S02. Drawings - ARCHITECURAL.pdf

PDF 27 MB Posted

Attached to
Expand Primary Care for Pact Realignment Federal contract opportunity
Solicitation number
36C25020B0060_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This solicitation is for a construction project to expand primary care facilities at the Louis Stokes Cleveland VA Medical Center in Cleveland, Ohio. The contractor shall provide all labor, equipment, supplies, and supervision necessary to add approximately 12,000 square feet of space across three floors by expanding the existing ambulatory care addition. The project budget is estimated between $10-15 million. Requests for information are due by August 12, 2021 and shall be emailed to the contracting officer. This is a 100% set-aside for a Service-Disabled Veteran Owned Small Business. Bidders must be verified in VETBIZ and registered in SAM by the time of offer and award to be eligible. The NAICS code for this project is 236220 with a size standard of $39.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to Expand Primary Care for Pact Realignment, newest first.
File Type Posted
S02. Solicitation 36C25020B0060_1.pdf PDF
S02. Wage Determination.pdf PDF
S02. Bid Opening Instructions.pdf PDF
S02. BID ISSUE - SPECIFICATIONS.pdf PDF
S02. Brand Name or Equal Memo 2020-05-06.pdf PDF
S02. Drawing - 1-H27 - Basement Plan - Zoning.pdf PDF
S02. Drawing - 1-H54 - Basement Plan - Mechanical Room.pdf PDF
S02. Drawing - Pre-Testing Reference Update.pdf PDF
S02. Drawings - HVAC.pdf PDF
S02. Drawings - SITE LANDSCAPE.pdf PDF
S02. Drawings - STRUCTURAL.pdf PDF
S02. VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx DOCX document
S02. Sole Source - Lenel - 2020-05-07_Redacted.pdf PDF
S02. Brand Name Spreadsheet 2020-05-07.pdf PDF
S02. Calculation of Self-Performed and Sub-Contracted Work.docx DOCX document
S02. Drawings - CIVIL.pdf PDF
S02. Drawings - FIRE PROTECTION.pdf PDF
S02. Sole Source - Notifier Fire Alarm - 2020-05-07_Redacted.pdf PDF
S02. Sole Source - Hill-Rom Nurse Call - 2020-05-07_Redacted.pdf PDF
S02. Drawing - 1-H28 - First Floor Plan - Zoning.pdf PDF
S02. Drawing - 1-H29 - Second Floor Plan - Zoning.pdf PDF
S02. Drawing - 1-H34 - First Floor Plan - ACC North.pdf PDF
S02. Drawing - 1-H36 - First Floor Plan - ACC South.pdf PDF
S02. Drawing - 1-H44 - Second Floor Plan - ACC North.pdf PDF
S02. VAMC Health Requirements.pdf PDF
S02. Sole Source - Tridium - 2020-05-07_Redacted.pdf PDF
S02. Sole Source - Corbin Russwin Door Lock - 2020-05-07_Redacted.pdf PDF
S02. Safety.docx DOCX document
S02. RFI Form.docx DOCX document
S02. Drawing - 1-H46 - Second Floor Plan - ACC South.pdf PDF
S02. Drawing - Outpatient Pharmacy Exhaust - EF-52.pdf PDF
S02. Drawings - ELECTRICAL.pdf PDF
S02. Drawings - PLUMBING.pdf PDF
S02. Drawings - RENDERINGS.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

HAZARDOUS MATERIALS

ASSESSMENT:

STEPHEN J. SEBESTA &

ASSOCIATES, INC.

30628 DETROIT RD., NO. 258

WESTLAKE, OH 44145

P. 216.781.0060

C U s e rs

\d a v e

\D o c u m e n ts \E x p a n d P ri m a ry

C a re

R d a k a p la n

.r v t

/3

/2

:2

:5

P

M

BID ISSUE SUBMISSION

GI-1

TITLE SHEET & DRAWING INDEX EXPAND PRIMARY CARE FOR

PACT REALIGNMENT

10701 EAST BLVD. CLEVELAND, OHIO

541-376

8.1.21 CJK DAK

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

EXPAND PRIMARY CARE FOR PACT REALIGNMENT

10701 EAST BLVD. CLEVELAND, OH 44106

PROJECT NO. 541-376

Cleveland Veterans Affairs Medical Center

SCOPE OF WORK

GROUND LEVEL

NORTH

CODE INFORMATION:

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER

10701 EAST BLVD.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING

A. NATURE OF PROJECT: TWO-STORY ADDITION TO AND INTERIOR RENOVATIONS OF EXISTING 1ST

FLOOR PRIMARY CARE DEPARTMENT, 2ND FLOOR SPECIALTY CARE

DEPARTMENT, AND BASEMENT LEVEL MECHANICAL ROOM

B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018, ABAAS & VA BARRIER-FREE GUIDELINES

C. USE GROUP: 1ST & 2ND FLOORS: B - AMBULATORY CARE FACILITY (EXISTING)

BASEMENT LEVEL: S - STORAGE

D. CONSTRUCTION TYPE: TYPE I-332, IA - NON-COMBUSTIBLE, PROTECTED

FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)

EXTERIOR BEARING WALLS 3 HRS

INTERIOR BEARING WALLS 3 HRS

STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)

2 HRS (SUPPORTING 1 FLOOR ONLY)

2 HRS (SUPPORTING ROOF ONLY)

BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)

FLOOR-CEILING ASSEMBLIES 2 HRS

ROOF-CEILING ASSEMBLIES 1-1/2 HRS

INTERIOR NON-BEARING WALLS 0 HRS

EXTERIOR NON-BEARING WALLS 0 HRS

WALL ASSEMBLIES

FIRE PARTITIONS 1 HR

SMOKE BARRIERS 1 HR

STAIR ENCLOSURES 2 HRS

SHAFT ENCLOSURES 2 HRS

E. PROJECT AREA: BASEMENT LEVEL: 5,422 GSF ADDITON

FIRST FLOOR: 10,170 SF INTERIOR RENOVATION + 5,102 GSF ADDITION

SECOND FLOOR: 1,067 SF INTERIOR RENOVATION + 5,216 GSF ADDITION

F. PROJECT AREA OCCUPANT LOAD: BASEMENT LEVEL: 19

FIRST FLOOR: 153

SECOND FLOOR: 63

G. FIRE PROTECTION: FULLY SPRINKLED - EXISTING AND ADDITION. EXISTING FIRE PROTECTION

SYSTEM TO BE MODIFIED AS REQUIRED FOR NEW IMPROVEMENTS. DESIGN

SHALL BE COMPLETED SEPARATELY BY A LICENSED FIRE PROTECTIONS

SYSTEM DESIGNER.

DRAWING INDEX:

BID ISSUE SUBMISSION

8.1.21

GI-1 TITLE SHEET & DRAWING INDEX

ARCHITECTURAL

LS-0.1 BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I

LS-1.1 FIRST FLOOR LIFE SAFETY PLAN - PHASE I

LS-1.2 FIRST FLOOR LIFE SAFETY PLAN - PHASE II

LS-1.3 FIRST FLOOR LIFE SAFETY PLAN - PHASE III

LS-1.4 FIRST FLOOR LIFE SAFETY PLAN - PHASE IV

LS-1.5 FIRST FLOOR LIFE SAFETY PLAN - PHASE V

LS-2.1 SECOND FLOOR LIFE SAFETY PLAN - PHASE I

AS-X-0.1 BASEMENT LEVEL EXISTING CONDITIONS PLAN

AS-D-0.1 BASEMENT LEVEL - DEMOLITION PLAN - PHASE I

AS-0.1 BASEMENT LEVEL PROPOSED IMPROVEMENT/ADDITION PLAN - PHASE I

AS-C-0.1 BASEMENT LEVEL - REFLECTED CEILING PLAN - PHASE I

AS-X-1.1 1ST FLOOR PRIMARY CARE DEPT. - EXISTING CONDITIONS PLAN

AS-D-1.1 1ST FLOOR PRIMARY CARE DEPT. - DEMOLITION PLAN - PHASE I

AS-DC-1.1 1ST FLOOR PRIMARY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE I

AS-1.1 1ST FLOOR PRIMARY CARE DEPT. - PROPOSED IMPROVEMENT/ADDITION PLAN -

PHASE I ADDITION

AS-1.1A 1ST FLOOR PRIMARY CARE DEPT. - PROPOSED IMPROVEMENT PLAN -

PHASE I INTERIORS

AS-C-1.1 1ST FLOOR PRIMARY CARE DEPT. - REFLECTED CEILING PLAN - PHASE I

AS-D-1.2 1ST FLOOR PRIMARY CARE DEPT. - DEMOLITION PLAN - PHASE II

AS-DC-1.2 1ST FLOOR PRIMARY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE II

AS-1.2 1ST FLOOR PRIMARY CARE DEPT. - PROPOSED IMPROVEMENT PLAN - PHASE II

AS-C-1.2 1ST FLOOR PRIMARY CARE DEPT. - REFLECTED CEILING PLAN - PHASE II

AS-D-1.3 1ST FLOOR PRIMARY CARE DEPT. - DEMOLITION PLAN - PHASE III

AS-DC-1.3 1ST FLOOR PRIMARY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE III

AS-1.3 1ST FLOOR PRIMARY CARE DEPT. - PROPOSED IMPROVEMENT PLAN - PHASE III

AS-C-1.3 1ST FLOOR PRIMARY CARE DEPT. - REFLECTED CEILING PLAN - PHASE III

AS-D-1.4 1ST FLOOR PRIMARY CARE DEPT. - DEMOLITION PLAN - PHASE IV

AS-DC-1.4 1ST FLOOR PRIMARY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE IV

AS-1.4 1ST FLOOR PRIMARY CARE DEPT. - PROPOSED IMPROVEMENT PLAN - PHASE IV

AS-C-1.4 1ST FLOOR PRIMARY CARE DEPT. - REFLECTED CEILING PLAN - PHASE IV

AS-D-1.5 1ST FLOOR PRIMARY CARE DEPT. - DEMOLITION PLAN - PHASE V

AS-DC-1.5 1ST FLOOR PRIMARY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE V

