S02_ICVA-Dialysis_CD_SpecVol1_20251210.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26326B0005
About this file
This document is a comprehensive technical specification for asbestos floor tile and mastic abatement for the Iowa City VA Health Care System. The project involves renovating the Dialysis Clinic, with work to be performed in multiple phases including preparing a temporary dialysis clinic and then renovating 5,000 square feet of the existing clinic. The solicitation is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under the Veterans First Contracting Program, with an expectation of receiving offers from at least two SDVOSB construction firms.
The technical specification provides extensive detailed requirements for asbestos abatement, including strict protocols for containment, personnel protection, respiratory safety, decontamination procedures, air monitoring, and waste disposal. Key requirements include maintaining negative air pressure in regulated areas, using specific personal protective equipment, conducting air quality testing, and following precise removal and cleanup procedures. The contractor must be prepared to handle approximately 10 square feet of gray adhesive on wall plaster, with comprehensive documentation, safety, and environmental compliance mandated throughout the abatement process.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Anderson Engineering of Minnesota, LLC
13605 1st Avenue North
Plymouth, MN 55441
Phone: 763-412-4000 Fax: 763-412-4090
Prepared in association with the following:
IMEG Corp 2882 106th Street
Des Moines, IA 50322 Phone: 515-334-9906
Renovate Dialysis
VA PROJECT NUMBER: 636A8-24-001
601 HWY 6 West
Iowa City, IA 52246
TECHNICAL SPECIFICATIONS
Volume 1: DIVISIONS 00 - 14
ANDERSON ENGINEERING OF MN, LLC
Project Number: 17909
Issue for
Construction Documents
April 24, 2025
Iowa City VA Health Care System VA Project 636A8-24-001
Renovate Dialysis April 24, 2025
601 HWY 6 West CONSTRUCTION DOCUMENTS
Iowa City, IA 52246
CERTIFICATIONS PAGE
Architect and Coordinating Professional:
Typed or Printed Name: Thomas Allen Olesak
License Number: ARC07582
License Expiration Date: 06/30/2025
Professional Engineer: (Structural)
Typed or Printed Name: Adam Adams
License Number: P22449
License Expiration Date: 12/31/2025
04/24/2025
601 HWY 6 West CONSTRUCTION DOCUMENTS
Iowa City, IA 52246
Professional Engineer: (Mechanical, Medical Gas, Plumbing, Fire Protection)
Typed or Printed Name: Dellan Llewellyn
License Number: P27052
License Expiration Date: 12/31/2026
Professional Engineer: (Electrical, Technology)
Typed or Printed Name: Kristen L. Spina
License Number: P21081
License Expiration Date: 12/31/2025
- - - END - - -
nder the laws of the St
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 06-01-24
00 01 10-1
TABLE OF CONTENTS
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules Small Projects – Design/Bid/Build 01-24 01 33 23 Shop Drawings, Product Data, and Samples 11-23 01 35 26 Safety Requirements 05-24 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 13.13 Glovebag Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 82 13.31 Asbestos Transite Abatement 01-21
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 06-01-24
00 01 10-2
TABLE OF CONTENTS
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01-21 07 01 50.19 Preparation for Re-Roofing 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22 08 32 13 ICU Sliding Doors 08 71 00 Door Hardware 03-24 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 00 Specialty Moldings and Trim 01-23 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 06-22 09 91 00 Painting 01-21 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 21 23 Cubicle Curtain Tracks 01-21 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment 01-21 11 73 00 Ceiling Mounted Patient Lift System 08-20 11 73 00.1 Ceiling Mounted Patient Lift System Checklist Rev 2.1
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17 12 32 00 Manufactured Wood Casework 01-21
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 06-01-24
00 01 10-3
TABLE OF CONTENTS
SECTION NO DIVISION AND SECTION TITLES DATE
12 36 00 Countertops 12-23
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 40 00 Plumbing Fixtures 05-24 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 05-23 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 05-23
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 03-23
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 03-23 23 09 23 Direct-Digital Control System for HVAC 03-23 23 25 00 HVAC Water Treatment 03-23 23 31 00 HVAC Ducts and Casings 03-23 23 34 00 HVAC Fans 03-23 23 36 00 Air Terminal Units 03-23 23 37 00 Air Outlets and Inlets 03-23
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 73 Overcurrent Protective Device Coordination Study 11-22 26 08 00 Commissioning of Electrical Systems 11-22 26 09 23 Lighting Controls 11-22 26 24 16 Panelboards 11-22 26 27 26 Wiring Devices 11-22 26 29 11 Motor Controllers 11-22 26 29 21 Enclosed Switches and Circuit Breakers 11-22
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 06-01-24
00 01 10-4
TABLE OF CONTENTS
SECTION NO DIVISION AND SECTION TITLES DATE
26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 03-24
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 05 61 Leased Space, Communication Equipment and Systems 06-15 27 08 00 Commissioning of Communications Systems 11-16 27 11 00 Telecommunications Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 52 23 Nurse Call and Code Blue Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 31 00 Fire Detection and Alarm 10-11
APPENDICES –INFORMATION AND REPORTS
Appendix A – Pre-Renovation Asbestos Survey Appendix B – Reverse Osmosis Information Appendix C – VA Provided Risk Assessment Informaton
- - - E N D - - -
601 HWY 6 West CONSTRUCTION DOCUMENTS
Iowa City, IA 52246 05-01-20
00 01 15 - 1
LIST OF DRAWING SHEETS
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
1-I1 COVER SHEET
1-I2 ABBREVIATIONS
1-I3 5TH FLOOR - LIFE SAFETY PLAN
1-I4 INFECTION CONTROL AND PHASING NOTES
1-I5 3RD AND 4TH FLOOR - INFECTION CONTROL & PHASING PLAN
1-I6 5TH FLOOR - INFECTION CONTROL & PHASING PLAN
1-I7 ICRA DETAIL
HAZARDOUS MATERIAL
HA001 5TH FL – HAZARDOUS MATERIAL ASBESTOS ABATEMENT
STRUCTURAL
1-S1 FIFTH FLOOR FRAMING PLAN
1-S2 SIXTH FLOOR / ROOF FRAMING PLAN
ARCHITECTURAL
1-A1 5TH FLOOR - OVERALL PLAN
1-A2 5TH FLOOR - DEMOLITION PLAN - ZONE 1
1-A3 5TH FLOOR - DEMOLITION PLAN - ZONE 2
1-A4 5TH FLOOR – PARTIAL FLOOR PLAN - ZONE 1
