This document includes an offer schedule and related federal contract opportunity notice. The offer schedule is for project 578-17-057 to replace the steam line at the Edward Hines, Jr. VA Hospital in Hines, Illinois, with a price range between $10-20 million. The scope of work includes replacing sections of underground steam and condensate lines, constructing concrete tunnels and above-ground pipe racks, and replacing sump pump controls. The offer schedule requests lump sum pricing for five contract line item numbers and unit pricing for additional work. The related federal contract opportunity is a pre-solicitation notice for request for proposal 36C25223R0026 for the same project. The solicitation will be set aside for a verified service-disabled veteran-owned small business. Work must be completed within 730 days of notice to proceed. The contracting agency is the Department of Veterans Affairs and the place of performance is the Edward Hines, Jr. VA Hospital. The solicitation will be posted on May 22, 2023 to SAM.gov.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFER SCHEDULE
(rev 7/13/2023)
SOLICITATION: 36C25223R0026
PROJECT: 578-17-057 Replace Steam Line – South Leg LOCATION: Edward Hines, Jr. VA Hospital in Hines, IL Price Range Between $10,000,000 - $20,000,000
Contractor shall furnish all labor, materials, equipment, and supervision in accordance with contract documents, scope of work, drawings, and specifications to provide for Project 578-17- 057 Replace Steam Line – South Leg at the Edward Hines, Jr. VA Hospital in Hines, IL
CLIN 0001 Construct vaults and box conduit from Vault 9 to Building 217 (Task 2): $______________________ LUMP SUM
CLIN 0002/ Construct vaults and box conduit CLIN 0002A from Vault 9 to Pit 5 near Building 37 (Task 5) $______________________ LUMP SUM
CLIN 0003 Replace existing sump pump panels and controls (Task 1): $______________________ LUMP SUM
CLIN 0004 Construct rooftop pipe rack on
Building 217 (Task 3) $______________________ LUMP SUM
CLIN 0005 Construct pipe rack spanning outer corridor to Vault 7 tunnel (Task 4) $______________________ LUMP SUM
NET TOTAL (CLINs 0001 – 0005) $_______________________ LUMP SUM
(continued on next page)
Unit Rate Pricing:
CLIN 0006 12-inch dia. underground steam line cost per ft with insulation $___________________ per Linear Foot
CLIN 0007 6-inch dia. underground condensate line cost per ft with insulation $___________________ per Linear Foot
CLIN 0008 6-inch dia. above-ground condensate line cost per ft with insulation $___________________ per Linear Foot
CLIN 0009 1.5-inch dia. above-ground steam line cost per ft with insulation $___________________ per Linear Foot
CLIN 0010.a Concrete tunnel (CLIN 1) 7’-0” x 6’-0” constructed typical per design without the cost of steam and condensate cost.
Shown on Detail SB502 $___________________ per Linear Foot
CLIN 0010.b Concrete tunnel, (CLIN 2A) 7’-6” x 6’-0” constructed typical per design without the cost of steam and condensate cost.
Shown on Detail SB502 $___________________ per Linear Foot
CLIN 0011 Cost of excavation and fill for non-contaminated soil $______________ per Cubic Yard (rev)
CLIN 0012 Cost of excavation and fill for contaminated soil (unknown existing conditions) $______________ per Cubic Yard (rev)