Drawings
Electrical Drawings
S001 SYMBOLS, NOTES AND ABBREVIATIONS
SS100 STRUCTURAL SITE PLAN- CLIN 1
SS101 STRUCTURAL KEY PLANS- BUILDING 217/221 AND WALKWAY
SS102 STRUCTURAL PLAN- ROOF BUILDING 217
SS103 STRUCTURAL PLAN -BUILDING 217/221 WALKWAY
SS104 STRUCTURAL SITE PLAN - ABOVE BUILDING 1 WALKWAY- FOUNDATION PLAN
SS105 STRUCTURAL SITE PLAN - ABOVE BUILDING 1 WALKWAY- ROOF PLAN
SS200 STRUCTURAL SITE PLAN - CLIN 2A
SS120 STRUCTURAL - CLIN 1 FNDT VAULT TRANSITION WITH BOX CONDUIT
SS121 STRUCTURAL - CLIN 1 PIPE ENCLOSURE
SS122 STRUCTURAL DETAILS - 217 RISER
SS123 STRUCTURAL DETAILS - 217 RISER
SS124 STRUCTURAL DETAILS - 217 RISER - ACM OPTION
SS130 ENLARGED VAULT DETAILS- FOUNDATION PLANS
SS131 ENLARGED VAULT DETAILS- ROOF PLANS
SS132 STRUCTURAL DEMOLITION AND NEW WORK PLAN - CLIN 1 @ VAULT 9
SS133 STRUCTURAL PIT 5 DEMO AND NEW WORK
SS134 BILCO ACCESS DOOR
SB502 CONCRETE SECTIONS AND DETAILS
SB503 CONCRETE SECTIONS AND DETAILS
SB504 STRUCTURAL SUPPORT DETAILS- ABOVE BUILDING 1 WALKWAY
SB505 STRUCTURAL SUPPORT DETAILS- ABOVE BUILDING 221/217 WALKWAY
SB506 STRUCTURAL SUPPORT DETAILS- ABOVE BUILDING 1 WALKWAY
SB507 STRUCTURAL SUPPORT DETAILS- ABOVE BUILDING 1 WALKWAY
SB508 STRUCTURAL - MISCELLANEOUS COLUMN WORK DETAILS
SB509 STRUCTURAL SUPPORT DETAILS - PIPE ANCHORS BUILDING 1 WALKWAY
SB509B STRUCTURAL SUPPORT DETAILS - PIPE ANCHORS BUILDING 1 WALKWAY
SB510 STRUCTURAL SUPPORT DETAILS - PIPE ANCHORS BUILDING 1 WALKWAY
SB510B STRUCTURAL SUPPORT DETAILS - PIPE SUPPORTS BUILDING 1 WALKWAY
SB511 STRUCTURAL SUPPORT DETAILS- PIPE ANCHORS BUILDING 217
SB512 STRUCTURAL SUPPORT DETAILS- PIPE SUPPORTS BUILDING 217
SB512B STRUCTURAL SUPPORT DETAILS - BUILDING 217 PS 1 SPRING CAN SUPPORT
SB513 STRUCTURAL SUPPORT DETAILS- PIPE SUPPORTS SCHEDULE
SB514 STRUCTURAL SUPPORT DETAILS- PIPE ANCHORS BUILDING 221
SB515 PIPE SUPPORTS AND MISCELLANEOUS DETAILS
SB516 STRUCTURAL DETAILS-217/221-WALKWAY ELEVATIONS
SB517 STRUCTURAL SUPPORT DETAILS - ABOVE BUILDING 1 WALKWAY
SB518 STRUCTURAL SUPPORT DETAILS - ABOVE BUILDING 1 WALKWAY - BENT 1
SB519 STRUCTURAL SUPPORT DETAILS - ABOVE BUILDING 1 WALKWAY
SB520 BOX CONDUIT ANCHORS ANC 9.3, ANC 9.4, ANC 09-X, ANC 09-Y
SB521 BOX CONDUIT ANCHORS ANC 09-A, ANC 09-B, ANC 05-1, ANC 05-2
SB522 VAULT 5.1, 5.2, 5.3 FLOOR ANCHORS
SB522B VAULT 5.2-3, 5.1-3, 5.3-4, 5.2-2 FLOOR ANCHORS
SB523 VAULT ANCHORS 5.3-1 AND 5.3-2
SB523B VAULT SUPPORTS 5.3-1 AND 5.3-2
SB524 VAULT ANCHORS 9.1-1 & 9.1-3
SB525 VAULT ANCHORS 9.1-2 & 9.1-4
SB526 VAULT ANCHORS 9.2-1 & 9.2-2
SB527 PIPE SUPPORT HANGER CLIN 1 (VAULT 9.1) & CLIN 2A (VAULT 5.3)
SB530 BOX CONDUIT CONNECTIONS TO VAULT 9
SB531 CONNECTION TO VAULT 7 TUNNEL
SB532 PIPE SUPPORT 82
SB533 STRUCTURAL TIE-IN TO BUILDING 217
SB700 WATERPROOFING SECTIONS AND DETAILS
DRAWING
NUMBER
DRAWING TITLE DRAWING TITLE
NUMBER
DRAWING DRAWING TITLEDRAWING
CS-001 CIVIL SHEET INDEX
CS-002 CIVIL NOTES AND LEGENDS
CS-100 EXISTING CONDITIONS PLAN - CLIN 1
CS-101 EXISTING CONDITIONS PLAN - CLIN 1
CS-200 SITE DEMOLITION PLAN - CLIN 2A
CD-100 SITE DEMOLITION PLAN- CLIN 1
CD-200 SITE DEMOLITION PLAN- CLIN 2A
CG-001 EROSION CONTROL NOTES AND DETAILS
CG-002 EROSION CONTROL NOTES AND DETAILS
CG-100 SITE GRADING, LANDSCAPING AND EROSION
CONTROL PLAN - CLIN 1
CG-101 SITE GRADING, LANDSCAPING AND EROSION
CONTROL PLAN - CLIN 1
CG-200 SITE GRADING, LANDSCAPING AND EROSION
CONTROL PLAN - CLIN 2A
CP-100 SITE PAVING & LAYOUT PLAN - CLIN 1
CP-101 SITE PAVING & LAYOUT PLAN - CLIN 1
CP-200 SITE PAVING & LAYOUT PLAN - CLIN 2A
CU-001 UTILITY INDEX PLAN
CU-002 ENLARGED UTILITY PLANS
CU-100 STEAM PLAN AND PROFILE - CLIN 1
CU-200 STEAM PLAN AND PROFILE - CLIN 2A
CU-201 STEAM PLAN AND PROFILE - CLIN 2A
CI-500 CIVIL DETAILS
CI-501 CIVIL DETAILS
M001 MECHANICAL, PLUMBING AND ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES
MI001 EXISTING CONDITIONS AND DEMO STEAM AND CONDENSATE DIAGRAM
MI002 NEW UPGRADES STEAM AND CONDENSATE DIAGRAM
MI003 STEAM AND CONDENSATE SCHEMATIC DIAGRAM CLIN 1
MI004 STEAM AND CONDENSATE SCHEMATIC DIAGRAM CLIN 2A
MI005 STEAM AND CONDENSATE SCHEMATIC DIAGRAM - ROOFTOP
MD100 MECH DEMOLITION PLAN - CLIN 1 VAULTS
MD101 MECH DEMOLITION PLAN - CLIN 1 VAULTS
MD200 MECH DEMOLITION PLAN - CLIN 2A VAULTS
MD201 MECH DEMOLITION PLAN - CLIN 2A VAULTS
MS100 MECHANICAL UNDERGROUND PLAN CLIN 1 VAULTS
MS101 MECHANICAL SITE PLAN - BUILDING 217/221
MS102 MECHANICAL SITE PLAN - ENLARGED BUILDING 217
MS103 MECHANICAL SITE PLAN - ENLARGED BUILDING 217/221 WALKWAY
MS104 MECH SITE PLAN - ENLARGED BUILDING 1 STEAM TIE IN
MS105 MECHANICAL SITE PLAN - ENLARGED BUILDING 221
MS106 MECHANICAL PLAN - BUILDING 1 ABOVE WALKWAY OPTION 1
MS107 MECH NEW WORK - STEAM DRIPS
MS108 MECHANICAL SECTIONS AND PROFILES
MS109 MECHANICAL SECTIONS AND PROFILES ABOVE GROUND NEW WORK
MS200 MECHANICAL SITE PLAN CLIN 2A - VAULTS
MS201 MECHANICAL SITE PLAN CLIN 2A - VAULTS
MS400 BOX CONDUIT SECTION AND VAULT DETAILS
MS401 ENLARGED PLANS, VAULT 9 DEMO AND NEW PLANS
MS402 VAULT 7 PIPING CONNECTIONS DETAILS
MS403 PIT 5 PIPING CONNECTIONS AND DETAILS
MS404 CLIN 1 - VAULT PIPING DETAILS
MS405 CLIN 2A - VAULT PIPING DETAILS
MS406 VAULT 7 PIPING CONNECTIONS - NEW TUNNEL CONNECTIONS
M500 MECHANICAL DETAILS- SHEET 1
M501 MECHANICAL DETAILS- SHEET 2
M502 MECHANICAL DETAILS- SHEET 3
