This solicitation is for an expansion project at the Louis Stokes Cleveland VA Medical Center to provide an additional 12,000 square feet of space on three floors for primary care. The contractor shall provide all labor, equipment, supplies and supervision necessary to complete the expansion project, which is valued between $10 million and $15 million. The NAICS code for this project is 236220 for commercial and institutional building construction. The business size standard is $39.5 million. The solicitation number is 36C25020B0060_1. This project is a 100% set-aside for a Service-Disabled Veteran Owned Small Business. Bidders must be verified in VETBIZ and registered in SAM by the offer due date and time of award to be eligible. The last day to submit requests for information is August 12, 2021. Site visits will be conducted following social distancing guidelines. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs Louis Stokes Cleveland VA Medical Center
WADE PARK
10701 East Blvd. Cleveland, Ohio 44106
TECHNICAL SPECIFICATIONS
EXPAND PRIMARY CARE FOR PACT REALIGNMENT
PROJECT #541-376
Bid Issue Submission
August 1, 2021
CIVIL/MECHANICAL/ELEC.
ENGINEER
Scheeser Buckley Mayfield, LLC
1540 Corporate Woods Pkwy.
Uniontown, OH 44685 Phone 330.526.2700
ARCHITECT
Kaczmar Architects
400 Western Reserve Building 1468 West Ninth Street Cleveland, Ohio 44113 Phone 216.687.1555 Fax 216.687.1558
STRUCTURAL ENGINEER
Thorson Baker & Associates
3030 West Streetsboro Rd.
Richfield, OH 44286 Phone 330.659.6688
LANDSCAPE ARCHITECT
James S. McKnight
P.O. Box 14158 Cleveland, Ohio 44114 Phone 216.952.2408
06-01-19
Bid Issue Submission VAMC WADE PARK 8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
TABLE OF CONTENTS
00 01 10-1
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 10 Table of Contents 06-19
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 03-20
01 32 16.13 Network Analysis Schedules (Major Construction Project
– Design/Bid/Build
03-20
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 03-20
Site Specific Accident Prevention Plan - Sample 1-49
Infection Control During Construction 1-9
Infection Control Risk Assessment 1-8
Infection Control Orientation for Construction Workers 1-2
Infection Control Construction Permit 1-3
Infection Control Construction Inspection Form 1-2
01 42 19 Reference Standards 05-16
01 45 00 Quality Control 03-19
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 03-19
01 57 19 Temporary Environmental Controls 01-11
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 09-13
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 08-16
02 41 00 Demolition 08-17
Hazardous Materials Testing Reports 06-19
Geotechnical Investigation Report
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 12-15
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17
04 05 16 Masonry Grouting 02-16
04 20 00 Unit Masonry 08-17
04 43 08 Limestone Masonry N/A
00 01 10-2
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 31 00 Steel Decking 02-16
05 40 00 Cold-Formed Metal Framing 05-16
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 10-15
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 16 63 Cementitious Sheathing 02-16
06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 08 00 Facility Exterior Enclosure Commissioning 11-16
07 14 16 Cold-Applied Below-Grade Vertical Waterproofing N/A
07 21 13 Thermal Insulation 10-17
07 22 00 Roof and Deck Insulation 02-16
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16
07 40 00 Roofing and Siding Panels 10-15
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16
07 60 00 Flashing and Sheet Metal 07-14
07 71 00 Roof Specialties 10-15
07 72 00 Roof Accessories 10-15
07 81 00 Applied Fireproofing 10-17
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
08 14 00 Interior Wood Doors 02-16
08 31 13 Access Doors and Frames 02-16
08 34 00 Special Function Doors N/A
08 41 13 Aluminum-Framed Entrances and Storefronts 08-16
08 44 13 Glazed Aluminum Curtain Walls 03-17
08 51 13 Aluminum Windows 02-16
08 71 00 Door Hardware 01-20
08 71 13.11 Low Energy Power Assist Door Operators 08-16
08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 06-18
09 30 13 Ceramic/Porcelain Tiling 09-15
09 51 00 Acoustical Ceilings 12-18
00 01 10-3
09 65 13 Resilient Base and Accessories 02-16
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring 05-18
09 68 00 Carpeting 10-15
09 72 16 Vinyl-Coated Fabric Wall Covering 10-15
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 26 00 Wall and Door Protection 10-15
10 28 00 Toilet, Bath, and Laundry Accessories 02-16
10 44 13 Fire Extinguisher Cabinets 08-18
10 51 13 Metal Lockers N/A
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS
12 36 61.19 Quartz Agglomerate Countertops N/A
DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED
DIVISION 14– CONVEYING EQUIPEMENT – NOT USED
DIVISION 21- FIRE SUPPRESSION
21 05 11 Common Work Results for Fire Protection 07-16
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16
22 05 23 General-Duty Valves for Plumbing Piping 09-15
22 07 11 Plumbing Insulation 09-15
22 11 00 Facility Water Distribution 09-15
22 11 23 Domestic Water Pumps 09-15
22 13 00 Facility Sanitary and Vent Piping 09-15
22 14 00 Facility Storm Drainage 09-15
22 14 29 Sump Pumps 09-15
22 40 00 Plumbing Fixtures 09-15
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15
22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-20
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-20
00 01 10-4
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 09 23.1 Niagara N4 SBS/EMS Network Standards Guide N/A
23 21 13 Hydronic Piping 02-20 23 22 13 Steam and Condensate Heating Piping 02-20
23 25 00 HVAC Hot Water Treatment 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 36 00 Air Terminal Units 02-20
23 37 00 Air Outlets and Inlets 02-20
23 40 00 HVAC Air Cleaning Devices 03-20
23 44 00 UVC Emitter Ultraviolet Disinfection 04-11
23 73 00 Indoor Central-Station Air-Handling Units 03-20
23 82 00 Convection Heating and Cooling Units 03-20
23 82 16 Air Coils 03-20
DIVISION 25 – INTEGRATED AUTOMATION
25 05 11 Requirements for Integrated Automation N/A
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 39 Underfloor Raceways for Electrical Systems 01-18
26 05 41 Underground Electrical Construction 01-17
26 08 00 Commissioning of Electrical Systems 11-16
26 09 23 Lighting Controls 01-18
26 24 13 Distribution Switchboards 01-18
26 24 16 Panelboards 01-18
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-17
26 41 00 Facility Lightning Protection 01-17
26 51 00 Interior Lighting 01-18
26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 08 00 Commissioning of Communication Systems 11-16
27 10 00 Control, Communication and Signal Wiring 06-15
27 15 00 Communications Structured Cabling 01-16
27 51 16 Public Address and Mass Notification Systems 10-18
27 52 23 Nurse Call and Code Blue Systems 10-18
00 01 10-5
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16
28 13 00 Physical Access Control System 10-11
28 13 16 Physical Access Control System and Database Management 09-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 07-16
31 23 19 Dewatering 10-12
31 63 26 Drilled Caissons 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 84 00 Planting Irrigation 08-16
32 90 00 Planting 07-16
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 03-17
33 40 00 Storm Sewer Utilities 12-17
07-01-15
LIST OF DRAWING SHEETS
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GI-1 Title Sheet & Drawing Index
CIVIL
GS-0 Existing Site Survey
GS-1 Symbol Legend and General Notes
GS-2 Clearing and Demolition Plan
GS-3 Site Utility and Grading Plan
GS-4 Site Paving Plan
GS-5 Erosion Control Narrative
GS-6 Site Details
LANDSCAPE/SITE
MSP-01 Master Site Improvement Plan
MSP-02 Site Elevations & Details
L-01 Landscape Plan
L-02 Irrigation Plan
ARCHITECTURAL
LS-0.1 Basement Level Life Safety Plan – Phase I
LS-1.1 1st Floor Life Safety Plan – Phase I
LS-1.2 1st Floor Life Safety Plan – Phase II
LS-1.3 1st Floor Life Safety Plan – Phase III
LS-1.4 1st Floor Life Safety Plan – Phase IV
LS-1.5 1st Floor Life Safety Plan – Phase V
LS-2.1 2nd Floor Life Safety Plan – Phase I
AS-X-0.1 Basement Level Existing Conditions Plan
AS-D-0.1 Basement Level – Demolition Plan – Phase I
AS-0.1 Basement Level Proposed Improvement/Addition
Plan – Phase I
AS-C-0.1 Basement Level – Reflected Ceiling Plan – Phase
I
00 01 15 - 2
AS-X-1.1 1st Floor Primary Care Dept. – Existing
Conditions Plan
AS-D-1.1 1st Floor Primary Care Dept. – Demolition Plan –
Phase I
AS-DC-1.1 1st Floor Primary Care Dept. – Ceiling
Demolition Plan – Phase I
AS-1.1 1st Floor Primary Care Dept. – Proposed
Improvement/Addition Plan – Phase I
AS-1.1A 1st Floor Primary Care Dept. – Proposed
Improvement Plan – Phase I Interiors
AS-C-1.1 1st Floor Primary Care Dept. – Reflected Ceiling
Plan – Phase I
AS-D-1.2 1st Floor Primary Care Dept. – Demolition Plan –
Phase II
AS-DC-1.2 1st Floor Primary Care Dept. – Ceiling
Demolition Plan – Phase II
AS-1.2 1st Floor Primary Care Dept. – Proposed
Improvement Plan – Phase II
AS-C-1.2 1st Floor Primary Care Dept. – Reflected Ceiling
Plan – Phase II
AS-D-1.3 1st Floor Primary Care Dept. – Demolition Plan –
Phase III
AS-DC-1.3 1st Floor Primary Care Dept. – Ceiling
Demolition Plan – Phase III
AS-1.3 1st Floor Primary Care Dept. – Proposed
Improvement Plan – Phase III
AS-C-1.3 1st Floor Primary Care Dept. – Reflected Ceiling
Plan – Phase III
AS-D-1.4 1st Floor Primary Care Dept. – Demolition Plan –
Phase IV
AS-DC-1.4 1st Floor Primary Care Dept. – Ceiling
Demolition Plan – Phase IV
AS-1.4 1st Floor Primary Care Dept. – Proposed
Improvement Plan – Phase IV
AS-C-1.4 1st Floor Primary Care Dept. – Reflected Ceiling
Plan – Phase IV
AS-D-1.5 1st Floor Primary Care Dept. – Demolition Plan –
Phase V
AS-DC-1.5 1st Floor Primary Care Dept. – Ceiling
Demolition Plan – Phase V
AS-1.5 1st Floor Primary Care Dept. – Proposed
Improvement Plan – Phase V
00 01 15 - 3
AS-C-1.5 1st Floor Primary Care Dept. – Reflected Ceiling
Plan – Phase V
AS-X-2.1 2nd Floor Specialty Care Dept. – Existing
Conditions Plan
AS-D-2.1 2nd Floor Specialty Care Dept. – Demolition Plan
– Phase II
AS-DC-2.1 2nd Floor Specialty Care Dept. – Ceiling
Demolition Plan – Phase II
AS-2.1 2nd Floor Specialty Care Dept. – Proposed
Improvement/Addition Plan – Phase I Addition
AS-2.1A 2nd Floor Specialty Care Dept. – Proposed
Improvement/Addition Plan – Phase I Interiors
AS-2.1B 2nd Floor Specialty Care Dept. – Deduct
Alternate 1-3 Plans
AS-C-2.1 2nd Floor Specialty Care Dept. – Reflected
Ceiling Plan – Phase I
AS-C-2.1B 2nd Floor Specialty Care Dept. – Deduct
Alternate 1-3 Ceiling Plans
AS-3.1 Third Floor/New Addition Roof Plan – Phase I
AS-200 New Addition Exterior Elevations
AS-201 Wall Sections
AS-202 Wall Sections
AS-203 Wall Sections
AS-204 Enlarged Stair Section, Plans, and Details
AS-300 Enlarged Plans and Interior Elevations
AS-301 Enlarged Plans and Interior Elevations
AS-302 Enlarged Plans and Interior Elevations
AS-303 Interior Elevations
AS-304 Interior Elevations
AS-305 Interior Elevations
AS-306 Millwork Details
AS-400 Enlarged Plan and Section Details
AS-401 Enlarged Section Details
AS-600 Window Types
AS-601 Wall Types
AS-700 Door Schedule and Details
AS-701 1st Floor – Master Finish Plan
AS-702 Basement Level and 2nd Floor – Master Finish
Plans
00 01 15 - 4
AS-703 Finish Schedule and Details
STRUCTURAL
S-0.1 General Notes
S-0.2 General Notes
S-0.3 General Notes
S-1.0 Foundation Plan – Phase I
S-2.0 1st Floor Framing Plan – Phase I
S-3.0 2nd Floor Framing Plan – Phase I
S-4.0 Roof/Future Third Floor Framing Plan – Phase I
S-5.0 Foundation Typical Details
S-5.1 Foundation Sections and Details
S-5.2 Foundation Sections and Details
S-6.0 Typical Masonry Details and Enlarged Stair Plan and Elevation
S-7.0 Concrete Typical Details
S-7.1 Framing Sections and Details
S-8.0 Sections and Details
S-9.0 Sections and Details
S-9.1 Sections and Details
MECHANICAL/HVAC
H-001 HVAC GENERAL NOTES AND SYMBOL LEGEND
H-002 HVAC DETAILS
H-003 HVAC DETAILS
H-004 HVAC TEMPERATURE CONTROLS
H-005 HVAC TEMPERATURE CONTROLS
H-006 HVAC SCHEDULES
H-007 HVAC SECTIONS AT BASEMENT LEVEL
H-D-0-1 BASEMENT LEVEL PHASE I HVAC DEMOLITION PLAN
H-0.1-1 BASEMENT LEVEL PHASE I HVAC DUCTWORK
IMPROVEMENT PLAN
H-0.2-1 BASEMENT LEVEL PHASE I HVAC PIPING IMPROVEMENT
PLAN
H-D-1-1 FIRST FLOOR LEVEL PHASE I HVAC DEMOLITION PLAN
H-1.1-1 FIRST FLOOR LEVEL PHASE I HVAC DUCTWORK
IMPROVEMENT PLAN
00 01 15 - 5
H-1.2-1 FIRST FLOOR PHASE PHASE I HVAC PIPING
IMPROVEMENT PLAN
H-D-1-2 FIRST FLOOR LEVEL PHASE II HVAC DEMOLITION PLAN
H-1.1-2 FIRST FLOOR LEVEL PHASE II HVAC DUCTWORK
IMPROVEMENT PLAN
H-1.2-2 FIRST FLOOR LEVEL PHASE II HVAC PIPING
IMPROVEMENT PLAN
H-D-1-3 FIRST FLOOR LEVEL PHASE III HVAC DEMOLITION
PLAN
H-1.1-3 FIRST FLOOR LEVEL PHASE III HVAC DUCTWORK
IMPROVEMENT PLAN
H-1.2-3 FIRST FLOOR LEVEL PHASE III HVAC PIPING
IMPROVEMENT PLAN
H-D-1-4 FIRST FLOOR LEVEL PHASE IV HVAC DEMOLITION PLAN
H-1.1-4 FIRST FLOOR LEVEL PHASE IV HVAC DUCTWORK
IMPROVEMENT PLAN
H-1.2-4 FIRST FLOOR LEVEL PHASE IV HVAC PIPING
IMPROVEMENT PLAN
H-D-1-5 FIRST FLOOR LEVEL PHASE V HVAC DEMOLITION PLAN
H-1.1-5 FIRST FLOOR LEVEL PHASE V HVAC DUCTWORK
IMPROVEMENT PLAN
H-1.2-5 FIRST FLOOR LEVEL PHASE V HVAC PIPING
IMPROVEMENT PLAN
H-D-2-1 SECOND FLOOR LEVEL PHASE I HVAC DEMOLITION PLAN
H-2.1-1 SECOND FLOOR LEVEL PHASE I HVAC DUCTWORK
IMPROVEMENT PLAN
H-2.2-1 SECOND FLOOR LEVEL PHASE I HVAC PIPING
PLUMBING
P-001 PLUMBING GENERAL NOTES, SCHEDULES, DETAILS, AND
SYMBOL LEGEND
P-D-0-1 BASEMENT LEVEL PHASE I PLUMBING DEMOLITION PLAN
P-D-1-1 FIRST FLOOR LEVEL PHASE I PLUMBING DEMOLITION
PLAN
P-D-2-1 SECOND FLOOR LEVEL PHASE I PLUMBING DEMOLITION
PLAN
P-0.1-1 BASEMENT LEVEL PHASE I PLUMBING PIPING
IMPROVEMENT PLAN
P-0.2-1 BASEMENT LEVEL PHASE I PLUMBING WASTE
00 01 15 - 6
P-1.1-1 FIRST FLOOR LEVEL PHASE I PLUMBING PIPING
IMPROVEMENT PLAN
P-1.2-1 FIRST FLOOR LEVEL PHASE I PLUMBING WASTE
IMPROVEMENT PLAN
P-2.1-1 SECOND FLOOR LEVEL PHASE I PLUMBING PIPING
IMPROVEMENT PLAN
P-2.2-1 SECOND FLOOR LEVE PHASE I PLUMBING WASTE
IMPROVEMENT PLAN
P-3.2-1 ROOF PLAN PHASE I PLUMBING WASTE IMPROVEMENT
PLAN
P-D-0-2 BASEMENT LEVEL PHASE II PLUMBING DEMOLITION
PLAN
P-D-1-2 FIRST FLOOR LEVEL PHASE II PLUMBING DEMOLITION
PLAN
P-0.2-2 BASEMENT LEVEL PHASE II PLUMBING WASTE
IMPROVEMENT PLAN
P-1.1-2 FIRST FLOOR LEVEL PHASE II PLUMBING PIPING
IMPROVEMENT PLAN
P-1.2-2 FIRST FLOOR LEVEL PHASE II PLUMBING WASTE
IMPROVEMENT PLAN
P-D-0-3 BASEMENT LEVEL PHASE III PLUMBING DEMOLITION
PLAN
P-D-1-3 FIRST FLOOR LEVEL PHASE III PLUMBING DEMOLITION
PLAN
P-0.2-3 BASEMENT LEVEL PHASE III PLUMBING WASTE
IMPROVEMENT PLAN
P-1.1-3 FIRST FLOOR LEVEL PHASE III PLUMBING PIPING
IMPROVEMENT PLAN
P-1.2-3 FIRST FLOOR LEVEL PHASE III PLUMBING WASTE
IMPROVEMENT PLAN
P-D-0-4 BASEMENT LEVEL PHASE IV PLUMBING DEMOLITION
PLAN
P-D-1-4 FIRST FLOOR LEVEL PHASE IV PLUMBING DEMOLITION
PLAN
P-0.2-4 BASEMENT LEVEL PHASE IV PLUMBING WASTE
IMPROVEMENT PLAN
P-1.1-4 FIRST FLOOR LEVEL PHASE IV PLUMBING PIPING
IMPROVEMENT PLAN
P-1.2-4 FIRST FLOOR LEVEL PHASE IV PLUMBING WASTE
IMPROVEMENT PLAN
P-D-0-5 BASEMENT LEVEL PHASE V PLUMBING DEMOLITION PLAN
P-D-1-5 FIRST FLOOR LEVEL PHASE V PLUMBING DEMOLITION
PLAN
00 01 15 - 7
P-0.2-5 BASEMENT LEVEL PHASE V PLUMBING WASTE
IMPROVEMENT PLAN
P-1.1-5 FIRST FLOOR LEVEL PHASE V PLUMBING PIPING
IMPROVEMENT PLAN
P-1.2-5 FIRST FLOOR LEVEL PHASE V PLUMBING WASTE
IMPROVEMENT PLAN
P-002-1 PLUMBING ISOMETRICS – PHASE I
P-002-2 PLUMBING ISOMETRICS – PHASE I & II
P-002-3 PLUMBING ISOMETRICS – PHASE III, IV, & V
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND
E-002 LIGHTING FIXTURE SCHEDULE - ELECTRICAL
E-003 PANELBOARD SCHEDULES - ELECTRICAL
E-004 MECHANICAL EQUIPMENT SCHEDULE - ELECTRICAL
E-005 ONE-LINE DIAGRAM - ELECTRICAL
E-006 ELECTRICAL DETAILS - ELECTRICAL
E-007 TELECOM DETAILS – ELECTRICAL
E-008 NURSE CALL DETAILS
ES-1 DEMOLITION SITE UTILITIY PLAN - ELECTRICAL
ES-2 NEW WORK - SITE UTILITY PLAN - ELECTRICAL
E-D-1-1 DEMOLITION - FIRST FLOOR LEVEL PHASE I FLOOR
PLAN - ELECTRICAL
E-D-2-1 DEMOLITION - SECOND FLOOR LEVEL PHASE I FLOOR
PLAN - ELECTRICAL
E-0.1-1 LIGHTING - BASEMENT LEVEL PHASE I IMPROVEMENT
PLAN - ELECTRICAL
E-0.2-1 POWER - BASEMENT LEVEL PHASE I IMPROVEMENT PLAN
- ELECTRICAL
E-0.3-1 SYSTEMS - BASEMENT LEVEL PHASE I IMPROVEMENT
PLAN - ELECTRICAL
E-1.1-1 LIGHTING - FIRST FLOOR LEVEL PHASE I
IMPROVEMENT PLAN - ELECTRICAL
E-1.2-1 POWER - FIRST FLOOR LEVEL PHASE I IMPROVEMENT
PLAN - ELECTRICAL
E-1.3-1 SYSTEMS - FIRST FLOOR LEVEL PHASE I IMPROVEMENT
PLAN - ELECTRICAL
E-1.4-1 TELECOM - FIRST FLOOR LEVEL PHASE I IMPROVEMENT
PLAN - ELECTRICAL
00 01 15 - 8
E-2.1-1A LIGHTING - SECOND FLOOR LEVEL PHASE I
IMPROVEMENT PLAN – BASE BID & DEDUCT ALT 1 & 2
PLANS
E-2.2-1A POWER - SECOND FLOOR LEVEL PHASE I IMPROVEMENT
PLAN - BASE BID & DEDUCT ALT 1 & 2 PLANS
E-2.3-1A SYSTEMS - SECOND FLOOR LEVEL PHASE I
IMPROVEMENT PLAN - BASE BID & DEDUCT ALT 1 & 2
PLANS
E-2.4-1A TELECOM - SECOND FLOOR LEVEL PHASE I
IMPROVEMENT PLAN - BASE BID & DEDUCT ALT 1 & 2
PLANS
E-2.5-1A LTG/PWR/SYS – SECOND FLOOR LEVEL PHASE I –
DEDUCT ALT. 3 PLAN
E-D-1-2 DEMOLITION - FIRST FLOOR LEVEL PHASE II FLOOR
PLAN - ELECTRICAL
E-1.1-2 LIGHTING - FIRST FLOOR LEVEL PHASE II
IMPROVEMENT PLAN - ELECTRICAL
E-1.2-2 POWER - FIRST FLOOR LEVEL PHASE II IMPROVEMENT
PLAN - ELECTRICAL
E-1.3-2 SYSTEMS - FIRST FLOOR LEVEL PHASE II
IMPROVEMENT PLAN - ELECTRICAL
E-1.4-2 TELECOM - FIRST FLOOR LEVEL PHASE II
IMPROVEMENT PLAN - ELECTRICAL
E-D-1-3 DEMOLITION - FIRST FLOOR LEVEL PHASE III FLOOR
PLAN - ELECTRICAL
E-1.1-3 LIGHTING - FIRST FLOOR LEVEL PHASE III
IMPROVEMENT PLAN - ELECTRICAL
E-1.2-3 POWER - FIRST FLOOR LEVEL PHASE III IMPROVEMENT
PLAN - ELECTRICAL
E-1.3-3 SYSTEMS - FIRST FLOOR LEVEL PHASE III
IMPROVEMENT PLAN - ELECTRICAL
E-1.4-3 TELECOM - FIRST FLOOR LEVEL PHASE III
IMPROVEMENT PLAN - ELECTRICAL
E-D-1-4 DEMOLITION - FIRST FLOOR LEVEL PHASE IV FLOOR
PLAN - ELECTRICAL
E-1.1-4 LIGHTING - FIRST FLOOR LEVEL PHASE IV
IMPROVEMENT PLAN - ELECTRICAL
E-1.2-4 POWER - FIRST FLOOR LEVEL PHASE IV IMPROVEMENT
PLAN - ELECTRICAL
E-1.3-4 SYSTEMS - FIRST FLOOR LEVEL PHASE IV
IMPROVEMENT PLAN - ELECTRICAL
E-1.4-4 TELECOM - FIRST FLOOR LEVEL PHASE IV
IMPROVEMENT PLAN - ELECTRICAL
00 01 15 - 9
E-D-1-5 DEMOLITION - FIRST FLOOR LEVEL PHASE V FLOOR
PLAN - ELECTRICAL
E-1.1-5 LIGHTING - FIRST FLOOR LEVEL PHASE V
IMPROVEMENT PLAN - ELECTRICAL
E-1.2-5 POWER - FIRST FLOOR LEVEL PHASE V IMPROVEMENT
PLAN - ELECTRICAL
E-1.3-5 SYSTEMS - FIRST FLOOR LEVEL PHASE V IMPROVEMENT
PLAN - ELECTRICAL
E-1.4-5 TELECOM - FIRST FLOOR LEVEL PHASE V IMPROVEMENT
PLAN – ELECTRICAL
FIRE PROTECTION
FP-001 FIRE PROTECTION GENERAL NOTES, DETAILS, AND
SYMBOL LEGEND
FP-0-1 BASEMENT LEVEL PHASE I FIRE PROTECTION
IMPROVEMENT PLAN
FP-1-1 FIRST FLOOR LEVEL PHASE I FIRE PROTECTION
IMPROVEMENT PLAN
FP-1-2 FIRST FLOOR LEVEL PHASE II FIRE PROTECTION
IMPROVEMENT PLAN
FP-1-3 FIRST FLOOR LEVEL PHASE III FIRE PROTECTION
IMPROVEMENT PLAN
FP-1-4 FIRST FLOOR LEVEL PHASE IV FIRE PROTECTION
IMPROVEMENT PLAN
FP-1-5 FIRST FLOOR LEVEL PHASE V FIRE PROTECTION
IMPROVEMENT PLAN
FP-2-1 SECOND FLOOR LEVEL PHASE I FIRE PROTECTION
- - - END - - -
03-01-20
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376 i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 WARRANTY MANAGEMENT
1.16 USE OF ROADWAYS
1.17 COR'S FIELD OFFICE
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.19 TEMPORARY USE OF EXISTING ELEVATORS
1.20 TEMPORARY USE OF NEW ELEVATORS
1.21 TEMPORARY TOILETS
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
1.23 NEW TELEPHONE EQUIPMENT
1.24 TESTS
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376 ii
1.25 INSTRUCTIONS
1.26 GOVERNMENT-FURNISHED PROPERTY
1.27 RELOCATED EQUIPMENT ITEMS
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
1.29 CONSTRUCTION SIGN
1.30 SAFETY SIGN
1.31 PHOTOGRAPHIC DOCUMENTATION
1.32 FINAL ELEVATION Digital Images
1.33 HISTORIC PRESERVATION
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Expand Primary Care for
PACT Realignment Project as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Medical Center Engineering Officer.
C. Offices of Kaczmar architects incorporated, Scheeser Buckley Mayfield
LLC, and Thorson Baker & Associates, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. BID ITEM 1: Work includes all labor, material, equipment and supervision to perform the required General Trades, Sitework/Civil, Landscaping, Structural, Mechanical, Plumbing, Electrical, and Fire
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -2
Protection work on this Project as described/depicted in the
Construction Documents, and all related General Conditions required for the Work. Work to be completed within 885 calendar days after contractor’s receipt of NTP.
B. BID ITEM 2 (DEDUCT ALTERNATE NO.1): All Work identified in Bid Item 1 above, except 2nd Floor Improvements extending approximately from column line L to the south wall of the Addition shall not be constructed and shall instead be left as a Shell Space. Refer to Sheets AS-2.1B and AS-
C-2.1B and MEP drawings. Work to be completed within 880 calendar days after contractor’s receipt of NTP.
C. BID ITEM 3 (DEDUCT ALTERNATE NO. 2): All Work identified in Bid Item 1 above, except 2nd Floor Improvements extending approximately from column line M to the south wall of the Addition shall not be constructed and shall instead be left as a Shell Space. Refer to Sheets AS-2.1B and AS-
C-2.1B and MEP drawings. Work to be completed within 878 calendar days after contractor’s receipt of NTP.
D. BID ITEM 4 (DEDUCT ALTERNATE NO. 3): All Work identified in Bid Item 1 above, except the entire 2nd Floor Addition footprint shall be left as a Shell space. Additionally, all improvements identified within the interior of the 2nd Floor shall not be constructed. Refer to Sheets
AS-2.1B and AS-C-2.1B and MEP drawings. Work to be completed within
871 calendar days after contractor’s receipt of NTP.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
B. A Supplmentary set of HVAC Reference Drawings is included as a part of the Bid package which provides additional information with respect to
Pre-Testing and Balancing of HVAC equipment. The Contractor shall obtain these drawings and include the full extent of Pre-Testing and
Balancing as required by the drawings. Refer to HVAC drawings for additional notes.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -3
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards:
1. The General Contractor shall provide unarmed guards at the project site after construction hours.
2. The Contractor shall provide the guards and VA police with communication devices as directed.
3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.
D. Key Control:
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -4
1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71
00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -5
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -6 sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for storing materials shall be as shown on the drawings or as determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
E*. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by the COR.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
F*. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -7 shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor. The Contractor shall provide a minimum notice of sixty (60) days to the COR to permit time to procure payments without construction delay.
G. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to
Medical Center Director, COR and Contractor, as follows:
Preconstruction: 60 Days
Phase I: 270 Days
VA Activation of Phase I: 45 Days
Phase II: 90 Days
VA Activation of Phase II: 45 Days
Phase III: 90 Days
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -8
VA Activation of Phase III: 45 Days
Phase IV:90 Days
VA Activation of Phase IV: 45 Days
Phase V: 60 Days
VA Activation of Phase V: 45 Days
Total: 885 Days*
*Deduct Alternates, if accepted, shall modify the Contract Timeframes as follows:
Deduct Alternate 1: Phase I shall be reduced by 5 Days, for a new Total
Timeframe of 880 Days.
Deduct Alternate 2: Phase I shall be reduced by 7 Days, for a new Total
Timeframe of 878 Days.
Deduct Alternate 3: Phase I shall be reduced by 14 Days, for a new
Total Timeframe of 871 Days.
Contractor shall be aware that a Punch List, Pre-Final Inspection, and
Final Inspection will occur at the end of each Phase, prior to proceeding with the next Phase of work.
H. The Main Medical Center will be occupied during performance of work;
but immediate areas of alterations will be vacated. All areas of the building outside of Construction Areas will be fully occupied and functional during construction.
Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans
Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -9
I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.4m (eight feet) minimum height, around the construction area indicated on the drawings.
Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm
(one inch) above grade. Remove the fence when directed by COR.
J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 60 degrees F at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -10 and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor. The Contractor shall provide a minimum notice of sixty (60) days to the COR to permit time to procure payments without construction delay.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -11 spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of buildings and areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -12
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -13 protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -14
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
8/1/2021 Expand Primary Care for PACT Realignment Project No. 541-376
GENERAL REQUIREMENTS
01 00 00 -15
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA
A. Data and information furnished or referred to below is for the
Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by
PSI/Intertek.
(FAR 52.236-4)
B. Subsurface conditions have been developed by core borings and test pits.