This document is a comprehensive set of architectural and engineering construction documents for renovating the Dialysis Clinic at the Iowa City VA Health Care System. The project involves a phased renovation approach, first preparing a temporary dialysis clinic and then renovating approximately 5,000 square feet of the existing clinic on the 5th floor. The solicitation is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an expectation of receiving bids from at least two qualifying contractors.
The construction documents include detailed architectural, structural, mechanical, electrical, plumbing, medical gas, and fire protection plans for the renovation. Key technical aspects include reconfiguring the existing dialysis space, installing new medical equipment, updating building systems, and maintaining infection control protocols during construction. The project requires precise phasing to ensure continuous healthcare operations, with specific requirements for temporary spaces, medical gas systems, HVAC modifications, and adherence to VA and federal building standards. The solicitation number is 36C26326B0005, with the project number designated as 636A8-24-001.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
█ ISSUED
NOT ISSUED
ISSUED FOR REFERENCE ONLY
ISSUED AS NOTED
R
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
VICINITY MAP:
DESIGNER OF RECORD
KEY PLAN:
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
IMEG CORP
2882 106th St,Des Moines, IA 50322 Contact: Dellan Llewellyn
(515) 334-7921
LANDMARK ENVIRONMENTAL
9555 James Ave S - Ste 262, Bloomington, MN 55431 Contact: Mark Meier (952) 295-9410
C U s e rs \p c h o i\ D o c u m e n ts
\1
-I C
V A
F L R
-A -R
Y e u n y o u n g .r v t
/2
/2
:1
:3
A
M
1-I1
COVER SHEET RENOVATE DIALYSIS
IOWA CITY, IA
636A8-24-001
04/24/2025 EM MWC
RENOVATE DIALYSIS
601 HIGHWAY 6 W,
IOWA CITY, IA 52246
636A8-24-001
17909
VA COR:
CONTACT:
ADDRESS:
PHONE:
BRIAN WHITE
IOWA CITY VA MEDICAL CENTER
601 HIGHWAY 6 WEST
IOWA CITY, IA 52246-2209
319-512-9764
SHEET INDEX - ARCHITECTURAL
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-A1 5TH FLOOR - OVERALL PLAN █
1-A2 5TH FLOOR - DEMOLITION PLAN - ZONE 1 █
1-A3 5TH FLOOR - DEMOLITION PLAN - ZONE 2 █
1-A4 5TH FLOOR - PARTIAL FLOOR PLAN - ZONE 1 █
1-A5 5TH FLOOR - PARTIAL FLOOR PLAN - ZONE 2 █
1-A6 5TH FLOOR - PARTIAL REFLECTED CEILING PLAN - ZONE 1 █
1-A7 ENLARGED PLANS AND INTERIOR ELEVATIONS █
1-A8 MOUNTING HEIGHTS █
1-A9 OPENING SCHEDULE, TYPES, AND DETAILS █
1-A10 PARTITION TYPES AND DETAILS █
1-A11 PLAN DETAILS █
1-A12 INTERIOR SECTION DETAILS AND CASEWORK GENERAL NOTES █
1-A13 ENLARGED RCP AND CEILING DETAILS █
1-A14 5TH FLOOR - FINISH PLAN - ZONE 1 █
1-A15 MATERIAL AND ROOM FINISH SCHEDULE - ZONE 1 █
1-A16 5TH FLOOR - WAYFINDING PLAN AND SIGN MESSAGE SCHEDULE █
1-A17 SIGNAGE DETAILS █
1-A18 5TH FLOOR - FURNITURE PLAN - ZONE 1 █
1-A19 5TH FLOOR - FURNITURE PLAN - ZONE 2 █
1-A20 5TH FLOOR - EQUIPMENT PLAN █
ZONE 1
ZONE 2
SHEET INDEX - FIRE PROTECTION
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-F1 FIRE PROTECTION COVERSHEET
1-F2 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - FIRE PROTECTION
1-F3 FIFTH FLOOR PLAN - ZONE 1 - FIRE PROTECTION
1-F4 FIRE PROTECTION DETAILS
SHEET INDEX - STRUCTURAL
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-S1 FIFTH FLOOR FRAMING PLAN █
1-S2 SIXTH FLOOR FRAMING PLAN █
SHEET INDEX - HAZARDOUS MATERIAL
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
HA001 5TH FL - HAZARDOUS MATERIALS ASBESTOS/ABATEMENT ZONE 1 █
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
ED MARKFORT
PHONE: 763-412-4000
SHEET INDEX - GENERAL
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-I1 COVER SHEET █
1-I2 ABBREVIATIONS █
1-I3 5TH FLOOR - LIFE SAFETY PLAN █
1-I4 INFECTION CONTROL AND PHASING NOTES █
1-I5 3RD AND 4TH FLOOR - INFECTION CONTROL & PHASING PLAN █
1-I6 5TH FLOOR - INFECTION CONTROL & PHASING PLAN █
1-I7 ICRA DETAIL █
SHEET INDEX - ELECTRICAL SYSTEM
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-FA1 ELECTRICAL SYSTEMS COVERSHEET
1-FA2 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - SYSTEMS
1-FA3 FIFTH FLOOR PLAN - ZONE 1 - SYSTEMS
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF IOWA.
DATE
MY LICENSE EXPIRATION DATE IS: 12/31/2025
PAGES OR SHEETS COVERED BY THIS SEAL:
I O W A
S E
D
PROFESS IONA
21081
L
IC
E N
L E
N G
I N E
E R
KRISTEN L.
SPINA KRISTEN L. SPINA
ELECTRICAL, TECHNOLOGY
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF IOWA.
DATE
MY LICENSE EXPIRATION DATE IS: 12/31/2026
PAGES OR SHEETS COVERED BY THIS SEAL:
I O W A
S E
D
PROFESS IONA
27052
L
IC
E N
L E
N G
I N E
E R
DELLAN
LLEWELLYN DELLAN LLEWELLYN
MECHANICAL, MEDICAL GAS, PLUMBING, FIRE PROTECTION
I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL
SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND RESPONSIBLE
CHARGE. I AM A DULY LICENSED ARCHITECT UNDER THE
LAWS OF THE STATE OF IOWA.
DATE
MY LICENSE EXPIRATION DATE IS: 06/30/2025
PAGES OR SHEETS COVERED BY THIS SEAL:
THOMAS OLESAK, AIA
GENERAL, ARCHITECTURAL
SHEET INDEX - MECHANICAL HVAC
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-H1 HVAC COVERSHEET
1-H2 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - HVAC
1-H3 SIXTH FLOOR DEMOLITION PLAN - ZONE 1 - HVAC
1-H4 FIFTH FLOOR PLAN - ZONE 1 - VENTILATION
1-H5 SIXTH FLOOR PLAN - ZONE 1 - VENTILATION
1-H6 FIFTH FLOOR PLAN - ZONE 1 - PIPING
1-H7 HVAC DETAILS
1-H8 HVAC DETAILS
1-H9 HVAC DIAGRAMS
1-H10 HVAC SCHEDULES
SHEET INDEX - ELECTRICAL
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-E1 ELECTRICAL COVERSHEET
1-E2 ELECTRICAL LIGHTING COVERSHEET
1-E3 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - ELECTRICAL
1-E4 FIFTH FLOOR PLAN - ZONE 1 - LIGHTING
1-E5 FIFTH FLOOR PLAN - ZONE 1 - POWER
1-E6 FIFTH FLOOR PLAN - ZONE 2 - POWER
1-E7 SIXTH FLOOR PLAN - ZONE 1 - POWER
1-E8 ELECTRICAL DETAILS
1-E9 ELECTRICAL DIAGRAMS
1-E10 ELECTRICAL SCHEDULES
1-E11 ELECTRICAL PANEL SCHEDULES
SHEET INDEX - TECHNOLOGY
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-T1 TECHNOLOGY COVERSHEET
1-T2 SECOND FLOOR PLAN - TECHNOLOGY
1-T3 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - TECHNOLOGY
1-T4 FIFTH FLOOR DEMOLITION PLAN - ZONE 2 - TECHNOLOGY
1-T5 FIFTH FLOOR PLAN - ZONE 1 - TECHNOLOGY
1-T6 FIFTH FLOOR PLAN - ZONE 2 - TECHNOLOGY
1-T7 TECHNOLOGY ENLARGED PLANS
1-T8 TECHNOLOGY DETAILS
1-T9 TECHNOLOGY DETAILS
1-T10 TECHNOLOGY RISER DIAGRAMS
1-T11 TECHNOLOGY RISER DIAGRAMS
1-T12 TECHNOLOGY SCHEDULES
SHEET INDEX - MEDICAL GAS
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-MG1 MEDICAL GAS COVERSHEET
1-MG2 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - MEDICAL GAS
1-MG3 FIFTH FLOOR PLAN - ZONE 1 - MEDICAL GAS
1-MG4 MEDICAL GAS DETAILS
SHEET INDEX - PLUMBING
SHEET
NO. SHEET TITLE C
O
NS
TR
UC
TI
O
N
DO
CU
M
EN
TS
4/
/2
1-P1 PLUMBING COVERSHEET
1-P2 THIRD LEVEL FLOOR DEMOLITION PLAN - ZONE 1 - PLUMBING
1-P3 FOURTH FLOOR DEMOLITION PLAN - ZONE 1 - PLUMBING
1-P4 FIFTH FLOOR DEMOLITION PLAN - ZONE 1 - PLUMBING
1-P5 FIFTH FLOOR - ABANDON PIPING DEMOLITION - ZONE 1 - PLUMBING
1-P6 THIRD LEVEL FLOOR PLAN - ZONE 1 - PLUMBING
1-P7 FOURTH FLOOR PLAN - ZONE 1 - PLUMBING
1-P8 FIFTH FLOOR PLAN - ZONE 1 - PLUMBING
1-P9 FIFTH FLOOR PLAN - ZONE 2 - PLUMBING
1-P10 PLUMBING DIAGRAMS
1-P11 PLUMBING DETAILS
1-P12 PLUMBING SCHEDULES
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
ADAM ADAMS
PHONE: 763-412-4000
MECHANICAL/PLUMBING/FIRE PROTECTION ENGINEER:
NAME:
ADDRESS:
CONTACT:
IMEG CORP
2882 106th STREET
DES MOINES, IA 50322
DELLAN J. LLEWELLYN
PHONE: 515-334-7921
ELETRICAL/TECHNOLOGY ENGINEER:
NAME:
ADDRESS:
CONTACT:
IMEG CORP
2882 106th STREET
DES MOINES, IA 50322
ZACHARY ROSS
HAZARDOUS MATERIALS (ASBESTOS/ABATEMENT):
NAME:
ADDRESS:
CONTACT:
LANDMARK ENVIROMENTAL
9555 JAMES AVENUE SOUTH, SUITE 262
BLOOMINGTON, MN 55431
MARK MEIER
PHONE: 952-295-9410
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE
OF IOWA.
DATE
MY LICENSE EXPIRATION DATE IS: 12/31/2025
PAGES OR SHEETS COVERED BY THIS SEAL:
I O W A
S E
D
PROFESS IONA
22449
L
IC
E N
L E
N G
I N E
E R
ADAM
ADAMS ADAM ADAMS
STRUCTURAL
Revisions: Date:
04/24/2025 04/24/2025 nder the laws of the St
04/24/2025 04/24/2025
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VD
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VOICE AND DATA
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMEG CORP
2882 106th St,Des Moines, IA 50322 Contact: Dellan Llewellyn
(515) 334-7921
LANDMARK ENVIRONMENTAL
9555 James Ave S - Ste 262, Bloomington, MN 55431 Contact: Mark Meier (952) 295-9410
C U s e rs \p c h o i\ D o c u m e n ts
\1
-I C
V A
F L R
-A -R
Y e u n y o u n g .r v t
/2
/2
:4
:2
P
M
1-I2
ABBREVIATIONS RENOVATE DIALYSIS
IOWA CITY, IA
636A8-24-001
04/24/2025 EM MWC
17909
Revisions: Date:
NOGENERAL TYPE OF PROJECT
REMODEL, LESS THAN 50% OF FLOOR (5 SOUTH)
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
CODE SUMMARY
Interior renovation of an existing 4,013 sf dialysis space to improve the condition of the unit. The project will use 2,150 sf of existing space on the same floor for a temporary dialysis ward during the construction process. NO
CHANGE OF OCCUPANCY?
New Patient Care Nonsleeping Suite in New
Health Care
SEPARATED OCCUPANCIES?
OCCUPANCY CLASSIFICATION IN 5 SOUTH
OCCUPANCIES
(Change from Existing Healthcare Suite to New
Healthcare Suite - Remodeling over 50%)
2024 LSC (TABLE 6.1.14.1)
(LSC CH 18)
YES
YES
(Section 8.3)FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
SEPARATED OCCUPANCIES: ABOVE AND BELOW FLOORS?
TESTRATING (HRS)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
PRIME & SEC. ROOF BEAMS, JOISTS
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
AREA SEPARATIONS / FIRE WALLS
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
CONSTRUCTION TYPE(S)
ADDITIONAL NOTES
SEE LIFE SAFETY PLANS
See Life Safety Plans
EXISTING HEALTH CARE
-- Common path:
-- Dead-end: 30' -- Total distance: 200'
EXISTING PATIENT CARE NONSLEEPING SUITE
-- Path to exit access: 100' -- Total distance: 200'
OCCUPANT LOAD OF CONSTRUCTION ZONES
SF/OCCUPANT OCCUPANTSACTUAL AREAAREA LOCATION
ZONE 1
ZONE 2
4,013 sf
2,150 sf 150 sf/occ
1 1/2
(NFPA 220 TABLE 4.1.1) Type I (332)
PLUMBING FIXTURES
TOILETS
LAVATORIES
DRINKING FOUNTAINS
SERVICE SINKS
PROVIDED RQD FACTOR
3 UNISEX 1 E, 1 CR
1/25 (care recipient treatment area)
3 UNISEX 1 E, 1 CR
1 per floor
1--
URINALS -- -- --
(IBC CH 29)
1/100
AREAS OF REFUGE REQUIRED
MEANS OF EGRESS CAPACITY (width in inches)
EGRESS
36" Stair or 48" Corridor
NOYES
ACCESSIBLE MEANS OF EGRESS ("MOE") REQUIRED
ELEVATOR REQUIRED AS MEANS OF EGRESS
NOYES
FIRE RESISTIVE CORRIDORS?
CORRIDOR TO LIMIT THE TRANSFER OF SMOKE
INCIDENTAL USE AREA RATING(S) SEE PLANS
MISCELLANEOUS
1/50 (care recipient treatment area)
NO CHANGE
NO CHANGE
1 1/2
ZONE 1a 325 sf
150 sf/occ
300 sf/occ 2
NO
CHANGE OF OCCUPANCY?
Existing Patient Care Nonsleeping Suite in Existing Health Care
SEPARATED OCCUPANCIES?
OCCUPANCY CLASSIFICATION IN 5 WEST
OCCUPANCIES
(If Remodeling)
2024 LSC (TABLE 6.1.14.1)
(LSC CH 19) YES
(Section 8.3)FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
SEPARATED OCCUPANCIES: ABOVE AND BELOW FLOORS?
ADDITIONAL NOTES
EXISTING HEALTH CARE
-- Common path:
-- Dead-end: 30' -- Total distance: 200'
EXISTING PATIENT CARE NONSLEEPING SUITE
-- Path to exit access: 100' -- Total distance: 200'
ZONE 2a 2,150 sf 150 sf/occ 15
APPLICABLE REGULATIONS
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2022 FGI GUIDELINES
2024 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2024 IBC (WHEN REFERENCED OR NFPA DOES NOT ADRESS ISSUE)
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (JC)
U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13834
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)
REMODEL, LESS THAN 50% OF FLOOR (ALL OTHERS)
TR
AV
EL
D
IS
TA
NC
E
7'
-0
E X
IT
'-5
'-7
E X
IT
E X
IT
EXIT
TR
AV
EL
D
IS
TA
NC
E
1'
TRAVEL DISTANCE
101'
5W12B
CLEAN
UTILITY
5W105W08
PATIENT
ROOM
5W08A
TOILET
5W11A
TOILET
5W11
PATIENT
ROOM
5W13
BREAKROOM
5C W03B
OFFICE
5W15
PROVIDER
WORKSTATIONS
5W21
MED PREP
5W15B
TOILET
5W29A
TOILET
5W29
DIALYSIS
STATIONS
5W27
TOILET
5W25
HSKPG
5W19
MEDICAL
REPAIR
ROOM
5W20
ISO BED
DIALYSIS
STATION
5W20A
TOILET
5W18A
TOILET
5W19A
TOILET
5W17A
TOILET
5W18
EQUIP
PROCESSING
5W17
DIALYSIS
STATIONS
5W14
SOILED
UTILITY
5W16
TOILET
5W12
CHARTING &
RECEPTION
5CW02
CORRIDOR
5CW01
CORRIDOR
5CW05
CORRIDOR
196 SF
5S24
R.O.
TREATMENT
157 SF
5C S02A
CORRIDOR
96 SF
5S18
SOILED
UTILITY
ROOM
189 SF
5S21
MEDICAL
REPAIR
ROOM
20 SF
5S23
LINEN
151 SF
5S25
BREAKROOM
33 SF
5S20
HSKPG
33 SF
5S22
STAFF
TOILET
167 SF
5S14A
EQUIP
CLEAN
STORAGE
138 SF
5S17
EQUIP
PROCESSING
50 SF
5S19
PATIENT
TOILET
188 SF
5S07
NURSE
STATION
76 SF
5S11
MED PREP
82 SF
5S09
CLEAN
SUPPLY
56 SF
5S04B
ISO TOILET
146 SF
5S04
ISO
DIALYSIS
BED
52 SF
5S04A
ANTE ROOM
52 SF
5S03
RECEPTION
109 SF
5S01
CHIEF
OFFICE
977 SF
5S02
CORRIDOR
ZONE 1
ZONE 2
5W07
TELECOM
5W09
PATIENT
ROOM
5W31
DIALYSIS
STATIONS
5W33
STORAGE
5W34
DIALYSIS
STATIONS
5W32
DIALYSIS
STATIONS
5W30
DIALYSIS
STATION
5W32A
TOILET
5W34A
TOILET
5W31A
TOILET
5W33A
TOILET
5W30A
TOILET
5E02
OFFICE
5E01
OFFICE
5E03
EQUIPMENT
5W09A
TOILET
5C01
ELEVATOR
LOBBY
5W06
PATIENT
ROOM
5W06A
TOILET
FEC
FEC
132'-0 1/2"
'-1
FEC
FEC
FEC
FEC
FEC
FEC
TRAVEL DISTANCE
75'
ZONE 1a
ZONE 1a
5S16
MECHANICAL
ROOM
5ST05
STAIR
5CE04
CORRIDOR
A1
ELEVATOR
A2
ELEVATOR
A3
ELEVATOR
A4
ELEVATOR
A5
ELEVATOR
5W01
DUMBWAITER
5N01 5W02
5ST04
STAIR
5W24
5W01A 5W03
5N05
5CW01A
5E04
PAT RM 6
5E04A
TLT
5E06
PAT RM 5
5E06A
TOILET
5E05A
TOILET
5E05
PATIENT
ROOM 7
PALLIATIVE
CARE
5E07
FAMILY
ROOM
5E09A
TOILET
5W04
B3
ELEVATOR
B2
ELEVATOR
B1
ELEVATOR
5W22
5W23
5CW04
5W12A
5W100
TELECOM
ZONE 2a
5ST01
STAIR
5W101
5W35
5ST13
STAIR
5CN01
LOBBY
5CW03A
CORRIDOR
FE
FEC
'-1
0"
16'-5 1/4"
46'-0 1/2"
SHAFT
SHAFT
SHAFT
SHAFT
SHAFT
LIFE SAFETY SYMBOLS
SMOKE TIGHT
ASSEMBLY
2 HOUR FIRE &
SMOKE BARRIER
1 HOUR FIRE &
SMOKE BARRIER
2 HOUR FIRE &
SMOKE BARRIER
HE
TRAVEL DISTANCE
100'-10"
TRAVEL DISTANCE
EA
EDEXIT EXIT
HORIZONTAL EXIT
EXIT DISCHARGE
EXIT ACCESS
FIRE
EXTINGUISHER
FE
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
SMOKE
COMPARTMENT
BOUNDARY
HEALTH CARE
SUITE
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
OCCUPANCY
SEPARATION
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING AND
DAMPER REQUIREMENTS
HAZARDOUS USE
ADJACENT SYMBOLS SHOW PARTITION RATING.
OPENINGS REQUIRE CLOSER & LATCH
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
NOT IN SCOPE
NO CONSTRUCTION IN THIS AREA AS PART OF
THIS PROJECT.
ADJUNCT CORRIDOR or PSYCHIATRIC AREA or CONSTRUCTED WITH MIN. 4'-0" CLEAR
WITH (PER CHAPTER 19)
CORRIDOR
SMOKE ZONE
BARRIER
KEYPLAN - BUILDING 1, 5TH FLOOR
TRUE
NORTH
ZONE 1
ZONE 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMEG CORP
2882 106th St,Des Moines, IA 50322 Contact: Dellan Llewellyn
(515) 334-7921
LANDMARK ENVIRONMENTAL
9555 James Ave S - Ste 262, Bloomington, MN 55431 Contact: Mark Meier (952) 295-9410
C U s e rs \p c h o i\ D o c u m e n ts
\1
-I C
V A
F L R
-A -R
Y e u n y o u n g .r v t
/2
/2
:2
:0
A
M
1-I3
5TH FLOOR - LIFE SAFETY PLAN RENOVATE DIALYSIS
IOWA CITY, IA
636A8-24-001
04/24/2025 EM MWC
17909
1/8" = 1'-0"
FIFTH FLOOR - LIFE SAFETY PLAN
0 8' 16'4'
VHA INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION, RENOVATION AND MAINTENANCE
TABLE 1 - CONSTRUCTION, RENOVATION, AND/OR MAINTENANCE ACTIVITY CATEGORY
Category A
INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.
• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• WORK THAT DOES NOT CREATE DUST OR DEBRIS.
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR
VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET WITH LIMITED EXPOSURE
TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY
WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT
CREATE DUST OR DEBRIS.
• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS
LIMITED TO FAUCET REPLACEMENT ETC. AND ELECTRICAL WORK SUCH AS
REPLACEMENT OF BULBS, RECEPTACLES, OR SWITCHES.
Category B
GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:
• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT
BUT NOT EXCEEDING A WEEK.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS
COMPLETED.
• WORK THAT CREATES MINIMAL DUST AND DEBRIS.
• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS
REPAIR OF FIREWALLS AND BARRIERS, AND NEW FLOORING THAT PRODUCES MINIMAL
DUST AND DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY SANDING)
THAT PRODUCE MINIMAL DUST AND DEBRIS.
• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR
PIPING FOR A SINGLE FIXTURE. ANY WORK ON SANITARY PLUMBING INCLUDING
SNAKING OF DRAINS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A
SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT FIXTURE THAT
PRODUCES MINIMAL DUST AND DEBRIS.
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS
REPLACEMENT OF A SINGLE DIFFUSER, SINGLE TERMINAL UNIT OR A SINGLE DEVICE
THAT PRODUCES MINIMAL DUST AND DEBRIS.
Category C
SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING
6 MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS
COMPLETED.
• DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN
CEILING, OR OTHER ARCHITECTURAL ELEMENTS.
• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS,
AND DOORS/FRAMING AND MINIMAL INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS
AND BRANCH PIPING.
• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING,
DRYWALL/PLASTER AND ASSOCIATED WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS
AND ASSOCIATED PLUMBING.
• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING,
RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND
WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND
TERMINAL UNITS FOR AN AREA.
Category D
LARGE-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
• WORK EXCEEDING 6 MONTHS IN DURATION.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS
COMPLETED.
• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE
INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING,
PIPING, ELECTRICAL AND HVAC.
• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND
DOORS INCLUDING FRAMING, DRYWALL AND ASSOCIATED PLASTER WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF:
• NEW MEDICAL GAS SYSTEMS,
• STEAM/HEATING HOT WATER, CONDENSATE SYSTEMS,
• MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED PLUMBING.
• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND
MEDICAL GAS SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION
PANELS, CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN
AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS
TERMINAL UNITS, FANS ETC.
• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.
• ELECTRICAL SHUTDOWN OF MULTIPLE PANELS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT,
ASSOCIATED DUCTWORK, DIFFUSERS, HEAT EXCHANGERS, TERMINAL UNITS AND
CONTROLS.
ACTIVITY AREA**
ACTIVITY CATEGORY
PATIENT RISK
CATEGORY A B C D
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV
II IVIII IV
IV
AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV.
CONSULT WITH INFECTION PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.
TABLE 3 - PATIENT RISK CATEGORY
SERVICE(S)/TYPE(S) OF AREA(S)
(E.G., OR, UNIT/WARD, STERILE
PROCESSING, ADMINISTRATIVE,
ETC.)*
AREA POINT OF CONTACT (POC)SERVICE(S)/TYPE(S) OF AREA(S)
(E.G., OR, UNIT/WARD, STERILE
PROCESSING, ADMINISTRATIVE,
ETC.)*
POC CONTACT
INFORMATION
AREA ABOVE
AREA BELOW
ADJACENT AREA 1
ADJACENT AREA 2
ADJACENT AREA 3
ADJACENT AREA 4
* THERE MAY BE MORE THAN ONE SERVICE/TYPE OF AREA FOR EACH ROW. LIST ALL.
** LIST THE AREA(S) IN WHICH THE CONSTRUCTION/RENOVATION/MAINTENANCE ACTIVITY WILL OCCUR. NOTE:
WHEN THE ACTIVITY CATEGORY IS B, C, OR D, THE CONTROL MEASURES ARE DETERMINED BY THE PATIENT
RISK IN THE ADJACENT AFFECTED AREAS
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
• PUBLIC HALLWAYS AND
GATHERING AREAS NOT IN
CLINICAL AREAS
• OFFICE AREAS NOT IN
CLINICAL AREAS
• BREAKROOMS NOT IN
CLINICAL AREAS
• BATHROOMS OR LOCKER
ROOMS NOT IN CLINICAL
AREAS
• MECHANICAL/ELECTRICAL
ROOMS NOT IN CLINICAL
AREAS
• WAITING AREAS
• CLINICAL ENGINEERING
(BIOMEDICAL)
• MATERIALS MANAGEMENT
• STERILE PROCESSING
DEPARTMENT – DIRTY SIDE
• KITCHEN, CAFETERIA, GIFT
SHOP, COFFEE SHOP, AND
FOOD KIOSKS
• PATIENT CARE ROOMS AND
AREAS, INCLUDING SPINAL
CORD INJURY UNITS
• ALL ACUTE CARE UNITS,
INCLUDING MENTAL HEALTH
• ALL OUTPATIENT UNITS AND
CLINICS
• EMERGENCY DEPARTMENT
• COMMUNITY LIVING
CENTERS, DOMICILIARIES,
AND TRANSITIONAL
RESIDENCES
• EMPLOYEE HEALTH
• PHARMACY – GENERAL
WORK ZONE
• MEDICATION ROOMS AND
CLEAN UTILITY ROOMS
• IMAGING SUITES –
DIAGNOSTIC IMAGING
• LABORATORY
• ALL TRANSPLANT UNITS
• ALL INTENSIVE CARE UNITS
• ALL ONCOLOGY UNITS AND
CHEMOTHERAPY/INFUSION
CENTERS
• OR THEATERS AND
RESTRICTED AREAS
• HEMODIALYSIS UNITS
• PROCEDURAL ROOMS*
• PHARMACY COMPOUNDING
AREA
• STERILE PROCESSING
DEPARTMENT – CLEAN SIDE
• TRANSFUSION SERVICES
• IMAGING SUITES –
INTERVENTIONAL IMAGING
• DEDICATED ISOLATION
WARDS/UNITS FOR
INFECTIOUS DISEASES
NON-PATIENT CARE AREAS
SUCH AS:
PATIENT CARE SUPPORT AREAS
SUCH AS:
PATIENT CARE AREAS
SUCH AS:
PROCEDURAL, INVASIVE,
STERILE SUPPORT AND HIGHLY
COMPROMISED PATIENT CARE
AREAS SUCH AS:
* PROCEDURAL ROOMS ARE DESIGNATED FOR THE PERFORMANCE OF PATIENT CARE ACTIVITIES THAT MAY REQUIRE HIGH-LEVEL DISINFECTED OR STERILE INSTRUMENTS AND SOME ENVIRONMENTAL CONTROLS BUT IS NOT REQUIRED TO BE PERFORMED WITH THE ENVIRONMENTAL CONTROLS OF AN OPERATING ROOM (OR). THE ROOM IS INTENDED FOR PROCEDURES THAT ARE PERFORMED IN AN ASEPTIC SURGICAL FIELD AND PENETRATES THE PROTECTIVE SURFACES OF A PATIENT’S BODY (E.G., SUBCUTANEOUS TISSUE, MUCOUS MEMBRANES, CORNEA) OR ENTRY INTO OR OPENING OF A STERILE BODY CAVITY. EXAMPLES OF THESE SPACES INCLUDE CARDIAC CATHETERIZATION SUITES, ELECTROPHYSIOLOGY SUITES, ENDOVASCULAR/GI SUITES, ANGIO SUITES AND OTHER SPACES WHICH MAY HAVE
HIGH RISK PATIENT POPULATIONS.
TABLE 4 - LEVEL OF INFECTION PREVENTION AND CONTROL PRECAUTIONS
TABLE 2 - AFFECTED AREA ASSESSMENT
VHA INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION,
RENOVATION AND MAINTENANCE
TABLE 5 - REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS
CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S).
AS THE ACTIVITY PROGRESSES, A FULL RE-EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO
DOWNGRADING THE LEVEL OF PRECAUTIONS.
LEVEL OF
PRECAUTIONS
CONTROL MEASURES
LEVEL I
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.
ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS AND LOOSE
MATERIAL.
TABLE 6 - MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED UPON COMPLETION OF THE ACTIVITY
CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND INSPECTED PRIOR TO TERMINATING
MEASURES DEFINED IN TABLE 5.
LEVEL OF
PRECAUTIONS
MEASURES
LEVELS I - II
CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND
FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS
WELL AS AIR DIFFUSER SURFACES.
HVAC SYSTEMS:
1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. VERIFY THAT
HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK
IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVELS III - IV
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION
PREVENTION AND CONTROL MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND
FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS
WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE
NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:
A. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
B. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.
C. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
D. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.
E. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST
REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF
CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR
EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK
IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVEL II
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER
MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST AND
REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO REDUCED
USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF TRASH
(COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED CONTAINERS
AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO TRANSPORT TRASH AND
DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON FACILITY POLICY.
STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.
10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA VACUUMING
SURFACES AT LEAST DAILY.
LEVEL III
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO
THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS
DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING APPROVED
MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED. EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS
PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION.
THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM MUST BE LARGE
ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE
WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE
REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE
COVERS MUST BE CHANGED IMMEDIATELY.
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND
PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA
PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS
SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.
ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN
ICRA CLASS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS
AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN
CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,
PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE
VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE
OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR
EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR
TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO SMOKE, FIRE,
OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND
TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST PROOF IC
BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-
CONSTRUCTION SIDE OF BARRIER.
6. INFECTION CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY
BEFORE 7:00 AM AND AFTER 8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE
NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,
(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR
AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR MUST PROVIDE ENOUGH NEGATIVE AIR MACHINES TO
COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL
TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF
UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE
REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE
ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE
NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.
PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR
EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,
CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER
PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE
BARRIER.
3RD FLOOR MODIFICATION_____________________
ZONE 1
CONSTRUCTION ZONE 3
CONSTRUCTION PROJECT ACTIVITY: B
INFECTION CONTROL RISK GROUP: MEDIUM
CLASS OF PRECAUTION: II
INFECTION CONTROL RISK ASSESSMENT (ICRA) BY PROJECT AREA USE AND PHASE
ZONE 2
CONSTRUCTION ZONE 5.2.A
CONSTRUCTION PROJECT ACTIVITY: B
INFECTION CONTROL RISK GROUP: HIGH
CLASS OF PRECAUTION: II
CONSTRUCTION ZONES
5.2.B, 5.2.C, 5.2.D, 5.2.E, 5.2.F, 5.2.G, 5.2.H
CONSTRUCTION PROJECT ACTIVITY: A
INFECTION CONTROL RISK GROUP: HIGH
CLASS OF PRECAUTION: I
CONSTRUCTION ZONE 5.2.I
CONSTRUCTION PROJECT ACTIVITY: B
INFECTION CONTROL RISK GROUP: LOW
CLASS OF PRECAUTION: II
5TH FLOOR MODIFICATIONS______________________________________________________________________________________
ZONE 1
CONSTRUCTION ZONE 5.1 A
CONSTRUCTION PROJECT ACTIVITY: D
INFECTION CONTROL RISK GROUP: HIGH
CLASS OF PRECAUTION: IV
CONSTRUCTION ZONE 5.1 B
CONSTRUCTION PROJECT ACTIVITY: C
INFECTION CONTROL RISK GROUP: MEDIUM
CLASS OF PRECAUTION: III
CONSTRUCTION ZONE 5.1 C
CONSTRUCTION PROJECT ACTIVITY: C
INFECTION CONTROL RISK GROUP: LOW
CLASS OF PRECAUTION: II
CONSTRUCTION ZONES 5.1 D
CONSTRUCTION PROJECT ACTIVITY: B
INFECTION CONTROL RISK GROUP: LOW
CLASS OF PRECAUTION: II
4TH FLOOR MODIFICATIONS_____________________
ZONE 1
CONSTRUCTION ZONES
4.1.A, 4.1.B, 4.1.C, 4.1.D, 4.1.E
CONSTRUCTION PROJECT ACTIVITY: B
INFECTION CONTROL RISK GROUP: HIGHEST
CLASS OF PRECAUTION: III
EXISTING
STRUCTURE
ABOVE
CONTINUOUS 1 HR
RATED FIRE CAULK
SEAL EACH SIDE
AT CEILING
COMPRESSIBLE
INSULATION
CONTINUOUS 1 HR
RATED FIRE CAULK SEAL
EACH SIDE AT FLOOR
EXISTING
FINISHED
FLOOR
(1) LAYER 5/8" GYP BD EACH SIDE.
FINISH OCCUPIED SIDE WITH GLOSS
PAINT. SEE SPECIFICATIONS.
3 5/8" STEEL STUDS @ 16" OC WITH SOUND
ATTENUATING INSULATION FULL HEIGHT
CLOSE OPEN DUCTS WITH 6
MIL POLYETHYLENE BARRIER.
SEAL EDGES WITH
CONTINUOUS DUCT TAPE
CONSTRUCTION SIDE OF BARRIER OCCUPIED SIDE
OF BARRIER
COMPRESSIBLE
INSULATION
REMOVE PORTION OF
CEILING OR ENTIRE
CEILING AS REQUIRED
ON CONSTRUCTION SIDE
OF BARRIER TO INSTALL
CONSTRUCTION /ICRA
BARRIER.
REMOVE PORTION OF CEILING AS
REQUIRED TO INSTALL
CONSTRUCTION/ICRA BARRIER.
MODIFY CEILING AT BARRIER ON
OCCUPIED SIDE
6 MIL POLY OVER
CEILING PENETRATION
NOTES:
1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS
2. SEAL ALL SIDES OF POLY WITH DUCT TAPE
3. SEAL ALL CRACKS WITH DUCT TAPE.
6 MIL POLY OVER
EQUIPMENT OR
FURNISHING
6 MIL POLY OVER
WALL PROTRUSION
FLOOR
DOOR
BEYOND
WINDOW
BEYOND
CEILING
6 MIL POLY OVER
WALL OPENINGS
6 MIL POLY OVER
DOORS & WINDOWS
CEILING
CONSTRUCTION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT MUST BE DIVIDED INTO PHASES. A PHASE
CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00
1.6.H PHASING.
2. THE GENERAL CONTRACTOR MUST COORDINATE ALL PHASING AND SEQUENCING
WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR MUST PROVIDE
A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE
PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR MUST COOPERATE FULLY WITH THE OWNER SO
WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR
DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE
PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE MUST INDICATE THE
SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND
APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL
FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR MUST PERFORM THE WORK IN EACH PHASE IN THE
SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION
PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH
THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND
THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON
COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT
PHASE CAN BE OCCUPIED BY THE VA PERSONNEL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .