This solicitation provides the details for an expansion project at the Louis Stokes Cleveland VA Medical Center to expand primary care for Patient Aligned Care Teams. The project scope includes providing an additional 12,000 square feet of space on three floors by expanding into an adjacent building on VA-owned land. The contractor shall provide all labor, equipment, and materials necessary to complete the expansion project. The project value is estimated between $10-15 million. The NAICS code is 236220 and the business size standard is $39.5 million.
The solicitation is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. Offerors must be verified in VETBIZ and registered in SAM by the offer due date and award date to be eligible. An organized site visit will be conducted on August 12th in accordance with FAR 52.236-27 and social distancing guidelines. The cut-off date to submit requests for information is August 12, 2021. The performance location is the Louis Stokes Cleveland VA Medical Center.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTIONABBREVIATION SYMBOL
AS
DAS
F
FIRE PROTECTION SYMBOL LEGEND
IW INDIRECT WASTE (ABOVE OR BELOW FLOOR)
AS AUTOMATIC SPRINKLER LINE
DAS DRY AUTOMATIC SPRINKLER LINE
FIRE LINE
UPRIGHT SPRINKLER HEAD
PENDENT SPRINKLER HEAD
RECESSED OR CONCEALED SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
T&D TEST AND DRAIN WITH HOSE ADAPTOR
BALL DRIP
FLOW SWITCH - AUTOMATIC SPRINKLERS
VALVE WITH TAMPER SWITCH (SEE SPECIFICATIONS FOR TYPE)
PIPE SLEEVE (SEE SPECIFICATIONS FOR ADDIT. REQUIREMENTS)
VIBRATION CONNECTION (SEE SPECIFICATIONS)
BEP DOUBLE CHECK BACKFLOW PREVENTER WITH TAMPER SWITCHES
DDC DOUBLE DETECTOR CHECK VALVE WITH TAMPER SWITCHES
F.H.C. F.H.C. FIRE HOSE CABINET
F.D.V.C. F.D.V.C. FIRE DEPARTMENT VALVE CABINET
PRESSURE GAUGE WITH GAUGE COCK (WATER)
PRESSURE GAUGE WITH BALL VALVE (WATER)
E.C. E.C. ELECTRICAL CONTRACTOR
F.P.C. F.P.C. FIRE PROTECTION CONTRACTOR
G.C. G.C. GENERAL CONTRACTOR
H.C. H.C. HVAC CONTRACTOR
P.C. P.C. PLUMBING CONTRACTOR
A.D. A.D. ACCESS DOOR
A.F.F. A.F.F. ABOVE FINISHED FLOOR
MFR. MFR. MANUFACTURER
N.O. N.O. NORMALLY OPEN
N.C. N.C. NORMALLY CLOSED
TYP. TYP. TYPICAL
INDICATES TIE INTO EXISTING
INDICATES REMOVE TO POINT FOR RECONNECTION
INDICATES REMOVE TO POINT AND CAP
WALL SECTION
FLOOR SECTION
FURNISH AND INSTALL
FIRESTOP MATERIALS IN
ACCORDANCE WITH
APPROPRIATE U.L. SYSTEMS
TO MAINTAIN FIRE RESISTANCE
RATING
PIPE SLEEVE
DAMMING MATERIAL
(PER U.L. TESTED
SYSTEM DESIGN)
FLOOR SLAB; SEE
ARCHITECTURAL DRAWINGS
FOR FLOOR CONSTRUCTION
AND FIRE RATING
PIPE INSULATION
(WHERE SPECIFIED)
PENETRATING COMPONENT
FURNISH AND INSTALL FIRESTOP
MATERIALS IN ACCORDANCE WITH
APPROPRIATE U.L. SYSTEMS TO
MAINTAIN FIRE RESISTANCE RATING
PIPE SLEEVE (SLEEVE TO
EXTEND 2" ABOVE FLOOR
IN MECHANICAL EQUIPMENT
ROOMS.)
SEAL JOINT BETWEEN SLEEVE
AND FLOOR SLAB WITH MIN. 1/2"
BEAD FIRESTOP CAULK
SEE ARCHITECTURAL
DRAWINGS FOR WALL
CONSTRUCTION AND FIRE
RATING
PENETRATING COMPONENT
PIPE INSULATION
(WHERE SPECIFIED)
NOTES:
1. WHERE PIPES, DUCTS AND OTHER COMPONENTS PASS THROUGH FIRE OR SMOKE RATED WALLS OR FLOORS, PROVIDE NON-ASBESTOS SEAL ASSEMBLIES CLASSIFIED BY U.L. TO PROVIDE FIRE BARRIERS EQUAL TO OR GREATER THAN THE TIME RATING OF THE CONSTRUCTION BEING PENETRATED, WITH APPROPRIATE MATERIALS AND SYSTEMS THAT COMPLY WITH APPLICABLE CODES AND THAT HAVE BEEN
TESTED IN ACCORDANCE WITH U.L. 1479 OR ASTM E814.
2. GROUT, MORTAR OR GYPSUM BASED PRODUCTS SHALL NOT BE INSTALLED IN LIEU OF FIRESTOPPING
MATERIALS AND U.L. SYSTEMS.
3. FOR SLEEVED PENETRATIONS, FIRESTOP ANNULAR SPACE, IF ANY, BETWEEN SLEEVE AND ADJACENT
CONSTRUCTION TO MEET U.L. SYSTEM REQUIREMENTS. SEE NOTE 2 ABOVE.
4. THIS CONTRACTOR SHALL FIRESTOP ALL MISCELLANEOUS OPENINGS IN FIRE-RATED CONSTRUCTION
RESULTING FROM HIS WORK.
5. CONTRACTOR SHALL PROVIDE SUBMITTAL DRAWINGS TO ARCHITECT, INCLUDING U.L. RATED SYSTEM
NUMBER AND DETAIL FOR EACH TYPE OF PENETRATION AND CONFIGURATION.
6. THE FIRESTOPPING SYSTEMS ARE TO BE INSTALLED BY EXPERIENCED, MANUFACTURER TRAINED, AND
UL CERTIFIED OR FM CERTIFIED PERSONNEL.
7. ALL FIRESTOPPING MATERIAL IS TO BE PROVIDED FROM A SINGLE MANUFACTURER FOR ALL
APPLICATIONS.
8. CONTRACTOR SHALL CONSULT MANUFACTURER'S TECHNICAL EXPERTS FOR ASSISTANCE IN SELECTING
APPROPRIATE FIRESTOPPING SYSTEM FOR EACH APPLICATION.
THROUGH FIRE-RATED CONSTRUCTIONS
N.T.S.
FIRESTOPPING DETAIL FOR PENETRATIONS
FIRE PROTECTION GENERAL NOTES
1. THE GENERAL NOTES LISTED HERE APPLY TO ALL FIRE PROTECTION DRAWINGS IN ADDITION
TO ANY ADDITIONAL DRAWING NOTES ON THE INDIVIDUAL DRAWINGS.
2. SEE CODED NOTES ON INDIVIDUAL DRAWING SHEETS FOR SPECIFIC INSTRUCTIONAL NOTES.
3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.
4. COORDINATE WITH GENERAL TRADES WORK, HVAC WORK, PLUMBING WORK, ELECTRICAL
WORK AND OTHER WORK.
5. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIRE AND SMOKE WALLS AND RATED
STRUCTURES. SEE DETAILS AND SPECIFICATIONS FOR PIPE PENETRATION SEAL
REQUIREMENTS.
6. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM DESIGNATIONS INCLUDING ALL STORAGE
AREAS. ALL STORAGE AREAS ARE TO BE SPRINKLERED AS ORDINARY HAZARD PER N.F.P.A.
7. THE FIRE PROTECTION DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO
SHOW EXACT LOCATION OF EQUIPMENT AND PIPING UNLESS DIMENSIONS ARE GIVEN OR
OTHERWISE IMPLIED FOR CLEARANCES, ETC. PIPING AND FIRE PROTECTION EQUIPMENT ARE TO
BE INSTALLED ALONG THE GENERAL PLANS SHOWN ON THE DRAWINGS, BUT KEEPING IN MIND
ACTUAL BUILDING CONDITIONS WHICH MUST BE CONFORMED WITH IN THE ACTUAL WORK. THIS
CONTRACTOR TO BE AWARE OF LIMITED SPACE ABOVE CEILING FOR NEW WORK AND SHOULD
MODIFY HIS WORK TO ACCOMMODATE OTHER TRADES. COORDINATE WORK WITH OTHER
TRADES PRIOR TO MAKING THE FINAL INSTALLATION DRAWING OR SYSTEM INSTALLATION. THE
CONTRACTORS IN THEIR BIDS ARE REQUIRED TO INCLUDE ALL LABOR AND MATERIALS AND
OTHER RELATED WORK NECESSARY TO PROVIDE MINOR OFFSETS IN FIRE PROTECTION WORK
AS REQUIRED TO AVOID CONFLICT WITH OTHER WORK ON THIS PROJECT, OR AS REQUIRED IN
ORDER TO OBTAIN MAXIMUM HEAD ROOM OR EQUIPMENT ACCESS IN SPACES.
8. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING, PATCHING,
REMOVAL, AND RE-INSTALLATION OF WALLS, CEILINGS, FLOORS, ETC. AND NEW MATERIALS FOR
THE INSTALLATION OF THEIR RESPECTIVE WORK AS SHOWN ON THE DRAWINGS OR
SPECIFICATIONS FOR AREAS OTHERWISE NOT INVOLVED IN THE GENERAL CONSTRUCTION
WORK.
9. ALL SPRINKLER HEADS ARE TO BE QUICK RESPONSE TYPE.
10. ALL FIRE PROTECTION PIPING AND CONDUIT SHALL FOLLOW THE INSTALLATION
REQUIREMENTS AS LISTED BELOW:
A. INSTALL TIGHT AGAINST BOTTOM OF ROOF AND FLOOR STRUCTURE.
B. INSTALL PARALLEL AND PERPENDICULAR TO BUILDING STRUCTURE.
C. INSTALL CONCEALED ABOVE CEILINGS OR INSIDE WALLS, UNLESS OTHERWISE NOTED.
11. SPRINKLER PIPING IS TO AVOID EQUIPMENT IN MECHANICAL AND ELECTRICAL ROOMS.
COORDINATE WITH H.C. AND E.C.
12. USE INTERMEDIATE LEVEL SPRINKLERS BELOW DUCTWORK AND STRUCTURAL MEMBERS,
WHERE APPLICABLE.
13. CONTRACTOR SHALL PAINT ALL EXPOSED FIRE PROTECTION PIPING INSIDE AND OUTSIDE
BUILDING WITH COLOR AS SELECTED BY ARCHITECT.
14. ALL VALVES, FLOW SWITCHES, AND ETC. ABOVE THE CEILING SHALL BE LABELED WITH
ENGRAVED LAMINATE TAG ATTACHED TO CEILING GRID WITH PRESSURE SENSITIVE TAPE. THE
(RED) LAMINATE TAG SHALL BE 1/2" WIDE WITH 1/4" HIGH ENGRAVED (WHITE) LETTERS.
15. FIRE PROTECTION CONTRACTOR TO COORDINATE FINAL PLACEMENT OF SPRINKLER HEADS
WITH REFLECTED CEILING PLANS. SPRINKLER HEADS SHALL BE INSTALLED IN STRAIGHT AND
PARALLEL LINES CENTERED IN A SYMMETRICAL AND UNIFORM PATTERN IN THE CEILING TILES
(TYP ALL HEADS).
16. SPRINKLER HEADS TO BE PROVIDED IN TYPES AND FINISHES AS SPECIFIED IN SPECIFICATION
SECTION 21100.
17. ALL WORK IS TO COMPLY WITH DESIGN AND INSTALLATION REQUIREMENTS PER NATIONAL
FIRE PROTECTION AGENCY 13, THE OHIO BUILDING CODE, AND THE OWNER'S INSURANCE
COMPANY. THE MOST STRINGENT REQUIREMENTS SHALL APPLY.
18. FIRE PROTECTION CONTRACTOR SHALL PERFORM WATER FLOW TEST PRIOR TO
PERFORMING HYDRAULIC CALCULATIONS AND SPRINKLER LAYOUT. TEST TO MEET N.F.P.A.
REQUIREMENTS. CONTRACTOR SHALL COORDINATE WHEN TEST IS TO BE PERFORMED WITH
OWNER AND COPY TEST RESULTS TO PROJECT ENGINEER AND OWNER.
19. FIRE PROTECTION CONTRACTOR SHALL HYDRAULICALLY CALCULATE AUTOMATIC SPRINKLER
SYSTEM AND INSTALL NEW SYSTEM AS REQUIRED BY NEW CALCULATIONS AND DESIGN. THE
FIRE PROTECTION CONTRACTOR SHALL DESIGN THE SYSTEM, SUBMIT AND ETC. AS LISTED
BELOW:
A. COMPLETE AND RETURN TO A/E A COPY OF THE AUTOMATIC SPRINKLER SYSTEM SHOP
DRAWINGS INCLUDING:
1. THE PLANS SHALL SHOW THE WATER SUPPLY REQUIREMENTS FOR THE HYDRAULICALLY MOST
DEMANDING AREA. THE DESIGN CALCULATIONS SHALL SUBSTANTIATE THAT THE AVAILABLE
WATER SUPPLY WILL FULFILL THE SYSTEM REQUIREMENTS.
2. THE WATER SUPPLY REQUIREMENTS SHALL BE DETERMINED ACCORDING TO HAZARD
CLASSIFICATION AS OUTLINED IN N.F.P.A. 13 HYDRAULICALLY DESIGNED SYSTEMS.
3. WHEN SPRINKLER SYSTEMS ARE CONNECTED TO CITY WATER MAINS, FLOW TEST RESULTS
SHALL BE SUBMITTED. THE PLANS SHALL SHOW THE FOLLOWING INFORMATION ON WATER
FLOW DATA WITH EXISTING OR PROPOSED WATER SUPPLY, DEAD END OR CIRCULATING:
a. LOCATION AND ELEVATION OF STATIC AND RESIDUAL TEST GAGE WITH RELATION TO THE
RISER REFERENCE POINT.
b. FLOW LOCATION.
c. STATIC PRESSURE, PSI
d. RESIDUAL PRESSURE, PSI
e. FLOW, GPM
f. DATE
g. TIME
h. TEST CONDUCTED BY OR INFORMATION SUPPLIED BY
i. PLOTTED GRAPH SHOWING WATER SUPPLY CURVES AND SYSTEM REQUIREMENTS IN ACCORDANCE WITH SECTIONS 6-3, 6-2.4, AND A-7-2.1 OF N.F.P.A. 13, APPROVED ADDITION.
20. FIRE MAIN TO BE HYDRAULICALLY CALCULATED AND SIZED TO DESIGN INSTALLATION
REQUIREMENTS AS PER N.F.P.A., SECTIONS 13.
21. STAIRWAYS TO BE PROTECTED PER N.F.P.A. 13.
22. INSTALL TEST AND DRAIN, SEE DETAIL AND NOTES ON DRAWING. BALL VALVE TO HAVE A 1/2"
ROUND CORROSION RESISTANT SMOOTH BORE OUTLET GIVING THE EQUIVALENT FLOW OF ONE
SPRINKLER HEAD.
23. ALL OCCUPIED AREAS OF THE BUILDING ARE TO HAVE A WET PIPE SPRINKLER SYSTEM,
HYDRAULICALLY CALCULATED AND SIZED TO DESIGN INSTALLATION REQUIREMENTS OF N.F.P.A.
SECTIONS 13. FOR LIGHT HAZARD OCCUPANCY UNLESS NOTED OTHERWISE.
24. IF THE FIRE PROTECTION CONTRACTOR REQUIRES ACCESS PANELS, THE FIRE PROTECTION
CONTRACTOR SHALL FURNISH THE ACCESS PANELS WITH INSTALLATION COSTS ASSUMED BY
THE FIRE PROTECTION CONTRACTOR, BUT INSTALLED BY THE GENERAL CONTRACTOR. ANY
ACCESS PANELS PURCHASED DURING CONSTRUCTION BY THE FIRE PROTECTION CONTRACTOR
SHALL MATCH THOSE ALREADY PURCHASED BY THE GENERAL CONTRACTOR.
25. SEAL ALL PIPING PENETRATIONS THROUGH NON-RATED FLOORS TO PREVENT PASSAGE OF
SMOKE.
26. EXISTING SPRINKLER SYSTEM TO REMAIN ACTIVE WITHIN WORK AREAS DURING
CONSTRUCTION.
DATESIGNATURE
SCHOONOVER
C. J.
ST
AT
E OF O
H IO
P R O F E
SS IO N
AL EN
G
IN
E E R
REG IS T E R
ED
E-62197
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
HAZARDOUS MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOCIATES, INC.
30628 DETROIT RD., NO. 258
WESTLAKE, OH 44145
P. 216.781.0060
C :\U se rs
\a m ca le es e\
D oc um en ts \1
_M
EP
_C
EN
TR
AL
F
IL
E_ am ca le es e.
rv t
7/
/2
4:
:0
PM
FP-001
FIRE PROTECTION NOTES, DETAILS AND
SYMBOL LEGEND
EXPAND PRIMARY CARE FOR
PACT REALIGNMENT
10701 EAST BLVD. CLEVELAND, OHIO
541-376
NICK CARROZZA
8.1.21 CJS JAV
BID ISSUE SUBMISSION
8.1.21Revisions: Date:
DD SUBMISSION 5.3.19
65% CD's SUBMISSION 6.14.19 90% CD's SUBMISSION 8.9.19 100% CD's SUBMISSION 2.14.20
BID ISSUE SUBMISSION 8.1.21
49 50 50.3 51 52 53
J
K
K4
L
M
M.8
N
N.1
N.2
N.3
O
P
575654.554.153A 54
4" FIRE
4" FIRE
4" FIRE
4" FIRE
6" FIRE 6" FIRE
4" FIRE
4" F
IR
E
4" F
IR
E
BAC318 BAC317
BAC316
BS1 BAC309
BAC308
BAC307
BA109A
BA111-1
BS5-1BA109
BA109C
BS3
BAC306
BAC303
BAC302
BAC301A
BAC301BAC312BAC313
BAC311
BAC330
BAC285
BAC281
BAC282
BAC280
BAC283 BAC253
BAC260B
BAC252 BAC251
BAC250
BAC256
BAC257
BAC258
BAC259
BAC255BAC254
BAC286BAC329
AS
CODED NOTES
1. EXISTING FIRE DEPARTMENT CONNECTION PIPING UP TO FIRST FLOOR TO BE DEMOLISHED
BACK TO POINT INDICATED AND TIED INTO NEW 4" FIRE PIPING.
2. TIE NEW 4" FIRE DEPARTMENT CONNECTION PIPING IN TO EXISTING FIRE MAIN AND EXTEND UP
TO FIRST FLOOR TO NEW FIRE DEPARTMENT CONNECTION LOCATED ON ADDITION EXTERIOR
WALL.
3. ROUTE 4" FIRE PIPING TO STAIRWELL RISER. PROVIDE 2-1/2" FIRE LINE TO FIRE DEPARTMENT VALVE AT 36" ABOVE FINISHED FLOOR. CONTINUE 4" RISER UP WITHIN STAIRWELL TO FLOORS
ABOVE.
4. EXTEND EXISTING SPRINKLER ZONE IN ADJACENT MECHANICAL ROOM TO SERVE NEW
MECHANICAL ROOM. SPRINKLE USING ORDINARY HAZARD CLASSIFICATIONS. CONTRACTOR
SHALL ENSURE OBSTRUCTION RULES ARE FOLLOWED AND HEADS ARE ADDED UNDER
DUCTWORK AND EQUIPMENT AS REQUIRED BY NFPA 13.
5. INSTALL DRY TYPE SIDEWALL SPRINKER HEADS TO SERVE OUTSIDE AIR SHAFTS VIA WET PIPE
SPRINKLER SYSTEM.
6. TIE NEW 4" FIRE PIPING INTO 6" FIRE MAIN.
7. INSTALL NEW 4" FIRE DEPARTMENT CONNECTION WITH BALL DRIP VALVE AND EXTEND PIPING
UP TO FIRST FLOOR TO NEW FIRE DEPARTMENT CONNECTION LOCATED ON ADDITION EXTERIOR
WALL.
8. EXISTING FLOOR CONTROL VALVE ASSEMBLY TO REMAIN.
9. TIE NEW AS LINE INTO EXISTING AS LINE AND EXTEND TO NEW ADDITION.
PLAN NOTES
A. THIS DRAWING WAS DESIGNED TO PLOT AS 30" X 42" PLOT. IF PLOT DOES NOT MATCH THE
DESIGNED SIZE, THE GRAPHICAL SCALE SHALL BE USED.
B. SEE SHEET FP-001 FOR FIRE PROTECTION SYMBOL LEGEND, FIRE PROTECTION GENERAL
NOTES, AND FIRE PROTECTION DETAILS.
C. AREAS WITH NO CEILINGS SUCH THAT THE AUTOMATIC SPRINKLER PIPING IS EXPOSED, THE
AUTOMATIC SPRINKLER PIPING SHALL BE INSTALLED TO FOLLOW ALONG THE STRUCTURE.
REFER TO ARCHITECTURAL PLANS.
D. OFFSET PIPING AROUND STRUCTURAL MEMBERS, LIGHTING, DUCTWORK, AND PLUMBING
PIPING AS REQUIRED TO MAINTAIN FINAL ROOM DIMENSIONS. COORDINATE EXACT PIPE ROUTING
WITH ALL TRADES.
E. SPRINKLER HEAD TYPES AT DESIGNATED AREAS: THE INSTALLATION OF SPRINKLER HEADS IN 2'X2' ACOUSTICAL TILE CEILINGS ARE TO BE CENTERED AND EITHER CENTERED AT HALFWAY OR QUARTER POINTS IN 2'X4' TILES. IN GYPSUM AND EXPOSED CEILING, INSTALL SPRINKLER HEADS
SYMMETRICALLY IN A STRAIGHT LINE. MAINTAIN A SYMMETRICAL PATTERN FOR ALL CEILING
TYPES FOR AN AESTHETICALLY PLEASING EFFECT. COORDINATE WITH ARCHITECTURAL
REFLECTED CEILING PLAN.
FINISHED CEILINGS (SUSPENDED LAY-IN AND GYPSUM): SPRINKLERS ARE TO BE CONCEALED
TYPE WITH WHITE COVERS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN.
EXPOSED CEILINGS: SPRINKLERS ARE TO BE UPRIGHT TYPE. PROVIDE SPRINKLER HEAD GUARDS
IN ALL AREAS SUBJECTED TO DAMAGE SUCH AS MECHANICAL ROOMS, ELECTRICAL ROOMS,
GYMNASIUM, AND STORAGE ROOMS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING
PLAN.
F. THE FIRE PROTECTION CONTRACTOR SHALL REMOVE OIL AND PREPARE AUTOMATIC
SPRINKLER PIPING AND DRAINS IN EXPOSED AREAS FOR PAINTING. THE FIRE PROTECTION
CONTRACTOR SHALL THEN PLACE PLASTIC BAGS OVER SPRINKLER HEADS. THE GENERAL
CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING THE AUTOMATIC SPRINKLER PIPING,
DRAINS, AND THEN REMOVE PLASTIC BAGS FROM SPRINKLER HEADS. COORDINATE PIPE
PREPARATION AND PAINTING REQUIREMENTS WITH ARCHITECT.
G. THE FIRE PROTECTION SYSTEM FOR THIS PROJECT SHALL BE DESIGNED BY THE INSTALLING
CONTRACTOR. THE INTENT OF THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS IS TO
PROVIDE BASIC INFORMATION ON MATERIALS AS WELL AS TO SHOW LOCATIONS OF VALVES,
PIPING MAINS, AND RISERS THAT HAVE ALREADY BEEN DIAGRAMMATICALLY COORDINATED INTO
THE BUILDING DESIGN. IT IS UNDERSTOOD THAT THE FIRE PROTECTION SYSTEM MUST BE
DESIGNED PRIOR TO INSTALLATION TO ASSURE THAT THE REQUIRED WATER FLOW RATES ARE
ACHIEVED AT ALL OF THE SPRINKLER HEADS.
H. IN THE CASE OF THIS PROJECT, DUE TO VERY LIMITED SPACE FOR MECHANICAL AND
ELECTRICAL SYSTEMS, IT WILL BE NECESSARY FOR THE FIRE PROTECTION SYSTEM DESIGNER
TO OBTAIN AND SHOW ON THE FIRE PROTECTION INSTALLATION DRAWINGS THE LOCATIONS OF
MAJOR DUCTWORK, PIPING AND ELECTRICAL MAINS, AND TO SHOW HOW THE FIRE PROTECTION
PIPING IS COORDINATED WITH THESE SYSTEMS. IT SHALL BE UNDERSTOOD THAT THE FIRE
PROTECTION DESIGNER SHALL MAKE REVISIONS TO THE INSTALLATION DRAWINGS AS
NECESSARY, BOTH DURING THE SHOP DRAWING REVIEW PROCESS AND DURING THE
INSTALLATION, AS REQUIRED TO INSTALL THE FIRE PROTECTION PIPING SYSTEMS INTO THE
SPACE AVAILABLE. THE AVAILABLE SPACE CAN BE DETERMINED BY REFERENCING THE
ARCHITECTURAL, STRUCTURAL, HVAC, PLUMBING, AND ELECTRICAL DRAWINGS. TO MAKE SURE
THAT THERE IS NO CONFUSION ON THIS ISSUE, ON THIS PROJECT, THE FIRE PROTECTION PIPING
SHALL BE INSTALLED AROUND THE BUILDING SYSTEMS AND NOT VICE VERSA.
DATESIGNATURE
SCHOONOVER
C. J.
ST
AT
E OF O
H IO
P R O F E
SS IO N
AL EN
G
IN
E E R
REG IS T E R
ED
E-62197
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
HAZARDOUS MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOCIATES, INC.
30628 DETROIT RD., NO. 258
WESTLAKE, OH 44145
P. 216.781.0060
C :\U se rs
\a m ca le es e\
D oc um en ts \1
_M
EP
_C
EN
TR
AL
F
IL
E_ am ca le es e.
rv t
7/
/2
4:
:0
PM
FP-0-1
BASEMENT LEVEL PHASE I FIRE PROTECTION
IMPROVEMENT PLAN
EXPAND PRIMARY CARE FOR
PACT REALIGNMENT
10701 EAST BLVD. CLEVELAND, OHIO
541-376
NICK CARROZZA
8.1.21 CJS JAV
BID ISSUE SUBMISSION
8.1.21
N 1/8" = 1'-0"
BASEMENT LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN
ROOM LEGEND
BA109 Mechanical Room
BA109A Areawell Access BA109C Office BA110-1 Outside Air Enclosure-1 BA111-1 Mechanical Room-1 BAC250 Waiting
BAC250B Passage BAC251 Triage BAC252 Exam BAC253 Exam BAC254 Exam BAC255 Exam BAC256 Records BAC257 Office BAC258 Soiled Holding BAC259 Clean Supply
BAC260B Passage BAC280 Anti-Coagulation Clinic Open Office BAC281 Office BAC282 Copy File/Work BAC283 Break Room BAC285 Storage, File Room BAC286 Conference Room BAC301 Storage
BAC301A HD Storage Room
BAC302 HAC
BAC303 Staff Lockers/Break BAC306 Office BAC307 Work Room BAC308 Comm BAC309 Electrical Closet BAC311 Outpatient Pharmacy BAC312 Tech Sup. Mail Order BAC313 Consult Room BAC316 Supervisor BAC317 Tech Supply BAC318 Controlled Sub,/ Sec Disp BAC325 Elevator Lobby BAC326 Waiting BAC327 Corridor BAC328 Corridor BAC329 Womens BAC330 Mens
BS1 Stair 1 BS3 Stair 3
BS5-1 Stair 5-1
Revisions: Date:
DD SUBMISSION 5.3.19
65% CD's SUBMISSION 6.14.19 90% CD's SUBMISSION 8.9.19
FEC
FE
C
FEC
REF
CODED NOTES
1. EXISTING FIRE DEPARTMENT CONNECTION TO BE DEMOLISHED BACK TO FLOOR BELOW.
2. INSTALL NEW FIRE DEPARTMENT CONNECTION IN APPROXIMATELY THIS LOCATION.
3. EXTEND EXISTING SPRINKLER ZONE SERVING FIRST FLOOR AREA TO SERVE ADDITION FIRST
FLOOR PER NFPA 13. SPRINKLE USING LIGHT HAZARD CLASSIFICATIONS; UNLESS NOTED
OTHERWISE.
4. 4" FIRE RISER UP FROM FLOOR BELOW. PROVIDE 2-1/2" FIRE DEPARTMENT VALVE AT 36" A.F.F.
CONTINUE 4" FIRE RISER UP TO FLOOR ABOVE.
5. EXISTING FIRE RISER AND ZONE VALVE SERVING FIRST FLOOR AREA.
6. RELOCATE EXISTING FIRE STANDPIPE DRAIN TO APPROXIMATELY THIS LOCATION.
7. SPRINKLE USING ORDINARY HAZARD CLASSIFICATIONS.
8. EXISTING FLOOR CONTROL VALVE ASSEMBLY TO REMAIN.
9. TIE NEW AS LINE INTO EXISTING AS LINE AND EXTEND TO NEW ADDITION.
PLAN NOTES
A. THIS DRAWING WAS DESIGNED TO PLOT AS 30" X 42" PLOT. IF PLOT DOES NOT MATCH THE
DESIGNED SIZE, THE GRAPHICAL SCALE SHALL BE USED.
B. SEE SHEET FP-001 FOR FIRE PROTECTION SYMBOL LEGEND, FIRE PROTECTION GENERAL
NOTES, AND FIRE PROTECTION DETAILS.
C. AREAS WITH NO CEILINGS SUCH THAT THE AUTOMATIC SPRINKLER PIPING IS EXPOSED, THE
AUTOMATIC SPRINKLER PIPING SHALL BE INSTALLED TO FOLLOW ALONG THE STRUCTURE.
REFER TO ARCHITECTURAL PLANS.
D. OFFSET PIPING AROUND STRUCTURAL MEMBERS, LIGHTING, DUCTWORK, AND PLUMBING
PIPING AS REQUIRED TO MAINTAIN FINAL ROOM DIMENSIONS. COORDINATE EXACT PIPE ROUTING
WITH ALL TRADES.
E. SPRINKLER HEAD TYPES AT DESIGNATED AREAS: THE INSTALLATION OF SPRINKLER HEADS IN 2'X2' ACOUSTICAL TILE CEILINGS ARE TO BE CENTERED AND EITHER CENTERED AT HALFWAY OR QUARTER POINTS IN 2'X4' TILES. IN GYPSUM AND EXPOSED CEILING, INSTALL SPRINKLER HEADS
SYMMETRICALLY IN A STRAIGHT LINE. MAINTAIN A SYMMETRICAL PATTERN FOR ALL CEILING
TYPES FOR AN AESTHETICALLY PLEASING EFFECT. COORDINATE WITH ARCHITECTURAL
REFLECTED CEILING PLAN.
FINISHED CEILINGS (SUSPENDED LAY-IN AND GYPSUM): SPRINKLERS ARE TO BE CONCEALED
TYPE WITH WHITE COVERS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN.
EXPOSED CEILINGS: SPRINKLERS ARE TO BE UPRIGHT TYPE. PROVIDE SPRINKLER HEAD GUARDS
IN ALL AREAS SUBJECTED TO DAMAGE SUCH AS MECHANICAL ROOMS, ELECTRICAL ROOMS,
GYMNASIUM, AND STORAGE ROOMS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING
PLAN.
F. THE FIRE PROTECTION CONTRACTOR SHALL REMOVE OIL AND PREPARE AUTOMATIC
SPRINKLER PIPING AND DRAINS IN EXPOSED AREAS FOR PAINTING. THE FIRE PROTECTION
CONTRACTOR SHALL THEN PLACE PLASTIC BAGS OVER SPRINKLER HEADS. THE GENERAL
CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING THE AUTOMATIC SPRINKLER PIPING,
DRAINS, AND THEN REMOVE PLASTIC BAGS FROM SPRINKLER HEADS. COORDINATE PIPE
PREPARATION AND PAINTING REQUIREMENTS WITH ARCHITECT.
G. THE FIRE PROTECTION SYSTEM FOR THIS PROJECT SHALL BE DESIGNED BY THE INSTALLING
CONTRACTOR. THE INTENT OF THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS IS TO
PROVIDE BASIC INFORMATION ON MATERIALS AS WELL AS TO SHOW LOCATIONS OF VALVES,
PIPING MAINS, AND RISERS THAT HAVE ALREADY BEEN DIAGRAMMATICALLY COORDINATED INTO
THE BUILDING DESIGN. IT IS UNDERSTOOD THAT THE FIRE PROTECTION SYSTEM MUST BE
DESIGNED PRIOR TO INSTALLATION TO ASSURE THAT THE REQUIRED WATER FLOW RATES ARE
ACHIEVED AT ALL OF THE SPRINKLER HEADS.
H. IN THE CASE OF THIS PROJECT, DUE TO VERY LIMITED SPACE FOR MECHANICAL AND
ELECTRICAL SYSTEMS, IT WILL BE NECESSARY FOR THE FIRE PROTECTION SYSTEM DESIGNER
TO OBTAIN AND SHOW ON THE FIRE PROTECTION INSTALLATION DRAWINGS THE LOCATIONS OF
MAJOR DUCTWORK, PIPING AND ELECTRICAL MAINS, AND TO SHOW HOW THE FIRE PROTECTION
PIPING IS COORDINATED WITH THESE SYSTEMS. IT SHALL BE UNDERSTOOD THAT THE FIRE
PROTECTION DESIGNER SHALL MAKE REVISIONS TO THE INSTALLATION DRAWINGS AS
NECESSARY, BOTH DURING THE SHOP DRAWING REVIEW PROCESS AND DURING THE
INSTALLATION, AS REQUIRED TO INSTALL THE FIRE PROTECTION PIPING SYSTEMS INTO THE
SPACE AVAILABLE. THE AVAILABLE SPACE CAN BE DETERMINED BY REFERENCING THE
ARCHITECTURAL, STRUCTURAL, HVAC, PLUMBING, AND ELECTRICAL DRAWINGS. TO MAKE SURE
THAT THERE IS NO CONFUSION ON THIS ISSUE, ON THIS PROJECT, THE FIRE PROTECTION PIPING
SHALL BE INSTALLED AROUND THE BUILDING SYSTEMS AND NOT VICE VERSA.
49 50 50.3 51 52 53
J
K
K4
L
M
M.8
N
N.1
N.2
N.3
O
P
575654.554.153A 54
1A104-1
1S1-1 1A113-1 1A114-1
1A115-1 1A116-1 1A117-1 1A118-1 1A119-1
1A120-2
1A121-1
1A130-1
1A129-1
1A122-1 1A123-1
1A128-1
1A127-1
1A124-1 1A125-1
1A126-1
1A100A-1
1A112
1A111C
1A111A
1A111
1A108-1
1A109
1A110
1A111B
1A105-1
1A138
1A139-1 1A137B
1A137A
1A137D-1
1A137C-1 1A140-1
1A136-1
1A135-1
1A141-1 1A142-1
1A134-1
1A100C-1
1A132-1
1A144-1
1A143-1
1A133-1
1A100D-1
1A148-1
1A1661A164
1A149-11A150-1
1A162-1 1A160
1A151-11A152
1A158
1A217-1
1A155-1
1A154 1A153A-1
1A153B-1
1A156
1A171-1 1A170 1A169-1
1A157A-1
1A157 1A159
1A161-1 1A163-1 1A165
1A100E-1
1A105-1
1A102-1
1A216-1
1A214-1
1A100G-1
1AC290-1
1AC288-1
1AC289A-1
1AC289B-1
1AC220-1
1AC221-1 1AC222-1
1AC223-1
1AC220A-1
1A100F-1
1S3-1
1A181-1
1AC226-1
1AC291-1
1A213-1
1A129
1A134-2 1A133-2
1A132-1 1A131-1
1A136-1 1A137-1 1A138-1
1A139-1
1S5A-1
1S5-1
1A140-1
1A141-1
1A142-1
1A143-1
1A143A-11A144-1
1A145-1
1A146-1
AS
DATESIGNATURE
SCHOONOVER
C. J.
ST
AT
E OF O
H IO
P R O F E
SS IO N
AL EN
G
IN
E E R
REG IS T E R
ED
E-62197
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
HAZARDOUS MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOCIATES, INC.
30628 DETROIT RD., NO. 258
WESTLAKE, OH 44145
P. 216.781.0060
C :\U se rs
\a m ca le es e\
D oc um en ts \1
_M
EP
_C
EN
TR
AL
F
IL
E_ am ca le es e.
rv t
7/
/2
4:
:1
PM
FP-1-1
FIRST FLOOR LEVEL PHASE I FIRE
PROTECTION IMPROVEMENT PLAN
EXPAND PRIMARY CARE FOR
PACT REALIGNMENT
10701 EAST BLVD. CLEVELAND, OHIO
541-376
NICK CARROZZA
8.1.21 CJS JAV
BID ISSUE SUBMISSION
8.1.21
ROOM LEGEND
1A100A-1 Corridor-1 1A100C-1 Corridor-1 1A100D-1 Corridor-1 1A100E-1 Corridor-1 1A100F-1 Corridor-1 1A100G-1 Corridor-1 1A102-1 Reception-1 1A104-1 Lobby-1 1A105-1 Waiting Room-1 1A105-1 Waiting-1 1A108-1 Toilet-1 1A109 LPN Work Area 1A110 LPN Work Area 1A111 LPN Work Area
1A111A Office 1A111B Office 1A111C Lockers 1A112 Soiled Utility
1A113-1 Electrical-1 1A114-1 Telecomm-1 1A115-1 Exam/Treatment Room-1 1A116-1 Exam/Treatment Room-1 1A117-1 Exam/Treatment Room-1 1A118-1 Exam/Treatment Room-1 1A119-1 Exam/Treatment Room-1 1A120-2 Precepting Room-2 1A121-1 Clean Utility-1 1A122-1 Exam/Treatment Room-1 1A123-1 Exam/Treatment Room-1 1A124-1 Exam/Treatment Room-1 1A125-1 Exam/Treatment Room-1 1A126-1 Exam/Treatment Room-1 1A127-1 Exam/Treatment Room-1 1A128-1 Exam/Treatment Room-1 1A129 PACT Team Hub - North
1A129-1 Exam/Treatment Room-1 1A130-1 Exam/Treatment Room-1 1A131-1 Exam/Treatment Room-1 1A132-1 Diabetes Education Office-1 1A132-1 Exam/Treatment Room-1 1A133-1 Exam/Treatment Room-1 1A133-2 Exam/Treatment Room-2 1A134-1 Exam/Treatment Room-1 1A134-2 Exam/Treatment Room-2 1A135-1 Exam/Treatment Room-1 1A136-1 Social Work Office-1 1A136-1 Exam/Treatment Room-1 1A137-1 Exam/Treatment Room-1 1A137A GS6 Office 1A137B GS9 Office
1A137C-1 Check-Out-1 1A137D-1 Check-Out-1
1A138 Mas Reception 1 1A138-1 Exam/Treatment Room-1 1A139-1 Mas Reception 2-1 1A139-1 Exam/Treatment Room-1 1A140-1 Social Work Office-1 1A140-1 PACT Team Hub - South-1 1A141-1 Exam/Treatment Room-1 1A141-1 Nurse Managers Office-1 1A142-1 Exam/Treatment Room-1 1A142-1 Director's Office-1 1A143-1 Exam/Treatment Room-1 1A143-1 Precepting Room-1
1A143A-1 Elec. Closet-1 1A144-1 Break Room-1 1A144-1 Staff Toilet-1 1A145-1 Exam/Treatment Room-1 1A146-1 Exam/Treatment Room-1 1A148-1 Exam/Treatment Room-1 1A149-1 Exam/Treatment Room-1 1A150-1 Exam/Treatment Room-1 1A151-1 Exam/Treatment Room-1 1A152 Exam/Treatment Room
1A153A-1 Consult.-1 1A153B-1 Consult.-1
1A154 Men's 1A155-1 RR Alcove-1 1A156 Women's 1A157 Lead Techs Work Room
1A157A-1 Staff Toilet-1 1A158 Exam/Treatment Room 1A159 Exam/Treatment Room 1A160 Exam/Treatment Room
1A161-1 Exam/Treatment Room-1 1A162-1 Exam/Treatment Room-1 1A163-1 Exam/Treatment Room-1 1A164 Exam/Treatment Room 1A165 Exam/Treatment Room 1A166 Exam/Treatment Room
1A169-1 On-Call Room-1 1A170 Program Support Asst.
1A171-1 Nurse Manager-1 1A181-1 Comm Clos-1 1A213-1 Restroom Alcove-1 1A214-1 Womens-1 1A216-1 Vending-1 1A217-1 Elevator Lobby-1
1AC220-1 Waiting Room-1 1AC220A-1 Passage-1 1AC221-1 Reception-1 1AC222-1 Toilet-1 1AC223-1 Radiology 1-1 1AC226-1 View Sort-1 1AC288-1 Fast Track Exam 2-1
1AC289A-1 Conference Room-1 1AC289B-1 Staff Lounge-1 1AC290-1 Fast Track Exam 3-1 1AC291-1 Corridor-1
1S1-1 Stair 1-1 1S3-1 Stair 3-1 1S5-1 Stair 5-1
1S5A-1 Stair 5 Vest.-1
N 1/8" = 1'-0"
FIRST FLOOR LEVEL PHASE I FIRE PROTECTION IMPROVEMENT PLAN
Revisions: Date:
DD SUBMISSION 5.3.19
65% CD's SUBMISSION 6.14.19 90% CD's SUBMISSION 8.9.19
FE
C
FEC
FEC
REF
49 50 50.3 51 52 53
J
K
K4
L
M
M.8
N
N.1
N.2
N.3
O
P
575654.554.153A 54
1A104-3
1S1-3 1A113-3
1A114-3 1A115-3
1A116-3 1A117-3
1A118-3
1A119-3
1A120-3
1A100A-3
1A121-2
1A122-3
1A123-31A124-3 1A125-3
1A126-2
1A127-3 1A128-2 1A129-2
1A130-3
1A108-3
1A112-2
1A111A-2
1A111-2
1A105-3
1A138-1 1A110-2
1A139-2
1A217-3
1A155-3
1A154-2
1A156-2
1A171-3
1A170-2 1A169-2
1A157A-2
1A153B-2
1A153A-2
1A137C-2
1A100C-2
1A136-2
1A140-2
1A135-3
1A141-2
1A134-4
1A142-2
1A133-4
1A143-2
1A132-2
1A144-2
1A130A-2
1S5-3
1A134-5
1A133-5
1A132-3 1A131-3
1A100H-2
1A136-3 1A137-3
1A138-3 1A139-3
1S5A-3
1A140-3
1A141-3
1A142-3
1A143-3
1A143A-3 1A144-3
1A145-3
1A146-3
1A153-2
1A148-3
1A147-2
1A100I-2
1A151-3 1A150-3 1A149-3
1A163-3 1A162-31A161-3
1A167-2 1A166-2 1A165-2 1A164-2 1A157-2
1S3-3
1A152-2
1A100F-3
1A181-3
1AC223-3
1A100G-3
1AC222-31AC221-3
1AC220-3
1AC289B-3
1AC290-3
1A216-3
1AC288-3
1A213-3
1A214-3
1A105-3
1A100D-5
1A137D-3
CODED NOTES
1. REWORK EXISTING SPRINKLER SYSTEM TO ACCOMMODATE RENOVATED ARCHITECTURAL
LAYOUT PER NFPA 13. ADD/RELOCATE HEADS AS REQUIRED. SPRINKLE USING LIGHT HAZARD
CLASSIFICATIONS; UNLESS NOTED OTHERWISE.
2. SPRINKLE USING ORDINARY HAZARD CLASSIFICATIONS.
PLAN NOTES
A. THIS DRAWING WAS DESIGNED TO PLOT AS 30" X 42" PLOT. IF PLOT DOES NOT MATCH THE
DESIGNED SIZE, THE GRAPHICAL SCALE SHALL BE USED.
B. SEE SHEET FP-001 FOR FIRE PROTECTION SYMBOL LEGEND, FIRE PROTECTION GENERAL
NOTES, AND FIRE PROTECTION DETAILS.
C. AREAS WITH NO CEILINGS SUCH THAT THE AUTOMATIC SPRINKLER PIPING IS EXPOSED, THE
AUTOMATIC SPRINKLER PIPING SHALL BE INSTALLED TO FOLLOW ALONG THE STRUCTURE.
REFER TO ARCHITECTURAL PLANS.
D. OFFSET PIPING AROUND STRUCTURAL MEMBERS, LIGHTING, DUCTWORK, AND PLUMBING
PIPING AS REQUIRED TO MAINTAIN FINAL ROOM DIMENSIONS. COORDINATE EXACT PIPE ROUTING
WITH ALL TRADES.
E. SPRINKLER HEAD TYPES AT DESIGNATED AREAS: THE INSTALLATION OF SPRINKLER HEADS IN 2'X2' ACOUSTICAL TILE CEILINGS ARE TO BE CENTERED AND EITHER CENTERED AT HALFWAY OR QUARTER POINTS IN 2'X4' TILES. IN GYPSUM AND EXPOSED CEILING, INSTALL SPRINKLER HEADS
SYMMETRICALLY IN A STRAIGHT LINE. MAINTAIN A SYMMETRICAL PATTERN FOR ALL CEILING
TYPES FOR AN AESTHETICALLY PLEASING EFFECT. COORDINATE WITH ARCHITECTURAL
REFLECTED CEILING PLAN.
FINISHED CEILINGS (SUSPENDED LAY-IN AND GYPSUM): SPRINKLERS ARE TO BE CONCEALED
TYPE WITH WHITE COVERS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN.
EXPOSED CEILINGS: SPRINKLERS ARE TO BE UPRIGHT TYPE. PROVIDE SPRINKLER HEAD GUARDS
IN ALL AREAS SUBJECTED TO DAMAGE SUCH AS MECHANICAL ROOMS, ELECTRICAL ROOMS,
GYMNASIUM, AND STORAGE ROOMS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING
PLAN.
F. THE FIRE PROTECTION CONTRACTOR SHALL REMOVE OIL AND PREPARE AUTOMATIC
SPRINKLER PIPING AND DRAINS IN EXPOSED AREAS FOR PAINTING. THE FIRE PROTECTION
CONTRACTOR SHALL THEN PLACE PLASTIC BAGS OVER SPRINKLER HEADS. THE GENERAL
CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING THE AUTOMATIC SPRINKLER PIPING,
DRAINS, AND THEN REMOVE PLASTIC BAGS FROM SPRINKLER HEADS. COORDINATE PIPE
PREPARATION AND PAINTING REQUIREMENTS WITH ARCHITECT.
G. THE FIRE PROTECTION SYSTEM FOR THIS PROJECT SHALL BE DESIGNED BY THE INSTALLING
CONTRACTOR. THE INTENT OF THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS IS TO
PROVIDE BASIC INFORMATION ON MATERIALS AS WELL AS TO SHOW LOCATIONS OF VALVES,
PIPING MAINS, AND RISERS THAT HAVE ALREADY BEEN DIAGRAMMATICALLY COORDINATED INTO
THE BUILDING DESIGN. IT IS UNDERSTOOD THAT THE FIRE PROTECTION SYSTEM MUST BE
DESIGNED PRIOR TO INSTALLATION TO ASSURE THAT THE REQUIRED WATER FLOW RATES ARE
ACHIEVED AT ALL OF THE SPRINKLER HEADS.
H. IN THE CASE OF THIS PROJECT, DUE TO VERY LIMITED SPACE FOR MECHANICAL AND
ELECTRICAL SYSTEMS, IT WILL BE NECESSARY FOR THE FIRE PROTECTION SYSTEM DESIGNER
TO OBTAIN AND SHOW ON THE FIRE PROTECTION INSTALLATION DRAWINGS THE LOCATIONS OF
MAJOR DUCTWORK, PIPING AND ELECTRICAL MAINS, AND TO SHOW HOW THE FIRE PROTECTION
PIPING IS COORDINATED WITH THESE SYSTEMS. IT SHALL BE UNDERSTOOD THAT THE FIRE
PROTECTION DESIGNER SHALL MAKE REVISIONS TO THE INSTALLATION DRAWINGS AS
NECESSARY, BOTH DURING THE SHOP DRAWING REVIEW PROCESS AND DURING THE
INSTALLATION, AS REQUIRED TO INSTALL THE FIRE PROTECTION PIPING SYSTEMS INTO THE
SPACE AVAILABLE. THE AVAILABLE SPACE CAN BE DETERMINED BY REFERENCING THE
ARCHITECTURAL, STRUCTURAL, HVAC, PLUMBING, AND ELECTRICAL DRAWINGS. TO MAKE SURE
THAT THERE IS NO CONFUSION ON THIS ISSUE, ON THIS PROJECT, THE FIRE PROTECTION PIPING
SHALL BE INSTALLED AROUND THE BUILDING SYSTEMS AND NOT VICE VERSA.
DATESIGNATURE
SCHOONOVER
C. J.
ST
AT
E OF O
H IO
P R O F E
SS IO N
AL EN
G
IN
E E R
REG IS T E R
ED
E-62197
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
HAZARDOUS MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOCIATES, INC.
30628 DETROIT RD., NO. 258
WESTLAKE, OH 44145
P. 216.781.0060
C :\U se rs
\a m ca le es e\
D oc um en ts \1
_M
EP
_C
EN
TR
AL
F
IL
E_ am ca le es e.
rv t
7/
/2
4:
:2
PM
FP-1-2
FIRST FLOOR LEVEL PHASE II FIRE
PROTECTION IMPROVEMENT PLAN
EXPAND PRIMARY CARE FOR
PACT REALIGNMENT
10701 EAST BLVD. CLEVELAND, OHIO
541-376
NICK CARROZZA
8.1.21 CJS JAV
BID ISSUE SUBMISSION
8.1.21
N 1/8" = 1'-0"
FIRST FLOOR LEVEL PHASE II FIRE PROTECTION IMPROVEMENT PLAN
ROOM LEGEND
1A100D-4 Space 1A100D-6 Space 1A100D-7 Space 1A100D-8 Space 1A100D-9 Space
1A100D-10 Space 1A100D-11 Space 1A100D-12 Space 1A100D-13 Space 1A100D-14 Space 1A100D-15 Space 1A100D-16 Space 1A100D-17 Space 1A100D-18 Space 1A100D-19 Space 1A100D-20 Space 1A100D-21 Space 1A100D-22 Space 1A100D-23 Space 1A100D-24 Space 1A100D-25 Space 1A100D-26 Space 1A100D-27 Space 1A100D-28 Space 1A100D-29 Space 1A100D-30 Space 1A100D-31 Space 1A100D-32 Space 1A100D-33 Space 1A100D-34 Space 1A100D-35 Space 1A100D-36 Space 1A100D-37 Space 1A100D-38 Space 1A100D-39 Space 1A100D-40 Space 1A100D-41 Space 1A100D-42 Space 1A100D-43 Space 1A100D-44 Space 1A100D-45 Space 1A100D-46 Space 1A100D-47 Space 1A100D-48 Space
BA110-2 Outside Air Enclosure-2 BA111-2 Mechanical Room-2 BS5-2 Stair 5-2
1A100A-3 Corridor-3 1A100C-2 Corridor-2 1A100D-5 Corridor-5 1A100F-3 Corridor-3 1A100G-3 Corridor-3 1A100H-2 Corridor-2 1A100I-2 Corridor-2 1A104-3 Lobby-3 1A105-3 Waiting Room-3 1A105-3 Waiting-3 1A108-3 Toilet-3 1A110-2 GS6/GS9 Office-2 1A111-2 SMA Conference Room-2
1A111A-2 SMA Storage Room-2 1A112-2 Exam/Treatment Room-2 1A113-3 Electrical-3 1A114-3 Telecomm-3 1A115-3 Exam/Treatment Room-3 1A116-3 Exam/Treatment Room-3 1A117-3 Exam/Treatment Room-3 1A118-3 Exam/Treatment Room-3 1A119-3 Exam/Treatment Room-3 1A120-3 Precepting Room-3 1A121-2 Clean Utility-2 1A122-3 Exam/Treatment Room-3 1A123-3 Exam/Treatment Room-3 1A124-3 Exam/Treatment Room-3 1A125-3 Exam/Treatment Room-3 1A126-2 Exam/Treatment Room-2 1A127-3 Exam/Treatment Room-3 1A128-2 Exam/Treatment Room-2 1A129-2 Exam/Treatment Room-2 1A130-3 Exam/Treatment Room-3
1A130A-2 Exam/Treatment Room-2 1A131-3 Exam/Treatment Room-3 1A132-2 Diabetes Education Office-2 1A132-3 Exam/Treatment Room-3 1A133-4 Exam/Treatment Room-4 1A133-5 Exam/Treatment Room-5 1A134-4 Exam/Treatment Room-4 1A134-5 Exam/Treatment Room-5 1A135-3 Exam/Treatment Room-3 1A136-2 Social Work Office-2 1A136-3 Exam/Treatment Room-3 1A137-3 Exam/Treatment Room-3
1A137C-2 Check-Out-2 1A137D-3 Check-Out-3 1A138-1 Mas. Reception 1-1 1A138-3 Exam/Treatment Room-3 1A139-2 Mas Reception 2-2 1A139-3 Exam/Treatment Room-3 1A140-2 Social Work Office-2 1A140-3 PACT Team Hub - South-3 1A141-2 Exam/Treatment Room-2 1A141-3 Nurse Managers Office-3 1A142-2 Exam/Treatment Room-2 1A142-3 Director's Office-3 1A143-2 Exam/Treatment Room-2 1A143-3 Precepting Room-3
1A143A-3 Elec. Closet-3 1A144-2 Break Room-2 1A144-3 Staff Toilet-3 1A145-3 Exam/Treatment Room-3 1A146-3 Exam/Treatment Room-3 1A147-2 Exam/Treatment Room-2 1A148-3 Exam/Treatment Room-3 1A149-3 Exam/Treatment Room-3 1A150-3 Exam/Treatment Room-3 1A151-3 Exam/Treatment Room-3 1A152-2 Storage-2 1A153-2 Soiled Holding-2
1A153A-2 Consult.-2 1A153B-2 Consult.-2 1A154-2 Mens-2 1A155-3 RR Alcove-3 1A156-2 Womens-2 1A157-2 Clean Utility-2
1A157A-2 Staff Toilet-2 1A161-3 Exam/Treatment Room-3 1A162-3 Exam/Treatment Room-3 1A163-3 Exam/Treatment Room-3 1A164-2 Mental Health Consult./Diabetes Education-2 1A165-2 Mental Health Consult.-2 1A166-2 Mental Health Consult.-2 1A167-2 Mental Health Consult.-2 1A169-2 On-Call Room-2 1A170-2 Program Support Ass't-2 1A171-3 Nurse Manager-3 1A181-3 Comm Clos-3 1A213-3 Restroom Alcove-3 1A214-3 Womens-3 1A216-3 Vending-3 1A217-3 Elevator Lobby-3
1AC220-3 Waiting Room-3 1AC221-3 Reception-3 1AC222-3 Toilet-3 1AC223-3 Radiology 1-3 1AC288-3 Fast Track Exam 2-3
1AC289B-3 Staff Lounge-3 1AC290-3 Fast Track Exam 3-3
1S1-3 Stair 1-3 1S3-3 Stair 3-3 1S5-3 Stair 5-3
1S5A-3 Stair 5 Vest.-3
Revisions: Date:
DD SUBMISSION 5.3.19
65% CD's SUBMISSION 6.14.19 90% CD's SUBMISSION 8.9.19
C
FEC
FEC
FEC
R
EF
FE
C
49 50 50.3 51 52 53
J
K
K4
L
M
M.8
N
N.1
N.2
N.3
O
P
575654.554.153A 54
1A104-4
1S1-4
1A113-4 1A114-4 1A115-4
1A116-4
1A117-4
1A118-4 1A119-4 1A126A-2
1A108-4
1A111A-3
1A112-3
1A111-3
1A138-2 1A110-3
1A139-3
1A125-4
1A124-4 1A123-4 1A122-4
1A129-3
1A128-31A127-4 1A126-3
1A100D-3
1A100A-4
1A127-5
1A129-2
1A130A-3
1S5-4
1A134-6
1A133-6
1A131-4
1A131-5
1A130-4
1A100H-3
1A135-4
1A136-4 1A137-4
1A138-4
1A139-4
1S5A-4
1A140-4
1A141-4
1A142-4
1A143-4
1A143A-4
1A144-4
1A145-4
1A146-4
1A100I-3
1A153-3
1A148-4
1A147-3
1A105-4
1A217-4
1A117-5
1A118-5
1A119-3 1A122-5
1A120-2 1A121-2 1A121A-2
1A137C-3
1A154-3
1A155-4
1A156-3
1A153B-3
1A153A-3
1A137D-2
1A151-4 1A150-4 1A149-4
1A163-4
1A162-41A161-4
1A171-4
1A170-3
1A157A-3
1A169-3
1A166-31A167-3 1A165-3
1A164-3 1A157-3
1A100F-4
1A152-3
1S3-4
1AC223-4
1A100G-4
1AC220-4
1AC221-4
1AC222-4
1AC289B-4
1AC290-4
1AC288-4
1A213-4
1A214-4
1A216-4
1A105-4
CODED NOTES
1. REWORK EXISTING SPRINKLER SYSTEM TO ACCOMMODATE RENOVATED ARCHITECTURAL
LAYOUT PER NFPA 13. ADD/RELOCATE HEADS AS REQUIRED. SPRINKLE USING LIGHT HAZARD
CLASSIFICATIONS; UNLESS NOTED OTHERWISE.
2. SPRINKLE USING ORDINARY HAZARD CLASSIFICATIONS.
PLAN NOTES
A. THIS DRAWING WAS DESIGNED TO PLOT AS 30" X 42" PLOT. IF PLOT DOES NOT MATCH THE
DESIGNED SIZE, THE GRAPHICAL SCALE SHALL BE USED.
B. SEE SHEET FP-001 FOR FIRE PROTECTION SYMBOL LEGEND, FIRE PROTECTION GENERAL
NOTES, AND FIRE PROTECTION DETAILS.
C. AREAS WITH NO CEILINGS SUCH THAT THE AUTOMATIC SPRINKLER PIPING IS EXPOSED, THE
AUTOMATIC SPRINKLER PIPING SHALL BE INSTALLED TO FOLLOW ALONG THE STRUCTURE.
REFER TO ARCHITECTURAL PLANS.
D. OFFSET PIPING AROUND STRUCTURAL MEMBERS, LIGHTING, DUCTWORK, AND PLUMBING
PIPING AS REQUIRED TO MAINTAIN FINAL ROOM DIMENSIONS. COORDINATE EXACT PIPE ROUTING
WITH ALL TRADES.
E. SPRINKLER HEAD TYPES AT DESIGNATED AREAS: THE INSTALLATION OF SPRINKLER HEADS IN 2'X2' ACOUSTICAL TILE CEILINGS ARE TO BE CENTERED AND EITHER CENTERED AT HALFWAY OR QUARTER POINTS IN 2'X4' TILES. IN GYPSUM AND EXPOSED CEILING, INSTALL SPRINKLER HEADS
SYMMETRICALLY IN A STRAIGHT LINE. MAINTAIN A SYMMETRICAL PATTERN FOR ALL CEILING
TYPES FOR AN AESTHETICALLY PLEASING EFFECT. COORDINATE WITH ARCHITECTURAL
REFLECTED CEILING PLAN.
FINISHED CEILINGS (SUSPENDED LAY-IN AND GYPSUM): SPRINKLERS ARE TO BE CONCEALED
TYPE WITH WHITE COVERS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN.
EXPOSED CEILINGS: SPRINKLERS ARE TO BE UPRIGHT TYPE. PROVIDE SPRINKLER HEAD GUARDS
IN ALL AREAS SUBJECTED TO DAMAGE SUCH AS MECHANICAL ROOMS, ELECTRICAL ROOMS,
GYMNASIUM, AND STORAGE ROOMS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING
PLAN.
F. THE FIRE PROTECTION CONTRACTOR SHALL REMOVE OIL AND PREPARE AUTOMATIC
SPRINKLER PIPING AND DRAINS IN EXPOSED AREAS FOR PAINTING. THE FIRE PROTECTION
CONTRACTOR SHALL THEN PLACE PLASTIC BAGS OVER SPRINKLER HEADS. THE GENERAL
CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING THE AUTOMATIC SPRINKLER PIPING,
DRAINS, AND THEN REMOVE PLASTIC BAGS FROM SPRINKLER HEADS. COORDINATE PIPE
PREPARATION AND PAINTING REQUIREMENTS WITH ARCHITECT.
G. THE FIRE PROTECTION SYSTEM FOR THIS PROJECT SHALL BE DESIGNED BY THE INSTALLING
CONTRACTOR. THE INTENT OF THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS IS TO
PROVIDE BASIC INFORMATION ON MATERIALS AS WELL AS TO SHOW LOCATIONS OF VALVES,
PIPING MAINS, AND RISERS THAT HAVE ALREADY BEEN DIAGRAMMATICALLY COORDINATED INTO
THE BUILDING DESIGN. IT IS UNDERSTOOD THAT THE FIRE PROTECTION SYSTEM MUST BE
DESIGNED PRIOR TO INSTALLATION TO ASSURE THAT THE REQUIRED WATER FLOW RATES ARE
ACHIEVED AT ALL OF THE SPRINKLER HEADS.
H. IN THE CASE OF THIS PROJECT, DUE TO VERY LIMITED SPACE FOR MECHANICAL AND
ELECTRICAL SYSTEMS, IT WILL BE NECESSARY FOR THE FIRE PROTECTION SYSTEM DESIGNER
TO OBTAIN AND SHOW ON THE FIRE PROTECTION INSTALLATION DRAWINGS THE LOCATIONS OF
MAJOR DUCTWORK, PIPING AND ELECTRICAL MAINS, AND TO SHOW HOW THE FIRE PROTECTION
PIPING IS COORDINATED WITH THESE SYSTEMS. IT SHALL BE UNDERSTOOD THAT THE FIRE
PROTECTION DESIGNER SHALL MAKE REVISIONS TO THE INSTALLATION DRAWINGS AS
NECESSARY, BOTH DURING THE SHOP DRAWING REVIEW PROCESS AND DURING THE
INSTALLATION, AS REQUIRED TO INSTALL THE FIRE PROTECTION PIPING SYSTEMS INTO THE
SPACE AVAILABLE. THE AVAILABLE SPACE CAN BE DETERMINED BY REFERENCING THE
ARCHITECTURAL, STRUCTURAL, HVAC, PLUMBING, AND ELECTRICAL DRAWINGS. TO MAKE SURE
THAT THERE IS NO CONFUSION ON THIS ISSUE, ON THIS PROJECT, THE FIRE PROTECTION PIPING
SHALL BE INSTALLED AROUND THE BUILDING SYSTEMS AND NOT VICE VERSA.
DATESIGNATURE
SCHOONOVER
C. J.
ST
AT
E OF O
H IO
P R O F E
SS IO N
AL EN
G
IN
E E R
REG IS T E R
ED
E-62197
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
CIVIL/MECH./ELEC./PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY.
UNIONTOWN, OH 44111
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
LANDSCAPE ARCHITECTURE:
JAMES S. MCKNIGHT
P.O. BOX 14158
CLEVELAND, OH 44114
P. 216.952.2408
HAZARDOUS MATERIALS
ASSESSMENT:
STEPHEN J. SEBESTA &
ASSOCIATES, INC.
30628 DETROIT RD., NO. 258
WESTLAKE, OH 44145
P. 216.781.0060
C :\U se rs
\a m ca le es e\
D oc um en ts \1
_M
EP
_C
EN
TR
AL
F
IL
E_ am ca le es e.
rv t
7/
/2
4:
:2
PM
FP-1-3
FIRST FLOOR LEVEL PHASE III FIRE
PROTECTION IMPROVEMENT PLAN
EXPAND PRIMARY CARE FOR
PACT REALIGNMENT
10701 EAST BLVD. CLEVELAND, OHIO
541-376
NICK CARROZZA
8.1.21 CJS JAV
BID ISSUE SUBMISSION
8.1.21
N 1/8" = 1'-0"
FIRST FLOOR LEVEL PHASE III FIRE PROTECTION IMPROVEMENT PLAN
ROOM LEGEND
1A129 PACT Team Hub - North
1A138-11 Space 1A138-22 Space 1A138-49 Space 1A138-53 Space 1A138-3 Space 1A138-5 Space 1A138-6 Space 1A138-7 Space 1A138-8 Space 1A138-9 Space 1A138-10 Space 1A138-12 Space 1A138-13 Space 1A138-14 Space 1A138-15 Space 1A138-16 Space 1A138-17 Space 1A138-18 Space 1A138-19 Space 1A138-20 Space 1A138-21 Space 1A138-23 Space 1A138-24 Space 1A138-25 Space 1A138-26 Space 1A138-27 Space 1A138-28 Space 1A138-29 Space 1A138-30 Space 1A138-31 Space 1A138-32 Space 1A138-33 Space 1A138-34 Space 1A138-35 Space 1A138-36 Space 1A138-37 Space 1A138-38 Space 1A138-39 Space 1A138-40 Space 1A138-41 Space 1A138-42 Space 1A138-43 Space 1A138-44 Space 1A138-45 Space 1A138-46 Space 1A138-47 Space 1A138-48 Space 1A138-50 Space 1A138-51 Space 1A138-52 Space 1A100A-4 Corridor-4 1A100D-3 Corridor-3 1A100F-4 Corridor-4 1A100G-4 Corridor-4 1A100H-3 Corridor-3 1A100I-3 Corridor-3 1A104-4 Lobby-4 1A105-4 Waiting Room-4 1A105-4 Waiting-4 1A108-4 Toilet-4 1A110-3 GS6/GS9 Office-3 1A111-3 SMA Conference Room-3
1A111A-3 SMA Storage Room-3 1A112-3 Exam/Treatment Room-3 1A113-4 Electrical-4 1A114-4 Telecomm-4 1A115-4 Exam/Treatment Room-4 1A116-4 Exam/Treatment Room-4 1A117-4 Exam/Treatment Room-4 1A117-5 Exam/Treatment Room-5 1A118-4 Exam/Treatment Room-4 1A118-5 Exam/Treatment Room-5 1A119-3 PACT Team Hub - West-3 1A119-4 Exam/Treatment Room-4 1A120-2 Exam/Treatment Room-2 1A121-2 Exam/Treatment Room-2
1A121A-2 Meds. Alcove-2 1A122-4 Exam/Treatment Room-4 1A122-5 Exam/Treatment Room-5 1A123-4 Exam/Treatment Room-4 1A124-4 Exam/Treatment Room-4 1A125-4 Exam/Treatment Room-4 1A126-3 Exam/Treatment Room-3
1A126A-2 Locker Area-2 1A127-4 Exam/Treatment Room-4 1A127-5 Exam/Treatment Room-5 1A128-3 Exam/Treatment Room-3 1A129-2 PACT Team Hub - North-2 1A129-3 Exam/Treatment Room-3 1A130-4 Exam/Treatment Room-4
1A130A-3 Exam/Treatment Room-3 1A131-4 Exam/Treatment Room-4 1A131-5 Exam/Treatment Room-5 1A133-6 Exam/Treatment Room-6 1A134-6 Exam/Treatment Room-6 1A135-4 Exam/Treatment Room-4 1A136-4 Exam/Treatment Room-4 1A137-4 Exam/Treatment Room-4
1A137C-3 Check-Out-3 1A137D-2 Check-Out-2 1A138-2 Mas. Reception 1-2 1A138-4 Exam/Treatment Room-4 1A139-3 Mas Reception 2-3 1A139-4 Exam/Treatment Room-4 1A140-4 PACT Team Hub - South-4 1A141-4 Nurse Managers Office-4 1A142-4 Director's Office-4 1A143-4 Precepting Room-4
1A143A-4 Elec. Closet-4 1A144-4 Staff Toilet-4 1A145-4 Exam/Treatment Room-4 1A146-4 Exam/Treatment Room-4 1A147-3 Exam/Treatment Room-3 1A148-4 Exam/Treatment Room-4 1A149-4 Exam/Treatment Room-4 1A150-4 Exam/Treatment Room-4 1A151-4 Exam/Treatment Room-4 1A152-3 Storage-3 1A153-3 Soiled Holding-3
1A153A-3 Consult.-3 1A153B-3 Consult.-3 1A154-3 Mens-3 1A155-4 RR Alcove-4 1A156-3 Womens-3 1A157-3 Clean Utility-3
1A157A-3 Staff Toilet-3 1A161-4 Exam/Treatment Room-4 1A162-4 Exam/Treatment Room-4 1A163-4 Exam/Treatment Room-4 1A164-3 Mental Health Consult./Diabetes Education-3 1A165-3 Mental Health Consult.-3 1A166-3 Mental Health Consult.-3 1A167-3 Mental Health Consult.-3 1A169-3 On-Call Room-3 1A170-3 Program Support Ass't-3 1A171-4 Nurse Manager-4 1A213-4 Restroom Alcove-4 1A214-4 Womens-4 1A216-4 Vending-4 1A217-4 Elevator Lobby-4
1AC220-4 Waiting Room-4 1AC221-4 Reception-4 1AC222-4 Toilet-4 1AC223-4 Radiology 1-4 1AC288-4 Fast Track Exam 2-4
1AC289B-4 Staff Lounge-4 1AC290-4 Fast Track Exam 3-4
1S1-4 Stair 1-4 1S3-4 Stair 3-4 1S5-4 Stair 5-4
1S5A-4 Stair 5 Vest.-4
Revisions: Date:
DD SUBMISSION 5.3.19
65% CD's SUBMISSION 6.14.19 90% CD's SUBMISSION 8.9.19
C
FEC
FEC
FEC
R
EF
FE
C
49 50 50.3 51 52 53
J
K
K4
L
M
M.8
N
N.1
N.2
N.3
O
P
575654.554.153A 54
1A104-5
1S1-5
1A113-5
1A114-5 1A115-5 1A116-5 1A117-6 1A118-6
1A128A
1A119-5
1A128-4
1A115-6
1A100D-4
1A112-4
1A108-5
1A111A-4
1A111-4
1A138-3 1A110-4
1A139-4
1A137C-4 1A118-7
1A117-7
1A116-6
1A124-5
1A123-5
1A122-6
1A119-4
1A120-3 1A121-3
1A121A-3
1A127-6
1A129-3
1A130A-4
1A130-5
1A131 1A132-4 1A132-5
1A134-7
1S5-51S5A-5
1A100H-4
1A135-5 1A136-5 1A137-5
1A138-5 1A139-5
1A140-5
1A147-4
1A148-5
1A153-4
1A146-5
1A100I-4
1A145-5
1A144-5
1A143-5 1A142-5
1A141-5
1A217-5
1A155-5
1A154-4
1A105-5
1A158-2 1A151-5 1A150-5 1A149-5
1A163-51A162-51A161-51A160-2
1A159-2
1A168-21A156-4
1A169
1A171-5 1A170-4
1A167-4 1A166-4 1A165-4
1A164-4 1A157-4
1A152-4
1S3-51A100F-5 1A100G-5
1A216-5
1A213-5
1A214-5
1AC290-5
1AC288-5
1AC289B-5
1AC220-5
1AC221-5
1AC222-5 1AC223-5
CODED NOTES
1. REWORK EXISTING SPRINKLER SYSTEM TO ACCOMMODATE RENOVATED ARCHITECTURAL
LAYOUT PER NFPA 13. ADD/RELOCATE HEADS AS REQUIRED. SPRINKLE USING LIGHT HAZARD
CLASSIFICATIONS; UNLESS NOTED OTHERWISE.
2. SPRINKLE USING ORDINARY HAZARD CLASSIFICATIONS.
PLAN NOTES
A. THIS DRAWING WAS DESIGNED TO PLOT AS 30" X 42" PLOT. IF PLOT DOES NOT MATCH THE
DESIGNED SIZE, THE GRAPHICAL SCALE SHALL BE USED.
B. SEE SHEET FP-001 FOR FIRE PROTECTION SYMBOL LEGEND, FIRE PROTECTION GENERAL
NOTES, AND FIRE PROTECTION DETAILS.
C. AREAS WITH NO CEILINGS SUCH THAT THE AUTOMATIC SPRINKLER PIPING IS EXPOSED, THE
AUTOMATIC SPRINKLER PIPING SHALL BE INSTALLED TO FOLLOW ALONG THE STRUCTURE.
REFER TO ARCHITECTURAL PLANS.
D. OFFSET PIPING AROUND STRUCTURAL MEMBERS, LIGHTING, DUCTWORK, AND PLUMBING
PIPING AS REQUIRED TO MAINTAIN FINAL ROOM DIMENSIONS. COORDINATE EXACT PIPE ROUTING
WITH ALL TRADES.
E. SPRINKLER HEAD TYPES AT DESIGNATED AREAS: THE INSTALLATION OF SPRINKLER HEADS IN 2'X2' ACOUSTICAL TILE CEILINGS ARE TO BE CENTERED AND EITHER CENTERED AT HALFWAY OR QUARTER POINTS IN 2'X4' TILES. IN GYPSUM AND EXPOSED CEILING, INSTALL SPRINKLER HEADS
SYMMETRICALLY IN A STRAIGHT LINE. MAINTAIN A SYMMETRICAL PATTERN FOR ALL CEILING
TYPES FOR AN AESTHETICALLY PLEASING EFFECT. COORDINATE WITH ARCHITECTURAL
REFLECTED CEILING PLAN.
FINISHED CEILINGS (SUSPENDED LAY-IN AND GYPSUM): SPRINKLERS ARE TO BE CONCEALED
TYPE WITH WHITE COVERS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN.
EXPOSED CEILINGS: SPRINKLERS ARE TO BE UPRIGHT TYPE. PROVIDE SPRINKLER HEAD GUARDS
IN ALL AREAS SUBJECTED TO DAMAGE SUCH AS MECHANICAL ROOMS, ELECTRICAL ROOMS,
GYMNASIUM, AND STORAGE ROOMS. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING
PLAN.
F. THE FIRE PROTECTION CONTRACTOR SHALL REMOVE OIL AND PREPARE AUTOMATIC
SPRINKLER PIPING AND DRAINS IN EXPOSED AREAS FOR PAINTING. THE FIRE PROTECTION
CONTRACTOR SHALL THEN PLACE PLASTIC BAGS OVER SPRINKLER HEADS. THE GENERAL
CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING THE AUTOMATIC SPRINKLER PIPING,
DRAINS, AND THEN REMOVE PLASTIC BAGS FROM SPRINKLER HEADS. COORDINATE PIPE
PREPARATION AND PAINTING REQUIREMENTS WITH ARCHITECT.
G. THE FIRE PROTECTION SYSTEM FOR THIS PROJECT SHALL BE DESIGNED BY THE INSTALLING
CONTRACTOR. THE INTENT OF THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS IS TO
PROVIDE BASIC INFORMATION ON MATERIALS AS WELL AS TO SHOW LOCATIONS OF VALVES,
PIPING MAINS, AND RISERS THAT HAVE ALREADY BEEN DIAGRAMMATICALLY COORDINATED INTO
THE BUILDING DESIGN. IT IS UNDERSTOOD THAT THE FIRE PROTECTION SYSTEM MUST BE
DESIGNED PRIOR TO INSTALLATION TO ASSURE THAT THE REQUIRED WATER FLOW RATES ARE
ACHIEVED AT ALL OF THE SPRINKLER HEADS.
H. IN THE CASE OF THIS PROJECT, DUE TO VERY LIMITED SPACE FOR MECHANICAL AND
ELECTRICAL SYSTEMS, IT WILL BE NECESSARY FOR THE FIRE PROTECTION SYSTEM DESIGNER
TO OBTAIN AND SHOW ON THE FIRE PROTECTION INSTALLATION DRAWINGS THE LOCATIONS OF
MAJOR DUCTWORK, PIPING AND ELECTRICAL MAINS, AND TO SHOW HOW THE FIRE PROTECTION
PIPING IS COORDINATED WITH THESE SYSTEMS. IT SHALL BE UNDERSTOOD THAT THE FIRE
PROTECTION DESIGNER SHALL MAKE REVISIONS TO THE INSTALLATION DRAWINGS AS
NECESSARY, BOTH DURING THE SHOP DRAWING REVIEW PROCESS AND DURING THE
INSTALLATION, AS REQUIRED TO INSTALL THE FIRE PROTECTION PIPING SYSTEMS INTO THE
SPACE AVAILABLE. THE AVAILABLE SPACE CAN BE DETERMINED BY REFERENCING THE
ARCHITECTURAL, STRUCTURAL, HVAC, PLUMBING, AND ELECTRICAL DRAWINGS. TO MAKE SURE
THAT THERE IS NO CONFUSION ON THIS ISSUE, ON THIS…