M503 MECHANICAL DETAILS- SHEET 4
M601 SCHEDULES ANCHORS AND EXPANSION JOINTS
M602 SCHEDULES STEAM TRAPS AND PIPE SPRING HANGER
M700 CONTROLS
Mechanical Drawings
E001 SYMBOLS, NOTES, AND ABBREVIATIONS
ES001 ELECTRICAL SITE PLAN - BOILER PLANT 205 TO CLIN 1 - UNDERGROUND
E100 ELECTRICAL SITE PLAN - CLIN 1 UNDERGROUND
E200 ELECTRICAL SITE PLAN - CLIN 2A UNDERGROUND
EP500 ELECTRICAL POWER DETAILS
EP600 ELECTRICAL POWER SCHEDULES
EP601 ELECTRICAL POWER ELECTRICAL SCHEMATIC
Structural Drawings
Edward Hines Jr. VA Medical Center Replace Steam Pipe- South Leg
Hines, Illinois
CONTRACT NO. 36C25219D0017
PROJECT NO. 578-17-027
VOLUME 1 DRAWING PACKAGE VOLUME 2 DRAWING PACKAGE
AMH DS
P001 SYMBOLS, NOTES, AND ABBREVIATIONS
PL100 PLUMBING SITE PLAN CLIN 1 - VAULTS
PL200 PLUMBING SITE PLAN CLIN 2A - VAULTS
PL500 PLUMBING DETAILS
Plumbing Drawings
Architectural Drawings
A001 GENERAL NOTES AND ABBRIVIATIONS
A100 OVERALL ROOF PLAN
A100.1 OVERALL ROOF PLAN
A101 DETAIL PLANS AT SOUTH ENCLOSURE
A102 DETAIL PLANS AT SOUTH ENCLOSURE
A200 ELEVATIONS
A300 SECTIONS
A400 SECTIONS - SOUTH ENCLOSURE
A401 SECTIONS - SOUTH ENCLOSURE
A500 EXTERIOR PERSPECTIVES
VICINTY MAP
CAMPUS MAP
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
ISSUED FOR BID
LOCATION
PROJECT
N
PIT 5
Lot Tennessee
Parking Bldg 16
P a rk in g
Lot J South Parking
LOT
OKLAHOMA
L O
T F
L O
R
ID
A
VAULT#10
VAULT#1
VAULT#6
BLDG 1
LOCATION
PROJECT
VAULT 9
LOCATION
PROJECT
STEAM TUNNEL
BLDG 217
LOCATION, POINT
& 1ST FLR BLDG 221
Lot G South Parking
MECHANICAL ROOM
WALKWAY INSTALL
BUILDING 1
PHASE 1C
BOX CONDUIT
UNDEGROUND
PHASE 1
UNDEGROUND
PHASE 2 &3
CLIN 1
CLIN 1
CLIN 1
CLIN 1
CLIN 1
CLIN 1
CLIN 2A
LOCATION
PROJECT
CLIN 2A
ABOVE GROUND TO UNDERGROUND
PHASE 1
CLIN 1
FINAL CONNECTIONS
DEMO
DEMO
CLIN 1
PHASE 2
Loyola Property
OF CONNECTION TIE IN
LOCATION, POINT
STEAM RISER FLANGE
OF CONNECTION TIE IN
UNDERGROUND STEAM DEMO
BUILDING 1
PHASE 2 & 3
CLIN 1
PHASE 1
PHASE 1
PHASE 2
CLIN 1
DEMO
PHASE 1B
PHASE 1B
PHASE 1B
PHASE 2 &3
CLIN 2a
DEMO
LIMITS
CONSTRUCTION
LIMITS WITHIN BUILDING 27 PARKING LOT
CONSTRUCTION
LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTIONLIMITS
CONSTRUCTION
LOCATION, POINT
MECHANICAL 1ST FLOOR PRV
CLIN 1
OF CONNECTION TIE IN BUILDING 1
PHASE 2 &3
CLIN 1
DEMO
PHASE 2 &3
CLIN 2a
DEMO
PHASE 2 &3
CLIN 2a
DEMO
PHASE 2 &3
DEMO
PHASE 1B
PHASE 1B
PHASE 1B
electrical work undergroundLIMITS
CONSTRUCTION
PHASING AND CONSTRUCTION SITE SHEET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID G101
AMH DS
AutoCAD SHX Text MECHANICAL GENERAL NOTES: 1. CONTRACTOR TO REQUEST ALL SHUTDOWNS IN WRITING , SIX WEEKS CONTRACTOR TO REQUEST ALL SHUTDOWNS IN WRITING , SIX WEEKS PRIOR TO REQUESTS FOR SHUTDOWN OF ANY MECHANICAL OR ELECTRICAL SYSTEMS. 2. PROJECT DOCUMENTS CONTAIN AN ATTEMPT TO LOCATE UNDERGROUND PROJECT DOCUMENTS CONTAIN AN ATTEMPT TO LOCATE UNDERGROUND UTILITIES AS WELL AS DEPTHS THAT WILL IMPACT UNDERGROUND ROUTING OF STEAM, CONCRETE BOX CONDUIT AND LOCATING VAULTS. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO HIRE UNDERGROUND LOCATING SERVICES SUCH AS BLOODHOUND OR ANY COMPARABLE COMPANY WITH EXPERIENCE AND KNOWLEDGE IN PROVIDING POTHOLING SERVICES. ADDITIONAL SOIL SAMPLE POINTS/BORING REPORTS/ GEOTECHNICAL INVESTIGATIONS IN THE DEFINED CONSTRUCTION AREA REQUIRED OR NECESSARY REMAIN THE RESPONSIBILITY OF THE CONTRACTOR. ANY RESTORATION OF AREAS AFFECTED BY INVESTIGATION SERVICES SHALL REMAIN RESPONSIBILITY OF CONTRACTOR. 3. CONSTRUCTION MUST BE PHASED SUCH THAT EXISTING STEAM AND CONSTRUCTION MUST BE PHASED SUCH THAT EXISTING STEAM AND CONDENSATE LINES REMAIN ACTIVE DURING THE INSTALLATION OF THE NEW PIPE. FINAL CUTOVER WILL TAKE PLACE OVER THE COURSE OF WEEKENDS. 3.1. FOR CLIN 1, REQUIRES TIE IN TO POINT OF CONNECTION WORK TO FOR CLIN 1, REQUIRES TIE IN TO POINT OF CONNECTION WORK TO BOTH BUILDING 217 AND 221, VAULT 9 AND VAULT 7 3.1.1. THE VA WILL BE WITHOUT STEAM. WEEKEND WORK FROM 8 PM THE VA WILL BE WITHOUT STEAM. WEEKEND WORK FROM 8 PM ON FRIDAY TO 10 PM ON SUNDAY SHOULD BE COORDINATED WITH OTHERS ESPECIALLY WITH VETERANS AFFAIRS STAFF AND PATIENT OPERATIONS. 3.1.2. ADDITIONAL SCHEDULING CONSIDERATIONS AND PHASING OF TIE ADDITIONAL SCHEDULING CONSIDERATIONS AND PHASING OF TIE IN SHUTDOWN IS PROPOSED IN THE MEANS WHERE THE FLOW IS LOWEST DURING THE SUMMER. SHUTDOWN OF THE SYSTEM AT THE BUILDINGS AND VAULTS SHALL MAKE TEMPORARY VALVE CONNECTIONS INTO THE EXISTING FOR FUTURE PHASING CONNECTIONS 3.2. FOR CLIN 2A, BUILDINGS 215, 48, 37, AND 20 WILL BE WITHOUT FOR CLIN 2A, BUILDINGS 215, 48, 37, AND 20 WILL BE WITHOUT STEAM. THE WORK MAY BE SCHEDULED DURING THE SUMMER MONTHS MAY 15 TO OCTOBER 15 (PLUS OR MINUS ONE DAY) WHEN PERIODS OF STEAM LOAD WILL BE SHUTDOWN. 4. STEAM PRESSURE AT THE LOCATION OF THIS PROJECT IS STEAM PRESSURE AT THE LOCATION OF THIS PROJECT IS APPROXIMATELY 120 PSIG. ALL STEAM SUPPLY COMPONENTS MUST BE RATED AT 150 PSIG MINIMUM. STEAM SUPPLY TEMPERATURE RATED IMUM. STEAM SUPPLY TEMPERATURE RATED 400 DEG F MAX. 5. IN CASE OF DEVIATION FROM THE DESIGN DUE TO UNFORESEEN IN CASE OF DEVIATION FROM THE DESIGN DUE TO UNFORESEEN CONDITION, THE CONTRACTOR TO PROPOSE REVISIONS, RE-ENGINEER AND CONDUCT STRESS ANALYSIS TO PRESENT CHANGES AND ANALYSIS FOR AE APPROVAL.
AutoCAD SHX Text CONTRACTOR IS REPONSIBLE FOR THE CONSTRUCTION SCHEDULE AND THEIR MEANS AND METHODS OF CONSTRUCTION. FOLLOWING IS A SUGGESTED DEMOLITION AND CONSTRUCTION PHASING SEQUENCE: NOTES APPLY TO ALL SUB-PHASES AS HIGHLIGHTED IN CLIN 1 AND 2A PHASE 1 CLIN1 - MAIN PROJECT EXCAVATION AND STEAM LINE INSTALL 1. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL PERFORM THE NECESSARY REQUIRED INVESTIGATION(S) TO SUPPLEMENT THE INFORMATION SOIL REPORT PROVIDED IN SPECIFICATION 33 63 00. CONVERSION OF THE SOIL BORING ELEVATIONS IN THE GEOTECHNICAL INVESTIGATION SHALL BE CONVERTED TO CROSS REFERENCE ELEVATIONS AS SHOWN IN THE DRAWINGS WHERE DATUMS MAY DIFFER. 2. CONTRACTOR TO PLACE ALL TRAFFIC CONTROL MARKERS, SIGNAGE, CONTRACTOR TO PLACE ALL TRAFFIC CONTROL MARKERS, SIGNAGE, SOIL AND EROSION CONTROLS. 3. CONTRACTOR TO EXCAVATE, TRENCH AND REMOVE ALL ITEMS ON SITE CONTRACTOR TO EXCAVATE, TRENCH AND REMOVE ALL ITEMS ON SITE SHOWN TO BE DEMOLISHED IN SOIL AND CONCRETE STRUCTURES. 4. CONTRACTOR TO INSTALL STEAM LINE BOX CONDUIT SECTIONS AND CONTRACTOR TO INSTALL STEAM LINE BOX CONDUIT SECTIONS AND VAULTS AS REQUIRED IN AREAS AFTER EXCAVATION AND SHORING SAFELY AS REQUIRED PER OSHA, HINES VA AND STATE CODES. 5. CONTRACTOR TO INSTALL NEW VAULTS WITH ALL PIPING, ELECTRICAL, CONTRACTOR TO INSTALL NEW VAULTS WITH ALL PIPING, ELECTRICAL, PUMP AND CONTROLS REQUIRED IN AREA SHOWN IN THE PLANS AND DETAILS. 6. CONTRACTOR TO CORE DRILL THROUGH EXISTING OR REMOVE PORTIONS CONTRACTOR TO CORE DRILL THROUGH EXISTING OR REMOVE PORTIONS OF VAULT 9 IN ORDER TO CONNECT NEW BOX CONDUIT AS SHOWN ON THE STRUCTURAL DRAWINGS. SEE NOTES FOR FURTHER INFORMATION ON MECHANICAL AND STRUCTURAL DESIGN DRAWINGS. FIELD VERIFY FINAL LOCATIONS AND DEPTHS FOR ANY DISCREPANCIES. PHASE 1B CLIN 2A - STEAM LINE CONNECTIONS TO EXISTING. SEE GENERAL NOTE 3 FOR OVERALL TIME ALLOWANCE 7. UPON SHUTDOWN APPROVAL, CONTRACTOR TO CUT EXISTING STEAM UPON SHUTDOWN APPROVAL, CONTRACTOR TO CUT EXISTING STEAM AND CONDENSATE SYSTEM PIPING AND CASINGS. FIELD VERIFY ALL FINAL LOCATIONS AND DEPTHS FOR ANY DISCREPANCIES 8. CONTRACTOR MAKE NEW TIE INS WHERE SHOWN AND FOLLOWING CONTRACTOR MAKE NEW TIE INS WHERE SHOWN AND FOLLOWING RECOMMENDATIONS OF THE MANUFACTURER PHASE 1C CLIN 1 BUILDING 1 WALKWAY - STRUCTURAL WORK INSTALLATION STEAM LINE CONNECTIONS TO EXISTING. 9. UPON BUILDING 217 & 221 PHASE 1 WORK COMPLETION, CONTRACTOR UPON BUILDING 217 & 221 PHASE 1 WORK COMPLETION, CONTRACTOR TO CUT & DEMO WITHIN VAULT 7 TUNNEL ALL EXISTING STEAM AND CONDENSATE PIPING IN ADDITION TO ALL ABANDONED CONDUIT. FIELD VERIFY ALL FINAL LOCATION FOR ANY DISCREPANCIES. 10. CONTRACTOR TO DEMO ALL UNDERGROUND STEAM AND CONDESATE CONTRACTOR TO DEMO ALL UNDERGROUND STEAM AND CONDESATE PIPING RUNNING NORTH & SOUTH FROM VAULT 7 TUNNEL TO PIT 1. STEAM AND CONDENSATE LINES LOCATED UNDER STRUCTURES TO BE FILLED WITH FLOWABLE FILL. 11. MAKE NEW TIE INS WHERE SHOWN. MAKE NEW TIE INS WHERE SHOWN. PHASE 2 - EXISTING STEAM DEMO 12. ONCE NEW CONNECTIONS HAVE BEEN ESTABLISHED AND OPERATING ONCE NEW CONNECTIONS HAVE BEEN ESTABLISHED AND OPERATING UNDER SATISFACTORY CONDITIONS, CONTRACTOR TO REMOVE EXISTING STEAM MANHOLES INCLUDING ALL PIPING, PUMPS, AND ELECTRICAL 13. CONTRACTOR TO REMOVE AND DEMOLISH EXISTING PIPE MADE CONTRACTOR TO REMOVE AND DEMOLISH EXISTING PIPE MADE OBSOLETE OR ABANDONED TO THE GREATEST EXTENT POSSIBLE WITHIN BUILDING 221. 14. CONTRACTOR TO REMOVE AND DEMOLISH EXISTING PIPE AND PITS CONTRACTOR TO REMOVE AND DEMOLISH EXISTING PIPE AND PITS MADE OBSOLETE OR ABANDONED TO THE GREATEST EXTENT POSSIBLE. FILL IN REMAINDER OF PIPE TO REMAIN WITH FLOWABLE FILL. PHASE 3 - RESTORATION 15. CONTRACTOR TO BACKFILL ALL EXCAVATED AREAS INCLUDING CONTRACTOR TO BACKFILL ALL EXCAVATED AREAS INCLUDING REMOVED PITS AND ALL UNDERGROUND STEAM AND CONDENSATE PIPING WHERE SHOWN. USE WITH MINIMUM 2" CLEAN FILL. MATCH GRADIENT WITH THE SURROUNDING FLOW PATTERNS. 16. CONTRACTOR TO RESTORE, RESEED, AND RECOMMISSION ALL REMOVED CONTRACTOR TO RESTORE, RESEED, AND RECOMMISSION ALL REMOVED SOIL, ASPHALT, CONCRETE, CURB, ELECTRICAL POLE, AND OTHER ITEMS TO CORRESPOND WITH EXISTING APPEARANCE AND FUNCTIONALITY PER SPECIFICATIONS.
AutoCAD SHX Text CIVIL GENERAL NOTES: 1. CONTRACTOR TO EXCAVATE, TRENCH AND REMOVE ALL ITEMS ON SITE CONTRACTOR TO EXCAVATE, TRENCH AND REMOVE ALL ITEMS ON SITE SHOWN TO BE REMOVED. 2. REMOVE CONCRETE SIDEWALK, CURB AND ASPHALT DRIVE WHERE REMOVE CONCRETE SIDEWALK, CURB AND ASPHALT DRIVE WHERE SHOWN. REMOVE SIDEWALKS TO THE NEAREST CONTROL JOINTS. CONCRETE CAN BE CRUSHED INTO AGGREGATE TO BE MIXED INTO SOIL FOR STRUCTURAL FILL. VERIFY EXTENT OF ASPHALT REMOVAL BASED ON STEAM PIPING FIELD JOINING WORK. 3. REMOVE ALL GRAVEL/RIVER ROCK SHOWN TO BE REMOVED. BASE REMOVE ALL GRAVEL/RIVER ROCK SHOWN TO BE REMOVED. BASE GRAVEL TO BE REMOVED IS TO BE STOCKPILED WITH CRUSHED RUBBLE AS NOTED. 4. ALL TREES TO REMAIN TO HAVE TREE PROTECTION. TREE PROTECTION ALL TREES TO REMAIN TO HAVE TREE PROTECTION. TREE PROTECTION TO REMAIN UNTIL COMPLETION OF CONSTRUCTION. A MINIMAL AMOUNT OF DISTURBANCE MUST BE MAINTAINED WHEN WORKING WITHIN TREE PROTECTION AREAS; FENCING TO BE UP WHEN AREAS ARE NOT BEING WORKED ON. 5. CONTRACTOR WOULD NEED TO COORDINATE SHUTDOWN OF STREET CONTRACTOR WOULD NEED TO COORDINATE SHUTDOWN OF STREET ACTIVITIES WITH INSTALLATION OF PIPING BOX CONDUIT. 5TH AVE AND TRIPP AVE CAN ONLY BE SHUTDOWN ONE LANE AT A TIME FOR CLIN 2A WORK. COORDINATION OF TRAFFIC CONTROL AND PACE BUS REROUTE OR LANE DIVERSIONS SHOULD BE PLANNED AND A FOUR WEEK NOTICE GIVEN. 6. WHEN EXCAVATING FOR NEW BOX CONDUIT IN BUILDING 37 PARKING WHEN EXCAVATING FOR NEW BOX CONDUIT IN BUILDING 37 PARKING LOT; CONTRACTOR TO PROVIDE APPROPRIATE MEASURES TO REMOVE COAL CONTAMINATED SOIL. 7. LIMITS OF CONSTRUCTION INCLUDE ALLOWANCE FOR EXCAVATION, LIMITS OF CONSTRUCTION INCLUDE ALLOWANCE FOR EXCAVATION, BACKHOES, AND TEMPORARY FENCING. 8. CONTRACTOR TO REVIEW CONSTRUCTION LIMITS AND PROVIDE FOR CONTRACTOR TO REVIEW CONSTRUCTION LIMITS AND PROVIDE FOR ALLOWANCES FOR TEMPORARY FENCING, EXCAVATION AND SHORING FOR VAULTS AND BOXED CONDUIT USING BACK HOE OR OTHER EXCAVATING EQUIPMENT
AutoCAD SHX Text ELECTRICAL GENERAL NOTES: 1. CONTRACTOR TO REQUEST ALL SHUTDOWNS IN WRITING , SIX WEEKS CONTRACTOR TO REQUEST ALL SHUTDOWNS IN WRITING , SIX WEEKS PRIOR TO REQUESTS FOR SHUTDOWN OF ANY MECHANICAL OR ELECTRICAL SYSTEMS. 2. PROJECT DOCUMENTS CONTAIN AN ATTEMPT TO LOCATE UNDERGROUND PROJECT DOCUMENTS CONTAIN AN ATTEMPT TO LOCATE UNDERGROUND UTILITIES AS WELL AS DEPTHS THAT WILL IMPACT UNDERGROUND ROUTING OF POWER, FOR BOTH DIRECT BURY AND CONCRETE ENCASED DUCT BANKS WHEN CROSSING HEAVILY TRAVELED ROADS. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO HIRE UNDERGROUND LOCATING SERVICES SUCH AS BLOODHOUND OR ANY COMPARABLE COMPANY WITH EXPERIENCE AND KNOWLEDGE IN PROVIDING SURVEYING SERVICES. ANY RESTORATION OF AREAS AFFECTED BY INVESTIGATION SERVICES SHALL REMAIN RESPONSIBILITY OF CONTRACTOR. 3. CONSTRUCTION MUST BE PHASED SUCH THAT EXISTING ELECTRICAL CONSTRUCTION MUST BE PHASED SUCH THAT EXISTING ELECTRICAL WORK IN BUILDING 205 - BOILER PLANT TIE IN TO COINCIDE WITH SUMP PUMP, POWER AND LIGHTING WITHIN THE VAULTS. FINAL ELECTRICAL ENERGIZING WILL TAKE PLACE OVER THE COURSE OF WEEKENDS. 3.1.1. FOR CLIN 1, REQUIRES TIE IN TO POINT OF CONNECTION WORK FOR CLIN 1, REQUIRES TIE IN TO POINT OF CONNECTION WORK TO BOX CONDUIT AT VAULT 9. ALL OTHER ELECTRICAL WORK SHOULD BE COORDINATED WITH OTHER CIVIL,MECHANICAL, STRUCTURAL AND PLUMBING TRADES. 3.1.2. ADDITIONAL SCHEDULING CONSIDERATIONS AND PHASING OF TIE ADDITIONAL SCHEDULING CONSIDERATIONS AND PHASING OF TIE IN SHUTDOWN FOR ELECTRICAL POWER; ROUTING OF DIRECT BURY AND CONCRETE ENCASED DUCT BANKS FROM THE PROPOSED AREA SHALL REMAIN THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE VA. 3.1.3. ROAD CLOSURES SHALL FOLLOW THE SAME PROTOCOL AT ROAD CLOSURES SHALL FOLLOW THE SAME PROTOCOL AT TRIPP AVE FOR STEAM AND CONDENSATE BOX CONDUIT INSTALLATIONS. 4. IN CASE OF DEVIATION FROM THE DESIGN DUE TO UNFORESEEN IN CASE OF DEVIATION FROM THE DESIGN DUE TO UNFORESEEN CONDITIONS, THE CONTRACTOR TO PROPOSE REVISIONS, RE-ENGINEER AND CONDUCT LINE AND LOAD CALCULATIONS TO PRESENT CHANGES AND ANALYSIS FOR AE APPROVAL. 5. COINCIDE RESTORATION OF PARKING LOT/PAVING AND SOD/SEEDING COINCIDE RESTORATION OF PARKING LOT/PAVING AND SOD/SEEDING DURING PHASE 3.
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
17TH STREET
AutoCAD SHX Text
AutoCAD SHX Text
AIR MAIL ROAD
AutoCAD SHX Text
5TH AVENUE
AutoCAD SHX Text
TRIPP AVENUE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
THE
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
FIRST AVENUE
AutoCAD SHX Text
HOUSE
AutoCAD SHX Text McDONALD
AutoCAD SHX Text
RONALD
AutoCAD SHX Text
AutoCAD SHX Text
AIR MAIL ROAD
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
MASONRY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HINES BOULEVARD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VAULT7
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
17TH ST.
AutoCAD SHX Text
16TH ST.
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
AutoCAD SHX Text 221A
AutoCAD SHX Text
AutoCAD SHX Text
FREEDOM'S PATH HOUSING 240
AutoCAD SHX Text Basketball Court
AutoCAD SHX Text
FREEDOM'S PATH 2 HOUSING 242
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
E85 STATION
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
5TH AVENUE
AutoCAD SHX Text
DETENTION POND
AutoCAD SHX Text
VAULT 9
AutoCAD SHX Text
PIT 5
AutoCAD SHX Text
VAULT 8
AutoCAD SHX Text
VAULT 9.1
AutoCAD SHX Text
VAULT 9.2
AutoCAD SHX Text
VAULT 5.1
AutoCAD SHX Text
VAULT 5.3
AutoCAD SHX Text
VAULT 5.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
12/16/22
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 0152812/16/2022ISSUED FOR BID
@ AT
GB GYPSUM BOARD
M-14A
OFFICE
101-1
DTL DETAIL
W/ WITH
WD WOOD
W/O WITHOUT
WP WORK POINT
WPR WATERPROOFING
WVNR WOOD VENEER
WC WATER CLOSET
UNF UNFINISHED
EQ EQUAL
NTS NOT TO SCALE
VB VINYL BASE
UNO UNLESS NOTED OTHERWISE
VIF VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
VEST VESTIBULE
VERT VERTICAL
OPNG OPENING
OPP OPPOSITE
OA OVERALL
OC ON CENTER
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
OH OPPOSITE HAND
OD OUTSIDE DIAMETER
TLT TOILET
T TREAD
THK THICK
TYP TYPICAL
TS TUBE STEEL
TT TRAFFIC TOPPING
TEL TELEPHONE
TEF TOILET EXHAUST FAN
T/ TOP OF
NOM NOMINAL
NO NUMBER
MIN MINIMUM
MTL METAL
ELEV ELEVATOR
EL ELEVATION
DWG DRAWING
EA EACH
ECP EXPOSED CONSTRUCTION PAINTED
EFTS EXPANDING FOAM TAPE SEALANT
EPEJF EXPANDED POLYETHYLENE JOINT FILLER
EC EXPOSED CONSTRUCTION
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NC NOISE CRITERIA
MO MASONRY OPENING
MISC MISCELLANEOUS
RFS ROOM FINISH SCHEDULE
CLO CLOSET
ID INSIDE DIAMETER
SSS SILICONE SANITARY SEALANT
STL STEEL
STN STAIN
SV SHEET VINYL
SUSP SUSPENDED
STOR STORAGE
STRUCT STRUCTURAL
ST SEALANT TAPE
STD STANDARD
2A3A
LAV LAVATORY
CMU CONCRETE MASONRY UNIT
MECH MECHANICAL
MED MEDIUM
MH MANHOLE
MACH MACHINE
MATL MATERIAL
MAX MAXIMUM
CPT CARPET
CO CLEAN OUT
CT CERAMIC TILE
DIA DIAMETER
DIM DIMENSION
DN DOWN
DF DRINKING FOUNTAIN
CMUP CMU PAINTED
LP LOW POINT
MFR MANUFACTURER
SIM SIMILAR
SHT SHEET
SQ SQUARE
SECT SECTION
SPEC SPECIFICATION
SS STAINLESS STEEL
SRS SILICONE RUBBER SEALANT
JT JOINT
LAM LAMINATED
IN INCH
INSUL INSULATION
INT INTERIOR
INFO INFORMATION
CORR CORRIDOR
CONT CONTINUOUS
COL COLUMN
CLG CEILING
CONCR CONCRETE
CONTR CONTRACTOR
CONCP CONCRETE PAINTED
CLR CLEAR OPENING
CONST CONSTRUCTION
JC JANITORS CLOSET
JB JUNCTION BOX
R RISER
HNCG HOLLOW NEOPRENE
RM ROOM
RBC RUBBERIZED BITUMINOUS COMPOUND
REF REFERENCE
REINF REINFORCED
REQ'D REQUIRED
REV REVISION
RO ROUGH OPENING
RB RESILIENT BASE
RD ROOF DRAIN
HORIZ HORIZONTAL
HT HEIGHT
HR HOURS
HP HIGH POINT
BLDG BUILDING
CL CENTER LINE
CB CERAMIC BASE TILE
C/C CENTER TO CENTER
CG CORNER GUARD
CIP CAST IN PLACE
CJ CONTROL JOINT
CH LNK CHAIN LINK FENCE
CJF CORK JOINT FILLER
HSKP HOUSEKEEPING
HM HOLLOW METAL
INCAND INCANDESCENT
A000
(TWO PART)
PT PAINTED
PSI POUNDS PER SQUARE INCH
2-PUMS POLYURETHANE SEALANT
PVF POLYVINYLIDINE FINISH
QT QUARRY TILE
QTY QUALITY
QUANT QUANTITY
GL GLASS
HDW HARDWARE
GRND GROUND
BRK BRICK
BLK BLOCK
B/ BOTTOM OF
BD BOARD
BJF BITUMINOUS JOINT FILLER
BMT BUTYLMASTIC TAPE SEALANT
BRS BUTYL RUBBER SEALANT
BOH BACK OF HOUSE
GLB GLAZED BLOCK
GC GENERAL CONTRACTOR
GYP BD GYPSUM BOARD
GBP GYPSUM BOARD PAINTEDEQUIPMENT / FURNITURE TAG
PLYWOOD
CONSTRUCTION KEY NOTE
BRICK
ALUMINUM
FINISHED WOOD
BATT INSULATION
DOOR AND FRAME
CARPET
WALL TYPE TAG
DOOR TAG
ROOM NAME AND NUMBER
GLASS
ACOUSTICAL TILE
MORTAR / SETTING BED
CONCRETE
DRYWALL
MEMBRANE GASKET
STEEL / STAINLESS STEEL
ELEVATION
DETAIL
A000
PBMR PRESHIMMED BUTYL MASTIC
ADJ ADJUSTABLES
FD FLOOR DRAIN
PERP PERPENDICULAR
PL PLASTIC
PLAM PLASTIC LAMINATE
PR PAIR
PLBG PLUMBING
PLWD PLYWOOD
PREFAB PREFABRICATED
PSF POUNDS PER SQUARE FOOT
PL PLATE
FIN FINISH
ALUM ALUMINUM
AFF ABOVE FINISHED FLOOR
ALS ACRYLIC LATEX SEALANT
GALV GALVANIZED
FLR FLOOR
GA GAUGE
APC ACOUSTICAL PANEL CEILING
A0RA AREA OF RESCUE ASSISTANCE
AP ACCESS PANEL
APPROX APPROXIMATELY
ARCH ARCHITECTURAL
ANOD ANODIZED
FDV FIRE DEPARTMENT VALVE
FLUOR FLUORESCENT
FHC FIRE HOSE CABINET
FEC FIRE EXTINGUISHER CABINET
PARTN PARTITION
AD AREA DRAIN
FC FOOT CANDLES
CONCRETE MASONRY UNITSEALANT AND BACKER ROD
RIGID INSULATION
SECTION1
WOOD BLOCKING
COMPRESSION GASKET
SYMBOLS
ARCHITECTURAL
MATERIAL SYMBOLS
ARCHITECTURAL
1A DEMOLITION KEY NOTE
SSD SEE STRUCTURAL DRAWINGS
ARCHITECTURAL ABBREVIATIONS
WALLS
VISION LITE TAG107-A
A000
SPECIAL SAFETY NOTICE
ALL CONTRACTORS, SUBCONTRACTORS AND THEIR REPRESENTATIVES
WORKING ON THIS PROJECT SHALL AT ALL TIMES PRIOR AND DURING THE
COURSE OF THEIR ACTIVITY BE RESPONSIBLE FOR THE SAFETY OF THEIR
EMPLOYEES AS WELL AS ALL OTHERS AND IN THE CARE OF THE PROPERTY.
EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF THEIR
EMPLOYEES, SHALL ASCERTAIN THAT THE CONDITIONS UNDER WHICH THEY
WILL BE REQUIRED TO ACCOMPLISH THEIR WORK ARE SAFE AND MEET ALL
REGULATIONS OF THE OCCUPATIONAL SAFETY AND HAZARD ACT OR OTHER
GOVERNING REGULATIONS. THE BEGINNING OF WORK BY A CONTRACTOR OR
SUBCONTRACTOR SHALL INDICATE SATISFACTION CONCERNING SAFETY AND
FULL RESPONSIBILITY FOR ACCIDENTS, INJURIES, AND/OR DAMAGES.
IF UNSATISFIED, THE CONTRACTOR OR SUBCONTRACTOR SHALL INDICATE
THE ACTIONS AND/OR DEVICES NECESSARY TO RENDER THE JOB-SITE SAFE.
IF THE WORK OF OTHER PARTIES IS, UPON INSPECTION, FOUND AT ANY TIME
TO BE UNSAFE THE CONTRACTOR OR SUBCONTRACTOR SHALL IMMEDIATELY
STOP ALL WORK AND NOTIFY THE GENERAL CONTRACTOR, ARCHITECT AND
OWNER. THE BID SUBMISSIONS AND BEGINNING OF WORK SHALL INDICATE
ACKNOWLEDGMENT AND ACCEPTANCE OF THESE REQUIREMENTS.
GENERAL NOTES TO CONTRACTOR(S)
APPLIES TO ALL CONTRACTORS
A. ALL WORK SHALL BE COMPLETED ACCORDING TO ALL PUBLISHED
APPLICABLE LOCAL STATE FEDERAL AND NATIONAL CODES AND ORDINANCES.
B. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE
AND WORKMAN'S COMPENSATION INSURANCE. CONSULT OWNER FOR EXACT
COVERAGE REQUIRED.
C. EACH CONTRACTOR SHALL COORDINATE WITH ALL OTHER CONTRACTORS.
CHECK, PRIOR TO COMMENCEMENT OF WORK, FOR SPACE REQUIREMENTS
WITH ALL OTHER TRADES.
D. RELOCATION OF DUCTS, PIPING, CONDUIT, ELECTRICAL BOXES WHICH MAY
ALTER THE ARCHITECTURAL OR STRUCTURAL CONSTRUCTION MUST BE
APPROVED BY THE ARCHITECT, PRIOR TO RELOCATION. NO EXTRA PAYMENT
WILL BE ALLOWED FOR WORK RESULTING FROM THESE CHANGES, WITHOUT
APPROVALS.
E. EXAMINATION OF THE DRAWINGS, SPECIFICATIONS AND SITE: BEFORE
SUBMITTING A BID, THE BIDDERS SHALL CAREFULLY EXAMINE THE DRAWINGS
AND SPECIFICATIONS SO AS TO BE THOROUGHLY FAMILIAR WITH ALL THE
REQUIREMENTS. THE BIDDER SHALL VISIT THE SITE OF THE WORK TO BECOME
ACQUAINTED WITH ALL THE CONDITIONS AFFECTING THE CONTRACT,
OBSTACLES WHICH MAY BE ENCOUNTERED AND ALL OTHER CONDITIONS
RELATIVE TO THE WORK TO BE PERFORMED: AND, IF AWARDED THE
CONTRACT, SHALL NOT BE ALLOWED ANY EXTRA COMPENSATION BY REASON
OF ANY UNFORESEEN DIFFICULTIES OR OBSTACLES WHICH THE BIDDER
COULD HAVE DISCOVERED OR REASONABLY ANTICIPATED PRIOR TO THE
BUILDING. SHOULD ANY DISCREPANCIES, ERRORS, CONFLICT OR ITEMS
NEEDING CLARIFICATION BE DISCOVERED IN THE PLANS AND/OR
SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT PRIOR TO
SUBMITTING A BID AND BEFORE STARTING WORK.
F. CONTRACTOR'S SUPERVISION: EACH CONTRACTOR SHALL MAINTAIN A
COMPETENT FOREMAN OR DIRECT REPRESENTATIVE ON THE JOB AT ALL
TIMES. THE CONTRACTOR SHALL COOPERATE WITH THE SUPERINTENDENT
AND FOREMEN OF OTHER TRADES IN ORDER THAT THERE MAY BE NOT DELAY
IN THE ERECTION AND COMPLETION OF THE WORK.
1. THE DRAWINGS DO NOT PRESENT FULLY DETAILED ASPECTS OF THE
EXISTING PHYSICAL CONDITIONS. THE INSTALLATION CONTRACTOR SHALL
BE RESPONSIBLE TO VISUALLY IDENTIFY INTERFERENCES AND TO MAKE
NECESSARY ADJUSTMENTS IN THE FIELD.
2. CONTRACTOR SHALL BE RESPONSIBLE TO IDENTIFY DISCREPANCIES AND
BRING THEM TO THE ATTENTION OF THE DEPARTMENT OF VETERANS
AFFAIRS (V.A.) REPRESENTATIVES AS SOON AS POSSIBLE DURING BIDDING
TO OBTAIN GUIDANCE. THIS SHALL NOT ALLEVIATE THE INSTALLATION
CONTRACTOR OF THE RESPONSIBILITY TO PROVIDE A FULLY FUNCTIONING
SYSTEM.
3. CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN INSTRUCTIONS FROM THE
DEPARTMENT OF VETERANS AFFAIRS REPRESENTATIVES FOR SPECIAL
WORKING CONDITIONS SUCH AS ALLOWABLE WORK PERIODS, RESTRICTIONS
ON TOOL USAGE, AND INSTALLATION PROCEDURES.
4. ALL WALL PENETRATIONS SHALL BE IMMEDIATELY PATCHED/REPAIRED
AFTER DUCTWORK/PIPING/CONDUIT IS INSTALLED OR REMOVED.
5. ALL ITEMS SHOWN ON THE DRAWINGS TO BE DEMOLISHED SHALL BE TAKEN
OFF SITE FOR DISPOSAL BY CONTRACTOR UNLESS INDICATED OTHERWISE.
6. THE DRAWINGS ARE PREPARED TO FUNCTIONALLY INTEGRATE SPECIFIC
VENDORS, AS INDICATED IN THE EQUIPMENT SCHEDULES. THE VA HAS NOT
CONTRACTED THESE VENDORS. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO EXAMINE THE PHYSICAL AND SCHEMATIC INTERFACE
REQUIREMENTS OF THE APPROVED VENDOR, DEVELOP AND IMPLEMENT
REQUIRED CONSTRUCTION DETAILS TO COMPLETE THE PROJECT.
SUBSTITUTIONS TO BE IDENTIFIED WITH THE BIDS.
7. CONTRACTOR SHALL PERFORM A HEALTH RISK ASSESSMENT TO DETERMINE
DUST CONTROL, NOISE CONTROL AND OTHER ENVIRONMENTAL CONTROLS
DURING THE WORK. VA ENGINEER WILL ASSIST IN COMPLETION.
ASSESSMENT CONTROLS TO BE INCLUDED IN BID.
GENERAL PROJECT NOTES
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
ARCHITECTURAL GENERAL NOTES, SYMBOLS
AutoCAD SHX Text A001
AutoCAD SHX Text
GC
DS
151616.117
J
K
H
M
G
F
E
D
C
A
181920212223242526 15.1
L
B
S14.1
S15.1
S17
S18
S19N16
N15
N14
N13
N12
N11
N10
N9
N8
N7
N6
N5
N4
N2
N1
F1
S16.1
N3
R
Q
S
P
O
N
M
H
K
J
17 16.1 16 1015 14 13 12 11.1 10.111
N16
N15
N14
N13
N12
N11
N10
N9
N8
N7
N6
N5
N4
N3
N2
N1
N19
N18
N17
N151
N161
23579 6 4
BUILDING 221
LOW ROOF
1.3 1.4 1.5 1.6 1.7 1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16 1.17 1.18 1.19 1.20
NOTE: STEAM LINES ARE SHOWN DIAGRAMMATICALLY
SEE MECHANICAL AND STRUCTURAL DRAWINGS FOR MORE SPECIFIC INFORMATIONBUILDING 221
LOW ROOF
1.3 1.4 1.5 1.6 1.7 1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16 1.17 1.18 1.19 1.20
NOTE: STEAM LINES ARE SHOWN DIAGRAMMATICALLY
SEE MECHANICAL AND STRUCTURAL DRAWINGS FOR MORE SPECIFIC INFORMATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/20/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/20/2023ISSUED FOR BID
N 1/16" = 1'-0"
2' 5' 10' 20' 40'0
1 ROOF PLAN
OVERALL ROOF PLAN
A100
1 A101
REMOVE 3'-0" x 2'-0" PORTION OF
ROOFING, INSULATION AND BALLAST
TO EXPOSE CONCRETE DECK. REMOVE
PORTION OF CONCRETE DECK AND
METAL DECK TO ACCOMMODATE
INSTALLATION OF PIPE SUPPORT
BASEPLATE. ONCE BASEPLATE IS
SECURED (REFER TO STRUCTURAL DWG
AND 1/A400-A401) REPLACE METAL
DECKING AND PATCH CONCRETE
DECK. REPLACE INSULATION AND
INSTALL NEW ROOFING MATERIAL TO
MATCH EXISTING. ADHERE PER
MANUFACTURER'S
RECOMMENDATIONS, REPLACE GRAVEL
BALLAST.
PROVIDE THROUGH WALL PIPE
PENETRATION SYSTEM IN
ACCORDANCE WITH ATSM E18
OR UL1479. SEE DETAIL 1/M503
FOR ADDITIONAL INFORMATION.
4 MS104
BUILDING 1
BUILDING 221
7 MS105
3 MS102
MS102
8 MS105
BUILDING 217
MS102
PROVIDE THROUGH WALL PIPE
PENETRATION SYSTEM IN ACCORDANCE
WITH ATSM E18 OR UL1479. SEE DETAIL
1/M503 FOR ADDITIONAL INFORMATION.
PROVIDE THROUGH WALL PIPE
PENETRATION SYSTEM IN
ACCORDANCE WITH ATSM E18 OR
UL1479. SEE DETAIL 1/M503 FOR
ADDITIONAL INFORMATION.
MATCHLINE
PROVIDE AND INSTALL NEW PIPE
CROSSOVER, TYP. SEE SB515 FOR
ADDITIONAL INFORMATION.
PROVIDE AND INSTALL NEW PIPE
CROSSOVER, TYP. SEE SB515 FOR
ADDITIONAL INFORMATION.
REMOVE 3'-0" x 2'-0" PORTION OF
ROOFING AND INSULATION TO EXPOSE
CONCRETE DECK. REMOVE PORTION OF
CONCRETE DECK AND METAL DECK TO
ACCOMMODATE INSTALLATION OF PIPE
SUPPORT BASEPLATE. ONCE BASEPLATE IS
SECURED (REFER TO STRUCTURAL DWG
AND 1/A400-A401) REPLACE METAL
DECKING AND PATCH CONCRETE DECK.
REPLACE INSULATION AND INSTALL NEW
ROOFING MATERIAL TO MATCH EXISTING
TPO OVEPDM MEMBRANE. ADHERE PER
MANUFACTURER'S RECOMMENDATIONS.
W
AL
KW
AY
T O
BU
IL
DI
NG
1716151413121110987654321
W
AL
KW
AY
T O
BU
IL
DI
NG
BUILDING 229 LOW ROOF
BU
IL
DI
NG
C
ON
NE
CT
IN
G W
AL
KW
AY
BUILDING 4
ROOF SCREEN- ATTACHED TO
SUPPORTING STEEL STRUCTURE OF STEAM LINES
B
A
4.2 4.5 4.7 1.1 1.2 1.3
BUILDING 1 CORRIDOR
W
AL
KW
AY
T O
BU
IL
DI
NG
1716151413121110987654321
W
AL
KW
AY
T O
BU
IL
DI
NG
BUILDING 229 LOW ROOF
BU
IL
DI
NG
C
ON
NE
CT
IN
G W
AL
KW
AY
BUILDING 4
ROOF SCREEN- ATTACHED TO
SUPPORTING STEEL STRUCTURE OF STEAM LINES
B
A
4.2 4.5 4.7 1.1 1.2 1.3
BUILDING 1 CORRIDOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC
Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
12/16/22
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 01528
12/16/2022ISSUED FOR BID
N 1/16" = 1'-0"
2' 5' 10' 20' 40'0
1 ROOF PLAN
OVERALL ROOF PLAN
A100.1
MATCHLINE
PROVIDE AND INSTALL NEW PIPE
CROSSOVER, TYP. SEE SB515 FOR
ADDITIONAL INFORMATION.
PROVIDE AND INSTALL NEW PIPE
CROSSOVER, TYP. SEE SB515 FOR
ADDITIONAL INFORMATION.
4'-8"
5'- 8"
1'- 0"
130°
1'- 0"
1'-8 1/2"
8' -0
3' -3
/4
3'- 7"
7'-8 1/2"
6'-0"
5'-1"
2' -0
10"
1'-0"
4'-8"
5'- 8"
1'- 0"
4"
7'-10"
6' -3
/4
3'- 7"
1/
2"
1'-8 1/2"
4'-0"
3'- 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/20/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/20/2023ISSUED FOR BID
DETAIL PLANS AT SOUTH
ENCLOSURE
A101
A300
N 1/2" = 1'-0"
0 1' 2' 5'6" 3'
2 OPTION 1 FLOOR PLAN
N
1/2" = 1'-0" 0 1' 2' 5'6" 3'
3 OPTION 2 FLOOR PLAN
N 1/2" = 1'-0"
0 1' 2' 5'6" 3'
1 ENLARGED VAULT LEVEL PLAN
A300
EXISTING FOOTING FOUNDATION
EXISTING MASONRY CONSTRUCTION
NEW CONCRETE FOOTING BELOW
STEAM PIPES. REFER TO MS406
FOR ADDITIONAL INFORMATION.
12" CONCRETE FOUNDATION WALL.
DOWEL TO EXISTING FOUNDATION
WITH #5 BARS AT 12" OC VERTICALLY.
EXTEND INTO NEW AND EXISTING
FOUNDATION 12" HORIZONTALLY.
REFER TO SS120 - SS121 FOR
ADDITIONAL VAULT INFORMATION.
MASONRY ENCLOSURE. MATCH
EXISTING BRICK COLOR, TEXTURE,
AND SIZE AS CLOSELY AS POSSIBLE.
REFER TO SECTION 1/A300 FOR
WALL CONSTRUCTION
EXISTING MASONRY
CONSTRUCTION
STEAM PIPES
METAL PANEL ENCLOSURE. REFER
TO SECTION 2/A300 FOR WALL
CONSTRUCTION.
A300
EXISTING MASONRY
CONSTRUCTION
STEAM PIPES
FOUNDATION FOR OPTION 1
AND 2 ARE SIMILAR - SEE
STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
N 1/2" = 1'-0"
0 1' 2' 5'6" 3'
4 OPTION 3 FLOOR PLAN
EXISTING MASONRY
CONSTRUCTION
STEAM PIPES (EXPOSED - NO VERTICAL
ENCLOSURE). REFER TO SECTION
3/A300 FOR ADDITIONAL DETAILS.
A300
LINE OF MANSARD
ROOF ABOVE
LINE OF MANSARD
ROOF ABOVE
LINE OF MANSARD ROOF ABOVE
LINE OF FOUNDATION
BELOW
LINE OF FOUNDATION
BELOW
LINE OF FOUNDATION
BELOW
MODIFY EXISTING MANSARD
ROOF AS NEEDED TO
ACCOMMODATE PIPES.
PROVIDE CLEAN EDGE AT ROOF
PANELS. REWORK ROOF
STRUCTURE IF REQUIRED. REFER
TO 3/A300 FOR ADDITIONAL
INFORMATION.
N 1/2" = 1'-0"
0 1' 2' 5'6" 3'
5 OPTION 3 VAULT LID PLAN
VAULT ACCESS. REFER TO SS120 -
SS121 FOR ADDITIONAL INFORMATION.
6" VAULT ROOF
PROVIDE 3" HIGH x 3" WIDE CONCRETE
CURB AT SLAB OPENING AT STEAM PIPE
PENETRATION. USE SBC FLASHING'S
CUSTOM FLASHING FABRICATION (OR
SIMILAR) AT PIPES. REFER TO DETAIL
5A/A101 FOR ADDITIONAL INFORMATION.
NOT TO SCALE
5A CUSTOM DOUBLE PIPE FLASHING
1'- 0"
9'-6"
5'- 8"
EQ
EQ
±3'-8"
N2 N2
N2
N19
N19 N19
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC
Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
12/16/22
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 01528
12/16/2022ISSUED FOR BID
DETAIL PLANS AT SOUTH
ENCLOSURE
A102
A300
N 1/2" = 1'-0"
0 1' 2' 5'6" 3'
1 OPTION 1 ROOF PLAN
N
1/2" = 1'-0" 0 1' 2' 5'6" 3'
2 OPTION 2 ROOF PLAN
A300
N 1/2" = 1'-0"
0 1' 2' 5'6" 3'
3 OPTION 3 ROOF PLAN
A300
EXISTING STANDING SEAM METAL
ROOF TO REMAIN. DEMO AS NEEDED
TO ACCOMMODATE NEW METAL
PANEL ENCLOSURE. PROVIDE CLEAN
VERTICAL EDGES AT NEW VERTICAL
PANEL ENCLOSURE AND CAULK TO
SEAL TIGHT.
EXISTING STANDING SEAM METAL
MANSARD ROOF.
EXTEND METAL MANSARD ROOF
CONSTRUCTION AS SHOWN. REFER TO
1/A300 FOR MORE INFORMATION.
EXTEND ROOF LINE HORIZONTALLY TO
MATCH EXISTING OVERHANG.
REMOVE PORTION OF EXISTING
MANSARD TO ACCOMMODATE NEW
CONSTRUCTION. PROVIDE CLEAN EDGES
TO SECURE NEW ROOFING PANELS.
REFER TO 1/A300 FOR VERTICAL ROOF
EXTENSION DIMENSION. EXISTING MASONRY WALL BELOW.
NEW METAL ROOFING / COPING. REFER
TO 2/A300 FOR ADDITIONAL
INFORMATION.
NEW STEAM PIPES TO
EXTEND BEYOND HEIGHT
OF EXISTING MANSARD
ROOF.
EXISTING STANDARD
SEAM METAL ROOF.
PROVIDE CLEAN OPENING AT EXISTING
WALL FOR PIPE PENETRATIONS. SEAL
WITH HIGH TEMPERATURE SILICONE
CAULK.
PROVIDE CLEAN OPENING AT EXISTING
WALL FOR PIPE PENETRATIONS. SEAL
WITH HIGH TEMPERATURE SILICONE
CAULK.
PROVIDE CLEAN OPENING AT EXISTING
WALL FOR PIPE PENETRATIONS. SEAL
WITH HIGH TEMPERATURE SILICONE
CAULK.
LINE OF VALLEY
NEW COPING NEW ROOF MEMBRANE
REMOVE EXISTING ROOFING AND
INSULATION AS NEEDED TO
ACCOMMODATE NEW PIPE ENCLOSURE.
INSTALL MATCHING INSULATION AND
ROOFING, ADHERE TO EXISTING
ROOFING PER MFR INSTRUCTIONS.
REFER TO 1/A401 FOR ADDITIONAL
INFORMATION.
TOP OF MASONRY
30' - 6"
TOP OF NEW MANSARD
30' - 7"
FIRST FLOOR
0' - 0"
SECOND FLOOR
12' - 11"
ROOF
25' - 10"
PARAPET
28' - 0"
BOTTOM OF FOOTING
-7' - 0"
GRADE
± -0' - 6"
FIRST FLOOR
0' - 0"
SECOND FLOOR
12' - 11"
ROOF
25' - 10"
PARAPET
28' - 0"
TOP OF METAL ENCLOSURE
30' - 6"
TOP OF MASONRY
30' - 6"
BOTTOM OF FOOTING
-7' - 0"
GRADE
± -0' - 6"
TOP OF MASONRY
30' - 6"
TOP OF MANSARD
30' - 7"
FIRST FLOOR
0' - 0"
SECOND FLOOR
12' - 11"
ROOF
25' - 10"
PARAPET
28' - 0"
BOTTOM OF FOOTING
-7' - 0"
GRADE
± -0' - 6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC
Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
12/16/22
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 01528
12/16/2022ISSUED FOR BID
1/4" = 1'-0" 0 1' 2' 10'4' 6'
1 OPTION 1 EXTERIOR ELEVATION
ELEVATIONS
A200
1/4" = 1'-0" 0 1' 2' 10'4' 6'
2 OPTION 2 EXTERIOR ELEVATION
EXTEND MANSARD ROOF TO
ENCLOSE VERTICAL AND
HORIZONTAL STEAMPIPES.
REFER TO 1/A300 FOR
ADDITIONAL DETAIL
EXISTING BUILDING 217
NEW MASONRY PIPE
ENCLOSURE REFER TO 1/A300
FOR ADDITIONAL DETAIL
NEW METAL PANEL PIPE
ENCLOSURE. REFER TO 2/A300
FOR ADDITIONAL DETAIL
1/4" = 1'-0" 0 1' 2' 10'4' 6'
3 OPTION 3 EXTERIOR ELEVATION
EXISTING BUILDING 217
EXPOSED PIPES
CONCRETE PIPE VAULT BELOW
GRADE. SEE STRUCTURAL
DRAWINGS FOR ADDITIONAL
INFORMATION.
CONCRETE PIPE VAULT BELOW
GRADE. SEE STRUCTURAL
DRAWINGS FOR ADDITIONAL
INFORMATION.
CONCRETE PIPE VAULT BELOW
GRADE. SEE STRUCTURAL
DRAWINGS FOR ADDITIONAL
INFORMATION.
4'-0" WIDE ACCESS HATCH
4'-0" WIDE ACCESS HATCH
4'-0" WIDE ACCESS HATCH
BACKER ROD AND
SILICONE SEAL
6" STRUCTURAL STEEL STUDS
AT 16" O.C. SECURE BOTTOM
TRACK TO FOUNDATION WALL.
1/2" DENSGLASS
SHEATHING
4MM ALUCOBOND PLUS
ALUMINUM COMPOSITE
PANELS
WEATHER BARRIER
EXISTING MANSARD ROOF
BEYOND
1/2" DENSGLASS SHEATHING
WITH 6" METAL STUDS
2' -4
EXISTING MASONRY WALL
CONSTRUCTION
REMOVE 3'-0" x 2'-0" PORTION OF ROOFING, INSULATION AND BALLAST TO EXPOSE CONCRETE
DECK. REMOVE PORTION OF CONCRETE DECK AND
METAL DECK TO ACCOMMODATE INSTALLATION OF
PIPE SUPPORT BASEPLATE. ONCE BASEPLATE IS
SECURED (REFER TO STRUCTURAL DWG) REPLACE
METAL DECKING AND PATCH CONCRETE DECK.
REPLACE INSULATION AND INSTALL NEW ROOFING
MATERIAL TO MATCH EXISTING. ADHERE PER
MANUFACTURER'S RECOMMENDATIONS, REPLACE
GRAVEL BALLAST.
PBU METAL PANEL
PARAPET
+28'-0"
ROOF
+25'-10"
SECOND FLOOR
+12'-11"
FIRST FLOOR
+0'-0"
B.O. VAULT FTG.
-7'-0"
NEW PARAPET
+31'-3"
GRADE
10" CONCRETE FOUNDATION
WALL TO 7'-0" BELOW
GRADE, WITH 20" X 10"
FOOTING. PROVIDE #5 REBAR
AT TOP AND BOTTOM OF
FOUNDATION WALL.
PROVIDE WEEPHOLES
AT 24" O.C.
6"
3 5/8"
10" CONCRETE FOUNDATION
WALL TO 7'-0" BELOW
GRADE, WITH 20" X 10"
FOOTING. PROVIDE #5 REBAR
AT TOP AND BOTTOM OF
FOUNDATION WALL.
EXISTING MASONRY WALL
CONSTRUCTION
REMOVE 3'-0" x 2'-0" PORTION OF ROOFING, INSULATION AND BALLAST TO EXPOSE
CONCRETE DECK. REMOVE PORTION OF
CONCRETE DECK AND METAL DECK TO
ACCOMMODATE INSTALLATION OF PIPE
SUPPORT BASEPLATE. ONCE BASEPLATE IS
SECURED (REFER TO STRUCTURAL DWG) REPLACE
METAL DECKING AND PATCH CONCRETE DECK.
REPLACE INSULATION AND INSTALL NEW
ROOFING MATERIAL TO MATCH EXISTING.
ADHERE PER MANUFACTURER'S
RECOMMENDATIONS, REPLACE GRAVEL BALLAST.
6" STRUCTURAL STEEL STUDS AT
16" O.C.
1/2" DENSGLASS SHEATHING
METAL COPING TRIM TO MATCH
EXISTING
RIB CLOSURE - SEE
MANUFACTURER RECOMMENDED
FASTENERS, CLIPS AND SEALANT
FIRE RETARDANT BLOCKING
STANDING SEAM
STANDING SEAM
DENS DECK
EAVE TRIM PER MANUFACTURER
2":12" SLOPE
PARAPET
+28'-0"
ROOF
+25'-10"
SECOND FLOOR
+12'-11"
FIRST FLOOR
+0'-0"
B.O. VAULT FTG.
-7'-0"
NEW PARAPET
+31'-0"
6" STRUCTURAL STEEL
STUDS AT 16" O.C.
PROVIDE 22 GAUGE
GALVANIZED MASONRY
TIES AT 18" O.C.
VERTICALLY AND 32"O.C.
HORIZONTALLY.
1/2" DENSGLASS
SHEATHING
3/4" AIR GAP
4" FACE BRICK
GRADE
10" CONCRETE FOUNDATION
WALL TO 7'-0" BELOW
GRADE, WITH 20" X 10"
FOOTING. PROVIDE #5 REBAR
AT TOP AND BOTTOM OF
FOUNDATION WALL.
EXISTING MASONRY WALL
CONSTRUCTION
REMOVE 3'-0" x 2'-0" PORTION OF ROOFING, INSULATION AND BALLAST TO EXPOSE CONCRETE
DECK. REMOVE PORTION OF CONCRETE DECK
AND METAL DECK TO ACCOMMODATE
INSTALLATION OF PIPE SUPPORT BASEPLATE.
ONCE BASEPLATE IS SECURED (REFER TO
STRUCTURAL DWG) REPLACE METAL DECKING
AND PATCH CONCRETE DECK. REPLACE
INSULATION AND INSTALL NEW ROOFING
MATERIAL TO MATCH EXISTING. ADHERE PER
MANUFACTURER'S RECOMMENDATIONS, REPLACE
GRAVEL BALLAST.
PARAPET
+28'-0"
ROOF
+25'-10"
SECOND FLOOR
+12'-11"
FIRST FLOOR
+0'-0"
B.O. VAULT FTG.
-7'-0"
REWORK/REPLACE EXISTING ROOF
FRAMING AND ROOF PANELS AS
NEEDED TO ACCOMMODATE
STEAM PIPE PENETRATIONS. SEAL
ALL PENETRATIONS W/ HIGH-TEMP
SILICONE CAULK
GRADE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC
Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
12/16/22
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 01528
12/16/2022ISSUED FOR BID
SECTIONS
A300
1/2" = 1'-0" 0 1' 2' 5'6" 3'
2 OPTION 2 WALL SECTION
3 A401
4 A401
2 A401
1 A401
1/2" = 1'-0" 0 1' 2' 5'6" 3'
1 OPTION 1 WALL SECTION
2 A400
3 A400
4 A400
1/2" = 1'-0" 0 1' 2' 5'6" 3'
3 OPTION 3 WALL SECTION
1 A401
6" STRUCTURAL STEEL STUDS
AT 16" O.C. PROVIDE 22
GAUGE GALVANIZED MASONRY
TIES AT 18" O.C. VERTICALLY
AND 32"O.C. HORIZONTALLY.
1/2" DENZ GLASS
SHEATHING
3/4" AIR GAP
6"
1/2"
3 5/8"
3/4"
4" FACE BRICK
10"
4" FACE BRICK
1/2" DENZ GLASS
SHEATHING
3/4" AIR GAP
10" CONCRETE FOUNDATION
WALL TO 7'-0" BELOW
GRADE, WITH 20" X 10"
FOOTING. PROVIDE #5 REBAR
AT TOP AND BOTTOM OF
FOUNDATION WALL.
PROVIDE WEEPHOLES AT 24"
O.C.
4" FACE BRICK
EXTEND EXISTING STANDING
SEAM METAL ROOF
GRADE
METAL CHANNELS SECURED TO
FOUNDATION WITH HILTI
CONCRETE EXPANSION
ANCHORS REFER TO S121
ROOF
+25'-10"
REMOVE 3'-0" x 2'-0" PORTION OF
ROOFING, INSULATION AND BALLAST TO
EXPOSE CONCRETE DECK. REMOVE
PORTION OF CONCRETE DECK AND METAL
DECK TO ACCOMMODATE INSTALLATION
OF PIPE SUPPORT BASEPLATE. ONCE
BASEPLATE IS SECURED (REFER TO
STRUCTURAL DWG) REPLACE METAL
DECKING AND PATCH CONCRETE DECK.
REPLACE INSULATION AND INSTALL NEW
ROOFING MATERIAL TO MATCH EXISTING.
ADHERE PER MANUFACTURER'S
RECOMMENDATIONS, REPLACE GRAVEL
BALLAST.
6" STRUCTURAL STEEL STUDS AT
16" O.C.
STANDING SEAM WALL PANEL TO
MATCH EXISTING
METAL COPING TRIM TO MATCH
EXISTING
RIB CLOSURE - SEE
MANUFACTURER RECOMMENDED
FASTENERS, CLIPS AND SEALANT
FIRE RETARDANT BLOCKING
EXTEND EXISTING STANDING
SEAM ROOF HEIGHT AS
SHOWN IN ELEVATION
STANDING SEAM METAL ROOF
TO MATCH EXISTING
8" DENSGLASS SHEATHING
EAVE TRIM PER MANUFACTURER
2":12" SLOPE
NEW PIPE SUPPORT. REFER TO
MECHANICAL AND STRUCTURAL
DRAWINGS FOR LOCATIONS
REWORK EXISTING ROOF
FLASHING IF NEEDED
EXISTING MASONRY WALL
NEW STEAM PIPES
EXTEND EXISTING
STANDING SEAM ROOF
HORIZONTALLY AS
NEEDED. REFER TO PLANS
AND ELEVATIONS FOR
DIMENSIONS
PARAPET
+28'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
12/16/22
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 0152812/16/2022ISSUED FOR BID
SECTIONS - SOUTH ENCLOSURE
A400
3" = 1'-0" 0 1"1
2" 8"2" 4"
2 OPTION 1 WALL BASE DETAIL
3" = 1'-0" 0 1"1
2" 8"2" 4"
4 OPTION 1 MASARD CONNECTION DETAIL
3" = 1'-0" 0 1"1
2" 8"2" 4"
3 OPTION 1 WALL SECTION DETAIL
1 1/2" = 1'-0" 0 6" 12"3"1" 18"
1 OPTION 1 MANSARD DETAIL
ALUCOBOND 0.040" AXCENT
BACKER ROD AND SILICONE SEAL
4" EXTERIOR GRADE PLYWOOD
SHEATHING
WEATHER BARRIER
4MM ALUCOBOND PLUS
ALUMINUM COMPOSITE PANELS
4MM ALUCOBOND PLUS
ALUMINUM COMPOSITE PANELS
SHIM IF NEEDED
BACKER ROD AND SILICONE SEAL
WEATHER BARRIER
4" EXTERIOR GRADE PLYWOOD
SHEATHING
6" STRUCTURAL STEEL STUDS
AT 16" O.C.
NEW METAL PARAPET COPING
TO MATCH EXISTING
6"
3/4"
2"
6" STRUCTURAL STEEL STUDS
AT 16" O.C.
10" CONCRETE FOUNDATION
WALL TO 7'-0" BELOW
GRADE, WITH 20" X 10"
FOOTING. PROVIDE #5 REBAR
AT TOP AND BOTTOM OF
FOUNDATION WALL.
NEW 4MM ALUCABOND
COLOR TO BE SELECTED
BY OWNER
NEW PARAPET RETURN BEYOND
10"
GRADE
METAL CHANNELS SECURED TO
FOUNDATION WITH HILTI
CONCRETE EXPANSION
ANCHORS. REFER TO S121.
REMOVE 3'-0" x 2'-0" PORTION
OF ROOFING, INSULATION AND
BALLAST TO EXPOSE CONCRETE
DECK. REMOVE PORTION OF
CONCRETE DECK AND METAL
DECK TO ACCOMMODATE
INSTAL…