S02. Drawing - Outpatient Pharmacy Exhaust - EF-52.pdf
PDF 368 KB Posted
- Attached to
- Expand Primary Care for Pact Realignment Federal contract opportunity
- Solicitation number
- 36C25020B0060_1
About this file
This document package includes a technical drawing for an outpatient pharmacy exhaust system renovation and the related federal contract opportunity solicitation.
The technical drawing outlines planned upgrades to the existing HVAC system serving the outpatient pharmacy, including installing new and relocating existing VAV boxes, extending ductwork, installing a new exhaust fan and ductwork to serve a new drug receiving area, and balancing various airflows. The opportunity solicitation is for expanding primary care spaces at the Louis Stokes Cleveland VA Medical Center to accommodate a patient aligned care team realignment. The project scope involves a 12,000 square foot expansion on three floors of an existing ambulatory care addition. The estimated value is between $10-15 million. The solicitation closes on August 12, 2021 and is a 100% set-aside for service-disabled veteran-owned small businesses.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
16"x6"
"x
D
A
A
A
"ø
"x
8"
1.0
"ø
E
P
O
N1
N
M
L
KJ
53A
53525150 m
N3
K450.3
8E
8E
1.2
CODED NOTES
1. EXTEND EXISTING 12"⌀ SUPPLY DUCTWORK AS REQUIRED FROM POINT INDICATED TO ALLOW
FOR NEW SUPPLY INLETS TO BE ROUTED TO VAV BOXES.
2. INSTALL RELOCATED VAV BOX IN APPROXIMATELY THIS LOCATION. EXTEND INLET FROM
SUPPLY MAIN. EXTEND HEATING WATER PIPING FROM EXISTING MAINS AND INSTALL TRIM PER
DETAIL. EXTEND CONTROL WIRING AS REQUIRED. REBALANCE BOX TO PROVIDE A MAXIMUM
SUPPLY OF 375 CFM AND A MINIMUM OF 375 CFM. REBALANCE WATER FLOW RATE TO 1.2 GPM.
3. INSTALL NEW VAV BOX IN APPROXIMATELY THIS LOCATION. EXTEND INLET FROM SUPPLY
MAIN. EXTEND HEATING WATER PIPING FROM EXISTING MAINS AND INSTALL TRIM PER DETAIL.
INSTALL NEW THERMOSTAT IN LOCATION INDICATED AND EXTEND CONTROL WIRING AS
REQUIRED.
4. INSTALL NEW 16"X6" EXHAUST DUCTWORK AND TIE IN TO EXISTING 16"X8" MAIN IN
APPROXIMATE LOCATION SHOWN. EXTEND 16"X6" DUCT TO SERVE NEW DRUG RECEIVING AREA.
TRANSITION TO 10"X10" AT APPROXIMATE LOCATION INDICATED. TRANSITION USING 45 DEGREE
OFFSETS ALONG ROUTE TO AVOID EXISTING CONDITIONS. ALL DUCTWORK SEAMS SHALL BE
FULLLY SEALED
5. INSTALL NEW RETURN AIR GRILLE AND EXTEND EXISTING ABOVE CEIING RETURN DUCTWORK
AS REQUIRED.
6. INSTALL REPLACEMENT EXHAUST FAN IN APPROXIMATELY THE SAME LOCATION AS THE
PREVIOUSLY DEMOLIHSED UNIT. ALTER EXISTING CURB/SUPPORTS AS REQUIRED. EXTEND AND
RECONNECT EXISTING DUCTWORK. FABRICATE AND INSTALL NEW STACK OUTLET AND
TRANSITION TO NEW FAN OUTLET AS REQUIRED.
7. INSTALL NEW EXHAUST VAV TERMINAL IN APPROXIMATELY THIS LOCATION. EXTEND OUTLET
TO SERVE NEW EXISTING GRILLE OR HOOD AS INDICATED. REFER TO SHEET H-200 FOR
ASSOCIATED TEMPERATURE CONTROL SEQUENCES.
8. ROUTE 10"⌀ DOWN TO HOOD CONNECTION. BALANCE HOOD EXHAUST OUTLET TO 400 CFM.
PLAN NOTES
A. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
B. COORDINATE ANY REQUIRED SHUTDOWNS WITH THE OWNER 7 DAYS IN ADVANCE.
C. ALL EXISTING DUCTWORK, EQUIPMENT, PIPING, ETC. SHALL REMAIN UNLESS NOTED
OTHERWISE. PROTECT DURING CONSTRUCTION.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HEPA FILTRATION UNITS TO SERVE
CONSTRUCTION AREAS AS REQUIRED BY ICRA. CONFORM TO ALL APPLICABLE GUIDELINES FOR
AIRFLOWS, DISCHARGE, ETC.
24"x20"
EF-52
P
O
N
M
L 53525150
50.3
DATESIGNATURE
SCHOONOVER
C. J.
ST
ATE OF OHIO
P R
O
FESS IO N
A L EN G
IN
E E
R
R EG IS T E RED
E-62197
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project Number
Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne fo ot on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
ARCHITECT:CONSULTANTS:
Office of
Construction and Facilities Management
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
1468 WEST 9TH STREET #400 CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
/2
8/
0:
:0
AM
C
:\U se rs \S
P av lik \D oc um en ts
\1
_M
EP
_C
E N
TR
AL
F
IL
E_ sp av lik
.rv t VETERANS AFFAIRS MEDICAL CENTER
RENOVATE PHARMACY TO COMPLY WITH
USP DIRECTIVES
5.30.19
BASEMENT LEVEL PHASE I HVAC
IMPROVEMENT PLAN - OUTPATIENT
PHARMACY
H-OP.1
541-19-103
10701 EAST BLVD. CLEVELAND, OHIO
CJS SRP
5.30.19
N 1/8" = 1'-0"
BASEMENT LEVEL PHASE I HVAC IMPROVEMENT PLAN - OUTPATIENT PHARMACY
N 1/8" = 1'-0"
5TH FLOOR/ROOF PHASE I HVAC IMPROVEMENT PLAN - OUTPATIENT PHARMACY
Revisions Date
2 RFI-004 RESPONSE 10.28.19
BID ISSUE SUBMISSION 5.30.19
100% CD'S SUBMISSION 12.21.18
90% CD'S SUBMISSION 11.16.18
65% CD'S SUBMISSION 10.12.18
35% CD'S SUBMISSION 8.20.18
HOOD IS
CURRENTLY NOT
INSTALLED.
File details come from the government source that posted it. Updated .