This document is a comprehensive Construction Document Narrative for the renovation of the Dialysis Clinic at the Iowa City VA Health Care System. The project involves a complete interior renovation of an existing 5,000 square foot dialysis space, with initial work focused on converting an existing 5W space into a temporary dialysis clinic. The primary objectives are to modernize the facility, improve functionality, create an efficient lean flow, maximize patient care stations, and design a flexible space that can also serve as an infusion clinic two days/nights per week.
The renovation will be conducted under VA Project Number 636A8-24-001, Contract 36C26319D0043, Task Order 36C26324N0754, and is specifically set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors. The project requires compliance with multiple codes and standards, including the 2021 International Building Code, NFPA 101, and VA design standards. Key design considerations include creating an open-plan layout with direct nurse supervision, convenient support space locations, appropriate medical gas systems, electrical infrastructure, and technology integration to support modern healthcare delivery.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Anderson Engineering of Minnesota, LLC
13605 1st Avenue North Plymouth, MN 55441
Phone: 763-412-4000 Fax: 763-412-4090
Prepared in association with the following:
IMEG
2882 106th Street Des Moines, IA 50322
Renovate Dialysis Iowa City VA Health Care System
VA PROJECT NUMBER: 636A8-24-001
601 HWY 6 WEST
IOWA CITY, IA 55246
NARRATIVE
ANDERSON ENGINEERING OF MN, LLC
Project Number: 17909
Issue for
CONSTRUCTION DOCUMENTS
APRIL 24, 2025
Contract 36C26319D0043 Task Order 36C26324N0754
Project No. 636A8-24-001 April 24, 2025 i
Iowa City VA Health Care System Renovate Dialysis 4/24/2025 Anderson Project Number: 17909
CONSTRUCTION DOCUMENTS
Table of Contents
• Executive Summary
• MEP Design Narrative
• Calculations
Executive Summary
This project involves the design for interior renovation of an existing Dialysis space to improve the condition of the unit, which is currently undersized, outdated and has functional deficiencies. This project will require use of existing 5W space to be converted into temporary Dialysis clinic while the main space is being renovated.
The primary goal of this project is to fully renovate the existing Dialysis Suite to modernize and right size it to current VA and industry standards. The space shall be designed in a manner that creates efficiency, provides a functional lean flow and allows the maximum amount of dialysis patient care station. The space should also be flexible to serve as an infusion clinic two days/nights a week. The space should be an open plan to allow direct nurse supervision of patients, maximize circulation, include right sized spaces and locate support spaces so they are conveniently accessible.
VA #636A8-24-001
IMEG #19004229.09
i
TABLE OF CONTENTS
A. Introduction
1. Purpose
B. Adopted Codes and Standards
1. Codes
2. Industry Recognized Standards
3. Owner Standards
C. General Building Design Criteria and Assumptions
D. Mechanical Design Requirements
1. Existing HVAC System
2. General HVAC System Description
3. Heating System Components
4. Cooling System Components
5. Air Handling Systems
6. Controls System
7. Plumbing Fixtures
8. Domestic Water System Components
9. Sanitary Waste and Vent System Description
10. Storm Water System Description
11. Laboratory/Special System Components
12. Medical Gas System Description
13. Fire Protection Description
E. Electrical Design Requirements
1. Overview:
2. Lighting Systems and Controls
3. Power System Requirements
4. Power Distribution
5. Branch Power Distribution
6. Receptacle and Wiring Devices
7. Motor Connection and Control
8. Wire, Cable, Raceway ii
9. Grounding and Bonding System Requirements
10. Fire Alarm and Automatic Detection System
11. Identification of Electrical System
12. Firestopping
F. Technology Design Requirements
1. General Technology System Description
2. General
3. Telecommunications Pathways and Spaces
4. Structured Cabling System
G. Security Systems
1. Wireless Access System
2. Access Control System
3. Video Surveillance System
4. Emergency Call System
5. Infant Protection System
6. Patient Wandering System
7. Audio Video Systems
8. Public Address/Overhead Paging System
9. Digital Signage System
10. Electronic Kiosks System
11. Nurse Call System
12. Specialty Systems
13. Biomedical/Telemetry System
14. In-Building Distributed Antenna System
15. Master Clock System
16. Real Time Locating System (RTLS)
Construction Document Narrative for
Iowa City VA Renovate Dialysis Iowa City, Iowa
A. Introduction
1. Purpose
a. The purpose of this report is to describe the proposed building systems for design coordination, preliminary pricing, and Owner review.
b. The proposed design assumptions are outlined for Owner review and approval.
These assumptions include, but are not limited to, external and internal temperature and humidity criteria, noise limits, occupancy, vibration criteria, future expansion needs, fire resistance, and lighting levels.
c. The proposed building systems may evolve in future design phases. Any preliminary pricing must include cost contingencies appropriate to the current phase.
d. Refer to the design development drawings and Owner’s design and construction standards for additional information.
B. Adopted Codes and Standards
1. Codes
a. Building Code - 2021 International Building Code
b. Existing Building Code - 2021 International Existing Building Code
c. Life Safety Code NFPA 101 - 2021
d. Healthcare Facilities Code NFPA 99 - 2021
e. Electrical Code - National Electrical Code NFPA 70 2023
f. Mechanical Code - 2021 International Mechanical Code
g. Plumbing Code - 2021 International Plumbing Code
h. Energy Conservation Code - International Energy Conservation Code - IECC
i. Fire Protection Code - NFPA-1
j. Fire Alarm Code - National Fire Alarm and Signaling Code NFPA 72 2022
VA Iowa City Renovate Dialysis
April 24, 2025
2. Industry Recognized Standards
a. Facility Guidelines Institute FGI - 2018.
b. Illumination Engineering Society IES - Recommended Maintained Illumination
Targets 2021.
c. Standard for Emergency and Standby Power Systems NFPA 110 - 2022.
3. Owner Standards
a. Published Standards of the Department of Veterans Affairs.
C. General Building Design Criteria and Assumptions
1. Summer Space Environmental Requirements: 72°F ± 2°F, 50%RH high limit.
2. Cooling Design Outdoor Air Conditions: 95°Fdb/78°Fwb.
3. Winter Space Environmental Requirements: 70°F ± 2°F, 30%RH low limit.
4. Zone Heating Design Outdoor Air Conditions: -5°F
5. Ventilation (Heating Coil) Design Outdoor Air Conditions: -15°F based on ASHRAE
6. Heating Safety Factor: 30%
7. Cooling Safety Factor: 15%
D. Mechanical Design Requirements
1. Existing HVAC System
a. The existing dialysis lab is served by a central indoor air handling unit (AHU) located in the mechanical penthouse above the space. The AHU was replaced in
2018 and meets current VA design standards. The AHU was sized for 8,100 cfm and is provided with a steam heating coil, a direct expansion (DX) cooling coil, a chilled water cooling coil, filters, and a steam humidifier.
b. The existing dialysis lab is served by a steam to hot water heat exchanger located in the mechanical penthouse that was installed in 1997. The heating water is distributed to terminal air boxes and radiant ceiling panels in the plenum space above the dialysis lab.
c. Existing cooling is provided by campus chilled water and an air-cooled condensing unit. The existing 37 nominal ton condensing unit was replaced in
2018.
d. The existing dialysis lab is served by two roof mounted exhaust fans.
April 24, 2025
2. General HVAC System Description
a. The existing AHU and all equipment in the mechanical penthouse will remain.
The existing condensing unit will remain. New exhaust fans will be provided.
Duct mains between the penthouse and the lab space will remain. Distribution ductwork, terminal air boxes, diffusers, thermostats, and controls will all be new and sized for the new floor plan layout.
3. Heating System Components
a. System Description
1) The existing steam to hot water heat exchanger, hot water pumps, and accessories will remain. The existing heating water main piping will remain. Branch piping to existing terminal air boxes and radiant ceiling panels will be demolished. New branch piping will be installed to serve the new terminal air boxes.
2) Heating water piping 2” and smaller will be copper with soldered joints and fittings or steel with screwed joints and fittings. Shutoff valves will be ball type, and check valves will be swing type. Piping 2-1/2” and larger will be Schedule 40 black steel, with butt-welded, or flanged joints, or Type L copper piping with soldered joints. Shutoff valves will be butterfly type, and check valves will be double-door type.
4. Cooling System Components
a. System Description
1) The existing air handling system is served by campus chilled water and an outdoor air cooled condensing unit. Both systems are to remain as currently installed.
5. Air Handling Systems
a. Air Handling System Type
1) Existing AHU to remain.
b. Terminal Air Boxes with Hot Water Reheat
1) New terminal air boxes will be added to provide heating, cooling, ventilation, and pressure relationships required for each thermal zone.
c. Exhaust Systems
1) Two general roof mounted exhaust fans will be added to provide exhaust in rooms where it is required by the VA Design Standards.
April 24, 2025
2) Two roof mounted exhaust fans with HEPA filters will be provided for the Isolation dialysis bed room as required by the VA Design Standards.
d. Zoning
1) Temperature zones will be designed per the VA Design Standards for a dialysis lab. Refer to mechanical drawings for additional information.
6. Controls System
a. The controls system will be an extension of the existing JCI system. New sequences of operation and controls components will be added for new equipment. The existing central air handler will operate as is.
7. Plumbing Fixtures
a. Plumbing fixtures (lavatories, water closets, urinals) will be porcelain type.
Fixture colors will be selected by the Architect. Sensor-operated flush valves and sensor-operated faucets will be provided for public restrooms.
b. Sinks will be stainless steel by Elkay or other approved manufacturer. Fixture trim will be by Chicago Faucet or other approved manufacturer.
8. Domestic Water System Components
a. Pipes and Distribution
1) Domestic water systems connected to existing systems and will be piped with Type K copper tubing. Piping will be routed to minimize dead legs in piping to less than 6”.
2) Cold water piping will be insulated with 1” thick elastomeric foam. Hot water and hot water recirculation piping will be insulated with 1-1/2” thick fiberglass insulation with an all service jacket.
9. Sanitary Waste and Vent System Description
a. Piping: All above grade piping will be cast iron no-hub and will be connected to existing sanitary and vent piping in the facility.
10. Storm Water System Description
a. Piping
1) Storm drains constructed of no-hub cast iron piping will be routed down within chases.
April 24, 2025
2) Secondary roof overflow drains will be piped down inside chases and connect to existing secondary storm piping which is routed to lambs tongue fittings and will spill onto grade.
11. Laboratory/Special System Components
a. Reverse Osmosis Water
1) Source Equipment: Pre-filtration system, pump(s), semi-permeable membrane module(s), and controller will be provided and installed by the
Owner outside of the scope of this project’s contract. Equipment is shown on the drawings for reference and coordination purposes.
2) Piping: Piping from the source equipment to the dialysis boxes will be provided and installed by the Owner outside of the scope of this project’s contract. Reverse Osmosis (RO) piping is shown on the drawings for reference and coordination purposes.
12. Medical Gas System Description
a. Medical Vacuum
1) Source Equipment
a) The existing vacuum pumps will continue to serve the renovated dialysis suite.
2) Piping: Type K or L hard drawn copper tube cleaned and capped “for oxygen service.” Joints will be BCuP silver brazed with wrought copper fittings.
3) Outlets: NFPA 99 compliant, non-interchangeable connectors with automatic valves, color-coded and labeled for intended service.
b. Medical Air
1) Source Equipment
a) The existing air compressor and dryer will continue to serve the renovated dialysis suite.
2) Piping
a) 3” and under: Type L hard drawn copper tube cleaned and capped “for oxygen service.”
b) Over 3”: Type K hard drawn copper tube cleaned and capped
“for oxygen service.”
c) Joints will be BCuP silver brazed with wrought copper fittings.
3) Outlets: NFPA 99 compliant, non-interchangeable connectors with automatic valves and secondary check valves on positive pressure outlets, color-coded and labeled for intended service.
April 24, 2025
c. Oxygen
1) Source Equipment
a) The existing oxygen storage will continue to serve the renovated dialysis suite.
2) Piping
a) 3” and under: Type L hard drawn copper tube cleaned and capped “for oxygen service”.
b) Over 3”: Type K hard drawn copper tube cleaned and capped
“for oxygen service.”
c) Joints will be BCuP silver brazed with wrought copper fittings.
3) Outlets: NFPA 99 compliant, non-interchangeable connectors with automatic valves and secondary check valves on positive pressure outlets, color-coded and labeled for intended service.
d. Alarm Panels
1) A new area alarm panel will be provided in the dialysis suite’s nurse’s station.
e. Medical Gas Valve Boxes
1) A new medical gas valve box will be installed immediately outside of the renovated dialysis suite.
13. Fire Protection Description
a. Design Criteria
1) Hazard Classification: Most spaces within the scope of this renovation are considered light hazard occupancies. Storage rooms and janitors closets will be classified as Ordinary Hazard Group 2.
b. Piping
1) Wet piping 2” and smaller will be Schedule 40 black steel with screwed or flanged joints.
2) Wet piping 2-1/2” and over will be Schedule 10 black steel with mechanically roll-grooved joints.
c. Sprinkler Types: chrome plated semi-recessed sprinklers will be installed in all suspended ceilings while areas without ceilings will be protected with upright sprinklers.
April 24, 2025
E. Electrical Design Requirements
1. Overview:
a. The electrical design for this project will include the components of lighting systems and controls, power distribution, fire alarm, and automatic detection.
b. Refer to the Technology Design Requirements for a description of the remaining electrical-based low voltage system requirements.
2. Lighting Systems and Controls
a. Lighting System Design Criteria
1) Lighting basis of design per the maintained illumination targets published by the Illumination Engineering Society (IES) and Owner standards.
Refer to average maintained illuminance level criteria in the table below.
2) Correlated Color Temperature (CCT)
a) Interior Luminaires: 4000°K
3) Color Rendering Index (CRI)
a) Interior Luminaires: 90
4) Interior Luminaires
a) Specification-grade LED source luminaires with switched or dimmable drivers, minimum 50,000 hour rated life.
b) Luminaires recessed in the thermal envelope will be IC rated and airtight.
c) Special Application Listings: Listed wet, damp, or ingress protection IP## rated, Hazardous Class # - Division # listed by application.
5) Egress and Emergency Egress Lighting Design Basis
a) Egress (non-emergency) lighting will be provided for all corridors, stairways, and egress paths defined by the Architect.
b) Emergency egress lighting will be served from life safety branch.
c) Exit Signage
(1) Specification grade LED type, diecast served from life safety branch.
(2) Ceiling/wall mounted for all applicable egress paths, exterior exits, assembly spaces, and code-required spaces.
d) Automatic load control relays (ALCR) will be provided for each lighting control zone when served by an emergency power source remote from the luminaire.
April 24, 2025
b. Lighting Control System Criteria
1) Additional mandatory controls for lighting that include manual switching/dimming, automatic controls to reduce lighting levels, and daylight responsive controls will be installed.
2) Lighting Control System Basis of Design
a) Stand Alone and Room Controllers: Acuity Controls, Legrand, Watt Stopper, Hubbell Automation, Eaton Greengate, Osram
Encelium, Lutron.
3) The energy code compliant lighting control system will include a combination of standalone controls. Refer to the Lighting and Lighting
Control System - Space Description Table. The following system components will be included:
a) Wall Mounted: Switches, dimmers, scene selection control stations, manual override stations.
Lighting and Lighting Control System - Space Description Table
Space Description Luminaires Lighting Controls Illuminance Levels
Common Administration Spaces
Task Light Linkable linear sections with frosted lens and integral driver.
Luminaires will have integral rocker switches when a single luminaire is used, and a wall switch when multiple luminaires are grouped together. Automatic off via sensor or timeclock.
Corridors, Circulation Recessed dimmable flat panel luminaires.
Manual controls 10 to 15 foot-candles
Utility, Janitorial, Storage
Suspended linear strip luminaires for non-finished ceiling spaces.
Recessed flat panel luminaires for spaces with finished ceilings.
Manual controls 10 to 15 foot-candles
Lobby, Reception Recessed downlighting. Dimming control 10 to 15 foot-candles
Single Use Restrooms
Recessed flat panel for spaces with drop ceilings.
Surface mount strips for spaces with hard ceilings.
Manual controls 10 to 20 foot-candles
April 24, 2025
Lighting and Lighting Control System - Space Description Table
Space Description Luminaires Lighting Controls Illuminance Levels
Break, Kitchenette, Lunch
2’x4’ or 2’x2’ dimmable flat panel luminaires.
Dimming control 30 foot-candles
Private Office 2’x4’ or 2’x2’ dimmable flat panel luminaires.
Dimming control 30 to 40 foot-candles
Health Care Spaces
Patient Rooms Multi-function (ambient, reading, exam) above bed patient light (Kenall MPC), dimmable down lights.
Manual controls 30 foot-candles ambient
50 foot-candles at patient bed
Patient Bathrooms Wet-listed down lights. Manual controls 20 to 30 foot-candles
Nurses Station Recessed downlighting. Dimming control 40 foot-candles ambient
60 foot-candles at work surface
Linen Services, Storage Rooms, Equipment Rooms, Soiled Utilities
Flat panel luminaires. Manual controls 15 to 25 foot-candles
Clean Utility Flat panel luminaires. Manual controls 50 foot-candles
3. Power System Requirements
a. Refer to Riser Diagram on drawings for power distribution equipment.
4. Power Distribution
a. Approved Manufacturers, Basis of Design: Schneider Electric.
b. Distribution Equipment Overview
1) Refer to riser diagram for power distribution system overall layout.
2) Spare Breakers: 15%
3) Minimum Spare Space: 15%
c. Circuit Breaker Branch Panelboards
1) Cabinet with door-in-door constructions, concealed hinge, and flush lock all keyed alike.
2) Copper bus with copper ground bus.
3) Molded case circuit breakers, bolt-on type, thermal-magnetic trip.
4) Current limiting molded case circuit breakers, bolt-on type, thermal-magnetic trip, current limiting, 100K interrupting rating.
April 24, 2025
d. Surge Protection Devices
1) Surge protection will be provided based on the following surge protection types and installation scenarios.
a) Branch panels associated with:
(1) Life safety, critical, emergency.
5. Branch Power Distribution
a. Branch Circuit Panelboards
1) Branch circuit panels serving lighting and receptacle loads will use molded case, thermal magnetic type circuit breakers.
2) Minimum Spare Capacity: 15% spare circuits.
3) Spare Branch Raceways: Recess-mounted panels and panels located in shallow electrical closets less than 2 feet deep will be provided with five empty 1” conduits stubbed into an accessible location above the ceiling for future use.
b. Branch Circuits
1) Branch circuit design will be based on a maximum of 1,900 volt-amperes per 20 amp, 120 volt circuit, and 4,400 volt amp per 20 ampere, 277 volt circuit.
2) General Purpose Lighting: 120 volt.
3) Minimum wire size will be #12 for power circuits and #18 for controls circuits.
4) A dedicated neutral conductor will be provided in all branch circuits.
5) Not more than three computer workstations will be served by a common circuit.
6) Dedicated circuits will be provided to serve the following equipment:
a) Refrigerators
b) Freezers
c) Copiers
d) Microwave
e) Coffee brewers
f) Equipment with a load greater than 10 amps
6. Receptacle and Wiring Devices
a. All receptacles will be hospital grade with stainless steel coverplates.
b. Tamper Resistant: All receptacles in areas required by the electrical code will be tamper resistant type.
April 24, 2025
c. GFCI receptacles will be provided for the following locations:
1) Interior Locations: When located adjacent to sinks (within 6 feet), electric water coolers, wet/damp locations, kitchens, janitor closets, mechanical/electrical/ plumbing/fire protection equipment spaces and other locations required by the electrical code.
d. Emergency Power Receptacles: Provide with red color for emergency circuits.
7. Motor Connection and Control
a. Motors 3/4 horsepower and larger will be served at 480- or 208 volt, 3-phase, 3-wire. Motors less than 3/4 horsepower will be served at 120-volt service, 1-phase, 2-wire as applicable.
b. Heating, ventilation, air conditioning, and other mechanical loads will generally be served at 480 volt, 3-phase, 3-wire.
c. Fans and large pumps will be controlled by variable frequency drives (VFDs).
Smaller motors will be controlled by full voltage starters or manual starters as required for the application.
8. Wire, Cable, Raceway
a. Voltage Drop: Feeder sizes will be increased as required to limit voltage drop from the service entrance to the branch circuit panel to 2% or less. The total voltage drop from the service entrance to the end of the branch circuit will not exceed 5%.
b. Feeders and Branch Circuits
1) 100 Amp or Larger: Copper, stranded conductor, 600-volt insulation, THHW/THWN or XHHW-2 copper.
2) Other Ratings: Copper, solid or stranded conductor, 600-volt insulation, THHN/THWN.
3) Special Applications
a) Feeders and Branch Circuits Serving Motor Loads: Copper.
b) Motor Feed from VFD: Copper, XHHW-2.
c. Raceways
1) Rigid Metal Conduit (RMC)
a) Wet, damp, dry interior, exterior, and underground locations.
b) Subject to physical damage.
April 24, 2025
2) Electrical Metallic Conduit (EMT)
a) Dry interior locations.
b) Steel fittings.
c) 2” Diameter or Smaller: Setscrew type.
d) Larger than 2” Diameter: Setscrew type.
3) Flexible Metallic Conduit (FMC)
a) Final connection to luminaires, motors, equipment.
b) Dry interior locations.
4) Liquidtight Flexible Metallic Conduit (LFMC)
a) Final connection to luminaires, motors, equipment.
b) Wet, damp, dry interior locations.
9. Grounding and Bonding System Requirements
a. A grounding system and equipment grounding will be provided per the applicable electrical code. The electrical distribution system will be provided with an effective bond and ground path for all equipment, including switchboards, distribution panels, panelboards, motor control centers, transformers, transfer switches, alternative power sources, raceways, cable tray, electrical busway, and enclosures.
b. Feeders and Branch Circuits: A green insulated copper equipment ground conductor sized per the applicable electrical code will be provided with all feeders and branch circuits.
c. Utilization Equipment: Fixed-in-place utilization equipment served by the electrical power distribution system will be bonded using the equipment ground conductor.
10. Fire Alarm and Automatic Detection System
a. Approved Manufacturers, Basis of Design: Johnson Controls - Simplex.
b. The existing Simplex addressable fire alarm system will be modified and extended. Existing devices within the project area will be removed and new devices will be provided to meet new code requirements.
c. Circuit Pathway, Survivability, Raceway
1) Pathway Class: B, capable of transmitting an alarm signal during a single open or non-simultaneous ground fault on the wiring system.
2) Pathway Survivability: Level 1, circuit system protected by automatic sprinkler and installed in metal raceways.
April 24, 2025
3) Raceway: System wiring installed in raceway when concealed in walls, ceilings, and installed in spaces without finished ceilings; open cabling with J-hook and bridle ring supports are acceptable in accessible plenum spaces.
4) Circuit Integrity (CI) (2-hour rated): Notification appliance circuits (NAC) and signal line circuits (SLC) passing through, but not serving, a 2-hour fire/smoke compartment will be 2-hour rated assembly; enclosure, concrete encased, MI cable, or alternative approved assembly.
d. System notification will consist of ADA- and NFPA-compliant audio voice visual, and combination audio/visual devices.
1) Notification devices will be ceiling mounted in front-of-house areas and wall mounted in back-of-house areas.
2) Device Color: White with red pictograph and white when ceiling mounted.
3) Notification appliance circuit panels will be sized for 24 hours of standby operation and 15 minutes of alarm.
e. System initiation will consist of individually addressable analog smoke and heat detectors, carbon monoxide detectors, addressable fire pull stations, and sprinkler system flow switches.
1) Partial coverage automatic detection will be provided where required by code.
2) Rated Dampers: Fire-smoke dampers (FSD) will be provided with a duct-type smoke detector with sampling tube or smoke type detector inside the duct, remote indicator when not visible from the floor, addressable relay to shut down associated air handling systems, to close smoke dampers, and shut down air distribution systems.
3) Pull stations will be located within a travel distance of 200 feet and at all exterior exits. Additional pull stations will be provided at stairway entrances and 5 feet from all marked exit doors.
f. Additional Fire Alarm System Components
1) Automatic sprinkler water flow detection and valve position tamper switch monitor.
2) Air handling system smoke detection and shutdown.
3) Fire/Smoke Doors: Fire alarm addressable control modules will be provided for door holders and door unlock functions per the safety plans and applicable codes.
April 24, 2025
11. Identification of Electrical System
a. Labeling for Raceways
1) 600 Volts and Below Normal: White letters on black background indicating feeder identification and voltage.
2) 600 Volt and Below Emergency: White or black letters on red background indicating feeder identification and voltage.
3) Fire Alarm: Red letter on white background indicating “FIRE ALARM”.
4) Temperature Control: White or black letters on blue background.
5) Grounding: White letters on green background indicating “GROUND” and equipment, and designation.
6) Security System: Blue letters on yellow background indicating "Security".
7) Telephone System: Green letters on yellow background indicating
"Telephone".
b. For all EMT conduit, provide color conduit as follows:
1) Fire Alarm System: Red
2) Normal Power Distribution System: Silver
3) Emergency Power Distribution System: Orange
4) Temperature Controls, Motor Controls, and Other Control Systems: Blue
5) Low Voltage and Telephone: Purple
6) Clock, Sound, and Intercom: Black
7) Nurse Call: White
8) Security: Yellow
9) Grounding: Green
c. Labeling Instructions
1) Indoor Equipment: Self-adhesive, engraved laminated acrylic or melamine label. Unless otherwise indicated, provide a single line of text with 1/2” high letters on 1-1/2” high label. Where two lines of text are required, use labels 2” high.
2) Elevated Components: Increase size of labels and letter to those appropriate for viewing from the floor.
3) Unless provided with self-adhesive means of attachment, fasten labels with appropriate mechanical fasteners that do not change the NEMA or
NRTL rating of the enclosure.
4) Equipment to be labeled:
a) Panelboards
b) Color coding of equipment nameplates will be as follows:
(1) Normal Power: Black plate with white lettering.
(2) Emergency Power Standby: Red plate with white lettering.
April 24, 2025
(3) Fire Alarm: White plate with red lettering.
(4) Temperature Controls: Blue plate with white lettering.
(5) Grounding: Green plate with white lettering.
5) Each switch and receptacle will be identified as to the circuit and panelboard from which it is fed. This will be identified both inside the junction box (permanent magic marker) and on the coverplate.
6) All junction, pull, and connection boxes will be provided with identification on the cover. Identification will be neatly handwritten with permanent magic marker denoting the wiring system, voltage, and panel and circuit numbers.
7) Panelboard directories will be created using Microsoft Word, and the typed printout should be provided in each panel. The Word file will be turned over to the Owner upon completion of the project.
12. Firestopping
a. All penetrations to fire rated wall will be firestopped.
b. Low Voltage and Cable Tray Systems: Conduit sleeves through wall with firestopping compound.
F. Technology Design Requirements
1. General Technology System Description
a. Telecommunications Systems for this project must be designed in accordance with the following:
1) Infrastructure Standard for Telecommunications Spaces (ISTS), Version
4.0, issued by U.S. Department of Veteran Affairs - Office of Information and Technology.
2) Dental Service Design Guide - June 2014 - Issued by U.S. Department of
Veteran Affairs - Office of Construction and Facilities Management.
3) TIA-526-7-A Measurement of Optical Power Loss of Installed
Singlemode Fiber Cable Plant (July 2015).
4) TIA-526-14-D Optical Power Loss of Measurement of Installed
Multimode Fiber Cable Plant (January 2023).
5) TIA-568.0-E Generic Telecommunications Cabling for Customer
Premises (March 2020).
6) TIA-568.1-E Commercial Building Telecommunications Cabling Standard
Part 1: General Requirements (March 2020).
7) TIA-568.2-D-2 Balanced Twisted-Pair Telecommunications Cabling and
Components Standard (April 2019).
April 24, 2025
8) TIA-568.3-E Optical Fiber Cabling Components Standard (September
2022).
9) TIA-568.4-D Broadband Coaxial Cabling and Components Standard (July
2022).
10) TIA-569-E Telecommunications Pathways and Spaces (May 2019).
11) TIA-598-E Optical Fiber Cable Coloring Coding (August 2018).
12) TIA-606-D Administration Standard for Commercial Telecommunications
Infrastructure (October 2021).
13) TIA-607-E Commercial Building Grounding (Earthing) and Bonding
Requirements for Telecommunications (May 2024).
14) TIA-758-B Cu - Customer-owned Outside Plant Telecommunications
Infrastructure Standard (March 2012).
15) TIA-TSB-162-B Telecommunications Cabling Guidelines for Wireless
Access Points (February 2021).
16) Building Industry Consulting Services International (BICSI) TDMM
(Telecommunications Distribution Methods Manual), 15th Edition.
17) International Building Code, 2015 edition.
18) Institute of Electrical and Electronics Engineers (IEEE).
19) National Electrical Manufacturers Association (NEMA).
20) NFPA 70: 2023 National Electrical Code (NEC).
21) NFPA 101: Life Safety Code.
22) Underwriters Laboratories, Inc. (UL)
2. General
a. Demolition
1) Before this project can begin, the existing cabling and infrastructure will have to be documented, a new infrastructure pathway be installed, and new cabling will have to be installed, terminated, tested, and cutover prior to the project starting.
2) There is an EHRM project that is currently going on at this site, and will be updating existing TRs, replacing copper, and fiber optic backbone cables.
b. Firestopping
1) The UL Solutions Qualified Firestop Contractor Program is voluntary and allows contractors to proactively demonstrate their commitment to the proper installation of firestop systems. These contractors have implemented a stringent quality management system that includes a review of project design and construction document requirements;
installation, training, application, and field quality; and documentation and record keeping. A contractor must select and install a firestop system to
April 24, 2025 protect penetrations and joints within fire-resistance-rated walls and horizontal assemblies. The building codes require these breaches to be protected, and the UL Solutions Qualified Firestop
c. Training
1) Training will be specified for any system which incorporates a new technology or system component that is not familiar to the maintenance and support staff presently trained on the existing systems.
3. Telecommunications Pathways and Spaces
a. Interior Spaces
1) Telecommunication Rooms (TR): The new TR will be constructed under the EHRM Project and will be located in Room 5W07 and will be stacked from floor to floor. The purpose of the TR rooms is to support horizontal and backbone building cabling, and voice and data equipment. The size of the TRs will be per ANSI/TIA 569-E and will meet/exceed the minimal size TR (Minimum size 10’ x 10’).
a) All walls will receive 3/4” fire treated plywood installed 6”to
8’-6” AFF. The rating stamp will be exposed.
b) The room will have dedicated power, cooling, and standard lighting. Cooling will be 24/7/365, maintaining 68°F to 72°F. The
TR will be humidified to maintain a humidity level between 30% and 60%. Dedicated 120 volt and/or 208 volt power receptacles will also be required.
c) Doors will be equipped with rough-ins for proximity readers, door status switches, exit devices, and camera locations for entry access.
d) New 19” (W) x 7’ (H) equipment racks with vertical and horizontal wire management will be installed as required.
e) Grounding of all equipment to a ground bar located in the room will be required.
f) UPS power will be provided for Owner-provided network switches.
b. Interior Pathways
1) General: Anywhere that a penetration is required through a corridor, wall or hard ceiling for telecommunications cabling, installation of conduit sleeves will be required. For penetrations serving more than 12 cables, mechanical firestopping will be required.
2) A wire basket cable tray system will be installed in all corridors within the areas identified under this scope of work to support voice, data, April 24, 2025 video surveillance, and CATV. Security system and access control system cables will be routed within their own conduit pathway.
a) Nurse Call, fire alarm, overhead paging, and other low voltage systems will use separate dedicated cable supports and/or conduit. Nurse call cabling for code blue applications will be routed in their own separate conduit system. Cable supports will not be supported from the cable tray system. Access control and PACs system cable can be installed in a cable tray segregated from the other systems’ cabling in the tray.
4. Structured Cabling System
a. The telecommunications infrastructure will be a “structured cabling system” designed and installed to ANSI/TIA requirements and the Infrastructure Standard for Telecommunications Spaces (ISTS), Version 4.0, issued by U.S. Department of Veteran Affairs - Office of Information and Technology.
b. A manufacturer’s System Assurance Warranty of at least 20 years will be required for the system.
c. All horizontal cabling (i.e., cabling between the workstations and technology rooms) will be Category 6A, 4-pair unshielded twisted pair cable for all applications. Cabling shall be identical for all applications (i.e., voice and data). All
Category 6A cabling will terminate onto a Modular Patch Panels on equipment racks in the TR’s. All horizontal cabling installed in plenum spaces shall be plenum rated.
d. Horizontal cabling from each Wireless Access Point (WAP) location will consist of two Category 6A, 4-pair unshielded twisted pair cables installed from the nearest TR to an outlet box at each WAP location. Terminate both ends of the cable onto a CAT 6A RJ-45 outlet, green in color onto both ends of the cable at each outlet box enclosure. Snap each outlet onto a 2-Port faceplate, white in color.
e. Each information outlet location will receive two (2) Category 6A jacks (RJ45).
The outlet box will be a typical dual gang backbox with a single gang plaster ring mounted at 18” unless otherwise noted. Special use outlets will be configured per the requirements of the equipment serviced by the outlet (copy machines, printers, wall phones, etc.). Two outlets will be provided for every 50 NSF of programmed space per room. High density WAOs, if required, will have four
RJ45 jacks).
April 24, 2025
f. The system will be required to be fully tested to CAT 6A performance requirements and will be tested at 500 MHz.
g. Labeling and Administration
1) Labeling and administration will be provided for the TIP to include each cable end, patch panel ports, racks, and patch panels. Work area outlets will also be labeled with source TR and patch panel port identifier. All system components will follow the numbering scheme currently used for the facilities on this campus.
h. Warranties
1) Labeling and administration will be provided for the TIP to include each cable end, patch panel ports, racks, and patch panels. Work area outlets will also be labeled with source TR and patch panel port identifier. All system components will follow the numbering scheme currently used for the facilities on this campus
G. Security Systems
1. Wireless Access System
a. Wireless Local Area Network (WLAN): A WLAN will be provided for the VA enterprise network and for a separate guest WLAN. A third-party vendor that has a national account with the VA, will provide heat maps to verify WLAN coverage and will design, provide, install, terminate, test, and turn up the WAPs in accordance with VA Standards.
2. Access Control System
a. Access control system is existing to remain in service. The system is a Lenel, On-Guard, PC-based access control system. New card readers (smart card), door contacts, electrified hardware, request to exit devices, and control panels will be installed per project requirements.
3. Video Surveillance System
a. New cameras will be provided and connected to the existing video surveillance system. New cameras will be IP based, with Category 6A cable drops to each camera. New network video recorders (NVR) will be specified as required.
1) Any required storage upgrades are not a part of this contract.
April 24, 2025
4. Emergency Call System
a. Not Provided as part of this project.
5. Infant Protection System
a. Not Provided as part of this project.
6. Patient Wandering System
a. Not Provided as part of this project.
7. Audio Video Systems
a. Professional Audio Video System
1) Not Provided as part of this project.
8. Public Address/Overhead Paging System
a. A complete zoned paging system is existing to remain. New speakers and cables will be installed in the renovated spaces.
9. Digital Signage System
a. Not provided as part of this project.
10. Electronic Kiosks System
a. Not provided as part of this project.
11. Nurse Call System
a. A new Rauland nurse call system will be provided in TR 5WS07. New nurse call devices will include emergency stations, duty/staff stations, toilet stations, master call station, and dome lights.
b. The nurse call system cabling will be installed in a dedicated conduit system.
c. No wireless devices shall be utilized in the nurse call system.
d. An uninterrupted power supply (UPS) with 30 minutes of support will be provided for the nurse call system.
e. Nurse call stations will be provided throughout the hospital. Areas of coverage include, but are not limited to:
Patient Bed Patient Station
Pillow Speaker with Entertainment and Lighting Control
Code Blue
Bed Interface Module
Medical Equipment Monitoring
Clinical Corridors Dome Lights
Zone Dome Lights (as required)
Clean Linen Duty Station
Soiled Utility Duty Station
Charting Duty Station
Nourishment Duty Station
Medication Duty Station
Equipment Storage (Clinical Areas) Duty Station
Exam/Treatment Rooms Duty Station
Nurse Assistance Station
Patient Toilet Patient Assist Pull Cord
Bath/Shower Patient Assist Pull Cord
Outpatient Surgery Nurse Assistance Station
Code Blue (some areas)
ICU Nurse Assistance Station
Code Blue
Medical Equipment Monitoring
Critical Care Patient Station
Pillow Speaker
Code Blue
Medical Equipment Monitoring
Nurse Assistance Station
Recovery Patient Station
Pillow Speaker
Code Blue
Medical Equipment Monitoring
Nurse Assistance Station
Pre-OP Patient Station
Pillow Speaker
Code Blue
LDRP / C-Section Patient Station
Pillow Speaker
Nurse Assistance Station
Code Blue
April 24, 2025
Misc. Procedure Room Nurse Assistance Station
Code Blue (some areas)
Cardiac Cath Lab Nurse Assistance Station
Code Blue
Stress / EKG Nurse Assistance Station
Code Blue
Admissions / Discharge Nurse Assistance Station
Seclusion / Isolation / Ante Nurse Assistance Station
Imaging Suite Nurse Assistance Station
Staff Lounge Duty Station
Nursery Nurse Assistance Station
Code Blue
12. Specialty Systems
a. Cable Television (CATV) System
1) Not provided as part of this project.
13. Biomedical/Telemetry System
a. Not provided as part of this project.
14. In-Building Distributed Antenna System
a. Not provided as part of this project.
15. Master Clock System
a. Not provided as part of this project.
16. Real Time Locating System (RTLS)
a. Not provided as part of this project.
Prepared by: Dellan Llewellyn, Zach Ross, Jim Heitz
DJL:ZRR:JDH/rjb \\files\Active\Projects\2019\19004229.09\ReportsNarratives\20250424_NarrConstructionDocuments\20250424 Narr VA Iowa City Renovate Dialysis CD.docx
Room Cooling and Heating Loads by Component
ROOM_1 VESTIBULE
Conditions at Time of Space Cooling Peak Peak Time (Mo/D/H:M) 7/21 14:00:00 Outside DB / WB / HR 95.0 °F / 78.1 °F / 122.5 gr/lb Room DB / RH / HR 72.0 °F / 40.0 % / 48.0 gr/lb Supply Air Dry Bulb Temp 48.0 °F
Time Percent Instant Delay of
Sensible Sensible Latent Total Total
(Btu/h) (Btu/h) (Btu/h) (Btu/h) (%) Roof 0 0 0 0 0.0 Other Roof 0 0 0 0 0.0 Glass 0 0 0 0 0.0 Door 0 0 0 0 0.0 Wall 0 0 0 0 0.0 Below-Grade Wall 0 0 0 0 0.0 Other Wall 0 0 0 0 0.0 Partition 0 90 0 90 17.9 Exterior Floor 0 0 0 0 0.0 Interior Floor 0 50 0 50 10.0 Slab 0 0 0 0 0.0 Other Floor 0 0 0 0 0.0 Infiltration 0 0 0 0 0.0
Envelope Subtotal 0 141 0 141 - People 0 0 0 0 0.0 Lights 108 226 0 335 66.2 Miscellaneous Loads 0 0 0 0 0.0
Internal Subtotal 108 226 0 335 - RA (All Other) 0 0 0 0 0.0 DOA Direct to Room 0 0 0 0 0.0 Ceiling 0 31 0 31 6.0 Refrigeration 0 0 0 0 0.0 Service Water 0 0 0 0 0.0 HVAC Equipment Losses 0 0 0 0 0.0 Adj Air Transfer Heat 0 0 0 0 0.0 Sizing Factor Correction 0 0 0 0 0.0 Time Delay Correction 0 0 0 0 0.0
Grand Total 108 397 0 506 100.0 RA Sensible (Lights) 0 0 0 0 -
Engineering Checks For Cooling
Cooling tons 0.04 No People(max) 0.00 %OA 0 People per 1000 ft² 0 cfm/ft² 0.16 Volume (ft³) 974.7 cfm/ton 568.57 ft²/ton 2,891.20 Btu/h-ft² 4.15
Conditions at Time of Space Heating Peak Peak Time (Mo/D/H:M) 1/21 24:00:00 Outside DB / WB / HR -15.0 °F / -15.0 °F / 2.5 gr/lb Room DB / RH / HR 70.0 °F / 2.3 % / 2.5 gr/lb Supply Air Dry Bulb Temp 130.0 °F
Time Percent Instant Delay of
Sensible Sensible Latent Total Total
(Btu/h) (Btu/h) (Btu/h) (Btu/h) (%) Roof 0 0 0 0 0.0 Other Roof 0 0 0 0 0.0 Glass 0 0 0 0 0.0 Door 0 0 0 0 0.0 Wall 0 0 0 0 0.0 Below-Grade Wall 0 0 0 0 0.0 Other Wall 0 0 0 0 0.0 Partition 0 -102 0 -102 22.4 Exterior Floor 0 0 0 0 0.0 Interior Floor 0 -237 0 -237 52.4 Slab 0 0 0 0 0.0 Other Floor 0 0 0 0 0.0 Infiltration 0 0 0 0 0.0
Envelope Subtotal 0 -339 0 -339 - People 0 0 0 0 0.0 Lights 0 0 0 0 0.0 Miscellaneous Loads 0 0 0 0 0.0
Internal Subtotal 0 0 0 0 - RA (All Other) 0 0 0 0 0.0 DOA Direct to Room 0 0 0 0 0.0 Ceiling 0 -114 0 -114 25.0 Refrigeration 0 0 0 0 0.0 Service Water 0 0 0 0 0.0 HVAC Equipment Losses 0 0 0 0 0.0 Adj Air Transfer Heat 0 0 0 0 0.0 Sizing Factor Correction 0 0 0 0 0.0 Time Delay Correction 0 -1 0 -1 0.1
Grand Total 0 -453 0 -453 100.0 RA Sensible (Lights) 0 0 0 0 -
Engineering Checks For Heating
Heating Mbh -0.45 No People(max) 0.00 %OA 0 People per 1000 ft² 0 cfm/ft² 0.06 Volume (ft³) 974.7 cfm/Mbh -15.86 ft²/Mbh -268.78 Btu/h-ft² -3.72
Cooling Airflows Main Fan cfm 24 Cooling ACH 1.48 Sec Fan cfm 0 Input Ventilation cfm 0 Calculated Ventilation cfm 0 Calculated Ventilation ACH 0.00 Infiltration cfm 0 Min Stop/RH (%) 30
Heating Airflows Main Fan cfm 7 Heating ACH 0.43 Sec Fan cfm 0 Input Ventilation cfm 0 Calculated Ventilation cfm 0 Calculated Ventilation ACH 0.00 Infiltration cfm 0 Min Stop/RH (%) 100
Areas ft²
Roof 0
Other Roof 0
Ceiling 142
Window 0
Door 0
0Wall
Below-Grade Wall 0
Other Wall 0
Partition 400
Exterior Floor 0
Internal Floor 142
Slab 0
Other Floor 142
Alternative: Primary Calculated at: Dec 16, 2024 - 05:58 PM
VA Iowa City Dialysis.mdf TRACE 3D Plus 6.10.289File name:
ROOM_2 ROOM
Conditions at Time of Space Cooling Peak Peak Time (Mo/D/H:M) 7/21 19:00:00 Outside DB / WB / HR 87.5 °F / 76.2 °F / 122.5 gr/lb Room DB / RH / HR 72.0 °F / 47.0 % / 56.5 gr/lb Supply Air Dry Bulb Temp 48.0 °F
Time Percent Instant Delay of
Sensible Sensible Latent Total Total
(Btu/h) (Btu/h) (Btu/h) (Btu/h) (%) Roof 0 0 0 0 0.0 Other Roof 0 0 0 0 0.0 Glass 0 0 0 0 0.0 Door 0 0 0 0 0.0 Wall 0 0 0 0 0.0 Below-Grade Wall 0 0 0 0 0.0 Other Wall 0 0 0 0 0.0 Partition 0 -192 0 -192 -8.9 Exterior Floor 0 0 0 0 0.0 Interior Floor 0 -82 0 -82 -3.8 Slab 0 0 0 0 0.0 Other Floor 0 0 0 0 0.0 Infiltration 0 0 0 0 0.0
Envelope Subtotal 0 -275 0 -275 - People 210 445 400 1,055 48.8 Lights 189 444 0 633 29.3 Miscellaneous Loads 609 165 0 774 35.8
Internal Subtotal 1,008 1,053 400 2,461 - RA (All Other) 0 0 0 0 0.0 DOA Direct to Room 0 0 0 0 0.0 Ceiling 0 -21 0 -21 -1.0 Refrigeration 0 0 0 0 0.0 Service Water 0 0 0 0 0.0 HVAC Equipment Losses 0 0 0 0 0.0 Adj Air Transfer Heat 0 0 0 0 0.0 Sizing Factor Correction 0 0 0 0 0.0 Time Delay Correction 0 -4 0 -4 -0.2
Grand Total 1,008 754 400 2,162 100.0 RA Sensible (Lights) 0 0 0 0 -
Engineering Checks For Cooling
Cooling tons 0.18 No People(max) 2.00 %OA 0 People per 1000 ft² 13 cfm/ft² 0.46 Volume (ft³) 1,206.0 cfm/ton 383.52 ft²/ton 837.07 Btu/h-ft² 14.34
Conditions at Time of Space Heating Peak Peak Time (Mo/D/H:M) 1/21 24:00:00 Outside DB / WB / HR -15.0 °F / -15.0 °F / 2.5 gr/lb Room DB / RH / HR 70.0 °F / 2.3 % / 2.5 gr/lb Supply Air Dry Bulb Temp 95.1 °F
Time Percent Instant Delay of
Sensible Sensible Latent Total Total
(Btu/h) (Btu/h) (Btu/h) (Btu/h) (%) Roof 0 0 0 0 0.0 Other Roof 0 0 0 0 0.0 Glass 0 0 0 0 0.0 Door 0 0 0 0 0.0 Wall 0 0 0 0 0.0 Below-Grade Wall 0 0 0 0 0.0 Other Wall 0 0 0 0 0.0 Partition 0 -111 0 -111 20.2 Exterior Floor 0 0 0 0 0.0 Interior Floor 0 -288 0 -288 52.6 Slab 0 0 0 0 0.0 Other Floor 0 0 0 0 0.0 Infiltration 0 0 0 0 0.0
Envelope Subtotal 0 -399 0 -399 - People 0 0 0 0 0.0 Lights 0 0 0 0 0.0 Miscellaneous Loads 0 0 0 0 0.0
Internal Subtotal 0 0 0 0 - RA (All Other) 0 0 0 0 0.0 DOA Direct to Room 0 0 0 0 0.0 Ceiling 0 -148 0 -148 27.0 Refrigeration 0 0 0 0 0.0 Service Water 0 0 0 0 0.0 HVAC Equipment Losses 0 0 0 0 0.0 Adj Air Transfer Heat 0 0 0 0 0.0 Sizing Factor Correction 0 0 0 0 0.0 Time Delay Correction 0 -1 0 -1 0.1
Grand Total 0 -547 0 -547 100.0 RA Sensible (Lights) 0 0 0 0 -
Engineering Checks For Heating
Heating Mbh -0.55 No People(max) 2.00 %OA 0 People per 1000 ft² 13 cfm/ft² 0.14 Volume (ft³) 1,206.0 cfm/Mbh -37.90 ft²/Mbh -275.66 Btu/h-ft² -3.63
Cooling Airflows Main Fan cfm 69 Cooling ACH 3.43 Sec Fan cfm 0 Input Ventilation cfm 0 Calculated Ventilation cfm 0 Calculated Ventilation ACH 0.00 Infiltration cfm 0 Min Stop/RH (%) 30
Heating Airflows Main Fan cfm 21 Heating ACH 1.04 Sec Fan cfm 0 Input Ventilation cfm 0 Calculated Ventilation cfm 0 Calculated Ventilation ACH 0.00 Infiltration cfm 0 Min Stop/RH (%) 100
Areas ft²
Roof 0
Other Roof 0
Ceiling 174
Window 0
Door 0
0Wall
Below-Grade Wall 0
Other Wall 0
Partition 452
Exterior Floor 0
Internal Floor 174
Slab 0
Other Floor 174
Alternative: Primary Calculated at: Dec 16, 2024 - 05:58 PM
VA Iowa City Dialysis.mdf TRACE 3D Plus 6.10.289File
ROOM_3 ROOM
Peak Time (Mo/D/H:M) 7/21 19:00:00 Outside DB / WB / HR 87.5 °F / 76.2 °F / 122.5 gr/lb Room DB / RH / HR 72.0 °F / 47.8 % / 57.5 gr/lb Supply Air Dry Bulb Temp 48.0 °F
Time Percent Instant Delay of
Sensible Sensible Latent Total Total
(Btu/h) (Btu/h) (Btu/h) (Btu/h) (%) Roof 0 0 0 0 0.0 Other Roof 0 0 0 0 0.0 Glass 0 0 0 0 0.0 Door 0 0 0 0 0.0 Wall 0 0 0 0 0.0 Below-Grade Wall 0 0 0 0 0.0 Other Wall 0 0 0 0 0.0 Partition 0 -197 0 -197 -10.0 Exterior Floor 0 0 0 0 0.0 Interior Floor 0 -88 0 -88 -4.5 Slab 0 0 0 0 0.0 Other Floor 0 0 0 0 0.0 Infiltration 0 0 0 0 0.0
Envelope Subtotal 0 -286 0 -286 - People 210 462 400 1,072 54.2 Lights 130 317 0 447 22.6 Miscellaneous Loads 609 171 0 780 39.4
Internal Subtotal 949 951 400 2,300 - RA (All Other) 0 0 0 0 0.0 DOA Direct to Room 0 0 0 0 0.0 Ceiling 0 -31 0 -31 -1.6 Refrigeration 0 0 0 0 0.0 Service Water 0 0 0 0 0.0 HVAC Equipment Losses 0 0 0 0 0.0 Adj Air Transfer Heat 0 0 0 0 0.0 Sizing Factor Correction 0 0 0 0 0.0 Time Delay Correction 0 -4 0 -4 -0.2
Grand Total 949 630 400 1,979 100.0 RA Sensible (Lights) 0 0 0 0 -
Engineering Checks For Cooling
Cooling tons 0.16 No People(max) 2.00 %OA 0 People per 1000 ft² 19 cfm/ft² 0.60 Volume (ft³) 829.5 cfm/ton 375.54 ft²/ton 628.59 Btu/h-ft² 19.09
Conditions at Time of Space Heating Peak Peak Time (Mo/D/H:M) 1/21 24:00:00 Outside DB / WB / HR -15.0 °F / -15.0 °F / 2.5 gr/lb Room DB / RH / HR 70.0 °F / 2.3 % / 2.5 gr/lb Supply Air Dry Bulb Temp 89.4 °F
Time Percent Instant Delay of
Sensible Sensible Latent Total Total
(Btu/h) (Btu/h) (Btu/h) (Btu/h) (%) Roof 0 0 0 0 0.0 Other Roof 0 0 0 0 0.0 Glass 0 0 0 0 0.0 Door 0 0 0 0 0.0 Wall 0 0 0 0 0.0 Below-Grade Wall 0 0 0 0 0.0 Other Wall 0 0 0 0 0.0 Partition 0 -66 0 -66 17.4 Exterior Floor 0 0 0 0 0.0 Interior Floor 0 -206 0 -206 54.2 Slab 0 0 0 0 0.0 Other Floor 0 0 0 0 0.0 Infiltration 0 0 0 0 0.0
Envelope Subtotal 0 -272 0 -272 - People 0 0 0 0 0.0 Lights 0 0 0 0 0.0 Miscellaneous Loads 0 0 0 0 0.0
Internal Subtotal 0 0 0 0 - RA (All Other) 0 0 0 0 0.0 DOA Direct to Room 0 0 0 0 0.0 Ceiling 0 -107 0 -107 28.3 Refrigeration 0 0 0 0 0.0 Service Water 0 0 0 0 0.0 HVAC Equipment Losses 0 0 0 0 0.0 Adj Air Transfer Heat 0 0 0 0 0.0 Sizing Factor Correction 0 0 0 0 0.0 Time Delay Correction 0 -1 0 -1 0.2
Grand Total 0 -380 0 -380 100.0 RA Sensible (Lights) 0 0 0 0 -
Engineering Checks For Heating
Heating Mbh -0.38 No People(max) 2.00 %OA 0 People per 1000 ft² 19 cfm/ft² 0.18 Volume (ft³) 829.5 cfm/Mbh -48.94 ft²/Mbh -273.00 Btu/h-ft² -3.66
Cooling Airflows Main Fan cfm 62 Cooling ACH 4.48 Sec Fan cfm 0 Input Ventilation cfm 0 Calculated Ventilation cfm 0 Calculated Ventilation ACH 0.00 Infiltration cfm 0 Min Stop/RH (%) 30
Heating Airflows Main Fan cfm 19 Heating ACH 1.37 Sec Fan cfm 0 Input Ventilation cfm 0 Calculated Ventilation cfm 0 Calculated Ventilation ACH 0.00 Infiltration cfm 0 Min Stop/RH (%) 100
Areas ft²
Roof 0
Other Roof 0
Ceiling 122
Window 0
Door 0
0Wall
Below-Grade Wall 0
Other Wall 0
Partition 361
Exterior Floor 0
Internal Floor 122
Slab 0
Other Floor 122
Alternative: Primary Calculated at: Dec 16, 2024 - 05:58 PM
VA Iowa City Dialysis.mdf TRACE 3D Plus 6.10.289File
ROOM_4 ROOM
Peak Time (Mo/D/H:M) 7/21 14:00:00 Outside DB / WB / HR 95.0 °F / 78.1 °F / 122.5 gr/lb Room DB / RH / HR 72.0 °F / 40.0 % / 48.0 gr/lb…