This pre-solicitation notice outlines a forthcoming construction request for proposal for replacing steam pipes at the Edward Hines, Jr. VA Hospital in Hines, Illinois. The project includes replacing existing steam pipes between Vaults 7, 9 and Pit 5 on the west and east sides of the campus. Work involves new steam vault pump controls, concrete box conduit tunnels, roof top and corridor pipe racks. The construction budget is between $10-20 million. The solicitation classified under NAICS 238220 with a small business size limit of $19.5 million will be set aside 100% for SBA-verified SDVOSBs and posted to SAM.gov on May 22, 2023. A pre-bid site visit will be scheduled after posting. Interested parties must represent SDVOSB eligibility and SBA certification and be registered in SAM to be considered for award. The projected period of performance is 730 days from notice to proceed.

View the file

Other files

File Type Posted
36C25223R0026 0007.docx DOCX document
36C25223R0026 0006.docx DOCX document
S02 SOL 0026 AttG Wage Rate.Rev2 IL20230009_mod7 2023.06.30 current as of 2023.07.13.pdf PDF
S06 36C25223R0026 0005 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf PDF
36C25223R0026 0005.docx DOCX document
S06 36C25223R0026 0004 Att Q6.12.b Spec 028213.13 Glovebag Abatement.pdf PDF
36C25223R0026 0004.docx DOCX document
S06 36C25223R0026 0004 Att Q6.12.a Spec 028211 Asbestos Abatement.pdf PDF
S06 36C25223R0026 0004 Att SOW.R2 578-17-027 2023.07.07.pdf PDF
S06 36C25223R0026 0004 Att OFFER SCHEDULE.Rev1 578-17-027 2023.07.11.pdf PDF
S06 36C25223R0026 0004 Att Q6.10 Photo Stockpile_Trailer.pdf PDF
S06 36C25223R0026 0004 Att Q5.5 Photos.pdf PDF
S06 36C25223R0026 0004 Att Q7.3 Spec 014500 Quality Control.pdf PDF
S06 36C25223R0026 0003.pdf PDF
S06 0003_Att1 36C25223R0026_SOL AttG.R1 Wage Rate Update IL20230009_06.09.2023.pdf PDF
36C25223R0026 0002.docx DOCX document
S06 001 Att1_2 S04 Site Visits Sign-In Sheets 578-17-027 Steam Line-South Leg.pdf PDF
36C25223R0026 0001.docx DOCX document
S02 SOL 0026 AttA-SOW.12) Contractor Parking.pdf PDF
S02 SOL 0026 AttF Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 SOL 0026 AttA.0 SOW 2023. 578-17-027 2023.04.26.kk.docx DOCX document
S02 SOL 0026 AttA-SOW.19.2) 578-17-027 Replace Steam Pipe South Leg SPECS Volume 2 of 2 Div 22_33 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.18.1b) 578-17-027 Replace Steam Pipe South Leg DWGS Vol 1Bof2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.13) OIT Horizontal Cable Requirements.pdf PDF
S02 SOL 0026 AttA-SOW.03) Pre-Construction Checklist Rev 07.27.2021.pdf PDF
S02 SOL 0026 AttA-SOW.02) Hines Underground Utility Plan.pdf PDF
S02 SOL 0026 AttA-SOW.20) 578-17-027 Replace Steam Pipe South Leg UNCONTAMINATED SOIL REPORT.pdf PDF
S02 SOL 0026 AttA-SOW.17) NOT APPLICABLE.docx DOCX document
S02 SOL 0026 AttB VAAR 852.219-75 Certification 578-17-027.docx DOCX document
36C25223R0026_1.docx DOCX document
S02 SOL 0026 AttA-SOW.01b) Hines VA Campus Site Plan-Building Directory.pdf PDF
S02 SOL 0026 AttD Contractor EMR Safety Info 578-17-027.docx DOCX document
S02 SOL 0026 AttA-SOW.04) Safety and Health During Construction Activities.pdf PDF
S02 SOL 0026 AttC Contractor Info 578-17-027.docx DOCX document
S02 SOL 0026 AttG Wage Rates IL20230009 2023.04.07 current as of 2023.04.25.pdf PDF
S02 SOL 0026 AttA-SOW.18.1a) 578-17-027 Replace Steam Pipe South Leg DWGS Vol 1Aof2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.05) Cutting Welding and Other Hot Work.pdf PDF
S02 SOL 0026 AttA-SOW.18.2) 578-17-027 Replace Steam Pipe South Leg DWGS Vol2of2 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.08) Pre-Construction Risk Assessment (PCRA).pdf PDF
S02 SOL 0026 AttA-SOW.06) Dig Permit SOP Form.pdf PDF
S02 SOL 0026 AttA-SOW.15) Infection Control Barrier Sample.pdf PDF
S02 SOL 0026 AttA-SOW.10) Interim Life Safety Measures (ILSM).pdf PDF
S02 SOL 0026 AttA-SOW.07) Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 SOL 0026 AttA-SOW.14) No Smoking Policy 10-1-19.pdf PDF
S02 SOL 0026 AttA-SOW.11) Contractor PIV Instructions and Form.pdf PDF
S02 SOL 0026 Att.A-SOW.01a) Hines VA Campus Site Plan.pdf PDF
S02 SOL 0026 AttE Financial Disclosure 578-17-027.docx DOCX document
S02 SOL 0026 AttA-SOW.19.1) 578-17-027 Replace Steam Pipe South Leg SPECS Volume 1 of 2 Div 00_21 2023.04.21.pdf PDF
S02 SOL 0026 AttA-SOW.09) Infection Control Risk Assessment (ICRA).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hines COVID-19 Guidelines The following are rules set in place to control the spread of the Coronavirus at the Hines hospital, all buildings on the campus, and the Community Based Outpatient Clinics (CBOCs).

General

A) Masks or face coverings are required to be worn at Hines.

B) All contractors need to have their PIV cards on their person.

C) All the doors on Hines campus close at 4:30 PM except the Emergency Department and the main lobby of Building 200. Once the doors on campus are secured at 4:30 PM, the only entrances to enter the facility are the Emergency Department and the main lobby of Building 200. Unauthorized entry to any other doors that have been secured will be enforced by the VA Police.

Upon Arrival at the Station

A) The station has four main entry points for COVID screening.

1. The main lobby of Building 200

2. The Atrium just north of Building 45

3. C-Section east entrance to Building 1

4. The main lobby of Building 217

B) Everyone entering the screening points will have their temperature checked and symptoms queried daily.

C) You will be given a sticker to place on you PIV card showing you have been screened for the day.

Exiting and Re-entry

A) You may exit any building from any normal door leading to the exterior. Please be sure the door is fully closed behind you after exiting.

B) If you need to re-enter the facility, you will need to go to one of the screening points. If you have already been screened you need only show the dated sticker showing you were screened earlier in the day.

C) After 4:30 PM, only the main lobby in Building 200 and the Emergency Department may be used for re-entry.

D) Propping open doors and allowing unscreened individuals to enter will result in immediate removal from the station and other penalties.