This is an addendum to bid documents for contract 636A8-24-001, "Renovate Dialysis Iowa City VA," dated February 20, 2026. The addendum updates the original solicitation documents with specification revisions, drawing modifications, and approved product substitutions.
The specification changes include dividing Section 00 01 10 (Table of Contents) into three separate volumes and adding a new Section 22 14 00 to Volume 2. The sheet revisions encompass 29 architectural, structural, fire protection, medical gas, plumbing, HVAC, and electrical drawing updates affecting the 5th and 6th floors of the facility. Notable revisions include adding a partial roof plan, revising demolition plans and notes across multiple zones, updating equipment and framing plans with keynotes, and revising mechanical, plumbing, and electrical system details. Specific plumbing additions include EE-2 equipment, MV-2 relocation, drain pipe routing from dialysis machines, reverse osmosis (RO) pipe routing, and shutoff valves, while removing SK-5 from the scope. The product substitutions section approves ten LED lighting fixture alternatives across various fixture types (F1 through F9 and X1/X2), specifying manufacturers including Daybrite, Lightolier, AEL, Amico, Vantage, and Chloride. The addendum includes three volumes of specifications and detailed enclosures referencing all modified sheets and specification documents.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
636A8-24-001 Renovate Dialysis Iowa City VA Addendum Page 1 of 3
Update to Bid Documents – February 20, 2026
SPECIFICATION ITEMS:
1. Specification Section 00 01 10 – Divided to specifications volumes
a. OMIT 00 01 10 (Specs Table of Contents Heading, Vol 1)
b. ADD 00 01 10.1 (Specs Table of Contents Heading, Vol 1)
c. ADD 00 01 10.2 (Specs Table of Contents Heading, Vol 2)
d. ADD 00 01 10.3 (Specs Table of Contents Heading, Vol3
2. Specification Section 22 14 00
a. ADD section 22 14 00 to table of contents (Specs Vol 2).
b. ADD specification section in its entirety (Specs Vol 2).
SHEET ITEMS:
3. Sheet 1-I1 – COVER SHEET
a. Update to sheet index
b. Update to project contacts
4. Sheet 1-A1 – 5TH FLOOR – OVERALL PLAN
a. ADD SHEET 2 – ADD Partial Roof Plan.
b. REVISE General Notes
5. Sheet 1-A2 – 5TH FLOOR - DEMOLITION PLAN - ZONE 1
a. REVISE Drawing 1.
b. REVISE Keyed Notes DE6.
c. REVISE Keyed Notes DE6.
d. REVISE Keyed Notes DE7.
e. REVISE Keyed Notes DE14.
f. REVISE Keyed Notes DE18.
g. REVISE Keyed Notes DE22.
h. REVISE Keyed Notes DE23.
6. Sheet 1-A3 – 5TH FLOOR – DEMOLITION PLAN – ZONE 2
a. REVISE Drawing 1.
b. REVISE Keyed Notes DE6.
c. REVISE Keyed Notes DE6.
d. REVISE Keyed Notes DE7.
e. REVISE Keyed Notes DE14.
f. REVISE Keyed Notes DE18.
g. REVISE Keyed Notes DE22.
h. REVISE Keyed Notes DE23.
7. Sheet 1-A4 – 5TH FLOOR – PARTIAL FLOOR PLAN – ZONE 1
a. ADDED general notes.
8. Sheet 1-A5 – 5TH FLOOR – PARTIAL FLOOR PLAN – ZONE 2
a. ADDED general notes.
9. Sheet 1-A6 – 5TH FLOOR – PARTIAL REFLECTED CEILING PLAN – ZONE 2
a. REVISE TV mounts.
10. Sheet 1-A7 – ENLARGED PLANS AND INTERIOR ELEVATIONS
a. Reissued Sheet
11. Sheet 1-A9 – OPENING SCHEDULE, TYPES, AND DETAILS
a. ADDED door 5W19A to opening schedule.
12. Sheet 1-A20 - 5TH FLOOR EQUIPMENT PLAN
a. Adjusted acquisition code.
13. Sheet 1-S2 – 6TH FLOOR FRAMING PLAN
a. Added Keynote #1.
b. Show concrete floor/roof infill locations.
14. Sheet 1-F1- FIRE PROTECTION COVERSHEET
Renovate Dialysis Iowa City VA Addendum Page 2 of 3
a. REVISE line type and tag key.
15. Sheet 1-F3 – FIFTH FLOOR PLAN – ZONE 1 – FIRE PROTECTION
a. ADD keynote #1.
16. Sheet 1-MG1- MEDICAL GAS COVERSHEET
a. REVISE line type and tag key.
17. Sheet 1-P1- PLUMBING COVERSHEET
a. REVISE line type and tag key.
18. Sheet 1-P4 – FIFTH FLOOR DEMOLITION PLAN – ZONE 1 – PLUMBING
a. REVISE keynote #1 location.
19. Sheet 1-P8 – FIFTH FLOOR PLAN – ZONE 1 – PLUMBING
a. REVISE keynote #4 and keynote #6.
b. ADD NT-1 in Soiled Utility Room 5S18.
20. Sheet 1-P9 – FIFTH FLOOR PLAN – ZONE 2 – PLUMBING
a. REVISE Keynotes #1, 2, and 3.
b. ADD General Sheet Note #1 and #2.
c. ADD EE-2 and associated piping to locations shown on revised attached drawing.
d. REVISE MV-2 location and associated piping as shown on revised attached drawing.
e. ADD drain pipe routing from dialysis machines as shown on revised attached drawing.
f. ADD RO pipe routing between portable RO machine and dialysis machine as shown on revised attached drawing.
g. ADD shutoff valves as shown on revised attached drawing.
h. REMOVE SK-5 from scope of work.
i. ADD CS-1 and NT-1 to room Soiled Utility 5W14.
j. ADD keynote #4 and #5.
21. Sheet 1-P12 – PLUMBING SCHEDULES
a. REVISE approved manufacturers for EE-1, EE-2, MV-1, & MV-2 in the Plumbing Material List.
b. ADD NT-1 to the Plumbing Material List.
c. REMOVE SK-5 from the Plumbing Material List.
d. REVISE DB-1 and UB-3 descriptions on the Plumbing Material List.
22. Sheet 1-H1 – HVAC COVERSHEET
a. REVISE line type and tag key.
23. Sheet 1-H2 – FIFTH FLOOR DEMOLITION PLAN – ZONE 1 – HVAC:
a. REVISE sheet general note #1.
b. ADD existing humidifier demolition scope.
24. Sheet 1-H7 – HVAC DETAILS:
a. REVISE specification references in detail #5.
b. REVISE notes on detail #7.
25. Sheet 1-E1 – ELECTRICAL COVERSHEET
a. REMOVE Electrical Installation Note #16.
26. Sheet 1-E3 – FIFTH FLOOR DEMOLITION PLAN – ZONE 1 – ELECTRICAL
a. ADD sheet note #1.
27. Sheet 1-E5 – FIFTH FLOOR PLAN – ZONE 1 – POWER
a. REVISE location of receptacles for TVs.
28. Sheet 1-E7 – SIXTH FLOOR PLAN – ZONE 1 - POWER
a. ADD sheet note #1.
29. Sheet 1-E8 – ELECTRICAL DETAILS
a. ADD detail #9 – Conduit Roof Penetration Detail.
Renovate Dialysis Iowa City VA Addendum Page 3 of 3
PRODUCT SUBSTITUTIONS
30. 26 51 19 – LED LIGHTING
a. APPROVE Daybrite 2FPZ for F1 fixture.
b. APPROVE Daybrite 2FPZ for F2 fixture.
c. APPROVE Lightolier CRN for F3 fixture.
d. APPROVE Daybrite FLP for F4 fixture.
e. APPROVE AEL CLQ for F5 fixture.
f. APPROVE AEL CLQ for F6 fixture.
g. APPROVE Amico L-SEC24 for F7 fixture.
h. APPROVE Vantage V4EVHU for F8 fixture.
i. APPROVE AEL CLE & Fail Safe CLM for F9 fixture.
j. APPROVE Chloride 46 Series for X1/X2 fixture.
REFERENCE ITEMS:
None
END OF REVISION
Enclosures 1-I1, 1-A1, 1-A2, 1-A3, 1-A4, 1-A5, 1-A7, 1-A9, 1-A20, 1-S2, 1-F1, 1-F3, 1-MG1, 1-P1, 1-P4, 1-P8 1-P9, 1-P12, 1-H1, 1-H2, 1-H7, 1-E1, 1-E3, 1-E5, 1-E7, 1-E8, 1-T1, 1-T2, 1-T3, 1-T4, 1-T5, 1-T6, 1-T7, 1-T8, 1- T9, 1-T10, 1-T11, 1-T12
Volume 1 specifications
Volume 2 specifications
Volume 3 specifications