S02 SOL 0026 AttA-SOW.18.2) 578-17-027 Replace Steam Pipe South Leg DWGS Vol2of2 2023.04.21.pdf
PDF 17 MB Posted
- Solicitation number
- 36C25223R0026
About this file
This document provides details regarding a federal contract opportunity for replacing steam pipes at the Edward Hines, Jr. VA Hospital in Hines, Illinois. The solicitation number is 36C25223R0026 and seeks to replace existing steam pipes between Vaults 9 and 7 and between Vault 9 and Pit 5. The work includes replacing sump pump controls, constructing new concrete box conduit steam tunnels and pipe racks, and must be completed within 730 calendar days of the notice to proceed. The project is set aside exclusively for verified Service-Disabled Veteran-Owned Small Businesses and falls under NAICS code 238220 with a small business size limit of $19.5 million. The estimated value is between $10-20 million. The solicitation will be posted on SAM.gov on May 22, 2023 and a pre-bid conference will be held thereafter. Interested parties should monitor the website and contact the points of contact listed with any questions.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID M001
AMH DS
SYMBOLS, ABBREVIATIONS AND NOTES
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
%%UMECHANICAL SYMBOLS AND ABBREVIATIONS
AutoCAD SHX Text S.P.
AutoCAD SHX Text
SET POINT
AutoCAD SHX Text
%%UGENERAL SYMBOLS AND ABBREVIATIONS
AutoCAD SHX Text
LPC
AutoCAD SHX Text
LPS
AutoCAD SHX Text
LOW PRESSURE STEAM SUPPLY
AutoCAD SHX Text
LOW PRESSURE CONDENSATE RETURN
AutoCAD SHX Text
AND EXISTING WORK
AutoCAD SHX Text
POINT OF CONNECTION BETWEEN NEW
AutoCAD SHX Text
AutoCAD SHX Text H4
AutoCAD SHX Text H7
AutoCAD SHX Text A
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
DRAWING NUMBER WHERE SHOWN
AutoCAD SHX Text
SECTION LETTER
AutoCAD SHX Text
DRAWING NUMBER WHERE DRAWN
AutoCAD SHX Text
DEMOLITION POINT OF CONNECTION
AutoCAD SHX Text
PC
AutoCAD SHX Text
HPS
AutoCAD SHX Text
HIGH PRESSURE STEAM SUPPLY
AutoCAD SHX Text
PRESSURE CONDENSATE RETURN
AutoCAD SHX Text
FLOW BALANCING VALVE
AutoCAD SHX Text DRAIN VALVE w/HOSE BIBB
AutoCAD SHX Text
AUTOMATIC TWO-WAY CONTROL VALVE
AutoCAD SHX Text
AUTOMATIC THREE-WAY CONTROL VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BACK PRESSURE VALVE
AutoCAD SHX Text
IN DIRECTION OF ARROW
AutoCAD SHX Text
SLEEVE
AutoCAD SHX Text
PIPE PITCHING DOWNWARD
AutoCAD SHX Text
TEE OUTLET DOWN
AutoCAD SHX Text
TEE OUTLET UP
AutoCAD SHX Text
PIPE RISING
AutoCAD SHX Text
PIPE DROPPING
AutoCAD SHX Text
PIPE GUIDE
AutoCAD SHX Text
FLANGED CONNECTION
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text V
AutoCAD SHX Text
OF
AutoCAD SHX Text
VENT
AutoCAD SHX Text
STEAM (PSIG)
AutoCAD SHX Text S( )
AutoCAD SHX Text
PUMPED CONDENSATE (PSI)
AutoCAD SHX Text
PC
AutoCAD SHX Text
OVERFLOW
AutoCAD SHX Text
INSTRUMENT AIR
AutoCAD SHX Text
IA
AutoCAD SHX Text
PREHEAT HOT WATER SUPPLY
AutoCAD SHX Text
PHWS
AutoCAD SHX Text
PHWR
AutoCAD SHX Text
PREHEAT HOT WATER RETURN
AutoCAD SHX Text D
AutoCAD SHX Text
DRAIN (CONDENSATE)
AutoCAD SHX Text
CWR
AutoCAD SHX Text
CONDENSER WATER RETURN
AutoCAD SHX Text
CWS
AutoCAD SHX Text
CONDENSER WATER SUPPLY
AutoCAD SHX Text
COLD WATER MAKE-UP
AutoCAD SHX Text
CW(MU)
AutoCAD SHX Text
CR( )
AutoCAD SHX Text
CONDENSATE RETURN (PSI)
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHWS
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
CHWR
AutoCAD SHX Text
REHEAT HOT WATER SUPPLY
AutoCAD SHX Text
RHWS
AutoCAD SHX Text
RHWR
AutoCAD SHX Text
REHEAT HOT WATER RETURN
AutoCAD SHX Text
STRAINER WITH NORMALLY CLOSED DRAIN VALVE
AutoCAD SHX Text
VENT VALVE AND GOOSENECK
AutoCAD SHX Text
UNION
AutoCAD SHX Text
SHUT-OFF VALVE NORMALLY OPEN
AutoCAD SHX Text
REDUCER - CONCENTRIC
AutoCAD SHX Text
STEAM TRAP
AutoCAD SHX Text
CHECK VALVE (LOCATED IN HORIZONTAL RUN)
AutoCAD SHX Text
BALANCING GLOBE VALVE
AutoCAD SHX Text
VALVE IN THE NORMALLY CLOSED POSITION
AutoCAD SHX Text
%%UPIPE SUPPORT SYMBOLS AND ABBREVIATIONS
AutoCAD SHX Text
%%UPIPING SYMBOLS
AutoCAD SHX Text
HOT WATER HEATING SUPPLY
AutoCAD SHX Text
CONDENSATE PUMP DISCHARGE
AutoCAD SHX Text
LOW PRESSURE STEAM CONDENSATE RETURN
AutoCAD SHX Text
LOW PRESSURE STEAM (15 PSIG AND BELOW)
AutoCAD SHX Text
VENT LINE
AutoCAD SHX Text
REFRIGERANT SUCTION
AutoCAD SHX Text
REFRIGERANT HOT GAS
AutoCAD SHX Text
REFRIGERANT LIQUID
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
DRAIN LINE
AutoCAD SHX Text
MAKE-UP WATER
AutoCAD SHX Text
CONDENSER WATER RETURN (TO TOWER)
AutoCAD SHX Text
GRAYWATER RETURN
AutoCAD SHX Text
GRAYWATER SUPPLY
AutoCAD SHX Text
CONDENSER WATER SUPPLY (FROM TOWER)
AutoCAD SHX Text
HOT WATER HEATING RETURN
AutoCAD SHX Text
LPS
AutoCAD SHX Text
LPR
AutoCAD SHX Text
PC
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text V
AutoCAD SHX Text
CWR
AutoCAD SHX Text
CHR
AutoCAD SHX Text
GR
AutoCAD SHX Text
RL
AutoCAD SHX Text
RS
AutoCAD SHX Text
RHG
AutoCAD SHX Text
CWS
AutoCAD SHX Text
CHS
AutoCAD SHX Text
GS
AutoCAD SHX Text
MW
AutoCAD SHX Text D
AutoCAD SHX Text
%%UGENERAL PIPING SYMBOLS
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text
REDUCER OR INCREASER
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
SIDE CONNECTION
AutoCAD SHX Text BOTTOM CONNECTION, 45%%d OR 90%%d
AutoCAD SHX Text TOP CONNECTION, 45%%d OR 90%%d
AutoCAD SHX Text
DIRECTION OF PIPE PITCH (DOWN)
AutoCAD SHX Text
UNION
AutoCAD SHX Text
RISE OR DROP IN PIPE
AutoCAD SHX Text
CAPPED OUTLET
AutoCAD SHX Text
PRESSURE GAGE
AutoCAD SHX Text
THERMOMETER
AutoCAD SHX Text
PIPING ACCESSORIES SEE DETAIL
AutoCAD SHX Text
INVERTED BUCKET TRAP SET INCLUDING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIPE UP
AutoCAD SHX Text
PIPE DOWN
AutoCAD SHX Text
AUTOMATIC AIR VENT
AutoCAD SHX Text
AV
AutoCAD SHX Text
MANUAL AIR VENT
AutoCAD SHX Text
MV
AutoCAD SHX Text
%%UVALVE SYMBOLS
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
GATE VALVE WITH 3/4" HOSE ADAPTER
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
MODULATING CONTROL VALVE
AutoCAD SHX Text
TWO POSITION CONTROL VALVE
AutoCAD SHX Text
THREE-WAY MODULATING CONTROL VALVE
AutoCAD SHX Text
AUTOMATIC BALANCING CONTROL VALVE
AutoCAD SHX Text
PRESSURE SAFETY VALVE
AutoCAD SHX Text
GATE VALVE - THREADED/FLANGED
AutoCAD SHX Text
GLOBE VALVE - THREADED/FLANGED
AutoCAD SHX Text
THREE-WAY TWO POSITION CONTROL VALVE
AutoCAD SHX Text
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
AutoCAD SHX Text
FLEXIBLE CONNECTION
AutoCAD SHX Text
WATER BALANCE DEVICE
AutoCAD SHX Text
MODULATING CONTROL BUTTERFLY VALVE
AutoCAD SHX Text
CIRCUIT SETTER VALVE
AutoCAD SHX Text
GATE VALVE WITH GLOBE-VALVED BYPASS
AutoCAD SHX Text
PRESSURE REDUCING VALVE (PRV)
AutoCAD SHX Text
HOSE CONNECTOR
AutoCAD SHX Text
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
AutoCAD SHX Text
%%UCONTROLS SYMBOLS
AutoCAD SHX Text T
AutoCAD SHX Text
ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
AutoCAD SHX Text M
AutoCAD SHX Text
ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
AutoCAD SHX Text
MT
AutoCAD SHX Text
MOISTURE (HUMIDITY) TRANSMITTER
AutoCAD SHX Text
PT
AutoCAD SHX Text
PRESSURE TRANSMITTER
AutoCAD SHX Text
SPS
AutoCAD SHX Text
STATIC PRESSURE SENSOR
AutoCAD SHX Text
SD
AutoCAD SHX Text
SMOKE DETECTOR
AutoCAD SHX Text
PDT
AutoCAD SHX Text
PRESSURE DIFFERENTIAL TRANSMITTER
AutoCAD SHX Text
PDS
AutoCAD SHX Text
PRESSURE DIFFERENTIAL SWITCH
AutoCAD SHX Text
LTCP
AutoCAD SHX Text
LOCAL TEMPERATURE CONTROL PANEL
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
HVAC CONTROL PANEL
AutoCAD SHX Text
VSMC
AutoCAD SHX Text
VARIABLE SPEED MOTOR CONTROLLER
AutoCAD SHX Text M
AutoCAD SHX Text
ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
AutoCAD SHX Text
AFMD
AutoCAD SHX Text
AIRFLOW MEASURING DEVICE
AutoCAD SHX Text
TT
AutoCAD SHX Text
TEMPERATURE TRANSMITTER
AutoCAD SHX Text
TT
AutoCAD SHX Text
TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
AutoCAD SHX Text
IT
AutoCAD SHX Text
CURRENT TRANSMITTER
AutoCAD SHX Text
TS
AutoCAD SHX Text
TEMPERATURE SENSOR
AutoCAD SHX Text
HS
AutoCAD SHX Text
HAND SWITCH (HAND-OFF-AUTO)
AutoCAD SHX Text
PSH
AutoCAD SHX Text
PRESSURE SENSOR, HIGH
AutoCAD SHX Text
FT
AutoCAD SHX Text
FLOW TRANSMITTER
AutoCAD SHX Text
TSL
AutoCAD SHX Text
TEMPERATURE SENSOR, LOW (FREEZESTAT)
AutoCAD SHX Text
ZC
AutoCAD SHX Text
VALVE OR DAMPER POSITION CONTROLLER
AutoCAD SHX Text
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS WORKSTATION AT ENERGY CONTROL CENTER
AutoCAD SHX Text
ECC
AutoCAD SHX Text
%%UDRAWING SYMBOLS
AutoCAD SHX Text
AutoCAD SHX Text H4
AutoCAD SHX Text H7
AutoCAD SHX Text A
AutoCAD SHX Text
26-SF 3
AutoCAD SHX Text
26-TU-I-I
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
DRAWING NUMBER WHERE SHOWN
AutoCAD SHX Text
SECTION LETTER
AutoCAD SHX Text
TYPICAL UNIT NO.
AutoCAD SHX Text
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
AutoCAD SHX Text
SUPPLY FAN NO. 3 IN BUILDING NO. 26
AutoCAD SHX Text
EQUIPMENT ABBREVIATION (SUPPLY FAN)
AutoCAD SHX Text
ITEM NUMBER (TERMINAL UNIT NO. 1)
AutoCAD SHX Text
ITEM (TERMINAL UNIT SHOWN)
AutoCAD SHX Text
SERVED BY AIR HANDLER UNIT NO. 1
AutoCAD SHX Text
DRAWING NUMBER WHERE DRAWN
AutoCAD SHX Text
BUILDING NO. WHERE EQUIPMENT IS LOCATED
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text D DAMPER - AUTOMATIC DAMPER - AUTOMATIC D-1 OUTDOOR AIR DAMPER OUTDOOR AIR DAMPER D-2 RETURN AIR DAMPER RETURN AIR DAMPER D-3 RELIEF AIR DAMPER RELIEF AIR DAMPER DB DECIBELS DECIBELS Db DRY-BULB TEMPERATURE DRY-BULB TEMPERATURE DD-1 DESIGN DEVELOPMENT (SUBMISSION1) DD-2 DESIGN DEVELOPMENT (SUBMISSION2) DDC DIRECT DIGITAL CONTROLS DIRECT DIGITAL CONTROLS DEG DEGREE DEGREE DF DIFFUSER DIFFUSER DIA DIAMETER DIAMETER DP DEW POINT TEMPERATURE DEW POINT TEMPERATURE DP DIFFUSER PLATE DIFFUSER PLATE DPA DIFFERENTIAL PRESSURE ASSEMBLY DIFFERENTIAL PRESSURE ASSEMBLY DPS DIFFERENTIAL PRESSURE SENSOR DIFFERENTIAL PRESSURE SENSOR DX DIRECT EXPANSION DIRECT EXPANSION DXCC DIRECT EXPANSION COOLING COIL
AutoCAD SHX Text CD-2 CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS (SUBMISSION2) (SUBMISSION2) CENT CENTRIFUGAL CENTRIFUGAL CFH CUBIC FEET PER HOUR CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CUBIC FEET PER MINUTE CFT CUBIC FEET CUBIC FEET CHP CHILLED WATER PUMP CHILLED WATER PUMP CHW CHILLER WATER CHILLER WATER CHR CHILLED WATER RETURN CHILLED WATER RETURN CHS CHILLED WATER SUPPLY CHILLED WATER SUPPLY CO2 CARBON DIOXODE CARBON DIOXODE CONV CONVECTOR CONVECTOR CP CONDENSATE PUMP CONDENSATE PUMP CUH CABINET UNIT HEATER CABINET UNIT HEATER CV CONSTANT VOLUME CONSTANT VOLUME CWS CONDENSER WATER SUPPLY CONDENSER WATER SUPPLY (FROM COOLING TOWER)(FROM COOLING TOWER)
AutoCAD SHX Text B BOILER BOILER BC BOX CONDUIT (STEAM TUNNEL) BOX CONDUIT (STEAM TUNNEL) BDD BACKDRAFT DAMPER BACKDRAFT DAMPER BHP BRAKE HORSEPOWER BRAKE HORSEPOWER BTU BRITISH THERMAL UNIT BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNIT PER HOUR
AutoCAD SHX Text A/E ARCHITECT / ENGINEER ARCHITECT / ENGINEER ACCU AIR-COOLED CONDENSING UNIT AIR-COOLED CONDENSING UNIT AD ACCESS DOOR ACCESS DOOR AFMD AIR FLOW MEASURING DEVICE AIR FLOW MEASURING DEVICE AHU AIR-HANDLING UNIT AIR-HANDLING UNIT AMP AMPERGE AMPERGE AP ACCESS PANEL ACCESS PANEL APD AIR PRESSURE DROP AIR PRESSURE DROP
AutoCAD SHX Text CC COOLING COIL COOLING COIL CCD COOLING COIL CONDENSATE COOLING COIL CONDENSATE DRAIN DRAIN CD CEILING DIFFUSER CEILING DIFFUSER CD-1 CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS (SUBMISSION1)(SUBMISSION1)
AutoCAD SHX Text EA EXHAUST AIR EXHAUST AIR EAT ENTERING AIR TEMPERATURE ENTERING AIR TEMPERATURE EF EXHAUST FAN EXHAUST FAN EG EXHAUST GRILLE EXHAUST GRILLE EH EXHAUST HOOD EXHAUST HOOD ENT ENTERING ENTERING ESP EXTERNAL STATIC PRESSURE EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE ENTERING WATER TEMPERATURE EX. EXISTING EXISTING
AutoCAD SHX Text F FAHRENHEIT FAHRENHEIT F/SDPR COMBINATION FIRE SMOKE DAMPER FA FREE AREA FREE AREA FC FLEXIBLE CONNECTION FLEXIBLE CONNECTION FCU FAN COIL UNIT (4 PIPE) FAN COIL UNIT (4 PIPE) FCUC FAN COIL UNIT COOLING ONLY FAN COIL UNIT COOLING ONLY FD FLOOR DRAIN FLOOR DRAIN FD FIRE DAMPER FIRE DAMPER FF FINAL FILTER FINAL FILTER FM FLOW METER FLOW METER FPM FEET PER MINUTE FEET PER MINUTE FS FLOW SWITCH FLOW SWITCH FSTAT FREEZESTAT
AutoCAD SHX Text GA GAUGE GAUGE GAL GALLONS GALLONS GC GENERAL CONTRACTOR GENERAL CONTRACTOR GPM GALLONS PER MINUTEGALLONS PER MINUTE
AutoCAD SHX Text H HUMIDIFER HUMIDIFER HC HEATING COIL HEATING COIL HD HEAD HEAD HP HORSEPOWER HORSEPOWER HSTAT HUMIDISTAT HUM HUMIDIFIER UNIT MOUNTED HUMIDIFIER UNIT MOUNTED HW HOT WATER HOT WATER HWC HOT WATER COIL HOT WATER COIL HWHC HOT WATER HEATING COIL HOT WATER HEATING COIL HWR HEATING HOT WATER RETURN HEATING HOT WATER RETURN HWS HEATING HOT WATER SUPPLYHEATING HOT WATER SUPPLY
AutoCAD SHX Text FT FEET FEET FT-LB FOOT-POUND FOOT-POUND FTR FIN TUBE RADIATION FIN TUBE RADIATION FV FACE VELOCITYFACE VELOCITY
AutoCAD SHX Text OA OUTSIDE AIR OUTSIDE AIR OAI OUTSIDE AIR INTAKE OUTSIDE AIR INTAKE OD OUTSIDE DIAMETER OUTSIDE DIAMETER
AutoCAD SHX Text NC NOISE CRITERIA NOISE CRITERIA NC NORMALLY CLOSED NORMALLY CLOSED NG NATURAL GAS NATURAL GAS NO NORMALLY OPEN NORMALLY OPEN NPSH NET POSITIVE SUCTION HEAD NTS NOT TO SCALE NOT TO SCALE
AutoCAD SHX Text MAT MIXED AIR TEMPERATURE MIXED AIR TEMPERATURE MAX MAXIMUM MAXIMUM MB MIXING BOX MIXING BOX MBH 1000 BTUH 1000 BTUH MCA MINIMUM BRANCH CIRCUIT AMPACITY MINIMUM BRANCH CIRCUIT AMPACITY MERV MINIMUM EFFICIENCY REPORTING MINIMUM EFFICIENCY REPORTING VALUE MIN MINIMUM MINIMUM
AutoCAD SHX Text LAT LEAVING AIR TEMPERATURE LEAVING AIR TEMPERATURE LBS/HR POUNDS PER HOUR LF LINEAR FOOT (FEET) LINEAR FOOT (FEET) LH LATENT HEAT LATENT HEAT LPR LOW PRESSURE RETURN (STEAM CONDENSATE) LOW PRESSURE RETURN (STEAM CONDENSATE) LPRC LOW PRESSURE STEAM RETURN (CLEAN) LOW PRESSURE STEAM RETURN (CLEAN) LPS LOW PRESSURE STEAM LOW PRESSURE STEAM LPSC LOW PRESSURE STEAM (CLEAN) LOW PRESSURE STEAM (CLEAN) LVR LOUVER LOUVER LWT LEAVING WATER TEMPERATURE LEAVING WATER TEMPERATURE
AutoCAD SHX Text kW KILOWATT KILOWATT kWh KILOWATT HOUR KILOWATT HOUR
AutoCAD SHX Text IN INCHES INCHES IN WC INCH WATER COLUMN INCH WATER COLUMN IN WG INCH WATER GAUGEINCH WATER GAUGE
AutoCAD SHX Text TD TEMPERATURE DIFFERENCE TEMPERATURE DIFFERENCE TG TRANSFER GRILLE TRANSFER GRILLE TP TRAP TRAP TSP TOTAL STATIC PRESSURE TOTAL STATIC PRESSURE TSTAT THERMOSTATTHERMOSTAT
AutoCAD SHX Text SA SUPPLY AIR SUPPLY AIR SAT SUPPLY AIR TEMPERATURE SUPPLY AIR TEMPERATURE SC SHADING COEFFICIENT SHADING COEFFICIENT SD SMOKE DETECTOR SMOKE DETECTOR SD SUPPLY AIR DIFFUSER SUPPLY AIR DIFFUSER SD-1 SCHEMATIC DESIGN (SUBMISSION1) SCHEMATIC DESIGN (SUBMISSION1) SD-2 SCHEMATIC DESIGN (SUBMISSION2) SCHEMATIC DESIGN (SUBMISSION2) SDPR SMOKE DAMPER SMOKE DAMPER SDR SMOKE DAMPER (RETURN) SMOKE DAMPER (RETURN) SDS SMOKE DAMPER (SUPPLY) SMOKE DAMPER (SUPPLY) SEN SENSIBLE HEAT SENSIBLE HEAT SF SUPPLY FAN SUPPLY FAN SG SUPPLY AIR GRILLE SUPPLY AIR GRILLE SH STEAM HUMIDIFIER STEAM HUMIDIFIER SHC STEAM HEATING COIL STEAM HEATING COIL SI SQUARE INCHES SQUARE INCHES SP STATIC PRESSURE STATIC PRESSURE SPS STATIC PRESSURE SENSOR STATIC PRESSURE SENSOR SQ FT SQUARE FOOT (FEET) SST START / STOP ST STEAM TRAPSTEAM TRAP
AutoCAD SHX Text R/E RETURN OR EXHAUST RETURN OR EXHAUST RA RETURN AIR RETURN AIR RAT RETURN AIR TEMPERATURE RETURN AIR TEMPERATURE REA RELIEF AIR RELIEF AIR RF RETURN FAN RETURN FAN RG RETURN GRILLE RETURN GRILLE RH RELATIVE HUMIDITY RELATIVE HUMIDITY RHC REHEAT COIL REHEAT COIL RHG REFRIGERANT HOT GAS REFRIGERANT HOT GAS RL REFRIGERANT LIQUID LINE REFRIGERANT LIQUID LINE RLA RUN LOAD AMPERE RUN LOAD AMPERE RPM REVOLUTIONS PER MINUTE REVOLUTIONS PER MINUTE RR RETURN REGISTER RETURN REGISTER RS REFRIGERANT SUCTION REFRIGERANT SUCTION RTU ROOF TOP UNIT ROOF TOP UNIT RV RELIEF VALVE RELIEF VALVE
AutoCAD SHX Text P PUMP PUMP PC PUMPED CONDENSATE PUMPED CONDENSATE PD PRESSURE DROP PRESSURE DROP PF PRE-FILTER PRE-FILTER PG PRESSURE GAGE PRESSURE GAGE PHC PREHEAT COIL PREHEAT COIL PPM PARTS PER MILLION PARTS PER MILLION PRV PRESSURE REGULATING VALVE PRESSURE REGULATING VALVE PSI POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH PSIA POUNDS PER SQUARE INCH – ABSOLUTE POUNDS PER SQUARE INCH – ABSOLUTE ABSOLUTE PSIG POUNDS PER SQUARE INCH – GAGE POUNDS PER SQUARE INCH – GAGE GAGE
AutoCAD SHX Text W WATTS WATTS Wb WET-BULB (TEMPERATURE) WET-BULB (TEMPERATURE) WPD WATER SIDE PRESSURE DROP WATER SIDE PRESSURE DROP
AutoCAD SHX Text V VALVE VALVE VAV VARIABLE AIR VOLUME VARIABLE AIR VOLUME VD VOLUME DAMPER (MANUAL OPPOSED BLADE) VOLUME DAMPER (MANUAL OPPOSED BLADE) VFD VARIABLE FREQUENCY DRIVE VARIABLE FREQUENCY DRIVE VSD VARIABLE SPEED DRIVE
AutoCAD SHX Text
UC UNDER CUT UNDER CUT UH UNIT HEATERUNIT HEATER
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
EXPANSION JOINT
1 STEAM BLOCK DIAGRAM
EXISTING CONDITIONS AND DEMOLITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID MI001
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR
PHASING OF DEMOLITION WORK INSTALL.
