S02. Calculation of Self-Performed and Sub-Contracted Work.docx

DOCX document 15 KB Posted

Attached to
Expand Primary Care for Pact Realignment Federal contract opportunity
Solicitation number
36C25020B0060_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document provides details for a federal contract solicitation to expand primary care facilities at a Department of Veterans Affairs medical center. The solicitation seeks bids for construction services to add 12,000 square feet of space across three floors in an expansion of the Louis Stokes Cleveland VA Medical Center in Cleveland, Ohio. The project magnitude is between $10-15 million according to the NAICS code 236220 for construction of other new nonresidential structures with a size standard of $39.5 million. All work must follow specifications and be coordinated with the VA Contracting Officer and representative. Bids are due by August 12, 2021 and the project is set aside 100% for a Service-Disabled Veteran Owned Small Business. Respondents must be verified in VETBIZ and registered in SAM by the offer due date and award date to be eligible.

View the file

Other files for this federal contract opportunity

Other files attached to Expand Primary Care for Pact Realignment, newest first.
File Type Posted
S02. VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx DOCX document
S02. Sole Source - Lenel - 2020-05-07_Redacted.pdf PDF
S02. Brand Name Spreadsheet 2020-05-07.pdf PDF
S02. Drawings - ARCHITECURAL.pdf PDF
S02. Drawings - CIVIL.pdf PDF
S02. Drawings - FIRE PROTECTION.pdf PDF
S02. Sole Source - Notifier Fire Alarm - 2020-05-07_Redacted.pdf PDF
S02. Sole Source - Hill-Rom Nurse Call - 2020-05-07_Redacted.pdf PDF
S02. Drawing - 1-H28 - First Floor Plan - Zoning.pdf PDF
S02. Drawing - 1-H29 - Second Floor Plan - Zoning.pdf PDF
S02. Drawing - 1-H34 - First Floor Plan - ACC North.pdf PDF
S02. Drawing - 1-H36 - First Floor Plan - ACC South.pdf PDF
S02. Drawing - 1-H44 - Second Floor Plan - ACC North.pdf PDF
S02. VAMC Health Requirements.pdf PDF
S02. Sole Source - Tridium - 2020-05-07_Redacted.pdf PDF
S02. Sole Source - Corbin Russwin Door Lock - 2020-05-07_Redacted.pdf PDF
S02. Safety.docx DOCX document
S02. RFI Form.docx DOCX document
S02. Drawing - 1-H46 - Second Floor Plan - ACC South.pdf PDF
S02. Drawing - Outpatient Pharmacy Exhaust - EF-52.pdf PDF
S02. Drawings - ELECTRICAL.pdf PDF
S02. Drawings - PLUMBING.pdf PDF
S02. Drawings - RENDERINGS.pdf PDF
S02. Solicitation 36C25020B0060_1.pdf PDF
S02. Wage Determination.pdf PDF
S02. Bid Opening Instructions.pdf PDF
S02. BID ISSUE - SPECIFICATIONS.pdf PDF
S02. Brand Name or Equal Memo 2020-05-06.pdf PDF
S02. Drawing - 1-H27 - Basement Plan - Zoning.pdf PDF
S02. Drawing - 1-H54 - Basement Plan - Mechanical Room.pdf PDF
S02. Drawing - Pre-Testing Reference Update.pdf PDF
S02. Drawings - HVAC.pdf PDF
S02. Drawings - SITE LANDSCAPE.pdf PDF
S02. Drawings - STRUCTURAL.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for NAICS codes 238210 & 238220) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division
SDVOB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$__________________
4. Self-performed work = Line 3/Line 1 x 100 =__________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

_______________________________________________
(signature)Date

(Typed Name of Authorized Representative)

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .