S02. Sole Source - Corbin Russwin Door Lock - 2020-05-07_Redacted.pdf

PDF 163 KB Posted

Attached to
Expand Primary Care for Pact Realignment Federal contract opportunity
Solicitation number
36C25020B0060_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document provides a justification for a sole source acquisition for removable core locking cylinders at the Louis Stokes Cleveland VA Medical Center. The medical center requires removable core locking cylinders that can be removed only with a special key or tool without disassembly of the knob or lockset. The core must allow the medical center's key lock policy to be met. One grand master key will be available to open all doors for authorized individuals including the Medical Center Director and Police. The estimated value of the removable core locking cylinders is $1,200. The justification cites 41 USC 3304(a)(1) and FAR 6.302-1 as the authority for the sole source, stating that only one responsible source can meet the agency's requirements. No market research was conducted since changing to a different locking system would require numerous master keys and potentially cause delays in emergency access across the medical center campus.

View the file

Other files for this federal contract opportunity

Other files attached to Expand Primary Care for Pact Realignment, newest first.
File Type Posted
S02. VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx DOCX document
S02. Sole Source - Lenel - 2020-05-07_Redacted.pdf PDF
S02. Brand Name Spreadsheet 2020-05-07.pdf PDF
S02. Calculation of Self-Performed and Sub-Contracted Work.docx DOCX document
S02. Drawings - ARCHITECURAL.pdf PDF
S02. Drawings - CIVIL.pdf PDF
S02. Drawings - FIRE PROTECTION.pdf PDF
S02. Sole Source - Tridium - 2020-05-07_Redacted.pdf PDF
S02. Safety.docx DOCX document
S02. RFI Form.docx DOCX document
S02. Drawing - 1-H46 - Second Floor Plan - ACC South.pdf PDF
S02. Drawing - Outpatient Pharmacy Exhaust - EF-52.pdf PDF
S02. Drawings - ELECTRICAL.pdf PDF
S02. Drawings - PLUMBING.pdf PDF
S02. Drawings - RENDERINGS.pdf PDF
S02. Sole Source - Notifier Fire Alarm - 2020-05-07_Redacted.pdf PDF
S02. Sole Source - Hill-Rom Nurse Call - 2020-05-07_Redacted.pdf PDF
S02. Drawing - 1-H28 - First Floor Plan - Zoning.pdf PDF
S02. Drawing - 1-H29 - Second Floor Plan - Zoning.pdf PDF
S02. Drawing - 1-H34 - First Floor Plan - ACC North.pdf PDF
S02. Drawing - 1-H36 - First Floor Plan - ACC South.pdf PDF
S02. Drawing - 1-H44 - Second Floor Plan - ACC North.pdf PDF
S02. VAMC Health Requirements.pdf PDF
S02. Solicitation 36C25020B0060_1.pdf PDF
S02. Wage Determination.pdf PDF
S02. Bid Opening Instructions.pdf PDF
S02. BID ISSUE - SPECIFICATIONS.pdf PDF
S02. Brand Name or Equal Memo 2020-05-06.pdf PDF
S02. Drawing - 1-H27 - Basement Plan - Zoning.pdf PDF
S02. Drawing - 1-H54 - Basement Plan - Mechanical Room.pdf PDF
S02. Drawing - Pre-Testing Reference Update.pdf PDF
S02. Drawings - HVAC.pdf PDF
S02. Drawings - SITE LANDSCAPE.pdf PDF
S02. Drawings - STRUCTURAL.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPM Part 806.3 Other Than Full and Open Competition (OFOC) SOP

Attachment 2: Request for Sole Source Justification Format >SAT

OFOC SOP Revision 08 Page 1 of 3

Original Date: 03/22/11

Revision 08 Date: 04/18/2018

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A)

For

Other Than Full and Open Competition (>SAT)

Acquisition Plan Action ID:___________________________________________

1. Contracting Activity: Department of Veterans Affairs, VISN 10, Louis Stokes Cleveland Medical

Center will enter into a construction contract that requires the procurement of this item which requires justification for other than full and open competition. A purchase request number is not yet available.

2. Nature and/or Description of the Action Being Processed: This project is named “PACT

Realignment”. Existing space will be renovated and augmented to enable team‐based care aligned with the principles of PACT (Patient Aligned Care Team). Meeting space will allow for daily team huddles and optimal flow of patients throughout their clinic visit. Basement space will support upgraded mechanicals, while the second floor will house clinical exam and support space. In addition, this project addresses several outstanding FCA (Facility Condition Assessment) items.

Patient experience as measured by SHEP scores are expected to improve materially as a direct result of this project.

This project provides an additional 12,000 square feet on three floors by an extension on VA owned land on the east side of the ambulatory care addition. Project also renovates 12,000 sqft of existing space to create the necessary clinical support space to properly implement the Patient

Aligned Care Team (PACT) model of primary care delivery to nearly 30,000 Veterans annually and while incorporating designs that support VHA patient access goals including same day access to

Primary Care.

3. Description of Supplies/Services Required to Meet the Agency’s Needs: Removable core locking cylinders that are removable only with a special key or tool without disassembly of knob or lockset.

Core that allows medical center policy for key locks to be met. One grand master key to be available to open all doors by authorized individuals. (Medical Center Director and Police) The estimated value of the removable core locking cylinder materials is $1,200.00.

4. Statutory Authority Permitting Other than Full and Open Competition: 41 USC §3304(a)(1), as implemented by FAR 6.302‐1.

(X) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy

Agency Requirements per FAR 6.302‐1;

( ) (2) Unusual and Compelling Urgency per FAR 6.302‐2;

( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per FAR 6.302‐3;

( ) (4) International Agreement per FAR 6.302‐4

( ) (5) Authorized or Required by Statute FAR 6.302‐5;

( ) (6) National Security per FAR 6.302‐6;

VHACOSBurdiS Typewritten Text

36C250-20-AP-2904

VHACOSBurdiS Text Box

OFOC SOP Revision 08 Page 2 of 3

Revision 08 Date: 04/18/2018

( ) (7) Public Interest per FAR 6.302‐7;

5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority. To meet needs stated above the medical center currently utilizes a “Corbin‐Russwin HO keyway great grand master key system”, single master key system is a requirement of VA engineering policy MP – 3. As the Cleveland VA medical center continues to move toward consolidation patient and staff safety concerns remain at the forefront of design decisions when selecting systems. To change to a different locking system would require numerous master keys potentially causing delays in accessing all area of the campus in event of emergencies. The lock set requested allows the facility to expand and renovate as required and maintain the ability to meet patient and staff safety requirements.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: This procurement will be competed and synopsized on (www.fbo.gov) as an

Invitation for Bid (IFB) and will indicate the requirement for brand name specification for the Hill

Nurse Call System. Since the construction contract is being awarded as a firm fixed price contract through competitive sealed bidding, the bidders are incentivized to locate the supplier that will provide the item at the most economical price.

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and

Reasonable: While FAR 8.404(d) states that GSA has already determined the prices of supplies under schedule contracts to be fair and reasonable the Contracting Officer intends to seek further price reductions. As the Navicare System is the preferred system to integrate the remainder of the

Medical Center the Contracting Officer has determined the procurement to be the best value to meet the Government’s needs. In addition, it is anticipated that two (2) or more bids will be received through the sealed bidding process. If two (2) or more bids are received than the cost of the entire project will be considered fair and reasonable to the government based on competition.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons

Market Research Was Not Conducted: Since this is the existing campus wide system and patching in another manufacturer to it is not possible, no additional market research was conducted and the decision was made to sole source the existing system. (Market Research will be conducted for the entire construction project).

9. Any Other Facts Supporting the Use of Other than Full and Open Competition: None. See Item 5 above.

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: None. (A Market

Survey will be completed on the entire construction project).

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to

Competition before Making subsequent acquisitions for the supplies or services required: None as it would be impractical to operate multiple types of call systems within an existing operation.

12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona

Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, OFOC SOP Revision 08 Page 3 of 3

Revision 08 Date: 04/18/2018 which are included in the justification, are accurate and complete to the best of my knowledge and belief.

_____________________________ _________05‐07‐2020___________

Brad Faulkenberg, P.E. Date

COR

Louis Stokes Cleveland VAMC

13. Approvals in accordance with FAR 6.304

a. Contracting Officer or Designee’s Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Diana Pittman Date

Contracting Officer

Network Contracting Office (NCO) 10

2020-08-07T13:15:29-0400
Diana J. Pittman 251505