2. COORDINATE WITH MECHANICAL NEW WORK DRAWINGS
3. SEE STRUCTURAL DRAWINGS FOR DEMO WORK
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL EROSION
CONTROL PLAN, GRADING AND PLANTING PLANS.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
DS
AutoCAD SHX Text
FB
AutoCAD SHX Text
VAULT 1
AutoCAD SHX Text
VAULT 6
AutoCAD SHX Text
VAULT 8
AutoCAD SHX Text
VAULT 9
AutoCAD SHX Text
VAULT 7
AutoCAD SHX Text
VAULT 12
AutoCAD SHX Text
VAULT 3
AutoCAD SHX Text
VAULT 2
AutoCAD SHX Text
VAULT 11
AutoCAD SHX Text
VAULT 10
AutoCAD SHX Text
LOYOLA BOILER PLANT
AutoCAD SHX Text
LOYOLA CAMPUS
AutoCAD SHX Text
BUILDING 200
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text
BUILDING 2
AutoCAD SHX Text
BUILDING 221
AutoCAD SHX Text
BUILDING 217
AutoCAD SHX Text
BLDG 205 BOILER PLANT
AutoCAD SHX Text
BUILDING 215
AutoCAD SHX Text
BUILDING 48
AutoCAD SHX Text
BUILDING 37
AutoCAD SHX Text
BUILDING 20
AutoCAD SHX Text
PIT 5
AutoCAD SHX Text
EXISTING STEAM AND CONDENSATE SYSTEM
AutoCAD SHX Text
EXISTING SYSTEM AND CONDENSATE SYSTEM IN EXISTING TUNNEL.
AutoCAD SHX Text
CONNECT TO EXISTING STEAM AND CONDENSATE SYSTEM
AutoCAD SHX Text
EXISTING DIRECT BURIED PIPING
AutoCAD SHX Text
EXISTING CONDITIONS AND DEMO STEAM AND CONDENSATE DIAGRAM
AutoCAD SHX Text
EXISTING PIT 1
AutoCAD SHX Text
EXISTING STEAM PIT 3A
AutoCAD SHX Text
EXISTING STEAM PIT 3
AutoCAD SHX Text
EXISTING HPS AND PC IN BOX CONDUIT SYSTEM TUNNEL.
AutoCAD SHX Text
EXISTING DIRECT BURIED PIPING
AutoCAD SHX Text
EXISTING PIT 2
AutoCAD SHX Text
EXISTING PIT 2A
AutoCAD SHX Text
EXISTING STEAM PIT 4
AutoCAD SHX Text
EXISTING STEAM PIT 1A
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
EXISTING DIRECT BURIED PIPING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING DIRECT BURIED PIPING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING PIT 1 AND CONNECTING PIPING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING DIRECT BURIED PIPING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
CONNECT TO EXISTING STEAM AND CONDENSATE SYSTEM
AutoCAD SHX Text
EXISTING PIT 4 AND CONNECTING PIPING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
DEMO CONNECTING PIPING FROM PIT 4 WITIN PIT 3A
AutoCAD SHX Text
EXISTING PIT 3
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING PIT 1A AND CONNECTING PIPING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING PIT 2 AND CONNECTING PIPING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING PIT 2A AND CONNECTING PIPING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
REFER TO MD101
AutoCAD SHX Text
REFER TO MD100
AutoCAD SHX Text
REFER TO MD200
AutoCAD SHX Text
REFER TO MD201
VAULT 4
1 STEAM BLOCK DIAGRAM
NEW UPGRADES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID MI002
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR
PHASING OF DEMOLITION WORK INSTALL.
2. COORDINATE WITH MECHANICAL NEW WORK DRAWINGS
3. SEE STRUCTURAL DRAWINGS FOR NEW WORK
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL EROSION
CONTROL PLAN, GRADING AND PLANTING PLANS.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
NEW UPGRADES STEAM AND CONDENSATE DIAGRAM
AutoCAD SHX Text
DS
AutoCAD SHX Text
FB
AutoCAD SHX Text
VAULT 1
AutoCAD SHX Text
VAULT 6
AutoCAD SHX Text
VAULT 8
AutoCAD SHX Text
VAULT 9
AutoCAD SHX Text
VAULT 7
AutoCAD SHX Text
VAULT 12
AutoCAD SHX Text
VAULT 3
AutoCAD SHX Text
VAULT 2
AutoCAD SHX Text
VAULT 11
AutoCAD SHX Text
VAULT 10
AutoCAD SHX Text
LOYOLA BOILER PLANT
AutoCAD SHX Text
LOYOLA CAMPUS
AutoCAD SHX Text
BUILDING 200
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text
BUILDING 2
AutoCAD SHX Text
BUILDING 221
AutoCAD SHX Text
BUILDING 217
AutoCAD SHX Text
BLDG 205 BOILER PLANT
AutoCAD SHX Text
BUILDING 215
AutoCAD SHX Text
BUILDING 48
AutoCAD SHX Text
BUILDING 37
AutoCAD SHX Text
BUILDING 20
AutoCAD SHX Text
PIT 5
AutoCAD SHX Text
CONNECT TO EXISTING STEAM AND CONDENSATE SYSTEM
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 9.1
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 9.2
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 5.2
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 5.1
AutoCAD SHX Text
ATTACH TO BUILDING 215 STEAM SYSTEM
AutoCAD SHX Text
EXISTING STEAM PIT 3A
AutoCAD SHX Text
EXISTING HPS AND PC IN BOX CONDUIT SYSTEM TUNNEL.
AutoCAD SHX Text
EXISTING DIRECT BURIED PIPING
AutoCAD SHX Text
NEW HPS AND PC IN UNDERGROUND BOX CONDUIT SYSTEM
AutoCAD SHX Text
NEW HPS AND PC ABOVE ON ROOF
AutoCAD SHX Text
NEW HPR AND PC IN UNDERGROUND BOX CONDUIT SYSTEM
AutoCAD SHX Text
NEW HPS AND PC IN UNDERGROUND BOX CONDUIT SYSTEM -
AutoCAD SHX Text
CONNECT TO EXISTING STEAM AND CONDENSATE SYSTEM
AutoCAD SHX Text
CONNECT TO EXISTING STEAM AND CONDENSATE SYSTEM TUNNEL SYSTEM
AutoCAD SHX Text
NEW WORK RISES TO ABOVE ROOF SEE MS101
AutoCAD SHX Text
CONNECT TO EXISTING STEAM AND CONDENSATE SYSTEM
AutoCAD SHX Text
CONNECT TO EXISTING STEAM AND CONDENSATE SYSTEM
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 5.3
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
REFER TO CLIN1
AutoCAD SHX Text
REFER TO CLIN2A
AutoCAD SHX Text
REFER TO MS106 REFER TO MS108 REFER TO MI005 REFER TO MS402
AutoCAD SHX Text
REFER TO MI003 REFER TO MS100 REFER TO MS404
AutoCAD SHX Text
REFER TO MI004 REFER TO MS200 REFER TO MS405
AutoCAD SHX Text
REFER TO MS201 REFER TO MS405
AutoCAD SHX Text
VAULT 4
AutoCAD SHX Text
REFER TO MS104 REFER TO MS105 REFER TO MS108
AutoCAD SHX Text
REFER TO MS101 REFER TO MS102 REFER TO MS103 REFER TO MS104
AutoCAD SHX Text
REFER TO MS403
NIC
NORTH
WALL
NEW
VAULT 9.1
6" PC
T-09-1-D
T-09.1-1-D
T-09-2-D
LENGTH 4 PIPE DIAMETERS (TYP.)
LENGTH 4 PIPE DIAMETERS (TYP.)
LENGTH 10 PIPE DIAMETERS (TYP.)
LENGTH 30' FEET (TYP.)
TYPICAL EQUIPMENT SPACING
(SEE PLANS FOR LOCATIONS OF ANCHORS, EXPANSION JOINTS, GUIDES,
AND GENERAL SUPPORTS)
12" HPS
T-09-3-DT-09-5-D
EXISTING 6" PC
T-09-4-DT-09-6-D
1" HPR
1" HPR 1" HPR
1" HPR
1" HPR
EXISTING
VAULT 9
WEST
WALL
TRANSITION TO STEEL
INSIDE THE VAULT (TYP)
DOUBLE FLANGE FOR
FUTURE DISCONNECT
(TYP)
12" HPS
BLD
NEW
VAULT 9.2
EXISTING DIRECT
BURIED 6" PC
EXISTING DIRECT
BURIED 14" HPS
DOUBLE FLANGE FOR
FUTURE DISCONNECT
(TYP)
14" X 10"
ECCENTRIC
REDUCER
10" HPS
T-09.2-1-D T-09.2-2-D
12"HPS/6"PC IN NEW
BOX CONDUIT
SEE SITE PLANS
T-09.1-2-D
WEST SIDE DEMO
PIPE GUIDES (TYP.)
EJ
PIPE ANCHOR
6" PC
LENGTH 4 PIPE DIAMETERS (TYP.)
LENGTH 4 PIPE DIAMETERS (TYP.)
LENGTH 10 PIPE DIAMETERS (TYP.)
LENGTH 60' FEET (TYP.)
PIPE GUIDES (TYP.)
EJ
PIPE ANCHOR
12" HPS
WALL
VAULT 9 INSIDE
2ft
SEE
EQUIPMENT
SPACING
12"HPS/6"PC IN NEW
BOX CONDUIT
SEE SITE PLANS
SEE
EQUIPMENT
SPACING
WEST NEW WORK
EJ-09.1-5-D
9"
9"
EJ-09.1-6-D
2ft
1" HPR
SPARGE TUBE (TYP.)
12" HPS (125)
TO VAULTS 8,6, 1,
TO BOILER PLANT
6" CPD
14" X 12"
ECCENTRIC
REDUCER
EXISTING DIRECT
BURIED 6" PC
EXISTING DIRECT
BURIED 12" HPS
EXISTING MULTI-THERM 500 DIRECT BURIED
SYSTEM. REFER TO MS401 FOR MATERIAL
SPECIFICATIONS AND TO 9/MJ500 AND 4/MJ500
FOR OTHER DETAILS (TYP)
LINK SEAL (TYP)T-09-3-DT-09-5-D
EXISTING 6" PC
T-09-4-DT-09-6-D
1" HPR
1" HPR 1" HPR
1" HPR
1" HPR
WEST
WALL
10" HPS
10" X 12"
ECCENTRIC
REDUCER
TRANSITION TO STEEL
INSIDE THE VAULT (TYP)
12" HPS
12" X 10"
ECCENTRIC
REDUCER
WALL
VAULT 9 INSIDE
1" HPR EAST
WALL
DEMO
PHASE 1
NEW WORK
PHASE 1
ANC-09-3-DANC-09-4-D
ANC-09-3-D
ANC-09-4-D
ANC-9.1-2-D
ANC-9.1-4-D
FIXED FLANGE
ANCHOR GUIDE
DIRECTION OF EXPANSION
LEGEND FOR EXPANSION JOINT
ANC-09-6-D
ANC-09-6-D
ANC-09-5-D
25'- 4"
6'
282' 125'-3 1/4"
'-0
NEW 12"
HPS
EJ-09-1-D
EXISTING
EXISTING
NEW 6" PC
ANC-9.1-3-D
ANC-9.1-1-D
NEW 12"
HPS
NEW 6" PC
12"HPS/6"PC IN
NEW BOX
CONDUIT
SEE CLIN 1 FOR
CONTINUATION
4.3" 4.3"
EJ-09.1-1-D EJ-09.1-2-D
ANC-09-2-D
ANC-09-1-D
ANC-09-5-D
NEW
SPARGER
2" HPR
2" HPR
EJ-09.2-2-D
6.6"
6.6"
EJ-09.2-1-D
ANC-9.2-1-D
ANC-9.2-2-D
ANC-9-B
ANC-9-A
ANC-9.4
ANC-9.3
ANC-9.2-3-D
'-8
EXISTING
EXISTING
ANC-09-7-D
ANC-09-8-D
EXPANTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID MI003
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR
PHASING OF DEMOLITION WORK INSTALL.
2. COORDINATE WITH MECHANICAL NEW WORK
DRAWINGS
3. SEE STRUCTURAL DRAWINGS FOR NEW WORK
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL
EROSION CONTROL PLAN, GRADING AND PLANTING
PLANS.
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[6" PC]
AutoCAD SHX Text
TRANSITIONAL VAULT AND CONDUIT BOX
AutoCAD SHX Text
[14" HPS]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[12" HPS]
AutoCAD SHX Text
[14" HPS]
AutoCAD SHX Text
[12" HPS]
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
STEAM AND CONDENSATE SCHEMATIC DIAGRAM-CLIN 1
AutoCAD SHX Text
DS
AutoCAD SHX Text
FB
GENERAL NOTES
NEW DIRECT
BURIED 6" PC
NEW DIRECT
BURIED 12" HPS
EAST WALL
T-09-1-D
T-09-2-D
INSTALL NEW MULTI-THERM 500 DIRECT BURIED
SYSTEM. REFER TO MS401 FOR MATERIAL
SPECIFICATIONS AND TO 9/MJ500 AND 4/MJ500
FOR OTHER DETAILS (TYP)
LINK SEAL (TYP)
T-09-3-DT-09-5-D
EXISTING 6" PC
T-09-4-DT-09-6-D
1" HPR
1" HPR 1" HPR
1" HPR
1" HPR
1" HPR
EXISTING
VAULT 9
WEST
WALL
10" HPS
10" X 12"
ECCENTRIC
REDUCER
TRANSITION TO STEEL
INSIDE THE VAULT (TYP)
12" HPS
12" X 10"
ECCENTRIC
REDUCER
NEW 12"
HPS
NEW 6" PC
12" HPS
6" PC
T-05.1-1-D
NEW
VAULT 5.1
EXISTING PIT 5
12" HPST-05.3-2-D
NEW
VAULT 5.3
12" HPS 6" PC
4" HPS 2" PC
12"X4"
HPS
INSTALL NEW MULTI-THERM 500 DIRECT BURIED
SYSTEM. REFER TO MS401 FOR MATERIAL
SPECIFICATIONS AND TO 9/MJ500 AND 4/MJ500
FOR OTHER DETAILS (TYP)
12" HPS
ECCENTRIC
REDUCER-TYP
T-05.3-3-D T-05.3-4-DT-05.3-1-D
CONNECT TO DOUBLE FLANGE
(TYP)
NEW 12"
HPS
NEW 6" PC
6"X2" PC
NEW BOX CONDUIT
NEW BOX CONDUIT
EAST SIDE DEMO
FOR DEMO SEE ABOVE
T-05.1-2-D
TO
LO
YO
LA
PLAN
T
BUILDING
TO BUILDING 215
TO BUILDING 48
TRANSITION TO STEEL
INSIDE THE VAULT (TYP)
NEW LINK SEAL (TYP)
INSTALL NEW MULTI-THERM 500 DIRECT BURIED
SYSTEM. REFER TO MS401 FOR MATERIAL
SPECIFICATIONS AND TO 9/MJ500 AND 4/MJ500
FOR OTHER DETAILS (TYP)
SEAL WALL BOX CONDUIT
WALL
VAULT 9 INSIDE
EXISTING DIRECT
BURIED 6" PC
EXISTING DIRECT
BURIED 12" HPS
EXISTING DIRECT
BURIED 12" HPS
2ft
SEE
EQUIPMENT
SPACING
12" HPS (125)
TO VAULTS 8,6, 1,
TO BOILER PLANT
6" PC
12"HPS/6"PC IN
NEW BOX
CONDUIT
SEE CLIN 1 FOR
CONTINUATION
12"HPS/6"PC/2" HPR IN
NEW BOX CONDUIT
SEE SITE PLANS
SEE BELOW
LEFT FOR
CONTINUATION
SEE ABOVE
RIGHT FOR
CONTINUATION 12" HPS
6" PC
T-05.2-1-D
NEW
VAULT 5.2
T-05.2-2-D
2ft
SEE
EQUIPMENT
SPACING2ft
7"
EJ-5.3-1-D
12"HPS/6"PC/2" HPR IN
NEW BOX CONDUIT
SEE SITE PLANS
12"HPS/6"PC/2" HPR IN
NEW BOX CONDUIT
SEE SITE PLANS
12"HPS/6"PC/2" HPR IN
NEW BOX CONDUIT
SEE SITE PLANS
6" PC
2ft
SEE
EQUIPMENT
SPACING
EJ-5.2-2-D
48"
6.3"
EJ-5.2-1-D
EJ-5.1-2-D
7.4"
7"
EJ-5.1-1-D
12" HPS
6" PC
LENGTH 4 PIPE DIAMETERS (TYP.)
LENGTH 4 PIPE DIAMETERS (TYP.)
LENGTH 10 PIPE DIAMETERS (TYP.)
LENGTH 30' FEET (TYP.)
TYPICAL EQUIPMENT SPACING
(SEE PLANS FOR LOCATIONS OF ANCHORS, EXPANSION JOINTS, AND GUIDES)
1" HPR
PIPE GUIDES (TYP.)
EJ
PIPE ANCHOR
6" PC
LENGTH 4 PIPE DIAMETERS (TYP.)
LENGTH 4 PIPE DIAMETERS (TYP.)
LENGTH 10 PIPE DIAMETERS (TYP.)
LENGTH 60' FEET (TYP.)
PIPE GUIDES (TYP.)
EJ
PIPE ANCHOR
12" HPS
EXISTING
FLASH TANK
CONDENSATE
RECEIVER/PUMPS
2" HPR
2" HPR
2" HPR
TO
BUILDING
1 1/2" HPR
3" PC6" HPS
EXISTING
FLASH TANK
CONDENSATE
RECEIVER/PUMPS
MECH ROOM 2
1 1/2" HPR
FIELD
VERIFY
max 12ft max 6ft
2ft
NORTH WALL
2" HPR
NEW
SPARGER
EXISTING 6" PC
EXISTING
SPARGER
EXISTING 6" PC
1" HPR
2" HPR
2" HPR
2" HPR
ANC-09-3-D
ANC-09-4-D
ANC-5.3-4-D
ANC-5.3-3-D
ANC-5.3-1-D
ANC-5.2-2-D
ANC-5.1-1-D
ANC-5.1-2-D
ANC-05-1-D
ANC-05-2-D
ANC-09-1-D
90 DEGREE
ROLLED ELBOW
90 DEGREE
ROLLED ELBOW
'-9
'-1
56'
'-6
164'-2"221'187'
187'
233'-6"
7'- 0"
EJ-09-1-D
ANC-09-2-D
ANC-09-6-D
EJ-5.3-2-D
7"
ANC-5.3-2-D
EJ-5.1-4-D
EJ-5.1-3-D
ANC-5.2-3-D
ANC-5.1-3-D
24'-3"
ANC-09-5-D
EXISTING
EXISTING
ANC-09-7-D
ANC-09-8-D
5.1"
5.1"
ANC-5.3-4-D
ANC-5.2-1-D
6.2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID MI004
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR
PHASING OF DEMOLITION WORK INSTALL.
2. COORDINATE WITH MECHANICAL NEW WORK
DRAWINGS
3. SEE STRUCTURAL DRAWINGS FOR NEW WORK
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL
EROSION CONTROL PLAN, GRADING AND PLANTING
PLANS.
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
STEAM AND CONDENSATE SCHEMATIC DIAGRAM-CLIN2A
AutoCAD SHX Text
DS
AutoCAD SHX Text
FB
ANC-PA-1
ANC-PA-2ANC-PA-2A
ANC-PA-3
ANC-PA-4
ANC-PA-5
ANC-PA-6ANC-PA-7
BUILDING 217 ROOFTOP
BUILDING 221 ROOFTOP
BUILDING 1 WALKWAY
EJ-PA-4-1
EJ-PA-5-1EJ-PA-6-1
EJ-PA-6-2 EJ-PA-5-2
EJ-PA-4-2
TO
UNDERGROUND
VAULT 9
SEE BELOW RIGHT
FOR CONTINUATION
SEE ABOVE LEFT
FOR CONTINUATION
TO UNDERGROUND
VAULT 7
TO BUILDING 221
PENTHOUSE
" H
PS
6"
PC
12" HPS
6" PC
12" HPS
6" PC
12" HPS
6" PC
3" HPS1.5" PC
BUILDING 221
WALKWAY
STEAM DRIP AND
SPARGER 3
STEAM DRIP AND
SPARGER 2
STEAM DRIP AND
SPARGER 1
STEAM DRIP AND
SPARGER 5
STEAM DRIP AND
SPARGER 6
STEAM DRIP AND
SPARGER 7
STEAM DRIP AND
SPARGER 4
30' -2"
87'-10"
36' -0"
39'-3"
50'
'-0
/2
35'-0 1/2"
'-0
/2
44'-6"
'-1
0"
5'-11"
'-0
85'-0"93'-10"16'-8"
16'-10"
'-7
11'-8"
'-6
132'-2"
2'- 4"
160'-0" 18'-10"244'-420'-0"
'-0
Drain
DRIPTRAP
STEAM
T-0 0-1
T-00-3
T-00-2
T-00-4
T-00-5T-00-7 T-00-6
2.8"
2.8"
4.6"
4.6"
7.1"
7.1"
ANC-PA-4.1
HT-00-3
HT-00-6 HT-00-5 HT-00-4
HT-00-2
HT-00-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID MI005
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
[3/4" DRIP RETURN]
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
STEAM AND CONDENSATE SCHEMATIC DIAGRAM-ROOPTOP
AutoCAD SHX Text
DS
FB
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM
STM
STM
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
VAULT 9
PIT2
PIT1A
PIT2A
STM
STM
STM
ST
M
ST
M
STM
STM
ST
M
STM
STM
STM
STM
xxx xx x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID
MECHANICAL SITE PLAN - CLIN 1 -
VAULTS
MD100
SCALE: 1" = 30'-0"
1 - MECHANICAL SITE PLAN - DEMOLITION1
N
DETAIL NUMBER
SHEET NUMBER
DEMO EXISTING STEAM MANHOLE INCLUDING:
-SUMP PUMPS
-ELECTRICAL
-STEAM/ CONDENSATE AN ALL VALVING AND ANCILLARIES
DEMO DIRECT BURY STEAM AND CONDENSATE.
AFTER DEMO OF STEAM AND CONDENSATE LINES, INFILL ENTIRE
LINES W/ FLOWABLE FILL AND CHECK REQUIREMENTS W/
MANUFACTURER FOR LIMITS WITH THE INTENT TO FILL ENTIRE
PIPE.
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR PHASING
OF DEMOLITION WORK INSTALL.
2. COORDINATE WITH MECHANICAL NEW WORK DRAWINGS
3. SEE STRUCTURAL DRAWINGS FOR NEW WORK
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL EROSION
CONTROL PLAN, GRADING AND PLANTING PLANS.
GRAPHIC SCALE
( IN FEET )
1 inch = 30 ft.
30 0 15 30 60 120
TO
M
D
TO
M D
AutoCAD SHX Text
AutoCAD SHX Text
AIR MAIL ROAD
AutoCAD SHX Text
RONALD
AutoCAD SHX Text McDONALD
AutoCAD SHX Text
HOUSE
AutoCAD SHX Text
THE
AutoCAD SHX Text 232*
AutoCAD SHX Text
TRIPP AVENUE
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FR
AutoCAD SHX Text
AMH/DS
AutoCAD SHX Text
MH-XXX
AutoCAD SHX Text
XX
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
%%UPLAN NOTES:
W .V
STMSTMSTMSTMSTM
ST
M
ST
M
ST
M
ST
M
ST
M
STMSTMSTMSTMSTM
ST
M
ST
M
ST
M
ST
M
ST
M
STMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTM
ST
M
ST
M
ST
M
STMSTMSTMSTMSTM
STM STM STM STM STM STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM STM STM STM STM STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM STM STM STM STM STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STMSTMSTMSTM
STM
STM
ST
M
ST
M
ST
M
STMSTMSTMSTMSTMSTMSTMSTM STMSTMSTMSTMSTMSTMSTMSTM STMSTMSTMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTMSTMSTMSTM
STMSTMSTMSTMSTMSTMSTMSTMSTM STMSTMSTMSTMSTMSTMSTMSTMSTM
454.05' B A
EL
EC
TR
IC
M
AN
H O
LE
R
IM
=6
.7
M O
N
IT
O R
IN
G
W
EL
L
STMSTM
STM
ST
M
ST
M
ST
M
ST
M
STM
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STMSTM
STM
STM
STMSTMSTMSTMSTMSTM
STM
STM
STM
STMSTMSTMSTM
STM
STM
STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTM
ST
M
ST
M
ST
M
STMSTM
ST
M
ST
M
STMSTMSTMSTMSTMSTM
ST
M
ST
M
STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM
STM
STM
STM
ST
M
STM
STM
STM
STM
STM
STM
STMSTMSTMSTMSTMSTMSTM
ST
M
STMSTMSTMSTMSTM
STM
STM
ST
M
ST
M
ST
M
STM
STM
STM
STMSTMSTMSTM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
PIT 1
MH4B
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M PI
T1 A
A x x x x x x x x x x x x x x x x x
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID
MECHANICAL SITE PLAN - CLIN 1 -
VAULTS
MD101
1N
1 - MECHANICAL SITE PLAN - DEMOLITION
DEMO PIPING WITHIN VAULT 7 TUNNEL.
ABANDON IN PLACE.
DEMO EXISTING STEAM MANHOLE INCLUDING:
-SUMP PUMPS
-ELECTRICAL AND CONTROLS
-STEAM/ CONDENSATE AN ALL VALVING AND ANCILLARIES
DEMO DIRECT BURY STEAM AND CONDENSATE TO APPROXIMATE
DIMENSIONS. FOR ABANDONED PIPE USE FLOWABLE FILL AND
CHECK REQUIREMENTS W/ MANUFACTURER FOR LIMITS WITH THE
INTENT TO FILL ENTIRE PIPE.
DEMO UNDERGROUND AND PIPE RUNS UP THE WALL INTO BLDG
221.
DEMO WITHIN STEAM PIT ALL STEAM AND CONDENSATE.
DEMO STEAM AND CONDENSATE WITHIN 1ST FLOOR BUILDING 221.
COORDINATE ACCESS AND WORK WITH SHUTDOWN WEEKEND
WORK FRIDAY AFTER 5 PM TO MONDAY 6AM.
DEMO DIRECT BURY STEAM AND CONDENSATE ALONG BUILDING 1
WALKWAY. FOR ABANDONED PIPE LOCATED UNDER STRUCTURES
USE FLOWABLE FILL AND CHECK REQUIREMENTS W/
MANUFACTURER FOR LIMITS WITH THE INTENT TO FILL ENTIRE
PIPE.
REPAIR MANHOLE HATCH AND STRUCTURE.
DETAIL NUMBER
SHEET NUMBER
1 3
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR PHASING
OF DEMOLITION WORK INSTALL.
2. COORDINATE WITH MECHANICAL NEW WORK DRAWINGS
3. SEE STRUCTURAL DRAWINGS FOR NEW WORK
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL EROSION
CONTROL PLAN, GRADING AND PLANTING PLANS.
5. FOR ALL ABANDONED IN PLACE USE FLOWABLE FILL AND
CHECK REQUIREMENTS W/ MANUFACTURER FOR LIMITS
WITH THE INTENT TO FILL ENTIRE PIPE.
M
AT
C H
L
IN
E- C
O N
TI
N
U
ED
BE
LO
W R
IG
H
T
M
AT
C H
L
IN
E- C
O N
TI
N
U
ED
AB
O
VE
L
EF
T
TO MD100
8 8 8
2N
2 - MECHANICAL SITE PLAN - DEMOLITION
GRAPHIC SCALE
( IN FEET )
1 inch = 20 ft.
20 0 10 20 40 80
GRAPHIC SCALE
( IN FEET )
1 inch = 20 ft.
20 0 10 20 40 80
AutoCAD SHX Text E
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
%%UPLAN NOTES:
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
MH-XXX
AutoCAD SHX Text
XX
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
FR
AMH/DS
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxx
BERIED TEL
UNDERGROUND
ELECTRIC
LINE
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
STM
ST
M
STM
ST
M
STM STM STM STM
STM
ST
M
STM STM STM STM STM STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
ST
M
STM STM
ST
M
ST
M
ST
M
STM
STM
ST
M
STMSTMSTMSTM
STM
STM
STM
STM
STMSTMSTM
STM STM
STM
STM
STM
STM
STM
STM
STM
STM
30'
60'
VAULT 9
PIT 3
MH48
PIT 3A
PIT 4
219.2'
.4
3'
32.25'
32.04'
BLDG.
LOT
STM
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
ST
M
STM
ST
M
STM
STM
STM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID
MECHANICAL SITE PLAN - CLIN 2A -
VAULTS
MD200
N
1 - MECHANICAL SITE PLAN - DEMOLITION
DETAIL NUMBER
SHEET NUMBER
DEMO WITHIN PIT 3A CONNECTIONS TO YARD PIPING.
ABANDON IN PLACE.
DEMO EXISTING STEAM MANHOLE INCLUDING:
-SUMP PUMPS
-ELECTRICAL
-STEAM/ CONDENSATE
DEMO DIRECT BURY STEAM AND CONDENSATE TO APPROXIMATE
DIMENSIONS.
AFTER DEMO OF STEAM AND CONDENSATE LINES, INFILL ENTIRE
LINES W/ FLOWABLE FILL AND CHECK REQUIREMENTS W/
MANUFACTURER FOR LIMITS WITH THE INTENT TO FILL ENTIRE
PIPE.
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR PHASING
OF DEMOLITION WORK INSTALL.
2. COORDINATE WITH MECHANICAL NEW WORK DRAWINGS
3. SEE STRUCTURAL DRAWINGS FOR NEW WORK
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL EROSION
CONTROL PLAN, GRADING AND PLANTING PLANS.
GRAPHIC SCALE
( IN FEET )
1 inch = 30 ft.
30 0 15 30 60 120
TO
M
D
TO
M
D
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AIR MAIL ROAD
AutoCAD SHX Text
TRIPP AVENUE
AutoCAD SHX Text
5TH AVENUE
AutoCAD SHX Text
TO EDWARD HINES JR. VA MEDICAL CENTER
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
MH-XXX
AutoCAD SHX Text
XX
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
%%UPLAN NOTES:
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
FR
AMH/DS
xxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
UNDERGROUND
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM
STM
STM STM STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM STM
STM
STM STM STM
68.05'
PIT 5
MH37
PIT 4
32.25'
32.04'
STM
STM
STM
ST
M
ST
M
STM
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
STM
STM
STM
STM
STM
STM
STM
STM
STM ST
M
STM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID
MECHANICAL SITE PLAN - CLIN 2A -
VAULTS
MD201
N
1 - MECHANICAL SITE PLAN - DEMOLITION
DETAIL NUMBER
SHEET NUMBER
ABANDON IN PLACE.
DEMO EXISTING STEAM MANHOLE INCLUDING:
-SUMP PUMPS
-ELECTRICAL AND CONTROLS
-STEAM/ CONDENSATE AN ALL VALVING AND ANCILLARIES
DEMO DIRECT BURY STEAM AND CONDENSATE TO APPROXIMATE
DIMENSIONS.
AFTER DEMO OF STEAM AND CONDENSATE LINES, INFILL ENTIRE
LINES W/ FLOWABLE FILL AND CHECK REQUIREMENTS W/
MANUFACTURER FOR LIMITS WITH THE INTENT TO FILL ENTIRE
PIPE.
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR PHASING
OF DEMOLITION WORK INSTALL.
2. COORDINATE WITH MECHANICAL NEW WORK DRAWINGS
3. SEE STRUCTURAL DRAWINGS FOR NEW WORK
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL EROSION
CONTROL PLAN, GRADING AND PLANTING PLANS.
GRAPHIC SCALE
( IN FEET )
1 inch = 30 ft.
30 0 15 30 60 120
TO
M
D
AutoCAD SHX Text
5TH AVENUE
AutoCAD SHX Text
TO EDWARD HINES JR. VA MEDICAL CENTER
AutoCAD SHX Text 37*
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FR
AutoCAD SHX Text
DS
AutoCAD SHX Text
MH-XXX
AutoCAD SHX Text
XX
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
%%UPLAN NOTES:
VAULT#9.1
VAULT#9.2
12" - HPS
12" - HPS
AN
C-
-A
AN
C-
-B
ANC-9.1-1
ANC-9.1-4
ANC-9.1-2
ANC-9.2-2
GUI-12
GU
I-6
GU
I-1
GU
I-6
GU
I-6
GU
I-6
GU
I-6
GU
I-6
GU
I-1
GUI-12
GUI-6
GUI-12
GUI-12
GUI-12
GUI-12
GUI-6
GUI-6 GUI-6
GUI-6 GUI-6 GUI-6 GUI-6
GUI-6
30'
GUI-6 GUI-6
GUI-6
GUI-12
12" - HPS
12" - HPS
2'
30'
13.3'
GUI-12
ANC-9.3
ANC-9.1-3
ANC-9.4 ANC-9.2-1
5'x3'x'5 expansion loop 28" pipe elevation change
MITERED JOINT
EX. ANCHOR
ANC-09-4-12" HPS
EX. ANCHOR
ANC-09-3-6" PC
36" pipe elevation change
EJ-5.1-1-D
EJ-5.1-2-D
CLIN 1 - MS100
2.
5'
1'
20.54'
GUI-12
15.92'
GUI-12
ANC-09-X-12"
HPS
ANC-09-Y-6" PC
23'-6 1/32"
T-09.2-2-D
6" - PC
12" - HPS
12" - HPS
6" - PC
1" - HPC
EJ-09.2-1-D
EJ-09.2-2-D
T-09.2-1-D
EJ-09.1-5-D
EJ-09.1-6-D
12" - HPS
6" - PC
H
PS
6"
PC
T-09.1-1-D
EJ-09.1-2-DEJ-09.1-1-D
T-09.1-2-D
TR
IPP AVEN
U E
VAULT#9.1
PIT#5VAULT#5.1
VAULT#5.3
BERIED TEL
UNDERGROUND
ELECTRIC
LINE
TR
IPP AVEN
U E
VAULT#5.2
VAULT#9.2 BUILDING
BUILDING
STM
STM
STM
STM
ST
M
ST
MSTM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
ST
M
STM
STM
STM
STM
ST
M
STM
STM
STM
EX. ANCHOR
EX. ANCHOR
EJ-5.1-1-D
EJ-5.1-2-D
23'-6 1/32"
T-09.2-2-D
EJ-09.2-1-D
EJ-09.2-2-D
T-09.2-1-D
EJ-09.1-5-D
EJ-09.1-6-D
T-09.1-1-D
EJ-09.1-2-DEJ-09.1-1-D
T-09.1-2-D
EJ-5.3-1-D
T-05.3-1-DEJ-5.3-2-D T-05.3-2-D T-05.3-3-D T-05.3-4-D
T-05.2-1-D
EJ-5.2-1-D
EJ-5.2-2-D T-05.2-2-D
EJ-5.1-3-D
EJ-5.1-4-D
EJ-5.1-1-D
EJ-5.1-2-D T-05.1-2-D
T-05.1-1-D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID
MECHANICAL SITE PLAN - CLIN 1 -
VAULTS
MS100
1 - MECHANICAL SITE PLAN - New Work1
N
INSTALL NEW ANCHORS FOR NEW STEAM LINES AND CONDENSATE
LINES.
CONTRACTOR TO INSTALL NEW BOX CONDUIT WITH PIPING
CONNECT ALL INTERNAL PIPING/STEAM TRAPS AND SUPPORTS PER
DETAILS SHOWN MS400, M500, M501, M502, M503.
INSTALL NEW 12" STM/6" PC FROM VAULT 9 TO JUST BEFORE POINT
OF CONNECTION TO EXISTING.
UPON SHUTDOWN APPROVAL AND WHEN EXISTING STEAM SERVICE
IS SHUTDOWN IN THE PLANT
CONNECT EXISTING 12" STEAM LINE AT EXISTING VAULT 9 WALL.
SEE MS401.
CONNECT EXISTING 6" CONDENSATE LINE AT EXISTING VAULT 9
WALL. SEE MS401.
INSTALL NEW 90 DEGREE ELBOWS WHERE SHOWN.
INSTALL VAULT 9.1. SEE MS404 FOR MECH, AND PL100 FOR SUMP
PUMPS. CONNECT ALL INTERNAL PIPING/STEAM TRAPS AND
SUPPORTS PER DETAILS SHOWN MS404, M500, M501, M502, M503.
INSTALL VAULT 9.2. SEE MS404 FOR MECH, AND PL100 FOR SUMP
PUMPS CONNECT ALL INTERNAL PIPING/STEAM TRAPS AND
SUPPORTS PER DETAILS SHOWN MS404, M500, M501, M502, M503.
CONNECTION TO BUILDING 217 ROOF. SEE MS406
MITERED JOINTS TO CHANGE SLOPE OF PIPE AND BOX CONDUIT.
1. SEE G101 AND ALL RELATED SPECIFICATIONS FOR PHASING
OF NEW WORK INSTALL.
2. SEE SHEETS MD-100, MD-200, MD-201 FOR EXISTING STEAM
DEMOLITION PLAN.
3. SEE SHEETS M500, 501, AND 502 FOR STEAM AND STEAM
LINE DETAILS.
4. SEE CIVIL DRAWINGS FOR SITE DEMO, SOIL EROSION
CONTROL PLAN, GRADING AND PLANTING PLANS.
5. REFER TO DETAIL SHEETS MI003 AND MI004 FOR PIPE
ANCHORS, GUIDES, AND SUPPORTS IN VAULTS AND PITS.
DETAIL NUMBER
SHEET NUMBER
CONTRACTOR TO INSTALL PIPE SUPPORTS NO
MORE THAN 17' APART FOR 6" PIPE, AND NO
MORE THAN 23' APART FOR 12" PIPE.
CONTRACTOR TO INSTALL PIPE GUIDES LESS
THAN 30' APART FOR 6" PIPE AFTER THE FIRST
GUIDE ADJUST PIPE SUPPORT SPAN AS
NEEDED.
CONTRACTOR TO INSTALL PIPE GUIDES LESS
THAN 60' APART FOR 12" PIPE AFTER THE FIRST
GUIDE ADJUST PIPE SUPPORT SPAN AS
NEEDED.
ADJUST SPANS AS NEED TO ACCOMMODATE
FIELD INTERFERENCES.
EXPANSION JOINT INSTALLATION SHALL
FOLLOW SLOPE OF PIPE FROM ANCHOR TO
ANCHOR. EXPANSION JOINT SHALL ONLY MOVE
AXIALLY WITHOUT ANY LATERAL MOVEMENT.
Key Plan
MS100 MS200 MS201
MS400
MS406
MS400
MS400
GRAPHIC SCALE
( IN FEET )
1 inch = 20 ft.
20 0 10 20 40 80
GENERAL GUIDANCE FOR PIPE SUPPORT
INSTALLATION
2 3 4 5
6 9
3 4
10 10
AutoCAD SHX Text E
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FR
AutoCAD SHX Text
AMH
AutoCAD SHX Text
%%UPLAN NOTES:
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
MH-XXX
AutoCAD SHX Text
XX
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
MS404
AutoCAD SHX Text
AutoCAD SHX Text
MS401
AutoCAD SHX Text
AutoCAD SHX Text
MS404
A
ANCHOR
TO MECHANICAL PENTHOUSE
6" - PC
12" - HPS
6" - PC
12" - HPS
BOTTOM OF PIPE INSULATION SHALL BE MINIMUM
2'-0" ABOVE FINISHED ROOF IN ALL LOCATIONS
FROM MS100
UNDERGROUND FROM
VAULT 9
12" - HPS
12" - HPS
12" - HPS
3"
HP
S
1 1 /2"
PC
DROPS TO FIRST FLOOR AND CONNECTS TO EXIST THRU BLDG
DROPS BELOW GRADE TO VAULT #9
6" - PC
6" - PC
12" - HPS
ANCHOR
ANCHOR
3" HPS TO 1ST FLR MECHANICAL ROOM A106
BUILDING 1 CONNECTING
3" - HPS
TO 1ST FLOOR
ANCHOR
6" - PC
2" - PC
4" - HPS
CHASE IN OFFICE A107 THRU BLDG 217 OUTSIDE WALL
1 1/2" - PC
STEAM D
RIP
LE
G 1
STEAM DRIP LEG 3
DETAIL 2
AND S
PARGER
AND SPARGER
AND SPARGER
ANCHOR
STEAM DRIP LEG 2
AND SPARGER
STEAM DRIP
LEG AND SPARGER 4
3" HPS CENTER RISE 14.5"
FROM CENTER OF 12" STEAM
14' - 11-3/4" DROP
W
/14X12 REDUCER
LOCATE PIPE
SUPPORTS
AT HALFWAY
POINTS
14 LR ELBLOW
INSTALL VALVES ON ALL SIDES OF THE TEE
INSTALL VALVES ON ALL SIDES OF THE TEE
STEAM SUPPLY OFF TOP OF MAIN
BUILDING 221
PENTHOUSE
LOWER ROOF
SCALE: 1/16" = 1'-0"
1 - MECHANICAL PLAN - New Work1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
POC: Aslam Husain
REPLACE STEAM PIPE-
SOUTH LEG
Edward Hines Jr. VAMC Hines, Illinois
578-17-027
221,217,1 Project Director
Revisions: Date:
9245 Calumet Ave. Suite 205, Phone: (219) 836-2120 Fax: (219) 836-1129 Munster, IN 46321
4/21/23
4/14/202230% SCHEMATIC DESIGN
P: 937-224-0861 www.heapy.com
PROJECT NO. STATE COA FIRM
NO.
2017-05127 015284/21/2023ISSUED FOR BID
MECHANICAL PLAN - BUILDING
217/221
MS101
N
1. SYMBOL PA- PIPE ANCHOR
2. SYMBOL PS- PIPE SUPPORT (PLANE)
3. SYMBOL GUI- PIPE GUIDE
4. ALL PS FOR 12" SPACING HAVE BEEN DESIGNED FOR THE
MAXIMUM 6" PIPE SPACING. CONTRACTOR MAY PLACE 12"
SUPPORTS IN ACCORDANCE WITH NOTE 6 WHERE FIELD
STRUCTURAL CONDITIONS ARE AVAILABLE.
5. CONTRACTOR TO INSTALL PIPE SUPPORTS LESS THAN 17'
APART FOR 6" PIPE.
6. CONTRACTOR TO INSTALL PIPE SUPPORTS LESS THAN 23'
APART FOR 12" PIPE.
7. CONTRACTOR TO INSTALL PIPE GUIDES LESS THAN 30' APART
FOR 6" PIPE AFTER THE FIRST GUIDE ADJUST PIPE SUPPORT
SPAN AS NEEDED.
8. CONTRACTOR TO INSTALL PIPE GUIDES LESS THAN 60' APART
FOR 12" PIPE AFTER THE FIRST GUIDE ADJUST PIPE SUPPORT
SPAN AS NEEDED.
9. ADJUST SPANS AS NEED TO ACCOMMODATE FIELD
INTERFERENCES.
10. ALL PIPE ANCHORS AND PIPE SUPPORTS ARE ATTACHED TO
BOTH THE HPS AND PC UNLESS OTHERWISE NOTED.
11. SEE PS, ANCHOR DETAILS ON STRUCTURAL DRAWINGS
S101-S105
12. SEE MI005 FOR ANTI-FREEZE COIL ON 6" PC.
13. IF INSTALLED IN THE WINTER, CONTRACTOR TO WARM PIPE TO
70 DEGREE F (21 DEGREE C).
NOTES
GENERAL NOTES