S02 - Attachment 8 - Butler EHRM IU - Drawing - Arch R1.pdf
PDF 17 MB Posted
- Attached to
- EHRM | Butler VA HCS 529-22-700 | Construct Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77625R0057
About this file
This document is a comprehensive set of architectural and engineering design drawings for the EHRM Infrastructure Upgrades project at the Butler VA Healthcare Center in Butler, Pennsylvania. The drawings, prepared by Spees Design Build, detail infrastructure improvements across multiple buildings (Buildings 2, 4, 6, 7, 8, 20, 21, 30, 46, 47, 48, and 137), with a primary focus on telecommunications rooms, data centers, and associated infrastructure upgrades.
The drawings include detailed floor plans, phasing plans, wall and roof types, door schedules, and interior signage specifications for each building. Key elements include new telecommunications rooms, fire-rated wall assemblies, roof modifications, and infrastructure updates. The project involves constructing new exterior rooms, reconfiguring existing spaces, and implementing upgrades across various building systems. The design emphasizes compliance with VA construction standards, fire safety requirements, and infrastructure modernization, with particular attention to infection control risk assessment (ICRA) protocols during construction.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S L
O P
E D
O W
N @
1.38A
(LEASED
ONLYONLY
V A
N
BUILDINGS WITHIN THE SCOPE OF THIS PROJECT
DATA CENTER
ARCHITECTURAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECTION
SPEES DESIGN BUILD
STRUCTURAL
WSP USA, INC.
ELECTRICAL
SPEES DESIGN BUILD
ENVIRONMENTAL
PERFORMANCE ENVIRONMENTAL
MECHANICAL
SPEES DESIGN BUILD
33301 9TH AVENUE SOUTH
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
105 BRADFORD ROAD, SUITE 320
WEXFORD, PA 15090
PHONE: (412) 616-1173
CIVIL
WSP USA, INC.
33301 9TH AVENUE SOUTH
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
COMMUNICATIONS
WSP USA, INC.
33301 9TH AVENUE SOUTH
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
PROJECT INFORMATION
STATE:
COUNTY:
JURISDICTION:
OWNER:
CODE ANALYSIS
PROJECT DESCRIPTION
THE PROPOSED DESIGN SHALL IMPROVE,
RECONFIGURE, EXPAND AND RENOVATE
EXISTING SPACES, AND CONSTRUCT NEW
EXTERIOR ROOMS FOR NEW
TELECOMMUNICATION ROOMS.
APPLICABLE BUILDING
BUILDING 2, 4, 6, 7, 8, 20, 21, 30,
46, 47, 48, 137 (DATA CENTER)
ICRA CLASS REQUIREMENTS
REQUIREMENTS DEPENDENT ON
EACH INDIVIDUAL ROOM LOCATION,
CLASS I, II, III AND IV.
PENNSYLVANIA
BUTLER
BUTLER TOWNSHIP
DEPARTMENT OF VETERANS
AFFAIRS
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
VA BUTLER HEALTHCARE, 325 NEW CASTLE ROAD, BUTLER, PA. 16001
COR
SIGNATURE LINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
G-001
COVER
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA CO
100% CONSTRUCTION
DOCUMENTS
EHRM INFRASTRUCTURE UPGRADES
VA BUTLER HEALTHCARE, 325 NEW CASTLE ROAD, BUTLER, PA. 16001
PROJECT #: 529-22-700
1" = 200'-0"
FACILITY SITE PLAN
TRUE
NORTH
NOT TO SCALE
LOCATION MAP
Revisions: Date:
11/30/202310/11/202311/30/2023
AB
ABA
AC(T)
ACM
ACW
ADA
ADJ
A/E
AF
AFF
AGG
ALT
ALUM
APPROX
ARCH
ASPH
A/V
BARR
BATH
BB
BLDG
BLK
BLKG
BLW
BM
BMTU
BO
BOC
BOS
BRC
BRKT
BRNG
BTM
BTWN
CAB
CC
CD
C.F.M.F
CJ
CLG
CLR
CMU
CO
COL
COMP
CONC
CONN
CONST
CONT
COORD
COR
CORR
CS
CT
CTR
CV
AND
ANGLE
AT
CENTERLINE
DEGREES
NUMBER
ANCHOR BOLT
ARCHITECTURAL BARRIERS ACT
ACOUSTICAL CEILING (TILE)
ASBESTOS CONTAINING MATERIAL
ACOUSTICAL WALL
AMERICANS W/ DISABILITIES ACT
ADJACENT
ARCHITECT/ENGINEER
ACCESS FLOOR
ABOVE FINISH FLOOR
AGGREGATE
ALTERNATE
ALUMINUM
APPROXIMATELY
ARCHITECT(URAL)
ASPHALT
AUDIO / VIDEO
BARRIER
BATHROOM
BACKER BOARD
BUILDING
BLOCK
BLOCKING
BELOW
BEAM
BONE MARROW TRANSPLANT UNIT
BOTTOM OF
BOTTOM OF CURB
BOTTOM OF SLAB
BRACE, BRACING
BRACKET
BEARING
BOTTOM
BETWEEN
CABINET
CONTRACTOR FURN, CONTRACTOR INST
CONSTRUCTION/CONTRACT DOCUMENTS
COLD FORMED METAL FRAMING
CONTROL JOINT
CEILING
CLEAR(ANCE)
CONCRETE MASONRY UNIT
CONTRACTING OFFICER
COLUMN
COMPOSITION
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
COORDINATE
CONTRACTING OFFICER REPRESENTATIVE
CORRIDOR
CONCRETE SEALER
CERAMIC TILE
CENTER
CONTRACTOR FURNISHED, VA INSTALLED
HDR
HDWE
HM
HORZ
HPDL
HR
HT
HVAC
ICRA
ID
ILSM
INCL
INST
INSUL
INT
JT
KV
LAM
LAV
LCM
LT
MAT
MAX
MDF
MECH
MEP
MFR
MIN
MISC
MOD
MTL
N N/A
NEG
NO.
NOM
NTS
O.C.
OPNG
OPP
OPT
OVHD
P
PCONC
PCRA
PL
PLAM
PLY(WD)
PNL
PR
PRFB
PS
PT
PTN(S)
PVMT
QTY
HEADER
HARDWARE
HOLLOW METAL
HORIZONTAL
HIGH PRESSURE DECORATIVE LAM
HOUR
HEIGHT
HEATING, VENTILATION & AIR CONDITIONING
INFECTIOUS CONTROL RISK ASSESSMENT
INSIDE DIAMETER OR DIM
INTERIM LIFE SAFETY MEASURES
INCLUDE(D,ING)
INSTALL
INSULATION
INTERIOR
JOINT
KILOVOLT
LAMINATE(D)
LAVATORY
LEAD CONTAINING MATERIAL(S)
LIGHT
MATERIAL(S)
MAXIMUM
MEDIUM-DENSITY FIBREBOARD
MECHANIC(AL)
MECHANICAL, ELECTRICAL, PLUMBING
MANUFACTURE(R)
MINIMUM
MISCELLANEOUS
MODIFIED
METAL
NORTH
NOT APPLICABLE
NEGATIVE
NUMBER
NOMINAL
NOT TO SCALE
ON CENTER(S)
OPENING
OPPOSITE
OPTION(AL)
OVERHEAD
PAINT
PRECAST CONCRETE
PRE-CONSTRUCTION RISK ASSESSMENT
PLATE
PLASTIC LAMINATE
PLYWOOD
PANEL
PAIR
PREFABRICATED
PLASTIC
PRESSURE TREATED
PARTITION(S)
PAVEMENT
QUANTITY
RAD
RCP
REF
REINF
REP
REQ(s,(')D)
RESIL
REV
RF
RM
RMV
RO
S
SCHED
SD
SECT
SF
SFRM
SHG
SHT(G)
SIM
SM
SOW
SPEC
SQ
SS
ST
STDG
STL
STOR
STRUCT
SUSP
SV
SYS
TEMP
T&G
THK
THRESH
TOC
TOS
TPH
TRANS
TS
TYP
UON
VA
VAR
VB
VC
VERT
VIF
VV
W W/
WD
WDW
WGHT
W/O
WP
WR
RADIUS
REFLECTED CEILING PLAN
REFERENCE
REINFORCE(D,ING)
REPRESENTATIVE
REQUIRE(D,S,MENT(S))
RESILIENT
REVERSE
RADIO FREQUENCY / ROOF
ROOM
REMOVE
ROUGH OPENING
SOUTH
SCHEDULE
SCHEMATIC DESIGN
SECTION
SQUARE FEET
SPRAY APPLIED FIRE-RESISTIVE MATERIAL
SHINGLES
SHEET (SHEATHING)
SIMILAR
SEAM
SCOPE OF WORK
SPECIFICATION
SQUARE
STAINLESS STEEL
STAIN
STANDING
STEEL
STORAGE
STRUCTURAL
SUSPENDED
SHEET VINYL
SYSTEM
TEMPORARY
TONGUE AND GROOVE
THICK(NESS)
THRESHOLD
TABLE OF CONTENTS
TOP OF SLAB
TOILET PAPER HOLDER
TRANSITION
TUBE STEEL
TYPICAL
UNLESS OTHERWISE NOTED
VETERANS AFFAIRS
VARIES
VAPOR BARRIER
VA FURNISHED, CONTRACTOR INSTALLED
VERTICAL
VERIFY IN FIELD
VA FURNISHED, VA INSTALLED
WEST
WITH
WOOD
WINDOW
WEIGHT
WITHOUT
WATERPROOF(ING)
WATER RESISTANT
DBL
DC
DD
DEMO
DEPT
DG
DIA
DIM
DS
DWN
DR
DTL
DWG
E
EA
EJ
ELEC
ELEV
ENG
EOC
EOP
EPDM
EQ
EQUIP
ES
ETS
EX(IST)
EXP
EXT
FA
FD
FE(C)
FF
FFB
FFL
FIN
FLASH
FLR
FLRSNT
FNDN
FOC
FOF
FOS
FP
FR
FRM
FT
FTG
FUR
FURN
GA
GALV
GE
G(W)B
GC
GL
GLB
GMU
GOV(T)
GYP
DOUBLE
DIRECT CURRENT
DESIGN DEVELOPMENT
DEMOLISH(ION)
DEPARTMENT
DESIGN GUIDE
DIAMETER
DIMENSION
DOWNSPOUT
DOWN
DOOR
DETAIL
DRAWING(S)
EAST
EACH
EXPANSION JOINT
ELECTRIC(AL)
ELEVATION OR ELEVATOR
ENGINEER(ING)
EDGE OF CURB
EDGE OF PAVEMENT
ETHYLENE PROPYLENE DIENE TERPOLYMER
EQUAL
EQUIPMENT
EACH SIDE
EXPOSED TO STRUCTURE
EXISTING
EXPANSION
EXTERIOR
FIRE ALARM
FLOOR DRAIN
FIRE EXTINGUISHER (CABINET)
FACTORY FINISH
FINISH FLOOR BREAK
FINISH FLOOR LINE
FINISH(ED)
FLASHING
FLOOR(ING)
FLORESCENT
FOUNDATION
FACE OF CONCRETE
FACE OF FINISH
FACE OF STUDS
FIRE PROOF
FIRE RATED
FRAME
FOOT, FEET
FOOTING
FURRING
FURNISHED
GAGE, GAUGE
GALVANIZED
GENERAL ELECTRIC
GYPSUM (WALL) BOARD
GENERAL CONTRACTOR
GRID LINE
GLUE LAMINATED BEAM
GLASS MASONRY UNIT
GOVERNMENT
GYPSUM BOARD
A101
1 TYP
101.1
A-101
SIM
EXTERIOR ELEVATION
INTERIOR ELEVATION
BUILDING SECTION FLAG
WALL SECTION FLAG
CALLOUT FLAG
VERTICAL GRID LINE
HORIZONTAL GRID LINE
TRUE NORTH ARROW
PROJECT NORTH ARROW
(TRUE NORTH DASHED)
ELEVATION MARKER
KEY NOTE
ROOM TAG (SF OPTIONAL)
CEILING MATERIAL WITH
CEILING HEIGHT TAG
ROOM NAME
150 SF
A
A-101
SIM
01A
TRUE
NORTH
W1
A-101
PROJECT
NORTH
WALL TAG
FLOOR TAG
ROOF TAG
DOOR TAG
WINDOW TAG
SPECIALTY EQUIPMENT TAG
SIGNAGE TAG
SIGNAGE KEY NOTE
(AW SHEETS ONLY)
SIGNAGE MATERIAL TAG
(AW SHEETS ONLY)
EXISTING TO REMAIN
NEW CONSTRUCTION
TO DEMOLISH
HIDDEN ABOVE OR BELOW
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
SMOKE ZONE
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE RATED WALL
SMOKE & 1 HR FIRE RATED WALL
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
AREA OF WORK / AREA SHOWN
CONSTRUCTION ZONE, ( - - )
PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
PATH OF TRAVEL
EMERGENCY EGRESS PATHWAY
SEISMIC JOINT
BATT INSULATION
RIGID INSULATION
GYPSUM BOARD, TYPE X
ACOUSTICAL CEILING TILE, 2' x 2'
CONCRETE
STEEL
PLYWOOD, FIRE RATED
EARTH
SUPPLY GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
RETURN GRILLE PER MECHANICAL
(SIZE & PROPORTIONS MAY VARY)
LIGHTING PER ELECTRICAL
(SIZE & PROPORTIONS MAY VARY)
A-101
A01
D88
A5175SOAP DISH
IN-04.02-01
AFF
ACT 2x2
9' - 0"
FEC
F-1
R-1
FE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-001
ARCHITECTURAL SYMBOLS &
ABBREVIATIONSSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA RB
100% CONSTRUCTION
DOCUMENTS
SYMBOLS ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-002
GENERAL NOTES
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA RB
100% CONSTRUCTION
DOCUMENTS
APPLICABLE PUBLICATIONS
1. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH A HIGH LEVEL OF
WORKMANSHIP.
2. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE AT ALL TIMES.
3. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD
TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS INDICATED.
4. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT ENCROACHMENTS.
5. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH THE CONTRACT DOCUMENTS.
6. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION, UON.
7. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR WALL MOUNTED DOOR STOPS. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO INSTALLING
DRYWALL.
8. ON EACH PIECE OF PLYWOOD IN THE TR ROOMS, CONTRACTOR SHALL NOT PAINT OVER THE FIRE RATING STAMP. FIRE
RATING STAMP SHALL REMAIN VISIBLE.
9. SEGREGATE ALL NURSE CALL, FIRE ALARM AND SECURITY SYSTEM ALARM WIRES FROM THE DATA CABLES WHEN THEY ARE INTERMIXED. CONTRACTOR SHOULD EXPECT WIRES TO BE INTERMIXED IN CERTAIN AREAS OF THE FACILITY TO
INCLUDE BUT NOT LIMITED TO CABLE TRAYS, J-HOOKS AND IN OPENINGS.
10. MOVE AND STORE ALL FURNITURE, FIXTURES, AND EQUIPMENT (FFE) AS NEEDED. FFE WILL BE COVERED WITH PLASTIC BEFORE BEING MOVED. FFE WILL BE MOVED BACK TO THE SAME LOCATION IT WAS ORIGINALLY LOCATED WHEN CONTRACTORS WORK IS COMPLETE. IF EQUIPMENT NEEDS TO BE MOVED OUTSIDE THE ROOM IT IS THE CONTRACTOR'S RESPONSIBILITY TO COVER ALL COSTS ASSOCIATED WITH MOVING, STORING, AND REINSTALLING FFE. MOVING, REMOVING AND SUBSEQUENT RETURN, OF ANY FURNITURE WILL BE THE RESPONSIBILITY OF THE VA.
11. WHEN THE CONTRACTOR MOVES FFE, THE CONTRACTOR IS RESPONSIBLE FOR UNPLUGGING ALL EQUIPMENT FROM WALLS APPROPRIATELY. DURING REINSTALLATION OF FFE, IT IS THE CONTRACTOR'S RESPONSIBILITY TO RECONNECT
POWER PLUGS. THE VA WILL RECONNECT ALL DATA TO THE NEW CAT 6A DATA PORTS.
12. REMOVAL OF EXISTING CEILING AND TURNING UPRIGHT EXISTING SPRINKLER HEADS NEED TO BE COORDINATED TO
HAPPEN CONCURRENTLY WHERE APPROPRIATE.
13. ANY CEILING TILES REMOVED DURING CONSTRUCTION ACTIVITIES (i.e. CABLING INSTALLATION) IN NON-BARRICADED
AREAS SHALL BE REINSTALLED AT THE END OF EVERY WORK SHIFT.
14. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRE STOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED
PENETRATION.
15. CONTRACTOR TO ADD A CO2 FIRE EXTINGUISHER WITHIN 10' OF THE NEW TR/TE SPACE. EXISTING FIRE EXTINGUISHERS
SHALL NOT BE MOVED OR REPLACED.
ARCHITECTURAL NOTES
AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS OF CODE ENFORCEMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC). THE VA SHALL FUNCTION AS THE
AUTHORITY HAVING JURISDICTION (AHJ).
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE AND OTHER
GUIDEANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).
INTERNATIONAL BUILDING CODE (IBC) 2021.
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021.
NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES PRECEDENCE OVER IBC.
NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
NATIONAL ELECTRICAL CODE (NEC).
INTERNATIONAL PLUMBING CODE (IPC)2021.
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAL SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT BARRIER FREE DESIGN GUIDE
(PG-18-3)
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433,434 AND 435.
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT.
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01 01 0 OF THE
VA MASTER CONSTRUCTION SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2022.
SAFETY STANDARD FOR REFRIDERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.
VAMC APPROVED HARDWARE LOCKING STANDARDS
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM)
FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND STANDARDS FOR TWO-WAY RADIO
EQUIPMENT, SYSTEMS AND OPERATION
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA)
INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE)
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND
INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI)
JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),
ENVIRONMENT OF CARE GUIDELINES AND STANDARDS
FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE
DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES
THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL
ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING
“ENVIRONMENTALLY RESPONSIBLE DESIGN”
1. THE CONTRACTOR SHALL NOTIFY "PA ONE CALL" (1-800-242-1776) AT LEAST 72 HOURS PRIOR TO EXCAVATION. THE
CONTRACTOR SHALL FOLLOW MCM SC-20.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS, STATE AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS WHEN CONSTRUCTION IS BEING PERFORMED ADJACENT TO BUILDING ENTRANCES/WALKWAYS.
3. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS AND/OR
FIRE HYDRANTS WITHOUT APPROPRIATE PERMITS AND/OR PERMISSIONS.
4. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTORS OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
5. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF SIX (6) INCHES OF TOPSOIL.
THESE ARES SHALL BE IMMEDIATELY SEEDED AND STABILIZED.
6. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
7. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER.
8. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES OR CONSTRUCTION FENCE DAILY.
NO OPEN TRENCHES SHALL BE LEFT UNATTENDED.
9. THE CONTRACTOR IS RESPONSIBLE FOR ALL FIELD MEASUREMENTS. THE GOVERNMENT WILL NOT BE HELD RESPONSIBLE FOR BIDDING ERRORS MADE OR FOR THE FAILURE TO ADEQUATELY INSPECT THE JOB SITE FOR EXISTING CONDITIONS, DIMENSIONS, AND GRADES.
10. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE SURVEY. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES BEFORE COMMENCING OR PROCEEDING WITH WORK.
11. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS, SEWER, ELECTRIC AND OTHER UTILITIES SHALL BE MAINTAINED AT ALL TIMES
DURING CONSTRUCTION.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING
CONSTRUCTION.
13. CONSTRUCTION ACTIVITIES SHALL NOT CONFLICT WITH THE VAMC OPERATIONS AND EMPLOYEE/PATIENT PARKING. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE VAMC POLICE DEPARTMENT (COR). WORK AFFECTING BUILDING ENTRANCES, WALKWAYS, LOADING AREAS, PARKING, ETC. SHALL BE COORDINATED AND SCHEDULED WITH THE VAMC.
14. THE CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS- BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO
EXCEPTION ALLOWED**
15. ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE RESET BY A
PROFESSIONAL LICENSED SURVEYOR AT THE CONTRACTORS EXPENSE.
16. THE CONTRACTOR SHALL PROTECT THE VA PROPERTY FROM DUST AND DAMAGE AT ALL TIMES. ANY RESULTING DAMAGE TO THE VA PROPERTY SHALL BE IMMEDIATELY CORRECTED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
17. ANY REQUIRED PAVEMENT RESTORATION TO ANY PARKING LOT THAT HAS BEEN PAVED WITHIN THE LAST TWO YEARS SHALL BE RESTORED FOR THE ENTIRE LIMITS OF THE LOT. ANY REQUIRED PAVEMENT RESTORATION TO ANY SECTION OF ROADWAY THAT HAS BEEN PAVED WITHIN THE LAST TWO YEARS SHALL BE RESTORED AT FULL WIDTH OF THE ROADWAY.
Revisions: Date:
GENERAL NOTES
1. COMPLY WITH ALL REQUIREMENTS LISTED IN THE
INFECTION CONTROL SECTION OF SPECIFICATION 01 35
26 -SAFETY REQUIREMENTS.
2. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
3. ADHESIVE WALK OFF CONSTRUCTION MATS TO BE USED
AT ALL CONSTRUCTION ZONE AND ANTE ROOM
ENTRANCES AND EXITS.
4. TEMP BARRIERS AND DOORS MAY ONLY BE DEMOLISHED
ONCE GIVEN FINAL APPROVAL BY THE VA COR.
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER
TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED
SPACE.
INSTALL TEMPORARY PLASTIC FIRE RESISTANT, DUST
BARRIER. MAY ONLY BE DURING NON FUNCTIONAL
MEDICAL CENTER HOURS.
INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
PLACE TACKY CONSTRUCTION WALK-OFF MATS AT
ENTRANCE AND EXIT SIDE OF CONSTRUCTION ACTIVITY
AREAS, TYPICAL.
FOR CLASS III & IV, NEGATIVE AIR MACHINE IS REQUIRED
AND SHALL BE LOCATED EITHER AT THE ICRA BARRIER OR
AT AN EXTERIOR WINDOW. COORDINATE WITH VA
INFECTIOUS PREVENTION TEAM AND COR.
DIGITAL/ANALOG PRESSURE GAUGE. CALCULATE CFM
FOR NEGATIVE PRESSURE AT
10 ACH.
EXISTING SUSPENDED
CEILING TO REMAIN ON
CORRIDOR SIDE
EXISTING
WALLS TO
REMAIN
EXISTING
WALLS TO
REMAIN
EXISTING DOOR BEHIND
VISQUEEN BARRIER
NON-SKID PLATE JACK
SCREWED FROM END OF
POLE TO TOP OF CEILING,
TYPICAL
FIRE RESISTANT PLASTIC
DUST BARRIER
SURROUNDING DOOR,
TYPICAL
EXTENSION POLES, TYPICAL
NON-SKID PLATE JACK
SCREWED FROM END OF
POLE TO BOTTOM OF
FLOOR, TYPICAL
BOTTOM OF CEILING
ZIPPER OPENING, TYPICAL
STICKY TACKY MATT
INFRONT OF VISQUEEN
BARRIER
TAPE TOP OF
CONSTRUCTION BARRIER
TO BOTTOM OF CEILING
CONSTRUCTION BARRIER
SURROUNDING EXIST
DOOR, TYPICAL
TAPE BOTTOM OF
CONSTRUCTION BARRIER TO
FLOOR SURFACE, TYPICAL
STICKY TACKY MATT IN FRONT
OF FIRE RESISTANT PLASTIC
BARRIER, TYPICAL
NEGATIVE AIR MACHINE,
TYPICAL (INSTALL AT ICRA
BARRIER IF EXTERIOR
WINDOW IS NOT AVAILABLE).
TEMPORARY FIRE
RATED DOOR, TYPICAL
DIGITAL/ANALOG PRESSURE
GAUGE. CALCULATE CFM FOR
NEGATIVE PRESSURE AT
10 ACH.
PROJECT AREA
PROJECT AREA
PATCH, REPAINT AND PAINT GWB WHERE ICRA
BARRIERS ARE CONSTRUCTED AND REMOVED.
PATCH AND REPAIR CEILINGS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS ARE
CONSTRUCTED AND REMOVED.
PROJECT AREA
PATCH, REPAINT AND PAINT GWB WHERE ICRA
BARRIERS ARE CONSTRUCTED AND REMOVED.
PATCH AND REPAIR CEILINGS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS ARE
CONSTRUCTED AND REMOVED.
ANTE
ROOM
PROJECT AREA
OUTSIDE
PROJECT AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS101
ICRA DETAILS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA RB
100% CONSTRUCTION
DOCUMENTS
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
CLASS I ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.
B. UPON COMPLETION:
1. CLEAN WORK AREA UPON COMPLETION OF TASK.
2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
CLASS II ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE. SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE
POSSIBLE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
B. UPON COMPLETION:
1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK
AREA.
4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.
CLASS III ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
B. UPON COMPLETION:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED
BY THE SAFETY DEPARTMENT AND INFECTION CONTROL, THOROUGHLY CLEANED BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CLASS IV ICRA REQUIREMENTS
A. DURING CONSTRUCTION WORK:
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA
FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR
THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
B. UPON COMPLETION:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED
BY THE SAFETY DEPARTMENT AND INFECTION CONTROL, THOROUGHLY CLEANED BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
6. WET MOP AREA WITH DISINFECTANT.
7. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1/2" = 1'-0"
ICRA CLASS I DETAIL
1/2" = 1'-0"
ICRA CLASS II DETAIL
1/2" = 1'-0"
ICRA CLASS III/IV DETAIL
1/2" = 1'-0"
TYPICAL ICRA CLASS II BARRIER - PLAN VIEW
1/2" = 1'-0"
TYPICAL ICRA CLASS III DETAIL - PLAN VIEW
1/2" = 1'-0"
TYPICAL ICRA CLASS IV BARRIER - PLAN VIEW
S
LO
PE
D
OW
N
@ 2%
1.38A
(LEASED
O NL YO NL Y
V A
N
S
LO
P E
D O
W N
2%
DATA
CENTER
SHOWN AREA
TRUE
NORTH
EXISTING
BUILDING 30
EXISTING ROLL-UP DOOR
EXISTING FIRE EXIT
DOOR
EXISTING
LOADING
DOCK
DATA CENTER
GENERATOR ROOM
MECHANICAL YARD
ENCLOSED CORRIDOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-100
BUILDING 137 - DATA CENTER
SITE PLANSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
30/11/2023 MA RB/CO
100% CONSTRUCTION
DOCUMENTS
KEY PLAN
3/32" = 1'-0"
BUILDING 137 - DATA CENTER - SITE PLAN
TRUE
NORTH
Revisions: Date:
0' 2' 4' 8' 16'
10/11/202311/30/2023
DCB
1153 SF
DATA CENTER
167 SF
ENTRANCE ROOM
#1
108 SF
TR
96 SF
STORAGE
106 SF
ENTRANCE ROOM
#2
154 SF
MECH
94 SF
ELEC
66 SF
UNPACKING/
PACKING
110 SF
SECURE
STORAGE
AE201 1
AE202
AE2021
AE201
AE301
AE301
EXISTING
BUILDING 30
EXISTING ROLL-UP DOOR,
FOR DEMOLITION
EXISTING FIRE EXIT
DOOR
EXISTING
LOADING DOCK
50 SF
FIRE RISER
A
987 SF
GENERATOR
ENCLOSURE
687 SF
MECHANICAL
YARD
586 SF
CORRIDOR
262 SF
WALKWAY
37 SF
STAGING
02a
01a
02b
02d
02b
02b
02a
01a
02a 02d
1.8
2.1
/8
/4
/8
65' - 9"
24' - 0" 14' - 10" 26' - 11"
30' - 6" 11' - 3"
24' - 0" 14' - 10" 26' - 11" 31' - 3"
10' - 8" 10' - 8" 9' - 9" 10' - 8"
8' - 8" 43' - 9 7/8" 13' - 3 1/8"
12' - 8" 11' - 4"
5' - 8"
E Q
E Q
AE301
3" DS
3" DS
3" DS3" DS
3" DS
3" DS
2" DS
2" DS
/4
1/4" / 1'-0"02c
02c3
02d
02e
02b
01a
01a
02b
02b
IN-03.01-17
IN-03.01-11
IN-03.01-12
IN-03.01-17
IN-03.01-13
IN-03.01-18
IN
-0
.0
-1
IN
-0
.0
-1
IN-03.01-14
/8
/8
26' - 8"
1/4" / 1'-0"
/4
1/4" / 1'-0"
/4
3 HR FIRE RATED WALL
1 HR FIRE RATED WALL
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A101
DATA CENTER - FLOOR PLAN
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
30/11/2023 MA KB/OB
100% CONSTRUCTION
DOCUMENTS
PROJECT
NORTH
3/16" = 1'-0"
BLDG 137 - DATA CENTER FLOOR PLAN
Revisions: Date:
0' 2' 4' 8'
3 HR FIRE RATED WALL
1 HR FIRE RATED WALL
LEGEND
PATH OF TRAVEL
KEYNOTES
POINT OF ORIGIN
EXIT POINT
EXIT EXIT SIGNAGE
DCBA
1.8
2.1
F
L S
M A
X A
L L
O W
A B
L E
P R
O V
ID
E
D
F&LS MAX ALLOWABLE 300'-0"
PROVIDED 31' - 0"
F
L S
M A
X A
L L
O W
A B
L E
P R
O V
ID
E
F&LS MAX ALLOWABLE 300'-0"
PROVIDED 95' - 11"
CLEAN AGENT
FIRE SUPPRESSION SYSTEM
(TO BE COMPLETED BY
DELEGATED DESIGN CONTRACTOR)
35' TO POINT OF TWO
EGRESS POINTS
EXIT
EXIT
EXIT
EXIT
167 SF
ENTRANCE ROOM
#1
108 SF
TR
96 SF
STORAGE
110 SF
SECURE
STORAGE
987 SF
GENERATOR
ENCLOSURE
687 SF
MECHANICAL
YARD
1153 SF
DATA CENTER
586 SF
CORRIDOR
106 SF
ENTRANCE ROOM
#2
154 SF
MECH
94 SF
ELEC
50 SF
FIRE RISER
66 SF
UNPACKING/
PACKING
37 SF
STAGING
586 SF
CORRIDOR
104 262 SF
WALKWAY
EXISTING
BUILDING 30
EXISTING FIRE EXIT
DOOR
EXISTING
LOADING DOCK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A102
DATA CENTER - FIRE LIFE SAFETY
PLANSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
30/11/2023 MA OB
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
3/16" = 1'-0"
BLDG 137 - DATA CENTER FIRE LIFE SAFETY PLAN
PROJECT
NORTH
DCB
AE301
AE301
A
E X
IS
T
IN
G
E X
IS
T
IN
G
BUILDING 30
R
ID
G E
L
IN
E R
ID
G
E L
IN
E
RIDGELINE
3-HOUR FIRE RATED
ROOF CONSTRUCTION
2-HOUR FIRE RATED
ROOF CONSTRUCTION
1.8
2.1
EXISTING
LOADING DOCK
AE301
NON- FIRE RATED ROOF
CONSTRUCTION
2' - 0"44' - 10 1/2"2' - 0"
/2
1' - 8" 68' - 10 1/2" 2' - 0"
/2
2" DS
2" DS
3" DS
3" DS
3" DS
3" DS
3" DS
3" DS
EXISTING
4" / 1'-0" 4" / 1'-0"
4" / 1'-0" 4" / 1'-0" 4" / 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A103
DATA CENTER - ROOF PLAN
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
30/11/2023 MA OB
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
3/16" = 1'-0"
DATA CENTER - ROOF PLAN
ROOF HOOD
(SEE MECHANICAL)
ROOF HOOD
(SEE MECHANICAL)
ROOF HOOD
(SEE MECHANICAL)
GENERATOR EXHAUST
(SEE MECHANICAL)
PREFINISHED SHEET
METAL GUTTER, TYP
STANDING SEAM
ROOFING PANELS
PROJECT
NORTH
FFL
0' - 0"
FOUNDATION
-2' - 0"
ROOF LEVEL
12' - 6"
BRICK EXTERIOR TO MATCH
EXISTING ON BUILDING 30
ROOFING TO MATCH
EXISTING ON BUILDING 30
GENERATOR ENCLOSURE MECHANICAL YARD
DATA CENTER BEYOND
ROOF APEX
23' - 9 7/32"
31.8 2.1
EXISTING BUILDING 30
BEYOND
TIE TO STORM
DRAINAGE SYSTEM, TYP
TIE TO STORM
DRAINAGE SYSTEM, TYP
9' - 0"
PROVIDE VENEER BRICK EXPANSION JOINT
25' O.C. MAX, WITHIN 10' AT CORNERS, AND
AT ANY OFFSETS OR INTERSECTIONS
FFL
0' - 0"
FOUNDATION
-2' - 0"
D C B
ROOF LEVEL
12' - 6"
BRICK EXTERIOR TO MATCH
EXISTING ON BUILDING 30
ROOFING TO MATCH
EXISTING ON BUILDING 30
EXISTING
BUILDING 30
A
ENCLOSED WALKWAY DATA CENER
GENERATOR ENCLOSURE
ROOF APEX
23' - 9 7/32"
4" / 1 '-0"
4" / 1'-0"
TIE TO STORM DRAINAGE
SYSTEM, TYP
TIE TO STORM DRAINAGE
SYSTEM, TYP
PROVIDE VENEER BRICK EXPANSION JOINT
25' O.C. MAX, WITHIN 10' AT CORNERS, AND
AT ANY OFFSETS OR INTERSECTIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE201
DATA CENTER - ELEVATIONS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
30/11/2023 MA OB
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
3/16" = 1'-0"
NORTH EXTERIOR ELEVATION
3/16" = 1'-0"
EAST EXTERIOR ELEVATION
FOUNDATION
-2' - 0"
4 2 1
ROOF LEVEL
12' - 6"
BRICK EXTERIOR TO MATCH
EXISTING ON BUILDING 30
ROOFING TO MATCH
EXISTING ON BUILDING 30
BLDG. 30 TO DATA CENTER
ENCLOSED WALKWAY
10' - 0"
DATA CENTER
ROOF APEX
23' - 9 7/32"
3 1.82.1
4" / 1 '-0" 4" / 1'-0"
TIE TO STORM DRAINAGE
SYSTEM, TYP
TIE TO STORM DRAINAGE
SYSTEM, TYP
TIE TO STORM DRAINAGE
SYSTEM, TYP
PROVIDE VENEER BRICK EXPANSION JOINT
25' O.C. MAX, WITHIN 10' AT CORNERS, AND
AT ANY OFFSETS OR INTERSECTIONS
FFL
0' - 0"
FOUNDATION
-2' - 0"
DCB
ROOF LEVEL
12' - 6"
BRICK EXTERIOR TO
MATCH EXISTING
ON BUILDING 30
EXISTING
BUILDING 30
A
ENCLOSED WALKWAYDATA CENTERMECHANICAL YARD
ROOF APEX
23' - 9 7/32"
GENERATOR ENCLOSURE
BEYOND
ROOFING TO MATCH
EXISTING ON BUILDING 30
4" / 1 '-0"
4" / 1'-0"
PROVIDE VENEER BRICK EXPANSION JOINT
25' O.C. MAX, WITHIN 10' AT CORNERS, AND
AT ANY OFFSETS OR INTERSECTIONS
TIE TO STORM DRAINAGE
SYSTEM, TYP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE202
DATA CENTER - ELEVATIONS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
30/11/2023 MA OB
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
3/16" = 1'-0"
SOUTH EXTERIOR ELEVATION
3/16" = 1'-0"
WEST EXTERIOR ELEVATION
FOUNDATION
-2' - 0"
ROOF LEVEL
12' - 6"
AE401
1153 SF
DATA CENTER
ROOF APEX
23' - 9 7/32"
31.8 2.1
167 SF
ENTRANCE ROOM
#1
586 SF
CORRIDOR
R-10, 24" AT PERIMETERVAPOR RETARDER
FFL
0' - 0"
FOUNDATION
-2' - 0"
D C B
ROOF LEVEL
12' - 6"
EXISTING
BUILDING 30 1
OPENING TO BUILDING 30
BLDG. 30 TO DATA CENTER
ENCLOSED WALKWAY
A
586 SF
CORRIDOR
ROOF APEX
23' - 9 7/32"
/2
167 SF
ENTRANCE ROOM
#1
987 SF
GENERATOR
ENCLOSURE
4" / 1 '-0" 4" / 1'-0"
R-10, 24" AT PERIMETER VAPOR RETARDER
FFL
0' - 0"
FOUNDATION
-2' - 0"
D C B
ROOF LEVEL
12' - 6"
A
ROOF APEX
23' - 9 7/32"
AE401
154 SF
MECH
586 SF
CORRIDOR
1153 SF
DATA CENTER
621 SF
MECHANICAL
YARD
4" / 1 '-0"
4" / 1'-0"
/4
R-10, 24" AT PERIMETER VAPOR BARRIER
METAL BUILDING ZONE 5 ROOF:
R-19+R-11 LS (LINEAR SYSTEM)
UNDERLAYMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE301
DATA CENTER - SECTIONS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA OB
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
3/16" = 1'-0"
LONGITUDINAL SECTION
3/16" = 1'-0"
CROSS SECTION A
3/16" = 1'-0"
CROSS SECTION B
FOUNDATION
-2' - 0"
2-LAYER 5/8" TYPE "X" GYPSUM
6" METAL STUD FRAMING
WITH INSULATION
12" CONCRETE, CIP
2" RIGID INSULATION
1" MIN. AIR GAP
BRICK VENEER
WEATHER BARRIER
FOUNDATION -
SEE STRUCTURAL
DRAWINGS
ROOF APEX
23' - 9 7/32"
02b
AE401
VAPOR RETARDER
R-13+R-13c
FFL
0' - 0"
FOUNDATION
-2' - 0"
B
2-LAYER 5/8" TYPE "X" GYPSUM
6" METAL STUD FRAMING WITH
BATT INSULATION
12" CONCRETE, CIP
2" RIGID INSULATION
1" MIN. AIR GAP
BRICK VENEER
ALUMINUM GUTTER AND
DOWNSPOUT
ALUMINUM FASCIA ON
WOOD BOARD BACK UP
ROOFING
WEATHER BARRIER
FOUNDATION - SEE
STRUCTURAL
DRAWINGS
ROOF TRUSS AND BEAM -
SEE STRUCTURAL
DRAWINGS
AE401
02c
RT5
1153 SF
DATA CENTER
VAPOR RETARDER
AE401
R-13+R-13ci
B
ZEE-LOCK STANDING SEAM ROOFING PANEL
2" RIGID ROOF INSULATION
3" METAL ROOF N-DECK
(SEE STRUCTURAL)
TRUSS WITH TOP CHORD
EXTENSION
W10X15 (SEE STRUCTURAL)
FILL FLUTE WITH
INSULATION, TYP
EAVE FLASHING AND
DRIP EDGE
5"x5" GUTTER
3/4" MARINE PLYWOOD
WRAPPED PRE-FINISHED
METAL FASCIA
1" MIN AIR GAP
PRE-FINISHED METAL
SOFFIT
FRAME SOFFIT WITH 6"
C.F.M.F.
PRE-FINISHED METAL
J-MOULD
1x4 TREATED
WOOD BLOCKING
2" RIGID INSULATION
1/2" NON-COMBUSTIBLE
PLYWOOD EXTERIOR
SHEETING
BATT INSULATION IN BETWEEN W10X15 RAFTERS
(SEE STRUCTURAL)
02c
PLATE (SEE STRUCTURAL)
BLOCKING
RT5
GYPSUM TYPE "X"
1" DIAMETER OPENING BETWEEN
RAFTERS FOR VENTILATION
VENTILATION STRIP
WEATHER BARRIER
BRICK VENEER
DOWNSPOUT
FFL
0' - 0"
B
02c
COLLECTION NET
WEEPS @ 24" OC MAX
WEATHER BARRIER
2" RIGID INSULATION
AIR GAP
BRICK VENEER
SHEET METAL FLASHING
5/8" TYPE "X" GYPSUM WALL
BOARD, DOUBLE LAYER
VAPOR RETARDER
6" METAL STUD FRAMING
WITH BATT INSULATION
12" CONCRETE, CIP
VAPOR BARRIER
R-10, 24" AT PERIMETER
FOUNDATION
(SEE STRUCTURAL)
5" THK CONCRETE SLAB
(SEE STRUCTURAL)
GRAVEL BED
R-13+R-13c
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE401
DATA CENTER WALL SECTIONS
AND DETAILSSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA OB
100% CONSTRUCTION
DOCUMENTS
3/4" = 1'-0"
BAY SECTION
Revisions: Date:
3/4" = 1'-0"
BAY SECTION - DATA CENTER
1 1/2" = 1'-0"
ENLARGED EAVE DETAIL, TYP
1 1/2" = 1'-0"
WALL - FLOOR CONNECTION DETAIL
EXISTING SUSPENDED CEILING
TO REMAIN ON CORRIDOR
SIDE
UNDERSIDE OF STRUCTURE ABOVE
EXISTING WALL
TO REMAIN
2" HM DOOR FRAME, TYPICAL
LENGTH SHALL VARY LENGTH SHALL VARY
REPAINT FULL HEIGHT FROM SUSPENDED CEILING
TO FINISH FLOOR WHERE DOOR/FRAME ARE TO BE
INSTALLED
EXISTING WALL
TO REMAIN
UNDERSIDE OF
STRUCTURE ABOVE
LENGTH SHALL VARY
DEMOLISH EXISTING
SUSPENDED CEILING AS
INDICATED ON RCP,
TYPICAL
EXPOSED WALL
FINISH SHALL BE
PAINTED WHITE,
TYPICAL
RUBBER BASE, TYPICAL
UNDERSIDE OF STRUCTURE ABOVE
DEMOLISH EXISTING SUSPENDED
CEILING AS INDICATED ON DEMO RCP,
TYPICAL
3/4" FR PLYWOOD
EXPOSED WALL FINISH SHALL BE PAINTED WHITE, TYPICAL
MOUNT FT PLYWOOD 12" AFF, TYPICAL
RUBBER BASE, TYPICAL
EXPOSED WALL
FINISH SHALL BE
PAINTED WHITE,
TYPICAL
AE421
PAINT EXISTING WALL TO
NEAREST BREAK, TYPICAL
INSTALL NEW DOOR OR
INFILL WALL AS INDICATED ON
PLANS
CONTRACTOR TO LEAVE FIRE RATING STAMP UNPAINTED,
COVER STAMP BEFORE PAINTING. REMOVE COVER AFTER PAINT.
FIRE RATED PLYWOOD PAINTED WHITE (P-03)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE421
INTERIOR ELEVATIONS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA KB
100% CONSTRUCTION
DOCUMENTS
GENERAL NOTES
1. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON NEW INSTALLED FRT
PLYWOOD.
2. PROVIDE NEW 3/4" FRT PLYWOOD ON WALLS WHERE
INDICATED ON PLANS. PAINT WITH FIRE RETARDANT PAINT
(P-02), REFERENCE DETAIL 3/AE421.
3. REFER TO DETAIL #3 ON SHEET AE421 FOR A TYPICAL
TELECOMMUNICATION ROOM INTERIOR ELEVATION.
4. INSTALL VERTICAL STUD OR HORIZONTAL BLOCKING AT
ALL GWB EDGES.
5. ALL PRODUCTS AND WALL FINISHES SHALL MATCH
EXISTING OR ADJACENT UNLESS OTHERWISE NOTED.
3/4" = 1'-0"
EXTERIOR TR ELEVATION - TYPICAL DOOR ELEVATION
3/4" = 1'-0"
INTERIOR TR ENTRANCE - TYPICAL INTERIOR ELEVATION
3/4" = 1'-0"
INTERIOR ELEVATION - TYPICAL TR PLYWOOD
3/4" = 1'-0"
TYPICAL TR WALL - PLAN VIEW
3/4" = 1'-0"
FIRE STAMP UNPAINTED DETAIL
1 2 3 4 5 6
9 10 11
12 13 14 15 16 17 18 19 20
A
B
C
D
E
G
H
I
J
D U
M P
S T
E R
C A
R D
B O
A R
D C
R U
S H
E R
DOCK
LEVELER
DOCK
LEVELER
198 SF
EXIST. MECH.
B005
164 SF
EXIST.
MECHANICAL
B006
60 SF
ELEC.
B004
76 SF
EXIST.
ELEVATOR
91 SF
EXIST.
CUST./RISER
B012
142 SF
EXIST.
MECHANICAL
B010
263 SF
EXIST.
MECHANICAL
2-819
76 SF
EXIST.
TOILET
B011
174 SF
STAIR B
152 SF
COOK'S
OFFICE
B023
233 SF
SUBSISTENCE
STORAGE
B024
361 SF
SUPPLY
STORAGE
B001
118 SF
DIETARY
OFFICE
B003
35 SF
ELEC.
B002A
402 SF
TRAY
ASSEMBLY
128 SF
CART
COOLER
B022
119 SF
COOLER
B021
154 SF
FREEZER
B020
945 SF
KITCHEN
PREP.
B019
22 SF
CLO
B014A
528 SF
DOCK
STAGING
B018
91 SF
CONTAMINATED
WASTE
B015
225 SF
TRASH
COLLECTION
B016
16 SF
CAN WASH
B017
985 SF
EXIST.
SERVICE
TUNNEL
B014
377 SF
NEW
SERVICE
TOWER
187 SF
CART
STAGING
B007
608 SF
EXIST
CORRIDOR
B013
460 SF
DISH WASH
B008
27 SF
TE
B08
PHASE 1:
CONTRACTOR TO COMPLETE
THE WORK OF THIS TE AND
ASSOCIATED DATA DROPS.
COMPLETE ONE SECTION AT A
TIME AS DIRECTED BY COR.
SECTION 1B:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM
CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN
THIS AREA.
SECTION 1A:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM CLOSURES
AND AVAILABILITY TO
COMPLETE DATA WIRING IN
THIS AREA
CO2 FIRE EXTINGUISHER
REQUIRED WITHIN 10' FROM
NEW TE ACCESS.
DIAMOND LINE
D
IA
M O
N D
L
IN
E
SHOWN AREA
PROJECT
NORTH
ICRA CLASS II
ICRA CLASS III
TR
ICRA CLASS IV
RM B08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
02AS100
BUILDING 02 - LEVEL 00 - PHASING
PLANSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA CO
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
1/8" = 1'-0"
BUILDING 02 - LEVEL 00 - PHASING PLAN
LEGENDLEGEND
KEY PLAN
0' 4' 8' 16'
PROJECT
NORTH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
1 HR FIRE AND SMOKE RATED WALL
NON-RATED SMOKE-TIGHT WALL (NRST)
2 HR FIRE AND SMOKE RATED WALL
NEW LIGHTS (SEE ELECTRICAL DETAILS)
SHOWN AREA
PROJECT
NORTH
4 5
I
J
LINE OF NEW WALL
/2
DUCT TO EXTERIOR 1
9 9
M
IN
C
L E
A R
154 SF
FREEZER
B020
528 SF
DOCK STAGING
B018
154 SF
FREEZER
B020
528 SF
DOCK STAGING
B018
27 SF
TE
B08
01a
B
4 5
I
J
EXISTING
FLOORING
NEW
FLOORING
IN-03.01-1
7' - 4 1/4" (FOR VARIANCE)
/2
3'X8' TE
FORM FACTOR
4 5
I
J
LINE OF NEW WALL
154 SF
FREEZER
B020
528 SF
DOCK STAGING
B018
EXPOSED
4 5
I
J
154 SF
FREEZER
B020
27 SF
TE
B08
528 SF
DOCK STAGING
B018
EXPOSED
2' - 4 1/2"
/2
RM B08
+ POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACK MAT
HEPA EQUIPED EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
02A-100
BUILDING 02 - LEVEL 00 - DEMO,
FLOOR PLANS & RCPSSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA ML/KB
100% CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING
OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING,
AND ELECTRICAL ITEMS ARE DEMOLISHED.
3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW
TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED
FOR NEW WORK.
4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT
PLYWOOD. SEE DETAILS 5/AE421.
5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED.
7. PATCH AND REPAIR GWB WHERE DOORS ARE DEMOLISHED
AND NEW DOORS ARE INSTALLED.
8. ALL CONSTRUCTION SPACES SHALL HAVE N+1 NEGATIVE AIR
MACHINES, SIZED TO MAINTAIN .01" w.c.- PRESSURE (TYP).
1/4" = 1'-0"
RM B08 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM B08 - FLOOR PLAN
1/4" = 1'-0"
RM B08 - DEMO RCP
1/4" = 1'-0"
RM B08 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
7 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER TO
SEPARATE CONSTRUCTION AREA FROM OCCUPIED SPACE.
8 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
9 PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.
1 PREPARE FLOORING FOR NEW WORK.
2 CONSTRUCT NEW WALL. PATCH AND PAINT TO MATCH
EXISTING.
3 INSTALL NEW DOOR/FRAME.
4 APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE
VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.
5 INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER
WITH SEALANT AT THE BOTTOM.
6 THIS SPACE WILL BE UTILIZED FOR NEW
TELECOMMUNICATION ENCLOSURE. PROVIDE NEW FRT
PLYWOOD OVER WALLS PER DETAIL 3/AE421, TYPICAL.
ICRA KEYNOTES
LEGEND
ICRA LEGEND - CLASS III
SHOWN AREA
PROJECT
NORTH
ICRA CLASS II
ICRA CLASS III
TR
ICRA CLASS IV
1 2 3 4 5 6
9 10 11
12 13 14 15 16 17 18 19 20
A
B
C
D
E
G
H
I
J
170 SF
WOMEN'S
RESTROOM
31 SF
EXIST.
TOILET
156 SF
EXIST. ADHC
OFFICE
139 SF
EXIST.
STAIRS A
148 SF
EXIST.
ADHC/OFFICE
652 SF
EXIST. CLC
NURSING
SUPPORT
152 SF
EXIST.
OFFICE
110 SF
TR
TC110
49 SF
ICRA ELEC.
CART
138 SF
EXIST.
VESTIBULE
100C
46 SF
EXIST MECH.
CHASE
122B106 SF
JANITOR
125 SF
EXIST.
STORAGE
128 SF
EXIST.
NURSE
99 SF
EXIST.
RESTROOM
158 SF
EXIST.
STAIRS B
140 SF
119B
109 SF
POLICE/SECURITY
268 SF
VENDING
AREA
81 SF
EXIST.
ELEVATOR
194 SF
SEATING
AREA
101 SF
EXIST.
VESTIBULE
146 SF
MEN'S
RESTROOM
148 SF
PSYCHOLOGIST
140 SF
EXIST. STAIR
C
164 SF
CHAPLAIN
OFFICE
160 SF
EXAM ROOM
#2
149 SF
EXAM ROOM
#1
85 SF
EUCHARISTIC
114A93 SF
CLEAN LINEN
92 SF
SOLID LINEN
826 SF
MULTI USE
151 SF
EXIST.
LOBBY
100A
266 SF
CHAPEL
1102 SF
EXIST.
CORRIDOR
100B
1063 SF
EXIST.
CORRIDOR
516 SF
CORRIDOR
162 SF
CHAPLAIN
OFFICE
240 SF
ENCLOSED
ELECTRICAL
GENERATOR
PHASE 1:
CONTRACTOR TO COMPLETE
THE WORK OF THIS TR AND
ASSOCIATED DATA DROPS.
COMPLETE ONE SECTION AT A
TIME AS DIRECTED TO COR.
SECTION 1B:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM
CLOSURES AND AVAILABILITY
TO COMPLETE DATA WIRING IN
THIS AREA.
SECTION 1A:
CONTRACTOR TO COORDINATE
WITH VA FOR ROOM CLOSURES
AND AVAILABILITY TO COMPLETE
DATA WIRING IN THIS AREA
143 SF
OFFICE
UNASSIGNED
15 SF
CO2 FIRE EXTINGUISHER
REQUIRED WITHIN 10'
FROM NEW TR ACCESS.
DIAMOND LINE
D
IA
M O
N D
L
IN
E
RM TC110
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
02AS101
BUILDING 02 - LEVEL 01 - PHASING
PLANSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA CO
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
LEGENDLEGEND
KEY PLAN
1/8" = 1'-0"
BUILDING 02 - LEVEL 01 - PHASING PLAN
0' 4' 8' 16'
PROJECT
NORTH
9 10
E
G
81 SF
EXIST. ELEVATOR
DUCT TO EXTERIOR
11 11
E
G
110 SF
I.T.
TC110 49 SF
ICRA ELEC. CART
138 SF
EXIST.
VESTIBULE
100C
1102 SF
EXIST. CORRIDOR
100B
EXPOSED
81 SF
EXIST. ELEVATOR
110 SF
TR
TC110
138 SF
EXIST.
VESTIBULE
100C
1102 SF
EXIST. CORRIDOR
100B
01b
T C
7 8 9 10
E
F
G
EXISTING
FLOORING
NEW
FLOORING
4 5
49 SF
ICRA ELEC. CART
9' - 9 1/4" (FOR VARIANCE)
10'X10' TR
FORM FACTOR
E
G
110 SF
TR
TC110
49 SF
ICRA ELEC. CART
138 SF
EXIST.
VESTIBULE
100C
1102 SF
EXIST. CORRIDOR
100B
EXPOSED
1' - 3"
/2
1' - 5"
2' - 11 1/2"
/2
1' - 3"
RM TC110
EXPOSED
110 SF
I.T.
TC110
49 SF
ICRA ELEC. CART
138 SF
EXIST.
VESTIBULE
100C
1102 SF
EXIST. CORRIDOR
100B
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
EXISTING LIGHTS TO DEMOLISH
1 HR FIRE AND SMOKE RATED WALL
NON-RATED SMOKE-TIGHT WALL (NRST)
2 HR FIRE AND SMOKE RATED WALL
NEW LIGHTS (SEE ELECTRICAL DETAILS)
+ POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACK MAT
HEPA EQUIPED EXHAUST
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
02A-101
BUILDING 02 - LEVEL 01 - DEMO,
FLOOR PLANS & RCPSSPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
529-22-700
10/11/2023 MA CO/KB
100% CONSTRUCTION
DOCUMENTS
GENERAL NOTES
KEY PLAN
1/4" = 1'-0"
RM TC110 - DEMO FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM TC110 - DEMO RCP
1/4" = 1'-0"
RM TC110 - FLOOR PLAN
1/4" = 1'-0"
RM TC110 - RCP
KEY NOTES (THIS SHEET ONLY)
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH…