This document outlines health requirements for contractors performing construction services at the Louis Stokes Cleveland VA Medical Center, as well as a related federal contract opportunity notice. The health requirements document specifies that contractor representatives must undergo daily COVID screening including temperature checks at the main entrance to Building 1A, obtain annual influenza vaccinations, and wear a visible contractor badge at all times on campus. The related solicitation seeks bids to expand primary care spaces at the Louis Stokes Cleveland VA Medical Center between $10-15 million. Bids are due by August 12, 2021 and the project is set aside for Service-Disabled Veteran Owned Small Businesses. The opportunity is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files for this federal contract opportunity

Other files attached to Expand Primary Care for Pact Realignment, newest first.
File Type Posted
S02. Sole Source - Tridium - 2020-05-07_Redacted.pdf PDF
S02. Sole Source - Corbin Russwin Door Lock - 2020-05-07_Redacted.pdf PDF
S02. Safety.docx DOCX document
S02. RFI Form.docx DOCX document
S02. Drawing - 1-H46 - Second Floor Plan - ACC South.pdf PDF
S02. Drawing - Outpatient Pharmacy Exhaust - EF-52.pdf PDF
S02. Drawings - ELECTRICAL.pdf PDF
S02. Drawings - PLUMBING.pdf PDF
S02. Drawings - RENDERINGS.pdf PDF
S02. VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx DOCX document
S02. Sole Source - Lenel - 2020-05-07_Redacted.pdf PDF
S02. Brand Name Spreadsheet 2020-05-07.pdf PDF
S02. Calculation of Self-Performed and Sub-Contracted Work.docx DOCX document
S02. Drawings - ARCHITECURAL.pdf PDF
S02. Drawings - CIVIL.pdf PDF
S02. Drawings - FIRE PROTECTION.pdf PDF
S02. Sole Source - Notifier Fire Alarm - 2020-05-07_Redacted.pdf PDF
S02. Sole Source - Hill-Rom Nurse Call - 2020-05-07_Redacted.pdf PDF
S02. Drawing - 1-H28 - First Floor Plan - Zoning.pdf PDF
S02. Drawing - 1-H29 - Second Floor Plan - Zoning.pdf PDF
S02. Drawing - 1-H34 - First Floor Plan - ACC North.pdf PDF
S02. Drawing - 1-H36 - First Floor Plan - ACC South.pdf PDF
S02. Drawing - 1-H44 - Second Floor Plan - ACC North.pdf PDF
S02. Solicitation 36C25020B0060_1.pdf PDF
S02. Wage Determination.pdf PDF
S02. Bid Opening Instructions.pdf PDF
S02. BID ISSUE - SPECIFICATIONS.pdf PDF
S02. Brand Name or Equal Memo 2020-05-06.pdf PDF
S02. Drawing - 1-H27 - Basement Plan - Zoning.pdf PDF
S02. Drawing - 1-H54 - Basement Plan - Mechanical Room.pdf PDF
S02. Drawing - Pre-Testing Reference Update.pdf PDF
S02. Drawings - HVAC.pdf PDF
S02. Drawings - SITE LANDSCAPE.pdf PDF
S02. Drawings - STRUCTURAL.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAMC Contractor Health Requirements

The construction firms’ representatives performing construction services on the Louis Stokes Cleveland VA campus must validate the following additional requirements are in place before starting site construction on campus:

1. Daily visit at check-in station for COVID and temperature screening a. Sticker/device must be worn visibly

2. Annual influenza shot is required for all staff performing work on

Louis Stokes Cleveland VA campus

3. Contractor badge must be obtained and worn by contractor or representative at all times while on campus

The temperature checks are performed on the Louis Stokes Cleveland

VA campus and must be performed immediately when the contractor arrives on site. Temperature checks are currently performed at the main entrance of the clinic building (Building 1A). If at any time an employee of the construction firm is found in deficiency of the listed, a stop work order will be issued for safety of Louis Stokes Cleveland

VAMC patients. Any further questions please refence the below documents

VHA Directive 1192.01 (Attachment 4)

File details come from the government source that posted it. Updated .