36C25223R0026 0006.docx

DOCX document 101 KB Posted

Attached to
Z2NZ--578-17-027 Replace Steam Pipe South Leg at Hines
Solicitation number
36C25223R0026
Issued by

About this file

This document is a solicitation notice and amendment for project 578-17-027 to replace steam pipe at the Edward Hines, Jr. VA Hospital in Hines, Illinois. The project scope includes replacing existing steam pipe between Vault 9 and Vault 7, and between Vault 9 and Pit 5, with new concrete box conduit steam tunnels. Offerors must provide electrical heat tracing for above-ground condensate lines using existing generator power. The pre-bid site visit will be after May 22, 2023, when full specifications and drawings are posted to SAM.gov. Offers are due by July 24, 2023 at 23:45 CST. This 100% set-aside solicitation for a Service-Disabled Veteran-Owned Small Business has a magnitude between $10-20 million. The contractor must complete all work within 730 calendar days from notice to proceed.

View the file

Other files

File Type Posted
36C25223R0026 0007.docx DOCX document
S02 SOL 0026 AttG Wage Rate.Rev2 IL20230009_mod7 2023.06.30 current as of 2023.07.13.pdf PDF
S06 36C25223R0026 0005 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf PDF
36C25223R0026 0005.docx DOCX document
S06 36C25223R0026 0004 Att Q6.12.b Spec 028213.13 Glovebag Abatement.pdf PDF
36C25223R0026 0004.docx DOCX document
S06 36C25223R0026 0004 Att Q6.12.a Spec 028211 Asbestos Abatement.pdf PDF
S06 36C25223R0026 0004 Att SOW.R2 578-17-027 2023.07.07.pdf PDF
S06 36C25223R0026 0004 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf PDF
S06 36C25223R0026 0004 Att Q6.10 Photo Stockpile_Trailer.pdf PDF
S06 36C25223R0026 0004 Att Q5.5 Photos.pdf PDF
S06 36C25223R0026 0004 Att Q7.3 Spec 014500 Quality Control.pdf PDF
S06 36C25223R0026 0003.pdf PDF
S06 0003_Att1 36C25223R0026_SOL AttG.R1 Wage Rate Update IL20230009_06.09.2023.pdf PDF
36C25223R0026 0002.docx DOCX document
S06 001 Att1_2 S04 Site Visits Sign-In Sheets 578-17-027 Steam Line-South Leg.pdf PDF
36C25223R0026 0001.docx DOCX document
S02 SOL 0026 AttA-SOW.12) Contractor Parking.pdf PDF
S02 SOL 0026 AttF Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0026 AttA.0 SOW 2023. 578-17-027 2023.04.26.kk.docx DOCX document
S02 SOL 0026 AttA-SOW.19.2) 578-17-027 Replace Steam Pipe South Leg SPECS Volume 2 of 2 Div 22_33 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.18.1b) 578-17-027 Replace Steam Pipe South Leg DWGS Vol 1Bof2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.13) OIT Horizontal Cable Requirements.pdf PDF
S02 SOL 0026 AttA-SOW.03) Pre-Construction Checklist Rev 07.27.2021.pdf PDF
S02 SOL 0026 AttA-SOW.02) Hines Underground Utility Plan.pdf PDF
S02 SOL 0026 AttA-SOW.20) 578-17-027 Replace Steam Pipe South Leg UNCONTAMINATED SOIL REPORT.pdf PDF
S02 SOL 0026 AttA-SOW.17) NOT APPLICABLE.docx DOCX document
S02 SOL 0026 AttB VAAR 852.219-75 Certification 578-17-027.docx DOCX document
36C25223R0026_1.docx DOCX document
S02 SOL 0026 AttA-SOW.16) Hines COVID-19 Guidelines.pdf PDF
S02 SOL 0026 AttA-SOW.01b) Hines VA Campus Site Plan-Building Directory.pdf PDF
S02 SOL 0026 AttD Contractor EMR Safety Info 578-17-027.docx DOCX document
S02 SOL 0026 AttA-SOW.04) Safety and Health During Construction Activities.pdf PDF
S02 SOL 0026 AttC Contractor Info 578-17-027.docx DOCX document
S02 SOL 0026 AttG Wage Rates IL20230009 2023.04.07 current as of 2023.04.25.pdf PDF
S02 SOL 0026 AttA-SOW.18.1a) 578-17-027 Replace Steam Pipe South Leg DWGS Vol 1Aof2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.05) Cutting Welding and Other Hot Work.pdf PDF
S02 SOL 0026 AttA-SOW.18.2) 578-17-027 Replace Steam Pipe South Leg DWGS Vol2of2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.08) Pre-Construction Risk Assessment (PCRA).pdf PDF
S02 SOL 0026 AttA-SOW.06) Dig Permit SOP Form.pdf PDF
S02 SOL 0026 AttA-SOW.15) Infection Control Barrier Sample.pdf PDF
S02 SOL 0026 AttA-SOW.10) Interim Life Safety Measures (ILSM).pdf PDF
S02 SOL 0026 AttA-SOW.07) Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 SOL 0026 AttA-SOW.14) No Smoking Policy 10-1-19.pdf PDF
S02 SOL 0026 AttA-SOW.11) Contractor PIV Instructions and Form.pdf PDF
S02 SOL 0026 Att.A-SOW.01a) Hines VA Campus Site Plan.pdf PDF
S02 SOL 0026 AttE Financial Disclosure 578-17-027.docx DOCX document
S02 SOL 0026 AttA-SOW.19.1) 578-17-027 Replace Steam Pipe South Leg SPECS Volume 1 of 2 Div 00_21 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.09) Infection Control Risk Assessment (ICRA).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

07-18-2023 578-23-2-6907-0002 578-23-2-6907-0003 578-17-027

Department of Veterans Affairs

GLAC (69D)

115 South 84th Street, Suite 101

Milwaukee WI 53214-1476

Department of Veterans Affairs

GLAC-MILWAUKEE (69D)

Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25223R0026 05-18-2023

X

X

Monday, 7/24/2023 at 23:45 CST

Project 578-17-027 REPLACE STEAM LINE - SOUTH LEG at the Hines VA Hospital in Hines, IL

Amendment 0006 hereby incorporates the attached questions &answers into the solicitation

Offers should be submitted via email to Kristi.Kluck3@va.gov.

Kristi Kluck Contracting Officer

VA-VHA-2020-8B1E7283

SOLICITATION 36C25223R0026

AMENDMENT 0006

July 18, 2023

Project:578-17-027 Replace Steam Pipe - South Leg
Location:Hines VA Hospital in Hines, IL

AMENDMENT 0006 hereby incorporates the following clarifications/change(s) into the solicitation package:

A. Amendment 0006 - ITEM 1 - QUESTION 14.1 – 14.7 (Contractor question received 7/14/2023):

ITEM
Question
Answer
14.1
Addenda #4 had the following RFI response:

“The drawing detail indicated on the Drawing M501, MI005 indicate steam tracing of condensate line. It should be electrical heat tracing instead of steam tracing. Revised drawing note to read: IN LIEU OF STEAM HEAT TRACING SHOWN, CONTRACTOR TO PROVIDE ELECTRIC HEAT TRACING. SHOULD INCLUDE CABLING, POWER SOURCE, AND ALL OTHER ANCILLARY DEVICES TO REGULATE TEMPERATURE. ELECTRIC HEAT TRACING TO BE RATED FOR HIGH TEMPERATURE OF 400 DEGREES F.”

This opens up another whole set of questions, this will be a large scope item in regard to cost if not given the right information.

-- 14.1.1 Are we heat tracing ONLY condensate lines?

-- 14.1.2 Where are we contractually responsible for installing heat trace on condensate lines? (in the manholes only, elsewhere?)

-- 14.1.3 Where are we supposed to acquire power to feed required heat trace? Where can we mount control panels for the heat trace?

-- 14.1.4 Do we need remote thermostats to regulate the temperature? This can add several new conduit/cable homeruns that can add thousands of feet of additional pipe and wire 14.1.1- Yes, above ground condensate ONLY. See the answers for 14.1.3 and 14.1.4 for further clarifications

14.1.2 – Above ground only as referenced on MI005

14.1.3 – Contractor will use the 277-volt circuits on the emergency power generators. Final panel locations and quantities to be designed. For estimation, assume 8 panels for 1,525 lineal ft of condensate piping with an average run of approximately 200 lineal ft of heat tracing cable from each power source suitable to maintain 6-inch insulated condensate piping at 55-degree F for an ambient temperature of 0-degree F. Panels to be located in multiple, existing, mechanical rooms or penthouses.

14.1.4- Thermostatically regulate following manufacturer’s literature with shortest runs possible. For instance, one circuit for Building 217, one for Building 221, and one for Building 1 centrally located from the electrical source for each. Provide and install a green, LED, end-seal signal light kit at the end of each heat trace run.

14.2
Please clarify if the precast planks are to be included in the unit prices for items CLIN 0010.a & b

Yes, precast planks are to be included.

14.3
Please clarify if any waterproofing admixtures (IE Xypex) are to be utilized in the cast-in-place box conduits and/or vaults.
Yes, reference 033000 Cast-In-Place Concrete specification calls for a Crystalline Waterproofing Admixture.
14.4
Please clarify if the interior finish of the box conduits/vaults need to have a “rubbed” finish

No, a “rubbed” finish is not required.

14.5
Please provide quantities for asbestos abatement, as AMD 004 issued specifications but no means of quantifying the abatement scope.

Quantities of pipe insulation is 100 LF and lead abatement is 300 SF. Follow others per SOW.

14.6
Is excess stockpiled soil to remain on site or be hauled off site and disposed of? If it is to be hauled off site, there will be a significant cost increase.
Excess excavated soil materials, including satisfactory soils, shall be hauled off of Medical Center property in accordance with State and Local requirements. See specification 312000 section 3.6 for more information.
14.7
AMD 0004, RFI 6.10 refers to stockpiling location on-site. Please confirm soils on-site can be used as backfill. If we are not allowed to use soils on-site for backfill, the contractor would instead be required to import approximately 18,000 cubic yards of a nonpermeable backfill per details 1 and 2 on drawing page CI501. This would be a significant cost increase to the job, please clarify whether existing soils are intended to be used as backfill or if new soil is intended to be imported and used to fill trenches.
It is possible that the on-site soils excavated from the box conduit trench can be used for backfill. The excavated soils will need to be tested by a geotechnical testing agency to verify that they meet the criteria for non-permeable fill as defined in specification 312000 section 2.1.C., which includes being classified as SC, CL, or ML soils, among other requirements. According to the Geotechnical Investigation Report prepared by Pioneer Engineering & Environmental Services, LLC, the brown and gray silty clays that will be encountered along most of the box conduit alignment are CL soils, which may qualify for use as non-permeable backfill.

B. Amendment 0006, ITEM 2 - QUESTION 15.1 (Contractor question received 7/17/2023):

15.1
(electrical contractor) identified questions regarding electrical heat tracing. The question about electrical vs steam heat tracing is addressed in Addendum 4, 10.3 that states the following:

“The drawing detail indicated on the Drawing M501, MI005 indicate steam tracing of condensate line. It should be electrical heat tracing instead of steam tracing. Revised drawing note to read: IN LIEU OF STEAM HEAT TRACING SHOWN, CONTRACTOR TO PROVIDE ELECTRIC HEAT TRACING. SHOULD INCLUDE CABLING, POWER SOURCE, AND ALL OTHER ANCILLARY DEVICES TO REGULATE TEMPERATURE. ELECTRIC HEAT TRACING TO BE RATED FOR HIGH TEMPERATURE OF 400 DEGREES F.”

However, specifications for this system are under Division 23, Mechanical Systems, not Electrical Specifications. No additional drawings were issued (?)

Electrical Contractor will need to know:

15.1.a Service requirements?

15.1.b Locations?

15.1.c How does electrical heat trace interpolate from steam pipe tracing?

15.1d Is this now a design/build component?

15.1e Should the General Contractor carry this item as an allowance?

15.1.a - See response to 14.1 above.

15.1.b - See response to 14.1 above.

15.1.c - The project is using electrical heat trace in lieu of steam heat trace. Steam heat trace is no longer part of the project.

15.1.d - See response to 14.1 above regarding the design.

15.1.e - No, this is part of the bid. See response to 14.1 above.

The time and due date for offers has been extended. A hard copy of the guarantee/bid bond is due NLT 16:00 CST, Monday, July 24, 2023.

Proposals, via email to Kristi.Kluck3@va.gov must be delivered NLT Monday, July 24, 2023 at 23:45 CST.

ATTACHMENTS - None