1-A5 5TH FLOOR – PARTIAL FLOOR PLAN - ZONE 2
1-A6 5TH FLOOR – PARTIAL REFLECTED CEILING PLAN
1-A7 ENLARGED PLANS AND INTERIOR ELEVATIONS
1-A8 MOUNTING HEIGHTS
1-A9 OPENING SCHEDULE, TYPES, AND DETAILS
1-A10 PARTITION TYPES AND DETAILS
1-A11 PLAN DETAILS
1-A12 INTERIOR SECTION DETAILS AND CASEWORK GENERAL NOTES
1-A13 ENLARGED RCP AND CEILING DETAILS
1-A14 5TH FLOOR - FINISH PLAN – ZONE 1
1-A15 MATERIAL AND ROOM FINISH SCHEDULE – ZONE 1
1-A16 5TH FLOOR - WAYFINDING PLAN AND SIGN MESSAGE SCHEDULE
1-A17 SIGNAGE DETAILS
601 HWY 6 West CONSTRUCTION DOCUMENTS
Iowa City, IA 52246 05-01-20
00 01 15 - 2
LIST OF DRAWING SHEETS
1-A18 5TH FLOOR - FURNITURE PLAN – ZONE 1
1-A19 5TH FLOOR - FURNITURE PLAN - ZONE 2
1-A20 5TH FLOOR - EQUIPMENT PLAN
FIRE PROTECTION
1-F1 FIRE PROTECTION COVERSHEET
1-F2 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - FIRE PROTECTION
1-F3 FIFTH FLOOR PLAN - ZONE 1 - FIRE PROTECTION
1-F4 FIRE PROTECTION DETAILS
PLUMBING
1-P1 PLUMBING COVERSHEET
1-P2 THIRD FLOOR DEMOLITION PLAN - ZONE 1 - PLUMBING
1-P3 FOURTH FLOOR DEMOLITION PLAN - ZONE 1 - PLUMBING
1-P4 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - PLUMBING
1-P5
FIFTH FLOOR - ABANDON PIPING DEMOLITION - ZONE 1 -
PLUMBING
1-P6 THIRD FLOOR PLAN - ZONE 1 - PLUMBING
1-P7 FOURTH FLOOR PLAN - ZONE 1 - PLUMBING
1-P8 FIFTH FLOOR PLAN - ZONE 1 - PLUMBING
1-P9 FIFTH FLOOR PLAN - ZONE 2 - PLUMBING
1-P10 PLUMBING DIAGRAMS
1-P11 PLUMBING DETAILS
1-P12 PLUMBING SCHEDULES
MEDICAL GAS
1-MG1 MEDICAL GAS COVERSHEET
1-MG2 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - MEDICAL GAS
1-MG3 FIFTH FLOOR PLAN - ZONE 1 - MEDICAL GAS
1-MG4 MEDICAL GAS DETAILS
MECHANICAL HVAC
1-H1 HVAC COVERSHEET
1-H2 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - HVAC
1-H3 SIXTH FLOOR DEMOLITION PLAN - ZONE 1 - HVAC
1-H4 FIFTH FLOOR PLAN - ZONE 1 - VENTILATION
1-H5 SIXTH FLOOR PLAN - ZONE 1 - VENTILATION
1-H6 FIFTH FLOOR PLAN - ZONE 1 - PIPING
1-H7 HVAC DETAILS
1-H8 HVAC DETAILS
601 HWY 6 West CONSTRUCTION DOCUMENTS
Iowa City, IA 52246 05-01-20
00 01 15 - 3
LIST OF DRAWING SHEETS
1-H9 HVAC DIAGRAMS
1-H10 HVAC SCHEDULES
ELECTRICAL
1-E1 ELECTRICAL COVERSHEET
1-E2 ELECTRICAL LIGHTING COVERSHEET
1-E3 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - ELECTRICAL
1-E4 FIFTH FLOOR PLAN - ZONE 1 - LIGHTING
1-E5 FIFTH FLOOR PLAN - ZONE 1 - POWER
1-E6 FIFTH FLOOR PLAN - ZONE 2 - POWER
1-E7 SIXTH FLOOR PLAN - ZONE 1 - POWER
1-E8 ELECTRICAL DETAILS
1-E9 ELECTRICAL DIAGRAMS
1-E10 ELECTRICAL SCHEDULES
1-E11 ELECTRICAL PANEL SCHEDULES
TECHNOLOGY
1-T1 TECHNOLOGY COVERSHEET
1-T2 SECOND FLOOR PLAN - TECHNOLOGY
1-T3 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - TECHNOLOGY
1-T4 FIFTH FLOOR DEMOLITION PLAN - ZONE 2 - TECHNOLOGY
1-T5 FIFTH FLOOR PLAN - ZONE 1 - TECHNOLOGY
1-T6 FIFTH FLOOR PLAN - ZONE 2 - TECHNOLOGY
1-T7 TECHNOLOGY ENLARGED PLANS
1-T8 TECHNOLOGY DETAILS
1-T9 TECHNOLOGY DETAILS
1-T10 TECHNOLOGY RISER DIAGRAMS
1-T11 TECHNOLOGY RISER DIAGRAMS
1-T12 TECHNOLOGY SCHEDULES
ELECTRICAL SYSTEMS
1-FA1 ELECTRICAL SYSTEMS COVERSHEET
1-FA2 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - SYSTEMS
1-FA3 FIFTH FLOOR PLAN - ZONE 1 - SYSTEMS
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -1
GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting Officer.
C. Offices of Anderson Engineering of MN, LLC, as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -2
GENERAL REQUIREMENTS
permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. Normal working hours for this contract will be from 7:00AM to 4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays.
1. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the
COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items. Work includes all labor, material, equipment, and supervision to perform the required demolition and construction work on this project including Hazardous Material Abatement, Structural and Architectural Modifications, Equipment, Fire
Protection Systems, Plumbing Systems, Mechanical Systems, Electrical Systems, and Telecommunication Systems as described in the Basis of Design and Indicated on the
Construction Documents.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -3
GENERAL REQUIREMENTS
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. The General Contractor’s employees shall not be permitted at the Iowa City VA Medical Center without an appropriate badge. Employees that will be on site for less than 5 business days throughout the entirety of the project must be escorted by an existing badge holder. For all other employees, the VA will conduct the appropriate background investigation based on the individual employee’s access needs.
2. In order to initiate the background check and badge request, the General Contractor shall submit the following documents to the VA COR at least one month before starting work for every employee that requires a badge:
a. Declaration of Federal Employment
b. OF 306
c. Contractor Background Investigation Request
d. Self-Certification of Continuous Service
e. Contractor Request Form
3. Following submittal of the background check documents to the VA COR, the General Contractor shall ensure their employee makes an appointment with the VA to provide their fingerprints. Employees shall bring a completed
Fingerprint Request Form with them to their
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -4
GENERAL REQUIREMENTS
fingerprinting appointment. Fingerprints are required by the VA as part of the background check process.
4. Favorable adjudication of the background investigation and badge issuance is required before the employee shall be permitted on site. Processing times vary and could take up to several months.
5. General Contractor’s employees may also be subject to inspection of their personal effects when entering or leaving the project site.
6. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
7. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards: Not used.
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work. See Section 08 71 00, DOOR
HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -5
GENERAL REQUIREMENTS
memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of
“sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -6
GENERAL REQUIREMENTS
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.
Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General
Contractor and its employees for parking in designated areas only. A maximum of 2 parking permits will be provided. Parking spaces are not guaranteed. Carpooling will be required. Contractor to coordinate with VA
Medical Center Facility Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The
Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the
Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -7
GENERAL REQUIREMENTS
as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as shown on the drawings as determined by the COR
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
sha
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -8
GENERAL REQUIREMENTS
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of
Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
H. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
The work to be outlined shall include, but not be limited to:
To ensure such executions, Contractor shall furnish the
COR with a schedule of approximate phasing dates on which
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -9
GENERAL REQUIREMENTS
the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.
Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:
Phase I: Prepare 5 Floor West (Zone 2) for temporary Dialysis
Clinic. Construct wall and door 5CW01A in Zone 2a.
Provide 14 days between phase 1 and 2 to allow for the
VA to remove equipment prior to demo/construction.
Phase II: Construct enclosure around decontamination unit and remove asbestos-containing building elements.
Phase III: Demolish 5 Floor South (Zone 1) as described in construction documents and prepare elements for new construction.
Phase IV: Cap and remove piping in 4 Floor ceiling. Replace sanitary pipe on 3 Floor.
Phase V: Construct 5 Floor South (Zone 1) including work on roof above and floors below as necessary.
Phase VI: Restore 5 Floor West (Zone 2) to pre-existing condition or better. Reinstall replaced lavatory and removed bathroom doors. Take care that each door is reinstalled in same frame as before Phase I. Remove wall and door 5CW01A in Zone 2a. Patch walls in Zone
2a.
I. Building No. 1 will be occupied during performance of work;
but immediate areas of alterations will be vacated.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -10
GENERAL REQUIREMENTS
property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of
Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.
Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
J. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems
(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -11
GENERAL REQUIREMENTS
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center
Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK
RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing via Contractor Request Form, at least 14 days in advance of the proposed interruption.
Request form shall state reason, date, exact shutdown time, and approximate duration of such interruption. In addition, all utility shutdowns involving or effecting any medical gas system will require at least 21 days advance notice to the COR via Contractor Request Form.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical
Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 21 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -12
GENERAL REQUIREMENTS
the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;
so that they are completely behind the finished surfaces.
L. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
M. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -13
GENERAL REQUIREMENTS
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of
VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the
Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -14
GENERAL REQUIREMENTS
SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-
4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved.
They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -15
GENERAL REQUIREMENTS
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the
Government are identified by attached tags or noted on drawings or in specifications as items to be stored.
Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the
Contractor and be removed by Contractor from Medical
Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.
When rooms and spaces are vacated by the Department of
Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the
Government in advance of work to avoid interfering with
Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, and equipment, on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract.
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -16
GENERAL REQUIREMENTS
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL
CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage
Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -17
GENERAL REQUIREMENTS
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by
Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -18
GENERAL REQUIREMENTS
the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.12 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21
Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting
Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the
Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -19
GENERAL REQUIREMENTS
and telephone numbers within the company of the
Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and Maintenance manuals.
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -20
GENERAL REQUIREMENTS
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance & Payment Bonds: The Performance & Payment
Bonds must remain effective throughout the construction period.
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the
Government at the contractor’s expenses, the Contracting
Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -21
GENERAL REQUIREMENTS
follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the
Contractor.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the
Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for
Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the
Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service
Requirements:
E. Following oral or written notification by the Contracting
Officer, the Contractor shall respond to construction warranty service requirements in accordance with the
“Construction Warranty Service Priority List” and the three
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -22
GENERAL REQUIREMENTS
categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within
4 hours, initiate work within 6 hours and work continuously to completion or relief.
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within
8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
4. The “Construction Warranty Service Priority List” is as follows:
a) Code 1-Life Safety Systems Fire suppression systems.
Fire alarm system(s).
b) Code 1-Air Conditioning Systems Air conditioning leak in part of the building, if causing damage.
Air conditioning system not cooling properly.
c) Code 1 Doors
Overhead doors not operational, causing a security, fire or safety problem.
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -23
GENERAL REQUIREMENTS
Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
d) Code 3-Doors Overhead doors not operational.
Interior/exterior personnel doors or hardware not functioning properly.
e) Code 1-Electrical Power failure (entire area or any building operational after 1600 hours).
Security lights.
Smoke detectors.
f) Code 2-Electrical Power failure (no power to a room or part of building). Receptacle and lights not operational (in a room or part of building).
g) Code 3-Electrical Exterior lights not operational.
h) Code 1-Gas Leaks and pipeline breaks.
i) Code 1-Heat Power failure affecting heat.
j) Code 1-Plumbing Hot water heater failure.
Leaking water supply pipes
k) Code 2-Plumbing Flush valves not operating properly Fixture drain, supply line or any water pipe leaking.
Toilet leaking at base.
l) Code 3- Plumbing
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -24
GENERAL REQUIREMENTS
Leaky faucets.
m) Code 3-Interior
Floors damaged.
Paint chipping or peeling.
Casework damaged.
n) Code 1-Roof Leaks Damage to property is occurring.
o) Code 2-Water (Exterior) No water to facility.
p) Code 2-Water (Hot) No hot water in portion of building listed.
q) Code 3 All work not listed above.
i. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer.
Attach each tag with a copper wire and spray with a silicone waterproof coating.
Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.
Warranty Tags
Type of product/material
Model number
601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -25
GENERAL REQUIREMENTS
Warranty Tags
Serial number
Contract number
Warranty period from/to
Inspector’s signature
Construction Contractor
Address
Telephone number
Warranty Contact
Address
Telephone number
Warranty response time priority code
1.13 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by
COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, 601 HWY 6 West CONSTRUCTION DOCUMENTS Iowa City, IA 52246 11-01-21
01 00 00 -26
GENERAL REQUIREMENTS
National Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded.
This is the start of the file's text. The full file is on GovTribe.