AS-1.5 1ST FLOOR PRIMARY CARE DEPT. - PROPOSED IMPROVEMENT PLAN - PHASE V

AS-C-1.5 1ST FLOOR PRIMARY CARE DEPT. - REFLECTED CEILING PLAN - PHASE V

AS-X-2.1 2ND FLOOR SPECIALTY CARE DEPT. - EXISTING CONDITIONS PLAN

AS-D-2.1 2ND FLOOR SPECIALTY CARE DEPT. - DEMOLITION PLAN - PHASE I

AS-DC-2.1 2ND FLOOR SPECIALTY CARE DEPT. - CEILING DEMOLITION PLAN - PHASE I

AS-2.1 2ND FLOOR SPECIALTY CARE DEPT. - PROPOSED IMPROVEMENT/ADDITION

PLAN - PHASE I ADDITION

AS-2.1A 2ND FLOOR SPECIALTY CARE DEPT. - PROPOSED IMPROVEMENT/ADDITION

PLAN - PHASE I INTERIORS

AS-2.1B 2ND FLOOR SPECIALTY CARE DEPT. - DEDUCT ALTERNATE 1-3 PLANS

AS-C-2.1 2ND FLOOR SPECIALTY CARE DEPT. - REFLECTED CEILING PLAN - PHASE I

AS-C-2.1B 2ND FLOOR SPECIALTY CARE DEPT. - DEDUCT ALTERNATE 1-3 CEILING PLANS

AS-3.1 THIRD FLOOR/NEW ADDITION ROOF PLAN - PHASE I

AS-200 NEW ADDITION EXTERIOR ELEVATIONS

AS-201 WALL SECTIONS

AS-202 WALL SECTIONS

AS-203 WALL SECTIONS

AS-204 ENLARGED STAIR SECTION, PLANS, AND DETAILS

AS-300 ENLARGED PLANS AND INTERIOR ELEVATIONS

AS-301 ENLARGED PLANS AND INTERIOR ELEVATIONS

AS-302 ENLARGED PLANS AND INTERIOR ELEVATIONS

AS-303 INTERIOR ELEVATIONS

AS-304 INTERIOR ELEVATIONS

AS-305 INTERIOR ELEVATIONS

AS-306 MILLWORK DETAILS

AS-400 ENLARGED PLAN & SECTION DETAILS

AS-401 ENLARGED SECTION DETAILS

AS-600 WINDOW TYPES

AS-601 WALL TYPES

AS-700 DOOR SCHEDULE AND DETAILS

AS-701 1ST FLOOR - MASTER FINISH PLAN

AS-702 BASEMENT LEVEL AND 2ND FLOOR - MASTER FINISH PLANS

AS-703 FINISH SCHEDULE AND DETAILS

MECHANICAL/HVAC

H-001 HVAC GENERAL NOTES AND SYMBOL LEGEND

H-002 HVAC DETAILS

H-003 HVAC DETAILS

H-004 HVAC TEMPERATURE CONTROLS

H-005 HVAC TEMPERATURE CONTROLS

H-006 HVAC SCHEDULES

H-007 HVAC SECTIONS AT BASEMENT LEVEL

H-D-0-1 BASEMENT LEVEL PHASE I HVAC DEMOLITION PLAN

H-0.1-1 BASEMENT LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN

H-0.2-1 BASEMENT LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN

H-D-1-1 FIRST FLOOR LEVEL PHASE I HVAC DEMOLITION PLAN

H-1.1-1 FIRST FLOOR LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN

H-1.2-1 FIRST FLOOR PHASE PHASE I HVAC PIPING IMPROVEMENT PLAN

H-D-1-2 FIRST FLOOR LEVEL PHASE II HVAC DEMOLITION PLAN

H-1.1-2 FIRST FLOOR LEVEL PHASE II HVAC DUCTWORK IMPROVEMENT PLAN

H-1.2-2 FIRST FLOOR LEVEL PHASE II HVAC PIPING IMPROVEMENT PLAN

H-D-1-3 FIRST FLOOR LEVEL PHASE III HVAC DEMOLITION PLAN

H-1.1-3 FIRST FLOOR LEVEL PHASE III HVAC DUCTWORK IMPROVEMENT PLAN

H-1.2-3 FIRST FLOOR LEVEL PHASE III HVAC PIPING IMPROVEMENT PLAN

H-D-1-4 FIRST FLOOR LEVEL PHASE IV HVAC DEMOLITION PLAN

H-1.1-4 FIRST FLOOR LEVEL PHASE IV HVAC DUCTWORK IMPROVEMENT PLAN

H-1.2-4 FIRST FLOOR LEVEL PHASE IV HVAC PIPING IMPROVEMENT PLAN

H-D-1-5 FIRST FLOOR LEVEL PHASE V HVAC DEMOLITION PLAN

H-1.1-5 FIRST FLOOR LEVEL PHASE V HVAC DUCTWORK IMPROVEMENT PLAN

H-1.2-5 FIRST FLOOR LEVEL PHASE V HVAC PIPING IMPROVEMENT PLAN

H-D-2-1 SECOND FLOOR LEVEL PHASE I HVAC DEMOLITION PLAN

H-2.1-1 SECOND FLOOR LEVEL PHASE I HVAC DUCTWORK IMPROVEMENT PLAN

H-2.2-1 SECOND FLOOR LEVEL PHASE I HVAC PIPING IMPROVEMENT PLAN

STRUCTURAL

S-0.1 GENERAL NOTES

S-0.2 GENERAL NOTES

S-0.3 GENERAL NOTES

S-1.0 FOUNDATION PLAN - PHASE I

S-2.0 FIRST FLOOR FRAMING PLAN - PHASE I

S-3.0 SECOND FLOOR FRAMING PLAN - PHASE I

S-4.0 ROOF/FUTURE THIRD FLOOR SLAB PLAN - PHASE I

S-5.0 FOUNDATION TYPICAL DETAILS

S-5.1 FOUNDATION SECTIONS AND DETAILS

S-5.2 FOUNDATION SECTIONS AND DETAILS

S-6.0 TYPICAL MASONRY DETAILS AND ENLARGED STAIR PLAN AND ELEVATION

S-7.0 CONCRETE TYPICAL DETAILS

S-7.1 FRAMING SECTIONS AND DETAILS

S-8.0 SECTIONS AND DETAILS

S-9.0 SECTIONS AND DETAILS

S-9.1 SECTIONS AND DETAILS

FIRE PROTECTION

FP-001 FIRE PROTECTION GENERAL NOTES, DETAILS, AND SYMBOL LEGEND

FP-0-1 BASEMENT LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN

FP-1-1 FIRST FLOOR LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN

FP-1-2 FIRST FLOOR LEVEL PHASE II FIRE PROTECTION IMPROVEMENT PLAN

FP-1-3 FIRST FLOOR LEVEL PHASE III FIRE PROTECTION IMPROVEMENT PLAN

FP-1-4 FIRST FLOOR LEVEL PHASE IV FIRE PROTECTION IMPROVEMENT PLAN

FP-1-5 FIRST FLOOR LEVEL PHASE V FIRE PROTECTION IMPROVEMENT PLAN

FP-2-1 SECOND FLOOR LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN

CIVIL

GS-0 EXISTING SITE SURVEY

GS-1 SYMBOL LEGEND AND GENERAL NOTES

GS-2 CLEARING AND DEMOLITION PLAN

GS-3 SITE UTILITY AND GRADING PLAN

GS-4 SITE PAVING PLAN

GS-5 EROSION CONTROL NARRATIVE

GS-6 SITE DETAILS

LANDSCAPE/SITE

MSP-01 MASTER SITE IMPROVEMENT PLAN

MSP-02 SITE ELEVATIONS & DETAILS

L-01 LANDSCAPE PLAN

L-02 IRRIGATION PLAN

PLUMBING

P-001 PLUMBING GENERAL NOTES, SCHEDULES, DETAILS, AND SYMBOL LEGEND

P-D-0-1 BASEMENT LEVEL PHASE I PLUMBING DEMOLITION PLAN

P-D-1-1 FIRST FLOOR LEVEL PHASE I PLUMBING DEMOLITION PLAN

P-D-2-1 SECOND FLOOR LEVEL PHASE I PLUMBING DEMOLITION PLAN

P-0.1-1 BASEMENT LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN

P-0.2-1 BASEMENT LEVEL PHASE I PLUMBING WASTE IMPROVEMENT PLAN

P-1.1-1 FIRST FLOOR LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN

P-1.2-1 FIRST FLOOR LEVEL PHASE I PLUMBING WASTE IMPROVEMENT PLAN

P-2.1-1 SECOND FLOOR LEVEL PHASE I PLUMBING PIPING IMPROVEMENT PLAN

P-2.2-1 SECOND FLOOR LEVE PHASE I PLUMBING WASTE IMPROVEMENT PLAN

P-3.2-1 ROOF PLAN PHASE I PLUMBING WASTE IMPROVEMENT PLAN

P-D-0-2 BASEMENT LEVEL PHASE II PLUMBING DEMOLITION PLAN

P-D-1-2 FIRST FLOOR LEVEL PHASE II PLUMBING DEMOLITION PLAN

P-0.2-2 BASEMENT LEVEL PHASE II PLUMBING WASTE IMPROVEMENT PLAN

P-1.1-2 FIRST FLOOR LEVEL PHASE II PLUMBING PIPING IMPROVEMENT PLAN

P-1.2-2 FIRST FLOOR LEVEL PHASE II PLUMBING WASTE IMPROVEMENT PLAN

P-D-0-3 BASEMENT LEVEL PHASE III PLUMBING DEMOLITION PLAN

P-D-1-3 FIRST FLOOR LEVEL PHASE III PLUMBING DEMOLITION PLAN

P-0.2-3 BASEMENT LEVEL PHASE III PLUMBING WASTE IMPROVEMENT PLAN

P-1.1-3 FIRST FLOOR LEVEL PHASE III PLUMBING PIPING IMPROVEMENT PLAN

P-1.2-3 FIRST FLOOR LEVEL PHASE III PLUMBING WASTE IMPROVEMENT PLAN

P-D-0-4 BASEMENT LEVEL PHASE IV PLUMBING DEMOLITION PLAN

P-D-1-4 FIRST FLOOR LEVEL PHASE IV PLUMBING DEMOLITION PLAN

P-0.2-4 BASEMENT LEVEL PHASE IV PLUMBING WASTE IMPROVEMENT PLAN

P-1.1-4 FIRST FLOOR LEVEL PHASE IV PLUMBING PIPING IMPROVEMENT PLAN

P-1.2-4 FIRST FLOOR LEVEL PHASE IV PLUMBING WASTE IMPROVEMENT PLAN

P-D-0-5 BASEMENT LEVEL PHASE V PLUMBING DEMOLITION PLAN

P-D-1-5 FIRST FLOOR LEVEL PHASE V PLUMBING DEMOLITION PLAN

P-0.2-5 BASEMENT LEVEL PHASE V PLUMBING WASTE IMPROVEMENT PLAN

P-1.1-5 FIRST FLOOR LEVEL PHASE V PLUMBING PIPING IMPROVEMENT PLAN

P-1.2-5 FIRST FLOOR LEVEL PHASE V PLUMBING WASTE IMPROVEMENT PLAN

P-002-1 PLUMBING ISOMETRICS - PHASE I

P-002-2 PLUMBING ISOMETRICS - PHASE I & II

P-002-3 PLUMBING ISOMETRICS - PHASE III, IV, & V

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND

E-002 LIGHTING FIXTURE SCHEDULE - ELECTRICAL

E-003 PANELBOARD SCHEDULES - ELECTRICAL

E-004 MECHANICAL EQUIPMENT SCHEDULE - ELECTRICAL

E-005 PARTIAL ONE-LINE DIAGRAMS - ELECTRICAL

E-006 ELECTRICAL DETAILS - ELECTRICAL

E-007 TELECOM DETAILS - ELECTRICAL

E-008 NURSE CALL DETAILS

ES-1 DEMOLITION SITE UTILITIY PLAN - ELECTRICAL

ES-2 NEW WORK - SITE UTILITY PLAN - ELECTRICAL

E-D-1-1 DEMOLITION - FIRST FLOOR LEVEL PHASE I FLOOR PLAN - ELECTRICAL

E-D-2-1 DEMOLITION - SECOND FLOOR LEVEL PHASE I FLOOR PLAN - ELECTRICAL

E-0.1-1 LIGHTING - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-0.2-1 POWER - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-0.3-1 SYSTEMS - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.1-1 LIGHTING - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.2-1 POWER - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.3-1 SYSTEMS - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-1.4-1 TELECOM - FIRST FLOOR LEVEL PHASE I IMPROVEMENT PLAN - ELECTRICAL

E-2.1-1A LIGHTING - SECOND FLOOR LEVEL PHASE I - BASE BID & DEDUCT ALTERNATE 1 & 2 PLANS

E-2.2-1A POWER - SECOND FLOOR LEVEL PHASE I - BASE BID & DEDUCT ALTERNATE 1 & 2 PLANS

E-2.3-1A SYSTEMS - SECOND FLOOR LEVEL PHASE I - BASE BID & DEDUCT ALTERNATE 1 & 2 PLANS

E-2.4-1A TELECOM - SECOND FLOOR LEVEL PHASE I - BASE BID & DEDUCT ALTERNATE 1 & 2 PLANS

E-2.5-1A LIGHT/PWR/SYS - SECOND FLOOR LEVEL PHASE I - DEDUCT ALT. 3 PLAN

E-D-1-2 DEMOLITION - FIRST FLOOR LEVEL PHASE II FLOOR PLAN - ELECTRICAL

E-1.1-2 LIGHTING - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL

E-1.2-2 POWER - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL

E-1.3-2 SYSTEMS - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL

E-1.4-2 TELECOM - FIRST FLOOR LEVEL PHASE II IMPROVEMENT PLAN - ELECTRICAL

E-D-1-3 DEMOLITION - FIRST FLOOR LEVEL PHASE III FLOOR PLAN - ELECTRICAL

E-1.1-3 LIGHTING - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL

E-1.2-3 POWER - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL

E-1.3-3 SYSTEMS - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL

E-1.4-3 TELECOM - FIRST FLOOR LEVEL PHASE III IMPROVEMENT PLAN - ELECTRICAL

E-D-1-4 DEMOLITION - FIRST FLOOR LEVEL PHASE IV FLOOR PLAN - ELECTRICAL

E-1.1-4 LIGHTING - FIRST FLOOR LEVEL PHASE IV IMPROVEMENT PLAN - ELECTRICAL

E-1.2-4 POWER - FIRST FLOOR LEVEL PHASE IV IMPROVEMENT PLAN - ELECTRICAL

E-1.3-4 SYSTEMS - FIRST FLOOR LEVEL PHASE IV IMPROVEMENT PLAN - ELECTRICAL

E-1.4-4 TELECOM - FIRST FLOOR LEVEL PHASE IV IMPROVEMENT PLAN - ELECTRICAL

E-D-1-5 DEMOLITION - FIRST FLOOR LEVEL PHASE V FLOOR PLAN - ELECTRICAL

E-1.1-5 LIGHTING - FIRST FLOOR LEVEL PHASE V IMPROVEMENT PLAN - ELECTRICAL

E-1.2-5 POWER - FIRST FLOOR LEVEL PHASE V IMPROVEMENT PLAN - ELECTRICAL

E-1.3-5 SYSTEMS - FIRST FLOOR LEVEL PHASE V IMPROVEMENT PLAN - ELECTRICAL

E-1.4-5 TELECOM - FIRST FLOOR LEVEL PHASE V IMPROVEMENT PLAN - ELECTRICAL

Revisions: Date:

SCHEM. DESIGN SUBMISSION 3.15.19

DD SUBMISSION 5.3.19

65% CD's SUBMISSION 6.14.19

90% CD's SUBMISSION 8.9.19

100% CD's SUBMISSION 2.14.20

BID ISSUE SUBMISSION 8.1.21

E

E

F E

FE

F E

F E

F E

P H

A S

E I S

C O

P E

O F

W O

R K

P H

A S

E I S

C O

P E

O F

W O

R K

E

Outpatient Pharmacy

BAC311

Tech Sup. Mail Order

BAC312

Storage

BAC301

HD Storage Room

BAC301A

Consult Room

BAC313

Consult Room

BAC313

Waiting

BAC326

Staff Lockers/Break

BAC303

HAC

BAC302

Office

BAC306

Mechanical Room

BA109

Stair 3

BS3

Office

BA109C

Corridor

BAC327

Corridor

BAC328

Mechanical Room

BA111

Outside Air Enclosure

BA110

Stair 5

BS5

Stair 1

BS1

Supervisor

BAC316

Tech Supply

BAC317

Controlled Sub,/ Sec Disp

BAC318Record Storage

BAC320

Staff Toilet

BAC319

Consult

BAC321

Waiting

BAC324

Electrical Closet

BAC309

Comm

BAC308

Work Room

BAC307

Areawell Access

BA109A

CONSTRUCTION AREA

EXISTING EGRESS PATHS FROM EXISTING

MECHANICAL ROOM TO REMAIN

UNAFFECTED DURING CONSTRUCTION

19 OCCUPANTS

76'-10" +/- EGRESS TRAVEL

DISTANCE/COMMON PATH OF

TRAVEL

IBC TABLE 1006.3.2(2) STORIES WITH

ONE EXIT OR ACCESS TO ONE EXIT:

-MAXIMUM OCCUPANT LOAD: 29

-MAXIMUM EXIT TRAVEL DISTANCE:

100' (SPRINKLED)

SPECIAL NOTE: AREA WITH DIAGONAL HATCH INDICATES EXISTING OUTPATIENT PHARMACY

DRUG PREPARATION AREA. ACCESS ABOVE EXISTING TILE CEILING IN THIS AREA IS

REQUIRED FOR 1ST FLOOR UTILITY WORK - REFER TO MEP DWGS. FOR SCOPE. GC SHALL

EMPLOY THE FOLLOWING INFECTION CONTROL PROTECTION MEASURES DURING

CONSTRUCTION IN OUTPATIENT PHARMACY AREAS AT ALL TIMES:

• WHEN REMOVING CEILING TILES, MOBILE HEPA FILTRATION CARTS MUST BE

UTILIZED THAT CREATE AN ENCLOSURE AROUND A SINGLE CEILING TILE

• WHEN REMOVING AN AREA OF CEILING TILES EQUAL TO OR EXCEEDING 10' X 10' AT

ANY ONE TIME, VISQUEEN ENCLOSURE MUST BE PROVIDED AROUND THE

PERIMETER OF THE AREA

ADDITIONALLY, A VA PHARMACIST MUST BE CONTACTED AND PRESENT BY LAW DURING ALL

CONSTRUCTION ACTIVITIES. THE GC AND THEIR EMPLOYEES/SUBCONTRACTORS SHALL

NOT BE PERMITTED FREE ACCESS INTO THE OUTPATIENT PHARMACY WITHOUT PROPER

PHARMACY SUPERVISION. WORK PERFORMED IN THE OUTPATIENT PHARMACY MUST

OCCUR OFF-HOURS WITHIN THE FOLLOWING TIMEFRAMES (WITH PHARMACY SUPERVISION

PRESENT):

• MON./TUES./WED./FRI. - 7 PM THRU 7 AM

• THURS. - 8 PM THRU 7 AM

• SAT./SUN. - 5 PM THRU 7 AM

79'-11" +/- EGRESS TRAVEL

DISTANCE/COMMON PATH OF

TRAVEL

F E

Areawell

BA110A

FE

FE

Mens

BAC330

Womens

BAC329

Conference Room

BAC286

Exam

BAC254

Exam

BAC255

Clean Supply

BAC259

Soiled Holding

BAC258

Office

BAC257

Records

BAC256

Waiting

BAC250

Triage

BAC251

Passage

BAC250B

Exam

BAC252

Exam

BAC253

Break Room

BAC283

Copy File/Work

BAC282Office

BAC281

Storage, File Room

BAC285

Elevator Lobby

BAC325

Corridor

BAC284

Anti-Coagulation Clinic Open Office

BAC280

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION (DIRECTIONAL ARROWS MAY

OCCUR, SEE PLAN)

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW

AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE

TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE

AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND

COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY

DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY

STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED FIRE/SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "SOLID BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE

PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BER ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 60 DAYS

PHASE I: 270 DAYS

VA ACTIVATION OF PHASE I: 45 DAYS

PHASE II: 90 DAYS

VA ACTIVATION OF PHASE II: 45 DAYS

PHASE III: 90 DAYS

VA ACTIVATION OF PHASE III: 45 DAYS

PHASE IV: 90 DAYS

VA ACTIVATION OF PHASE IV: 45 DAYS

PHASE V: 60 DAYS

VA ACTIVATION OF PHASE V: 45 DAYS

TOTAL TIMEFRAME: 885 DAYS*

*DEDUCT ALTERNATES, IF ACCEPTED, SHALL MODIFY THE CONTRACT TIMEFRAME AS FOLLOWS:

• DEDUCT ALTERNATE #1: PHASE I SHALL BE REDUCED (5) DAYS, FOR A NEW TOTAL TIMEFRAME OF 880

DAYS

• DEDUCT ALTERNATE #2: PHASE I SHALL BE REDUCED BY (7) DAYS, FOR A NEW TOTAL TIMEFRAME OF 878

DAYS

• DEDUCT ALTERNATE #3: PHASE I SHALL BE REDUCED BY (14) DAYS, FOR A NEW TOTAL TIMEFRAME OF 871

DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES TO TIMES WHEN THE PRIMARY CARE AND SPECIALTY CARE DEPARTMENTS ARE CLOSED.

COORDINATE TIMES WITH VA.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• ABOVE-CEILING WORK IN THE BASEMENT LEVEL OUTPATIENT PHARMACY MUST OCCUR AFTER HOURS OR ON THE WEEKEND. REFER TO BASEMENT LEVEL LIFE SAFETY PLAN FOR APPLICABLE HOURS. VA

PHARMACIST MUST BE ON SITE DURING ALL ACTIVITIES IN THIS SPACE BY LAW.

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING

FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

HAZARDOUS MATERIALS

ASSESSMENT:

STEPHEN J. SEBESTA &

ASSOCIATES, INC.

30628 DETROIT RD., NO. 258

WESTLAKE, OH 44145

P. 216.781.0060

C U s e rs

\d a v e

\D o c u m e n ts \E x p a n d P ri m a ry

C a re

R d a k a p la n

.r v t

/2

/2

:5

:3

P

M

BID ISSUE SUBMISSION

LS-0.1

BASEMENT LEVEL LIFE SAFETY PLAN - PHASE

I

EXPAND PRIMARY CARE FOR

PACT REALIGNMENT

10701 EAST BLVD. CLEVELAND, OHIO

541-376

8.1.21 CJK DAK

SCALE: 1/8" = 1'-0"

BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I

NORTH

Revisions: Date:

SCHEM. DESIGN SUBMISSION 3.15.19

DD SUBMISSION 5.3.19

65% CD's SUBMISSION 6.14.19

90% CD's SUBMISSION 8.9.19

FEC

F E

C

FEC

REF

REF. REF.

E

E

E

CONSTRUCTION AREA

E

FE

FE

F E

5'-0"

FE

F E

PROVIDE TEMPORARY FIRE

EXTINGUISHER CABINET IN TEMP.

CONSTRUCTION BARRIER DURING

PHASE I CONSTRUCTION. GC SHALL

RETAIN CABINET AND RELOCATE

DURING FUTURE PHASES

GC SHALL PROIVIDE MIN. 5'-0" WIDE

EGRESS PATH BETWEEN TEMPORARY

CONST. BARRIER AND EXISTING CORRIDOR

WALL

ALL EXISTING EGRESS PATHS IN PRIMARY CARE

DEPT. (DASHED LINES) TO REMAIN AS IS DURING

PHASE I CONSTRUCTION

REFER TO FUTURE PHASE LIFE

SAFETY PLANS FOR

CONTINUATION OF NEW SMOKE

BARRIER

CONSTRUCTION NOTE: SAFE EGRESS FROM THIS

EXISTING FIRST FLOOR STAIR DOOR MUST BE

MAINTAINED THROUGH CONSTRUCTION. NEW

CONSTRUCTION BARRIER FENCING SHALL BE

DESIGNED TO ACCOMMODATE SAFE EGRESS TRAVEL

TO SOUTH SIDE OF SITE WITHOUT TRAVEL THROUGH

CONSTRUCTION AREAS. SEE CIVIL DRAWINGS FOR

LAYOUT OF CONSTRUCTION FENCING

NEW SHAFT

NEW SHAFTS

Vestibule

1A101

Reception

1A102

Lobby

1A104

Waiting

1A105

Stair Alcove

1A106

Stair 1

1S1

Toilet

1A108

LPN Work Area

1A109

LPN Work Area

1A110

LPN Work Area

1A111

Soiled Utility

1A112

Electrical

1A113

Telecomm

1A114

Exam/Treatment Room

1A115

Exam/Treatment Room

1A116

Clean Utility

1A121

Exam/Treatment Room

1A122

Exam/Treatment Room

1A123

Exam/Treatment Room

1A124

Exam/Treatment Room

1A125

Exam/Treatment Room

1A126

Exam/Treatment Room

1A127

Exam/Treatment Room

1A128

Exam/Treatment Room

1A129

Exam/Treatment Room

1A130

Diabetes Education Office

1A132

Exam/Treatment Room

1A133

Exam/Treatment Room

1A134

Exam/Treatment Room

1A135

Social Work Office

1A136

Mas Reception 1

1A138

Mas Reception 2

1A139

Social Work Office

1A140

Exam/Treatment Room

1A141

Exam/Treatment Room

1A142

Exam/Treatment Room

1A143

Break Room

1A144

Exam/Treatment Room

1A148

Exam/Treatment Room

1A149

Exam/Treatment Room

1A150

Exam/Treatment Room

1A151

Exam/Treatment Room

1A152

Consult.

1A153A Men's

1A154

RR Alcove

1A155

Women's

1A156

Lead Techs Work Room

1A157

Exam/Treatment Room

1A158

Exam/Treatment Room

1A159

Exam/Treatment Room

1A160

Exam/Treatment Room

1A161

Exam/Treatment Room

1A162

Exam/Treatment Room

1A163

Exam/Treatment Room

1A164

Exam/Treatment Room

1A165

Exam/Treatment Room

1A166

Exam/Treatment Room

1A146

Stair 3

1S3

On-Call Room

1A169

Program Support Asst.

1A170

Nurse Manager

1A171

Staff Toilet

1A157A

Office

1A111A Office

1A111B

Lockers

1A111C

Corridor

1A100C

Corridor

1A100D

Corridor

1A100E

Corridor

1A100F

Corridor

1A100G

Waiting Room

1AC220

Reception

1AC221 Toilet

1AC222

Radiology 1

1AC223

Womens

1A214

Hospitality

1A215

Vending

1A216

Elevator Lobby

1A217

PCAS Waiting

1A218

Fast Track Exam

1AC288

Fast Track Exam

1AC290

Staff Lounge

1AC289B

GS6 Office

1A137A

GS9 Office

1A137B

Check-Out

1A137C

Stair 2

1S2

PACT Team Hub

- South

1A140

Exam/Treatment Room

1A136

Exam/Treatment Room

1A131

Check-Out

1A137D

Waiting Room

1A105

Consult.

1A153B

Exam/Treatment Room

1A132

Exam/Treatment Room

1A133

Exam/Treatment Room

1A134

Exam/Treatment Room

1A137

Exam/Treatment Room

1A138

Exam/Treatment Room

1A139

Nurse Managers Office

1A141

Director's Office

1A142

Precepting Room

1A143Elec. Closet

1A143A

Staff Toilet

1A144

Exam/Treatment Room

1A145

Stair 5

1S5 Stair 5 Vest.

1S5A

Corridor

1A100I

Exam/Treatment Room

1A117

Exam/Treatment Room

1A118

Exam/Treatment Room

1A119

Precepting Room

1A120

PACT Team Hub

- North

1A129

Break Room

1A126

Exam/Treatment Room

1A130A

Corridor

1A100H

86'-3" +/- EGRESS TRAVEL

DISTANCE/COMMON PATH OF

TRAVEL

Fire Alarm

1A126B

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION (DIRECTIONAL ARROWS MAY

OCCUR, SEE PLAN)

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW

AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE

TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE

AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND

COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY

DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY

STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED FIRE/SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "SOLID BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE

PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BER ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 60 DAYS

PHASE I: 270 DAYS

VA ACTIVATION OF PHASE I: 45 DAYS

PHASE II: 90 DAYS

VA ACTIVATION OF PHASE II: 45 DAYS

PHASE III: 90 DAYS

VA ACTIVATION OF PHASE III: 45 DAYS

PHASE IV: 90 DAYS

VA ACTIVATION OF PHASE IV: 45 DAYS

PHASE V: 60 DAYS

VA ACTIVATION OF PHASE V: 45 DAYS

TOTAL TIMEFRAME: 885 DAYS*

*DEDUCT ALTERNATES, IF ACCEPTED, SHALL MODIFY THE CONTRACT TIMEFRAME AS FOLLOWS:

• DEDUCT ALTERNATE #1: PHASE I SHALL BE REDUCED (5) DAYS, FOR A NEW TOTAL TIMEFRAME OF 880

DAYS

• DEDUCT ALTERNATE #2: PHASE I SHALL BE REDUCED BY (7) DAYS, FOR A NEW TOTAL TIMEFRAME OF 878

DAYS

• DEDUCT ALTERNATE #3: PHASE I SHALL BE REDUCED BY (14) DAYS, FOR A NEW TOTAL TIMEFRAME OF 871

DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES TO TIMES WHEN THE PRIMARY CARE AND SPECIALTY CARE DEPARTMENTS ARE CLOSED.

COORDINATE TIMES WITH VA.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• ABOVE-CEILING WORK IN THE BASEMENT LEVEL OUTPATIENT PHARMACY MUST OCCUR AFTER HOURS OR ON THE WEEKEND. REFER TO BASEMENT LEVEL LIFE SAFETY PLAN FOR APPLICABLE HOURS. VA

PHARMACIST MUST BE ON SITE DURING ALL ACTIVITIES IN THIS SPACE BY LAW.

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING

FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

HAZARDOUS MATERIALS

ASSESSMENT:

STEPHEN J. SEBESTA &

ASSOCIATES, INC.

30628 DETROIT RD., NO. 258

WESTLAKE, OH 44145

P. 216.781.0060

C U s e rs

\d a v e

\D o c u m e n ts \E x p a n d P ri m a ry

C a re

R d a k a p la n

.r v t

/2

/2

:5

:4

P

M

BID ISSUE SUBMISSION

LS-1.1

1ST FLOOR LIFE SAFETY PLAN - PHASE I EXPAND PRIMARY CARE FOR

PACT REALIGNMENT

10701 EAST BLVD. CLEVELAND, OHIO

541-376

8.1.21 CJK DAK

SCALE: 1/8" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN - PHASE I

NORTH

TOTAL EXAM ROOMS AVAILABLE FOR USE DURING PHASE I CONSTRUCTION = 34

Revisions: Date:

SCHEM. DESIGN SUBMISSION 3.15.19

DD SUBMISSION 5.3.19

65% CD's SUBMISSION 6.14.19

90% CD's SUBMISSION 8.9.19

F E

C

FEC

FEC

REF

REF. REF.

LIFE SAFETY LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED AROUND CONSTRUCTION AREA PER VA

SAFETY STANDARDS. INSTALLATION OF ZIP WALL MAY NEED TO OCCUR AFTER RELOCATION OF

CASEWORK/FURNITURE. GC TO COORDINATE SEQUENCING OF INSTALL WITH COR

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION (DIRECTIONAL ARROWS MAY

OCCUR, SEE PLAN)

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION. BUILDING IS CLASSIFIED AS A "NEW

AMBULATORY HEALTH CARE OCCUPANCY" PER NFPA 101 2018.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS, OR TEMPORARILY RELOCATE EXISTING EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS AND/OR ARE IN THE WAY OF TEMPORARY CONSTRUCTION BARRIERS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE

TO MATCH EXISTING

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH THE OPENING SIZE

AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND

COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY

DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE WITH SAFETY

STANDARDS.

HAZARDOUS ROOM

EXISTING/NEW 2 HOUR RATED FIRE/SMOKE BARRIER

FIRE-RATED PLASTIC SHEETING/METAL STUD WALL TEMPORARY PARTITION WALL W/3'-0" X 7'-0"

SCWD DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL OF ALL TEMPORARY CONSTRUCTION. REFER TO "SOLID BARRIER" TYPICAL TEMPORARY PARTITION DETAIL ON SHEET AS-601. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE

PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR.

SEPARATE ALL OCCUPIED AREAS OF THE RENOVATION AREA BY TEMPORARY SMOKE-TIGHT

CONSTRUCTION PARTITIONS BUILT TO THE DECK ABOVE, AND FOR AREAS WITHOUT ACTIVE

SPRINKLER PROTECTION ON BOTH SIDES, THE PARTITION SHALL BER ONE-HOUR FIRE RATED.

PROJECT SCOPE BOUNDARY

Nurse Manager

1A171

Program Support Ass't

1A170

On-Call Room

1A169

Staff Toilet

1A157A

Mental Health Consult.

1A167

Mental Health Consult.

1A166

Mental Health Consult.

1A165

Mental Health Consult./Diabetes

Education

1A164

Exam/Treatment Room

1A163

Exam/Treatment Room

1A162

Exam/Treatment Room

1A161

Exam/Treatment Room

1A150

Exam/Treatment Room

1A149

Exam/Treatment Room

1A143

Exam/Treatment Room

1A142

Social Work Office

1A140

Social Work Office

1A136 GS6/GS9 Office

1A110

Mas. Reception 1

1A138

Mas Reception 2

1A139

SMA Conference Room

1A111

SMA Storage Room

1A111A

Exam/Treatment Room

1A112

Toilet

1A108 Stair Alcove

1A106

Stair 1

1S1 Electrical

1A113

Telecomm

1A114

Exam/Treatment Room

1A125

Exam/Treatment Room

1A126

Exam/Treatment Room

1A128

Corridor

1A100A

Exam/Treatment Room

1A122

Exam/Treatment Room

1A129

Exam/Treatment Room

1A133

Precepting Room

1A120

Exam/Treatment Room

1A131

Exam/Treatment Room

1A132

Exam/Treatment Room

1A133

Exam/Treatment Room

1A134

Corridor

1A100H

Exam/Treatment Room

1A136

Exam/Treatment Room

1A137

Exam/Treatment Room

1A138

Exam/Treatment Room

1A139

Stair 5 Vest.

1S5A

Stair 5

1S5

PACT Team Hub

- North

1A129

PACT Team Hub

- South

1A140 Exam/Treatment

Room

1A147

Exam/Treatment Room

1A148

Soiled Holding

1A153

Exam/Treatment Room

1A146

Corridor

1A100I

Storage

1A152

Stair 3

1S3Corridor

1A100F

Corridor

1A100G

Consult.

1A153B Staff Toilet

1A144

Exam/Treatment Room

1A145

Precepting Room

1A143

Director's Office

1A142

Nurse Managers Office

1A141

Corridor

1A100D

Corridor

1A100A

Corridor

1A100E

Diabetes Education Office

1A132

Consult.

1A153A

Exam/Treatment Room

1A151

Clean Utility

1A157

Exam/Treatment Room

1A127

Exam/Treatment Room

1A124

Exam/Treatment Room

1A123

Exam/Treatment Room

1A115

Exam/Treatment Room

1A116

Exam/Treatment Room

1A117

Exam/Treatment Room

1A118

Exam/Treatment Room

1A119

Clean Utility

1A121

Exam/Treatment Room

1A130

Check-Out

1A137C

Exam/Treatment Room

1A134

Exam/Treatment Room

1A135

Exam/Treatment Room

1A141

Break Room

1A144

FE

CONSTRUCTION AREA

CONSTRUCTION AREA

E

E

E

D E

A D

E N

D

5'-0"

GC SHALL PROVIDE

MIN. 5'-0" WIDE

EGRESS PATH

BETWEEN

TEMPORARY CONST.

BARRIER AND

EXISTING CORRIDOR

WALL

PROPOSED INTERIM

EGRESS PATHS IN

PRIMARY CARE DEPT.

(DASHED LINES)

FE

FE

FE

PROVIDE TEMPORARY FIRE

EXITINGUISHER CABINET IN TEMP.

CONST. BARRIER DURING PHASE II

CONSTRUCTION (RELOCATED FROM

PHASE I). GC SHALL RETAIN CABINET

AND RELOCATE DURING FUTURE

PHASES

F E

SPECIAL PHASING NOTE: EXAMS

ROOMS 1A145 AND 1A146 WILL NOT

BE IN USE BY PATIENTS DURING

PHASE II. DOORS FACING

CONSTRUCTION AREAS SHALL BE

FULLY SEALED BY GC AND

PROTECTED FROM

CONSTRUCTION ACTIVITIES

REFER TO FUTURE PHASE LIFE SAFETY PLANS

FOR CONTINUATION OF NEW SMOKE BARRIER

GC ACCESS

DOOR

GC ACCESS

DOOR

MAINTAIN ACCESS TO STAFF

TOILET ROOM DURING THIS

PHASE

Corridor

1A100C

5'-0"

SPECIAL PHASING NOTE: THE DEMOLITION OF THE

ELECTRICAL ROOM WALL AND EX. SOILED UTILITY

ROOM SHALL OCCUR AT THE END OF PHASE II. SEE

PHASE II DEMO PLAN

Elec. Closet

1A143A

Exam/Treatment Room

1A130A

Break Room

1A126

Corridor

1A100C

17'-5"

6'-10"

Mens

1A154

Womens

1A156

RR Alcove

1A155

Elevator Lobby

1A217

Waiting Room

1A105

Lobby

1A104

Reception

1A102

PCAS Waiting

1A218

Vestibule

1A101

Fast Track Exam

1AC290

Fast Track Exam

1AC288

Staff Lounge

1AC289B

Waiting Room

1AC220

Reception

1AC221 Toilet

1AC222 Radiology 1

1AC223

Vending

1A216

Hospitality

1A215

Fire Alarm

1A126B

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 60 DAYS

PHASE I: 270 DAYS

VA ACTIVATION OF PHASE I: 45 DAYS

PHASE II: 90 DAYS

VA ACTIVATION OF PHASE II: 45 DAYS

PHASE III: 90 DAYS

VA ACTIVATION OF PHASE III: 45 DAYS

PHASE IV: 90 DAYS

VA ACTIVATION OF PHASE IV: 45 DAYS

PHASE V: 60 DAYS

VA ACTIVATION OF PHASE V: 45 DAYS

TOTAL TIMEFRAME: 885 DAYS*

*DEDUCT ALTERNATES, IF ACCEPTED, SHALL MODIFY THE CONTRACT TIMEFRAME AS FOLLOWS:

• DEDUCT ALTERNATE #1: PHASE I SHALL BE REDUCED (5) DAYS, FOR A NEW TOTAL TIMEFRAME OF 880

DAYS

• DEDUCT ALTERNATE #2: PHASE I SHALL BE REDUCED BY (7) DAYS, FOR A NEW TOTAL TIMEFRAME OF 878

DAYS

• DEDUCT ALTERNATE #3: PHASE I SHALL BE REDUCED BY (14) DAYS, FOR A NEW TOTAL TIMEFRAME OF 871

DAYS

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, INCLUDING CONSTRUCTION OF THE ADDITION. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES TO TIMES WHEN THE PRIMARY CARE AND SPECIALTY CARE DEPARTMENTS ARE CLOSED.

COORDINATE TIMES WITH VA.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• ABOVE-CEILING WORK IN THE BASEMENT LEVEL OUTPATIENT PHARMACY MUST OCCUR AFTER HOURS OR ON THE WEEKEND. REFER TO BASEMENT LEVEL LIFE SAFETY PLAN FOR APPLICABLE HOURS. VA

PHARMACIST MUST BE ON SITE DURING ALL ACTIVITIES IN THIS SPACE BY LAW.

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING

FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

CIVIL/MECH./ELEC./PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY.

UNIONTOWN, OH 44111

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

LANDSCAPE ARCHITECTURE:

JAMES S. MCKNIGHT

P.O. BOX 14158

CLEVELAND, OH 44114

P. 216.952.2408

HAZARDOUS MATERIALS

ASSESSMENT:

STEPHEN J. SEBESTA &

ASSOCIATES, INC.

30628 DETROIT RD., NO. 258

WESTLAKE, OH 44145

P. 216.781.0060

C U s e rs

\d a v e

\D o c u m e n ts \E x p a n d P ri m a ry

C a re

R d a k a p la n

.r v t

/2

/2

:5

:4

P

M

BID ISSUE SUBMISSION

LS-1.2

FIRST FLOOR LIFE SAFETY PLAN - PHASE II EXPAND PRIMARY CARE FOR

PACT REALIGNMENT

10701 EAST BLVD. CLEVELAND, OHIO

541-376

8.1.21 Checker Author

SCALE: 1/8" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN - PHASE II

NORTH

TOTAL EXAM ROOMS AVAILABLE FOR USE DURING PHASE II CONSTRUCTION = 30 (INCL. DIABETES EDUCATION OFFICE)

Revisions: Date:

SCHEM. DESIGN SUBMISSION 3.15.19

DD SUBMISSION 5.3.19

65% CD's SUBMISSION 6.14.19

90% CD's SUBMISSION 8.9.19

E

C

FEC

FEC

FEC

R E

F

REF. REF.

F E

C

Mas. Reception 1

1A138

Mas Reception 2

1A139

GS6/GS9 Office

1A110

SMA Conference Room

1A111

Electrical

1A113

Telecomm

1A114

Stair Alcove

1A106

Toilet

1A108

Stair 1

1S1

Waiting Room

1A105

Mens

1A154

Womens

1A156

RR Alcove

1A155

Nurse Manager

1A171

Program Support Ass't

1A170

Corridor

1A100G

Exam/Treatment Room

1A112 SMA Storage

Room

1A111A

Exam/Treatment Room

1A125

Exam/Treatment Room

1A126

Exam/Treatment Room

1A117

Exam/Treatment Room

1A118

Exam/Treatment Room

1A128

Exam/Treatment Room

1A120

Exam/Treatment Room

1A121

Exam/Treatment Room

1A122

Exam/Treatment Room

1A129

Exam/Treatment Room

1A122

Corridor

1A100A

Exam/Treatment Room

1A127

PACT Team Hub

- North

1A129

Exam/Treatment Room

1A130

Exam/Treatment Room

1A131

Exam/Treatment Room

1A132

Exam/Treatment Room

1A133

Exam/Treatment Room

1A134

Exam/Treatment Room

1A135

Exam/Treatment Room

1A136

Exam/Treatment Room

1A137

Exam/Treatment Room

1A138

Exam/Treatment Room

1A139

PACT Team Hub

- South

1A140Exam/Treatment Room

1A147

Exam/Treatment Room

1A148 Nurse Managers Office

1A141

Director's Office

1A142

Precepting Room

1A143Elec. Closet

1A143A

Staff Toilet

1A144

Exam/Treatment Room

1A145

Exam/Treatment Room

1A146

Soiled Holding

1A153

Storage

1A152

Exam/Treatment Room

1A149

Exam/Treatment Room

1A150

Exam/Treatment Room

1A151

Consult.

1A153B

Exam/Treatment Room

1A161

Exam/Treatment Room

1A162

Exam/Treatment Room

1A163

Mental Health Consult./Diabetes

Education

1A164

Mental Health Consult.

1A165

Mental Health Consult.

1A166

Mental Health Consult.

1A167

Staff Toilet

1A157A

On-Call Room

1A169

Stair 5

1S5Stair 5 Vest.

1S5A

Stair 3

1S3

Corridor

1A100D

Corridor

1A100A

Corridor

1A100E

Corridor

1A100H

Corridor

1A100F

Corridor

1A100IClean Utility

1A157

Meds. Alcove

1A121A

Exam/Treatment Room

1A130A

Vestibule

1A101

Reception

1A102

Lobby

1A104

Waiting

1A105

Exam/Treatment Room

1A115

Exam/Treatment Room

1A116

Exam/Treatment Room

1A117

Exam/Treatment Room

1A118

Exam/Treatment Room

1A123

Exam/Treatment Room

1A124

Exam/Treatment Room

1A127

PACT Team Hub

- West

1A119

Consult.

1A153A

Waiting Room

1AC220

Reception

1AC221 Toilet

1AC222

Radiology 1

1AC223

Womens

1A214

Hospitality

1A215

Vending

1A216

Elevator Lobby

1A217

PCAS Waiting

1A218

Fast Track Exam

1AC288

Fast Track Exam

1AC290

Staff Lounge

1AC289B

Stair 2

1S2

Corridor

1A100C

Check-Out

1A137C

CONSTRUCTION AREA

C O

N S

T R

U C

T

IO

N A

R E

A

FE

E

E

E

SMOKE COMPARTMENT 'A'

9,229 SF

SMOKE COMP. 'B'

5,992 SF

SMOKE COMPARTMENT 'A'

9,229 SF

SMOKE COMPARTMENT 'B'

5,992 SF

FE

F E

FE

F E

PROVIDE TEMPORARY FIRE EXITINGUISHER

CABINET IN TEMP. CONST. BARRIER DURING

PHASE III CONSTRUCTION (RELOCATED FROM

PHASES I & II). GC SHALL RETAIN CABINET

AND RELOCATE DURING FUTURE PHASES

SPECIAL PHASING NOTE: AREA OF PHASE III CONSTRUCTION

HATCHED IN GRAY IS INTENDED TO BE BUILT LAST, AFTER

TEMPORARY CONST. BARRIERS ARE REMOVED. INTENT IS TO

MAINTAIN EGRESS PATH IN CORRIDOR TO NEW STAIR 5 AS

INDICATED UNTIL SUCH TIME THAT CONST. BARRIERS CAN BE

REMOVED. REMAINING PORTION OF EXAM ROOM 1A130

CONSTRUCTION IN GRAY AREA SHALL THEN BE

CONSTRUCTED. COORD. PROTECTION REQUIREMENTS WITH

VA COR AND VA SAFETY

EMPLOYEES SHALL NOT

HAVE ACCESS TO WEST

PACT ENTRY DOOR

DURING PHASE III.

EMPLOYEES WILL HAVE

ACCESS TO DOOR OFF

CORRIDOR 1A100H

9'-11"

5'-0"

GC SHALL PROVIDE

MIN. 5'-0" WIDE

EGRESS PATH

BETWEEN

TEMPORARY CONST.

BARRIER AND

EXISTING CORRIDOR

WALL

DEAD END

44'-2"

PROPOSED INTERIM EGRESS

PATHS IN PRIMARY CARE

DEPT. (DASHED LINES)

FE

FE

CURVED DASHED LINE INDICATES 83'-8"

+/- COMMON PATH OF TRAVEL

GC ACCESS

DOORS

(SHELL) (SHELL)

(SHELL)

Corridor

1A100C

Corridor

1A100B

Exam/Treatment Room

1A128

Staff/Patient Toilet

1A128A

Locker Area

1A126A

Break Room

1A126

GC SHALL COORD. TIMING OF CUTTING NEW

CONNECTING OPENING TO BREAK ROOM TO BE

TOWARDS THE END OF PHASE III SO AS TO

MINIMIZE TIMEFRAME TO SEPARATE THE BREAK

ROOM FROM TEMPORARY BARRIER AS SHOWN

'A '. 'B

Fire Alarm

1A126B

Storage

1A129A

LIFE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .