S02 - Attachment 11 - Butler EHRM IU - Drawing - Electrical 2 of 6 R1.pdf

PDF 17 MB Posted

Attached to
EHRM | Butler VA HCS 529-22-700 | Construct Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77625R0057
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is an electrical engineering drawing (EP502) for infrastructure upgrades at the VA Butler Healthcare facility, specifically detailing power elevation and schematic configurations for telecommunications rooms (TRs). The drawing provides technical specifications for power distribution, including:

Rack-mounted power infrastructure with detailed electrical configurations such as Uninterruptible Power Supply (UPS) units rated at 5kW, 208V with 16.5-minute runtime at 50% load, and Power Distribution Units (PDUs) with specific voltage and amperage requirements. The design includes redundant power sources (Source A and Source B) for each telecommunications rack, utilizing L21-20R and L21-30R locking receptacles, and specifies equipment like Eaton BladeUPS or approved equivalents. The drawing is part of a comprehensive infrastructure upgrade project for the VA Butler Medical Center, with precise electrical connectivity and power management specifications for telecommunications equipment.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM | Butler VA HCS 529-22-700 | Construct Infrastructure Upgrades, newest first.
File Type Posted
S06 - Amendment 0005 - Butler EHRM IU - WD - PA20250079 7.18.2025.pdf PDF
S06 - 36C77625R0057 0005.pdf PDF
S06 - 36C77625R0057 0004.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixE 1of4-Geotech Report.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixE 2of4-Suggeted Boring Locations.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixE 4of4-Summary of Subsurface Explorations.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixK Drainage Report-231130.pdf PDF
S06 - Amendment 0004 - RFI Q 25 - Electrical Equipment List - Equipment Evaluation.xlsx XLSX spreadsheet
S06 - Amendment 0004 - RFI Q 35 - AppendixD Subsurface Utility Locate Campus Exterior Fiber Routes-230818.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixD Subsurface Utility Locate Buidling21-230323.pdf PDF
S06 - Amendment 0004 - Technical Questions and VA Responses - EHRM IU - Butler VAMC.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixC - MCR Topo-Utility Survey.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixE 3of4-Boring Logs.pdf PDF
S06 - 36C77625R0057 0003.pdf PDF
S06 - Amendment 0002 - Attachment 1 - Site Visit Sign In - Butler EHRM.pdf PDF
S06 - 36C77625R0057 0002.pdf PDF
S06 - Attachment 4 - Butler EHRM IU - Drawing - Telecom 1 of 2 R 1 6-17-2025.pdf PDF
S06 - Attachment 1 - Butler EHRM IU - Specs 6-17-2025.pdf PDF
S06 - 36C77625R0057 0001.pdf PDF
S02- Attachment 1 - Butler EHRM IU - Specs.pdf PDF
S02 - Attachment 4 - Butler EHRM IU - Drawing - Telecom 1 of 2 R 1.pdf PDF
S02 - Attachment 5 - Butler EHRM IU - Drawing - Telecom 2 of 2 R 1.pdf PDF
S02 - Attachment 7 - Butler EHRM IU - Drawing - Mechanical 2 of 2 R 1.pdf PDF
S02 - Attachment 9 - Butler EHRM IU - Drawing - Structural 1 of 1 R 1.pdf PDF
S02 - Attachment 12 - Butler EHRM IU - Drawing - Electrical 3of 6 R1.pdf PDF
S02 - Attachment 14 - Butler EHRM IU - Drawing - Electrical 5 of 6 R1.pdf PDF
S02 - Attachment 8 - Butler EHRM IU - Drawing - Arch R1.pdf PDF
S02 - Attachment 10 - Butler EHRM IU - Drawing - Electrical 1 of 6 R1.pdf PDF
S02 - Attachment 13 - Butler EHRM IU - Drawing - Electrical 4 of 6 R1.pdf PDF
S02 - Attachment 16 - Butler EHRM IU - Asbestos Survey.pdf PDF
S02 - Attachment 18 - Butler EHRM IU - WD - PA20250079 3.28.2025.pdf PDF
S02 - Attachment 22 - Limitations on Subcontracting.pdf PDF
S02 - Attachment 19 - Butler EHRM IU - J and A.pdf PDF
S02 - Attachment 2 - Butler EHRM IU - Drawing - Civil 1 of 2 R2.pdf PDF
S02 - Attachment 3 - Butler EHRM IU - Drawing - Civil 2 of 2 R1.pdf PDF
S02 - Attachment 6 - Butler EHRM IU - Drawing - Mechanical 1 of 2 R 1.pdf PDF
S02 - Attachment 17 - Butler EHRM IU - VA HCS MCP.pdf PDF
S02 - Attachment 20 - Butler EHRM IU - PCRA form.pdf PDF
S02 - 36C77625R0057.pdf PDF
S02 - Attachment 15 - Butler EHRM IU - Drawing - Electrical 6 of 6 R1.pdf PDF
S02 - Attachment 21 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
S02 - Attachment 23 - Butler Site Visit Map.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEG 1 LEG 2 LEG 1 LEG 2

AGROUPA

B

BGROUP AGROUP BGROUP

L21-30P SIDE B

REQUIRES A 208V, 30A, THREE-PHASE

CIRCUIT, TERMINATING IN A NEMA L21-30R

LOCKING RECEPTACLE.

L21-30P SIDE A

REQUIRES A 208V, 30A, THREE-PHASE

CIRCUIT, TERMINATING IN A NEMA

L21-30R LOCKING RECEPTACLE.

30A 3-PHASE ZONE PDU BASE

UNIT - REQUIRES TWO 30A 3-

PHASE (WYE) CIRCUITS WITH

L21-30R RECEPTACLES

PHASE Z PHASE Y PHASE X

RACK-MOUNTED UNINTERRUPTIBLE

POWER SUPPLY (UPS), 5KW, 208V WITH

NEMA 20A L21-20P INPUT AND L21-20R

OUTPUT.

SIZE: 6RU, 19" RACK-MOUNTABLE

RUNTIME: 16.5 MINUTES AT 50% LOAD

EATON BLADEUPS OR APPROVED EQUAL.

RACK-MOUNT

UPS

RACKED

EQUIPMENT

RACKED

EQUIPMENT

PDU

A

PDU

B

PDU

A

PDU

BPSA PSB PSA PSB

LEG A LEG B

ZONE PDU

RACK-MOUNT

UPS

RACK/ENCLOSURE RACK/ENCLOSURE

SOURCE A 30A

RECEPTACLE

SOURCE B 30A

RECEPTACLE

REFERENCE

TN DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

REFERENCE

TN DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

EP501

EP502

TYP

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W a rn in g

C ri ti c a l

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W ar ni n g C ri tic al

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T O

N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W ar ni n g C ri tic al

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W ar ni n g C ri tic al

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

L21-20P SIDE B

REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT,

TERMINATING IN A NEMA

L21-20R LOCKING

RECEPTACLE.

L21-20P SIDE A

REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT,

TERMINATING IN A NEMA

L21-20R LOCKING

RECEPTACLE.

RACK-MOUNTED UNINTERRUPTIBLE POWER

SUPPLY (UPS), 5KW, 208V WITH NEMA 20A L21-20P

INPUT AND L21-20R OUTPUT.

SIZE: 6RU, 19" RACK-MOUNTABLE

RUNTIME: 16.5 MINUTES AT 50% LOAD

EATON BLADEUPS OR APPROVED EQUAL.

RACK/ENCLOSURE

RACK-MOUNT

UPS

RACKED

EQUIPMENT

PSA PSB

PDU

A

PDU

B

SOURCE A 20A

RECEPTACLE

SOURCE B 20A

RECEPTACLE

REFERENCE

TN DRAWINGS

FOR RACK

MOUNTED

NETWORK

EQUIPMENT

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W ar ni n g C ri tic al

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

CB1

CB1

CB2

CB2

CB3

CB3

In lO lO lO

O ut

T em p /H u m id it y

O K

W ar ni n g C ri tic al

R e se t

C H

A T

S W

O R

T H

P R

O D

U C

T

O N l

O F

F O

N l

O F

F O

N l

O F

F

CB3

CB3

CB2

CB2

REQUIRES ONE (1) L21-20R

20A 120/208V 3øY

APC AP8861 RPDU OR EQUIVALENT; RACK

PDU 2G, METERED; L21-20 PLUG; THREE

PHASE; 120/208V INPUT; 20A; ZERO U, 5.7 KW,

208V, (36) C13 & (6) C19 & (2) 5-20 OUTLETS;

FOR USE IN TELECOMMUNICATION ROOMS

AND LOCATIONS WITH LEGACY 110V ONLY

EQUIPMENT

NOTE: USED IN TELECOMMUNICATIONS

ROOMS WHERE 110V DISTRIBUTION

USING NEMA 5-15 OR NEMA 5-20

RECEPTACLES ARE REQUIRED IN

ADDITION TO THE STANDARD 208V

RACK MOUNT PDU. L5- 30 INPUT. NEMA 5-20

OUTPUT. 1 RU. TWO PER ENCLOSURE. ONE ENERGIZED

BY UPS. ONE ENERGIZED BY WALL OUTLET. (SHOWN

HERE FRONT FACING, BUT ARE TO BE INSTALLED ON

THE BACK RAIL.)

RACK MOUNT UPS. L5-30 INPUT.

L5-30 OUTPUT. CAPACITY NTE 2880 VA. 2 RU.

METERED. (APC SMX3000RMLV2U OR EQUIVALENT)

O U

T

IN

O

CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6 CAT6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TELECOMMUNICATIONS

BONDING BUSBAR

QUAD OUTLET (5-20) FOR

BACKBOARD MOUNTED

EQUIPMENT

TE SOURCE A AND B POWER

RECEPTACLES (LOCKING, 120V, 30A,

L5-30) MOUNTED IN JUNCTION BOX SIZED

TO FIT TE POWER CUTOUT LOCATION.

JUNCTION BOX SHALL BE RECESSED IN

WALL BEHIND TE. SOURCE A

RECEPTACLE SHALL FEED TE UPS.

SOURCE B RECEPTACLE SHALL FEED TE

PDU. EACH RECEPTACLE ENERGIZED BY

SEPARATE ONE-POLE 30 AMP

BREAKERS; REFERENCE PLANS FOR

ADDITIONAL CIRCUITING INFORMATION.

<6"

<6"

WALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:5

:1 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP502

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

- NTS

3 POWER ELEVATION AND SCHEMATIC FOR A TWO RACK TR

- NTS

1 NOT USED

- NTS

4 POWER ELEVATION AND SCHEMATIC FOR ONE RACK TR

- NTS

2 208V RACK PDU FOR TRs

EP502

TYP

GENERAL NOTES

1. THIS SHEET SHALL BE PRINTED IN COLOR TO

PROVIDE ALL NECESSARY INFORMATION.

- 1/2" = 1'-0"

5 TELECOMMUNICATIONS ENCLOSURE ELEVATION DETAIL

Revisions: Date:

TE SOURCE A AND B POWER RECEPTACLES

(LOCKING, 120V, 30A, NEMA L5-30) MOUNTED

IN SINGLE GANG JUNCTION BOXES, EACH

SIZED TO FIT TE POWER 6"x6" CUTOUT

LOCATION. JUNCTION BOXES SHALL BE

RECESSED IN WALL BEHIND TE.

SOURCE A RECEPTACLE SHALL FEED TE

UPS. SOURCE B RECEPTACLE SHALL FEED

TE PDU. EACH RECEPTACLE ENERGIZED BY

SEPERATE 1-POLE 30-AMP BREAKERS;

REGERENCE PLANS FOR ADDITIONAL

CIRCUITING INFORMATION.

Load

Blue

Occupancy sensor switch

Black Black

White Bare

Ground

GENERAL NOTES:

1. MAINTAIN A MINIMUM CLEARANCE OF 305mm (12") ON ALL SIDES OF ROOF PENETRATION FROM WALLS, CURBS, AND OTHER PROJECTIONS TO FACILITATE PROPER

FLASHING.

2. FLANGES OF ADJACENT FLASHINGS SHALL NOT BE CUT OR OVERLAPPED.

3. VERIFY ROOF & STRUCTURAL SYSTEM WITH ARCHITECT.

4. COORDINATE FLASHING INSTALLATION WITH ROOFING CONTRACTOR TO ENSURE PROPER METHODS & MATERIALS ARE USED TO MAINTAIN ROOF WARRANTY.

9.52mm (3/8")

MIN GALVANIZED

THREADED ROD,

TYP.

CONDUIT CLAMP.

SIZE AS REQUIRED

LOCKING SQUARE

WASHER &

LOCKNUT

STEEL

EXPANSION

ANCHOR

INTEGRAL GALVANIZED

LIPPED STEEL MOUNTING

CHANNEL

PREFABRICATED RUBBER BOOT

CAP WITH GRADUATED STEPS &

WEATHER-PROOF PRESSURE SEAL

TO COLLAR

SEALANT AT PENETRATION

TO MEMBRANE JUNCTURE

BY ROOFING CONTRACTOR

MULTIPLE MEMBRANE STRIPPING PLIES

FEATHERED AT FIELD OF ROOF BY

ROOFING CONTRACTOR. PRIME FLANGE

BEFORE STRIPPING.

PREFABRICATED FORMED 1.52mm

(0.06") THICK ALUMINUM FLASHING

ROUND COLLAR WITH MIN. 76mm (3")

WIDE FLANGE. ATTACH TO ROOF PER

MANUFACTURER'S INSTRUCTIONS

CONDUIT CLAMP.

SIZE AS REQUIRED

BATT INSULATION

ROOF MEMBRANE

WATER CUT-OFF MASTIC

COMPATIBLE WITH ROOF

MEMBRANE

STAINLESS

CLAMP, TYP.

SEAL-OFF

FITTING, TYP.

CONCRETE DECKING

STEEL EXPANSION

ANCHOR

INTEGRAL GALVANIZED

LIPPED STEEL

MOUNTING CHANNEL

CONDUIT,

TYP.

FIELD OF VIEW

FOR DETAIL

FINISHED SURFACE

(OR ROOF)

PROVIDE RMC OR

LTFMC AS

REQUIRED TO

CONNECT TO

LOAD

ALL FASTENING

HARDWARE SHALL

BE STAINLESS

STEEL, TYP.

GENERAL DETAIL NOTES:

1. ALL CHANNEL STRUT, POST BASES AND ACCESSORIES SHALL BE HOT-

DIPPED GALVANIZED, UNLESS SPECIFICALLY NOTED OTHERWISE.

2. THIS IS A GENERAL DETAIL INDICATING GENERAL LAYOUT

REQUIREMENTS. CONTRACTOR SHALL SIZE RACK ACCORDINGLY TO

MOUNT ALL REQUIRED EQUIPMENT AS SHOWN ON PLANS; ADDITIONAL

HORIZONTAL AND/OR VERTICAL STRUCTURAL MEMBERS MAY BE

REQUIRED.

ID PLACARD, PROVIDE PER SPECIFICATIONS.

ALL FASTENING

HARDWARE SHALL

BE STAINLESS

STEEL, TYP.

CHANNEL STRUT, 1-5/8" X 1-5/8", LENGTH AS

REQUIRED, TYP.

MYERS HUB, TYP

48" MIN.

ROOF MOUNTED DISCONNECT

FINISHED GROUND/

EARTH

PROVIDE RMC OR

LTFMC AS

REQUIRED TO

CONNECT TO

LOAD

ANCHOR BOLTS,

1/4"-DIA x 12" L (MIN.), STAINLESS STEEL

ID PLACARD, PROVIDE PER SPECIFICATIONS.

ALL FASTENING

HARDWARE SHALL

BE STAINLESS

STEEL, TYP.

CHANNEL STRUT, 1-5/8" X 1-5/8", LENGTH

AS REQUIRED, TYP.

MYERS HUB, TYP

48" MIN.

GROUND MOUNTED DISCONNECT

CONCRETE FOOTING WITH

CHAMFERED EDGE,

3000-PSI,12"-DIA x 30" L (MIN)

CONDUIT STRAP,

TYP.

CONDUIT STRAP,

TYP.

GROUND STRAP, BRAIDED

TINNED COPPER

RMC/IMC CONDUIT, TYP.

EXPANSION COUPLING, EATON

XJG, OR APPROVED EQUAL

U-BOLT WITH FASTENING

HARDWARE, TYP.

FIRE ALARM

CONTROL PANEL

OUTPUTS

INPUTS

DETAIL NOTES

1. DETAIL IS GENERIC IN NATURE AND IS INCLUDED ONLY TO INDICATE HVAC EQUIPMENT SHUNT-TRIP AND SMOKE DAMPER ACTUATOR LOGIC. ALTHOUGH MULTIPLE CIRCUITS MAY BE REQUIRED, ONLY (1) EXAMPLE FOR EACH TYPE OF LOGICAL DIAGRAM IS SHOWN; EACH SETUP SHALL BE PROVIDED WITH THE SAME LOGIC AND MATERIALS. CONTRACTOR SHALL PROVIDE COMPLETE SUBMITTAL INCLUDING, BUT NOT LIMITED TO, FUNCTIONAL NARRATIVE, WIRING DIAGRAMS, SHOP DRAWINGS, BILL OF MATERIALS, AND FLOOR PLANS REDLINING EQUIPMENT INSTALLATION LOCATIONS FOR ENGINEER AND VA

REVIEW AND APPROVAL PRIOR TO COMMENCING WORK.

2. FIRE ALARM CONTROL PANEL SHALL PROVIDE SHUNT TRIP OUTPUT SIGNAL TO CIRCUIT BREAKERS SERVING DATA CENTER HVAC UNITS AND ACTUATE FIRE/SMOKE DAMPERS UPON SMOKE DETECTION VIA SMOKE DETECTORS. PROVIDE ADJACENT JUNCTION BOX TO UTILIZE FOR CONDUIT AND WIRE TERMINATIONS; PROVIDE ADDITIONAL CONTROL HARDWARE AND APPURTENANCES INCLUDING, BUT NOT LIMITED TO, TERMINAL BLOCKS, RELAYS, AND FUSES AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL SYSTEM.

3. COORDINATE WITH VA, CAMPUS FIRE ALARM CONTRACTOR, AND MECHANICAL CONTRACTOR AS REQUIRED.

4. GROUNDING CONDUCTORS NOT SHOWN FOR CLARITY; PROVIDE GROUNDING CONDUCTORS PER NEC AND AS SPECIFIED.

5. REFERENCE DETAIL '1' ON TELECOMMUNICATIONS SHEET 'TN505' FOR ADDITIONAL FIRE ALARM CONTROL PANEL INFORMATION.

JUNCTION BOX

HVAC SHUTDOWN

PUSHBUTTON

120V

PWR

CR1

TERMINAL BLOCK

CONNECTION, TYP.

ST

CR

PWR

SMOKE

DAMPER

ACTUATOR

(TYPICAL)

CR CR PWR

SHUNT TRIP CIRCUIT

BREAKER (TYPICAL)

HVAC UNIT

(TYPICAL)

CR CR1

(2) SMOKE DETECTORS, NORTH AND SOUTH

(2) SMOKE DETECTORS, MIDDLE AISLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:5

:1 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP503

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

- NTS

1 TYPICAL CONDUIT ROOF PENETRATION DETAIL

- 1 1/2" = 1'-0"

2 TYPICAL UNISTRUT RACK MOUNTED DISCONNECT SWITCH

- NTS

3 CONDUIT EXPANSION JOINT DETAIL

- NTS

4 DATA CENTER HVAC SHUTDOWN SWITCH WIRING DIAGRAM

Revisions: Date:

TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR (TEBC) AWG

IRREVERSIBLE CRIMP

CONNECTOR, TYP.

CABLE TRAY BONDING

CONDUCTOR. TYPICAL AT

EACH SECTION

CONNECTION POINT

TO PRIMARY OR SECONDARY

BONDING BUSBAR

IRREVERSIBBLE

COMPRESSION

CONNECTION

RACK BONDING

CONDUCTOR

(6 AWG)

TEBC

(TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR - 4 AWG)

RACK BONDING CONDUCTOR (6 AWG)

UNIT BONDING CONDUCTOR (6 AWG)

TOP-MOUNTED

RACK BONDING

BUSBAR

IRREVERSIBLE CRIMP

CONNECTOR, TYP.

GROUND TO PRIMARY

BONDING BUSBAR.

COORDINATE WITH VA

FOR EXACT

CONDUCTOR ROUTING

TWO-HOLE COMPRESSION LUGS (RACKS SHALL NOT

BE MODIFIED IF ONLY ONE-HOLE IS PROVIDED; USE

ONE-HOLE COMPRESSION LUGS IN THIS CASE)

TWO-HOLE

COMPRESSION LUGS (RACKS

SHALL NOT BE MODIFIED IF

ONLY ONE-HOLE IS PROVIDED;

USE ONE-HOLE COMPRESSION

LUGS IN THIS CASE)

RACK ISOLATION PADS

BONDING CONDUCTOR TO

PANEL BOARD GROUND LUG (ACEG)

USE TWO-HOLE LUGS FOR

BONDING CONNECTOR

TELECOMMUNICATIONS

BONDING BUSBAR

BOND RBB TO CABINET LUG. AWG #6

BOND RBB TO EACH SWITCH

AND ROUTER CHASIS

BOND RBB TO TELECOMMUNICATIONS BONDING BUSBAR. AWG #6

RACK BONDING BUSBAR (RBB)

OTHER CONNECTIONS

AS REQUIRED

(BONDING CONDUIT,

CABLE TRAYS,

BUILDING STEEL, TO

THE PBB OR SBB,

ETC.)

CHATSWORTH PRODUCTS

#40158-012, OR APPROVED

EQUAL

MOUNTING BRACKETS

1/4" THICK

L= 12"

D

INSULATOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0 /2

:2

:4 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP504

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

- NTS

2 CABLE TRAY GROUNDING/BONDING REQUIREMENTS

- NTS

1 TELECOMMUNICATION RACK BONDING DETAIL

- NTS

4 TELECOMMUNICATIONS ENCLOSURE GROUNDING DETAIL

- NTS

5 BONDING BUSBAR

- NTS

3 TELECOMMUNICATIONS GROUNDING RISER DETAIL

TELECOMMUNICATIONS

SECONDARY BONDING BUSBAR

ALL CONNECTIONS TO

BUSBAR SHALL BE (2) BOLT

MECHANICAL LUGS, TYP.

BONDING CONDUCTOR TO

BUILDING STEEL, #3/0 AWG

GREEN INSULATION W/YELLOW

TRACER

BONDING CONDUCTOR TO

RACEWAYS, CONDUITS,

WIREWAYS, CABLE TRAYS, #6

AWG GREEN INSULATION W/

YELLOW TRACER

BONDING CONDUCTOR TO

PANELBOARD(S) IN ROOM

PRESENT, #6 AWG GREEN

INSULATION W/ YELLOW TRACER

BONDING CONDUCTOR FROM

TELECOMMUNICATIONS

SECONDARY BONDING

BUSBAR TO

TELECOMMUNICATIONS

BONDING BACKBONE (IF NOT

PRESENT, BOND TO PRIMARY

SERVICE ENTRY MAIN

BUSBAR), #3/0 AWG GREEN

INSULATION W/YELLOW

TRACER

TELECOMMUNICATIONS BONDING

BACKBONE CONDUCTOR. PROVIDE WITH

GREEN INSULATION AND YELLOW

TRACER, SIZE PER TIA/ANSI STANDARDS

AS REQUIRED. WHERE EXISTING, EXTEND

AND REROUTE BACKBONE TO AND FROM

RELOCATED/EXPANDED

TELECOMMUNICATIONS ROOMS. IF NEW,

PROVIDE AS REQUIRED.

IRREVERSIBLE

CRIMP CONNECTOR,

UL LISTED

Revisions: Date:

PROVIDE BOND TO ELECTRO-STATIC

DISCHARGE FLOORING. BONDING

CONDUCTOR SHALL BE 12 AWG MIN'

PROVIDE AND INSTALL PER

MANUFACTURER'S INSTRUCTIONS.

EXOTHERMIC WELD

STRUCTURAL STEEL REINFORCING BAR

BARE COPPER CONDUCTOR

EXOTHERMIC WELD

BARE COPPER CONDUCTOR, TYP.

PRECAST CONCRETE CURB

VALVE BOX - 8 1/2" (212mm) I.D. X 18" (450mm) D. - CHRISTY #F14

BOX OR EQUAL

BURNDY TYPE GK CONNECTOR

REMOVABLE COVER - REINFORCED CONCRETE -

CHRISTY CONCRETE PRODUCTS #F8D OR EQUAL

GRADE

SAND FILL

BARE SOFT-DRAWN COPPER

GROUNDING ELECTRODE

CONDUCTOR, TYP.

GROUND ROD "COPPERWELD" 3/4"

(20mm) DIA. X 10'-0" (3M) LONG

EXOTHERMIC WELD CROSS CONNECTOR

BARE COPPER CONDUCTOR, TYP.

FLEXIBLE COPPER STRAP,

COORDINATE INSTALLATION

WITH ARCHITECTURAL

AIR TERMINAL ROD

(18"L, COPPER)

CLASS I LIGHTNING

CONDUCTOR

STRUCTURE

AIR TERMINAL ROD

(18"L, COPPER)

COPPER CLAD STEEL

BASE PLATE

STRUCTURE

EXOTHERMIC

WELD

STEEL PLATE,

COORDINATE INSTALLATION

WITH ARCHITECTURAL

CLASS I LIGHTING

CONDUCTOR

CLASS 1 LIGHTING

CONDUCTOR, COPPER

TEE CONNECTOR, HANGER

MODEL A207, OR EQUAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:5

:2 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP505

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

- NTS

1 TYPICAL BUILDING STRUCTURE EXOTHERMIC CONNECTION DETAIL

- NTS

4 TYPICAL EXOTHERMIC "T" CONNECTION DETAIL

- NTS

2 TYPICAL GROUND ROD WITH TEST WELL INSTALLATION DETAIL

- NTS

5 TYPICAL EXOTHERMIC CROSS CONNECTION DETAIL

DETAIL NOTES:

1. ALL CONDUCTORS SHALL BE SIZED PER PLANS. EXOTHERMIC CONNECTOR

SHALL BE SIZED PER CONDUCTOR AND STRUCTURAL STEEL.

DETAIL NOTES:

1. ALL CONDUCTORS SHALL BE SIZED PER PLANS. EXOTHERMIC CONNECTOR

SHALL BE SIZED PER CONDUCTORS.

DETAIL NOTES:

1. ALL CONDUCTORS SHALL BE SIZED PER PLANS. EXOTHERMIC CONNECTOR

SHALL BE SIZED PER CONDUCTORS.

- NTS

3 PEAK-ROOFED AIR TERMINAL ROD INSTALLATION DETAIL

- NTS

7 NON-PEAKED AIR TERMINAL ROD INSTALLATION DETAIL

- NTS

6 LIGHTNING CONDUCTOR TEE CONNECTOR

PDU

A1

PDU

B1

RACKED EQUIPMENT

PS

PS

BUS A BUS B

L21-20P SIDE B REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT, TERMINATING

IN A NEMA L21-20R LOCKING

RECEPTACLE.

L21-20P SIDE A REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT, TERMINATING

IN A NEMA L21-20R LOCKING

RECEPTACLE.

EACH RACK WILL CONTAIN:

1. ONE L21-20C DROP PER BUSWAY.

2. A MINIMUM OF TWO ZERO U VERTICAL RACK PDUs

UTILIZING SEPARATE BUSWAY TAP INPUTS.

3. DIVERSE POWER INPUTS FOR ACTIVE EQUIPMENT

ALLOWING FOR SOURCE POWER TO BE SPLIT ACROSS

THE TWO BUSWAYS.

DETAIL NOTES:

1. UPS A AND UPS B SHALL HAVE A MIRRORED LAYOUT WITH POWER DISTRIBUTION CABINETS CLOSEST TO MAIN

DISTRIBUTION AREA AND BATTERY CABINET FURTHEST AWAY.

2. MAINTENANCE BYPASS SWITCH CAN BE INSTALLED ON THE RIGHT OR LEFT OF UPS CABINET.

3. EACH CABINET DEPTH IS 42"

4. UPS IS TOP AIR EXHAUSTED.

5. UPS SHALL BE ENERGY SAVER SYSTEM (ESS) PROVIDING 99% EFFECIENCY RATING.

CONDUIT TO BUSWAY FEEDER BOXES.

BATTERY

CABINET

120kW FRAME

UPS CABINET

MAINTENANCE

BYPASS SWITCH POWER

DISTRIBUTION

CABINET

COLOR DISPLAY

PERFORATED DOORS FOR

VENTILATION

.74"

FLOOR .34.2"

.34.5"

.31"

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

SOURCE A/B BUSWAY

FEEDER BOX A/B SIDE FIBER OPTIC AND

UTP BACKBONE PATCH

PANEL

L21-20P SIDE A REQUIRES

A 208V, 20A, THREE-PHASE

CIRCUIT, TERMINATING IN

A NEMA L21-20R LOCKING

RECEPTACLE.

L21-20P SIDE B REQUIRES

A 208V, 20A, THREE-PHASE

CIRCUIT, TERMINATING IN

A NEMA L21-20R LOCKING

RECEPTACLE.

VERTICAL PDU

SOURCE A/B BUSWAY

DETAIL NOTES:

1. MDA A AND B WILL HAVE A MIRRORED LAYOUT, WITH THE OUTER MOST CABINETS BEING THE TR DISTRIBUTION CABINETS.

2. EACH CABINET HAS A DEPTH OF 43.3".

3. BUSWAY 'A' AND 'B' ARE PHYSICALLY SEPARATE BY AT LEAST 1' BUT ARE AT THE SAME ELEVATION WITH 'A' IN FRONT OF 'B'.

RESERVED FOR

DISTRIBUTION TO

TR'S

RESERVED FOR

CORE, SECURITY

AND WAN

ELEMENTS

RESERVED FOR

SPINE,

AGGREGATION AND

OOB SWITCHES AND

LAN ELEMENTS.

7'

3' 4"

10'

EP506

TYP

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB2

CB3

CB3

CB2

CB1

CB1

CB1

CB1

CB1

CB1

CB1

CB1

CB1

CB1

CB1

CB1

CB2

CB3

CB3

CB2

CB2

CB3

CB3

CB2

CB2

CB3

CB3

CB2

CB2

CB3

CB3

CB2

CB2

CB3

CB3

CB2

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0 /2

:4

:3 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP506

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

- NTS

1 POWER SCHEMATIC FOR STANDARD DENSITY DATA CENTER ENCLOSURE DETAIL

- NTS

2 TYPICAL UPS ELEVATION.

- NTS

3 MDA POWER ELEVATION, TYPICAL

GENERAL NOTES

THIS SHEET SHALL BE PRINTED IN COLOR TO

PROVIDE ALL NECESSARY INFORMATION.

1.

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

FLOOR

CHATSWORTH eCONNECT PDU

OR EQUIVALENT

(2) 208V, 3-PHASE

A/B BUSWAY RAILS

L21-20P SIDE B REQUIRES A 208V, 20A, THREE-PHASE

CIRCUIT, TERMINATING IN A NEMA L21-20R LOCKING

RECEPTACLE.

L21-20P SIDE A REQUIRES A 208V, 20A,

THREE-PHASE CIRCUIT, TERMINATING IN A

NEMA L21-20R LOCKING RECEPTACLE.

STANDARD DENSITY

IT ENCLOSURE, TYPICAL

SOURCE A BUSWAY

FEEDER BOX,

PHYSICALLY SEPARATE

FROM SOURCE B

BUSWAY

HORIZONTOL

DISTRIBUTION AREA

ENCLOSURE, TYPICAL

.3' 4" .

30' 3"

C B

C

B

C B

C B

C

B

C B

SOURCE B BUSWAY

FEEDER BOX,

PHYSICALLY SEPARATE

FROM SOURCE A

BUSWAY

.7'

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

C B

C

B

C B

.2'

A SIDE BUSWAY B SIDE BUSWAY

BEHIND A SIDE

EP506

TYP.

EP506

TYP.

TO UPS B POWER

DISTRIBUTION

PANEL

TO UPS A POWER

DISTRIBUTION

PANEL

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

CB1

CB2

CB1

CB2

CB3

CB3

CB1

CB1

CB2

CB2

CB3

CB3

CB1

CB1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0 /2

:1

:4 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP507

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

NTS137EP101

1 SERVER CABINET ROW POWER ELEVATION

- NTS

2 NOT USED

- NTS

3 NOT USED

GENERAL NOTES

1. THIS SHEET SHALL BE PRINTED IN COLOR TO

PROVIDE ALL NECESSARY INFORMATION.

CB1

CB1

BLUE

BLACKBLACK

BARE

OCCUPANCY

SENSOR SWITCH

LOAD

WHITE

GROUND

HOT/LIVE

120 V~ 50/60 Hz

NEUTRAL

WHEN USING CONTROLS IN

SINGLE LOCATION

INSTALLATIONS, TIGHTEN THE

BLUE TERMINAL OR CAP BLUE

WIRE. DO NOT CONNECT THE

BLUE TERMINAL/WIRE TO ANY

OTHER WIRE OR TO GROUND.

BARE

BLACK

BLUE

WHITE WIRE WITH

GREEN SLEEVE

TYPICAL

DATA

RACK

FIN. FLOOR

HORIZONTAL CAT6A

DISTRIBUTION AND

FIBER-OPTIC BACKBONE

CABLE TRAY, TYPICAL.

F L O

O R

T O

U N

D E

R S

ID

E

S T

R U

C T

U R

E

84"

6" MIN

BOTTOM OF FLOOR OR ROOF ABOVE

LIGHT FIXTURE: REFERENCE TR ROOM

LUMINAIRE MOUNTING SCHEDULE. LIGHT

MOUNTING LOCATION IS DIAGRAMMATIC;

CONTRACTOR SHALL COORDINATE EXACT

MOUNTING HEIGHT AND PLACEMENT WITH ALL

OBSTRUCTIONS INCLUDING CABLE TRAY, RACKS

AND ARCHITECTURAL FEATURES.

POWER PACK(S)

(QUANTITY AS REQUIRED)

LIGHTING

LOAD

DAYLIGHT / OCCUPANCY SENSOR(S)

(QUANTITY AS REQUIRED; WHERE

INDICATED ON PLANS)

OCCUPANCY SENSOR(S)

(QUANTITY AS REQUIRED;

WHERE INDICATED ON PLANS)

LOW VOLTAGE SWITCH(ES)

(QUANTITY AS REQUIRED;

WHERE INDICATED ON PLANS)

N

L

120VAC

24V CONTROL

DS

OS

PP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:5

:0 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP508

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

- NTS

1 TYPICAL WALL SWITCH OCCUPANCY SENSOR

- 3/4" = 1'-0"

2 TYPICAL TELECOMMUNICATIONS ROOM ELEVATION

- NTS

3 TYPICAL CEILING MOUNTED SENSOR LIGHTING WIRING DIAGRAM

- NTS

4 TYPICAL RECESSED LIGHTING INSTALLATION

- NTS

5 TYPICAL EXIT SIGN INSTALLATION DETAIL

FUEL TANK GENERATOR CONTROL PANEL

OVERFILL FLOAT SWITCH

"FLT-OF"

LOW FLOAT SWITCH

"FLT-LO"

LD

COMM

MODULE

AUTOMATIC

TRANSFER SWITCH

"137-ATS-A"

GENERATOR

CALL TO RUN

GENERATOR

CALL TO RUN

AUTOMATIC

TRANSFER SWITCH

"137-ATS-B"

FUEL POLISHING SYSTEM

GENERAL ALARM

GENERATOR

START

BMS JACE PANEL

COMM

BACNET

COMM

MODULE

DPM

SWITCHBOARD

"137-SWBD-B"

BACNET

COMM

DPM

SWITCHBOARD

"137-SWBD-N"

BACNET

COMM

COMM

MODULE

UPS

"137-UPS-A1"

BACNET

COMM

COMM

MODULE

UPS

"137-UPS-B1"

BACNET

COMM

BACNET

COMM 2

PANEL "137-106A"

BACNET

COMMDPM

PANEL "137-108A"

BACNET

COMMDPM

PANEL "137-105A"

BACNET

COMMDPM

BACNET

COMMDPM

SWITCHBOARD

"137-SWBD-A"

COMM

MODULE BACNET

COMMDPM

SWITCHBOARD

"137-SWBD-E"

BACNET

COMMDPM

PANEL "137-106B"

COMM 3

BACNET

COMMDPM

PANEL "137-108B"

BACNET

COMMDPM

PANEL "137-105B"

LEAK DETECTION

BACNET

EXISTING STRUCTURE

EXISTING CEILING JOIST, TYPICAL

ELECTRICAL CONDUITCONDUIT STRAP

WITH GALVANIZED

FASTENING

HARDWARE

DETAIL NOTES:

1. UTILIZE GALVANIZED STEEL HARDWARE

TO SUPPORT CONDUIT AS REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:5

:0 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP509

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

- NTS

1 DATA CENTER EQUIPMENT CONTROL AND STATUS WIRING DIAGRAM

- NTS

3 NOT USED

- NTS

2 JOIST CONDUIT MOUNTING DETAIL

DETAIL NOTES:

1. DETAIL IS GENERIC IN NATURE. PROVIDE

STATUSES INDICATED PER MANUFACTURER'S

REQUIREMENTS. PROVIDE ALL TERMINATIONS,

CABLING, RACEWAYS,PROGRAMMING AND

APPURTENANCES AS REQUIRED.

GENERAL NOTES (FOR THIS SHEET ONLY)

GENERATOR POINTS TO BE MONITORED, AT MINIMUM, SHALL BE AS FOLLOWS:

- GENERATOR RUNNING "137-GEN-RUN"

- GENERATOR TROUBLE "137-GEN-TRB"

- GENERATOR FAIL "137-GEN-FL"

- GENERATOR LOW FUEL "137-GEN-LOF"

- GENERATOR START "137-GEN-STR"

ATS "A" POINTS TO BE MONITORED, AT MINIMUM, SHALL BE AS FOLLOWS:

- ATS IN NORMAL POSITION "137-ATS-A-NPS"

- ATS IN EMERGENCY POSITION "137-ATS-A-EPS"

- ATS NORMAL POWER AVAILABLE "137-ATS-A-NPA"

- ATS EMERGENCY POWER AVAILABLE "137-ATS-A-EPA"

- ATS FAIL "137-ATS-A-FAL"

ATS "B" POINTS TO BE MONITORED, AT MINIMUM, SHALL BE AS FOLLOWS:

- ATS IN NORMAL POSITION "137-ATS-B-NPS"

- ATS IN EMERGENCY POSITION "137-ATS-B-EPS"

- ATS NORMAL POWER AVAILABLE "137-ATS-B-NPA"

- ATS EMERGENCY POWER AVAILABLE "137-ATS-B-EPA"

- ATS FAIL "137-ATS-B-FAL"

BMS PANEL SHALL BE ACCOMPANIED BY I/O EXPANSION MODULES AS REQUIRED

FOR ALL ELECTRICAL AND MECHANICAL EQUIPMENT CONTROL AND STATUS.

PROVIDE ALL TERMINATIONS, CABLING, RACEWAYS, PROGRAMMING AND

APPURTENANCES AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL

SYSTEM. REFERENCE MECHANICAL DRAWINGS AND SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

KEY NOTES (FOR THIS SHEET ONLY)

LEVEL 01

TR-D-119A TE-105A TR-101D TE-105H TE-100CA

PBB PBB PBB PBB

BUILDING 21 BUILDING 30 BUILDING 46 BUILDING 47 BUILDING 48

LEVEL 01

ER-105 TR-106 ER-108

PBB

BUILDING 137

RM D-148 RM 101 RM 119

RM 102 RM 100CA

LEVEL 02

TYP.

TR-204

LEVEL 01

TR-TC110

TE-B08

TYP.

LEVEL 00

PBB

TE-B03

PBB PBB PBB

TR-102 TE-101A TE-103 TR-220A TR-417A

PBB

TYP.

BUILDING 2

PBB

BUILDING 4 BUILDING 6 BUILDING 7 BUILDING 8 BUILDING 20

TYP.

2 4

TYP.

TYP.

RM W123RM 102ARM 106

RM 2-B19

21-BUS-MDP 30-BUS-MDP

FUSED

DISCONNECT

46-01-DC

47-BUS-MDP NE

TYP.

GENERATOR ROOM 116 DATA CENTER 114

RM 110

SWITCHBOARD N

TYP.

47-BUS-MDP

2-BUS-MDPC 4-BUS-M

RM B02A

RM 104

6-BUS-MDP PP-7 PANEL LS 20-BUS-SWBD1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0 /2

:1

:0 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

EP510

ELECTRICAL DETAILS

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

- NTS

1 TELECOMMUNICATIONS BONDING RISER DIAGRAM

GENERAL NOTES (FOR THIS SHEET ONLY)

PROVIDE PRIMARY BONDING BUSBAR (PBB). WHERE EXISTING PBB EXISTS,

CONTRACTOR SHALL REPLACE; CONTRACTOR TO FIELD VERIFY EXISTING

LOCATION. PROVIDE ALL BONDING CONNECTIONS AS REQUIRED.

PROVIDE TELECOMMUNICATIONS BONDING BACKBONE (TBB) CONDUCTOR AS

INDICATED. CONTRACTOR SHALL ROUTE AND PROVIDE ALL REQUIRED PATHWAYS

FOR TBB AS REQUIRED. EXISTING TBB SHALL BE DEMOLISHED AND REMOVED;

PROVIDE ALL PATCHING, REPAIR AND FIREPROOF SEALING AS REQUIRED.

PROVIDE IRREVERSIBLE CRIMP CONNECTOR, UL LISTED.

TELECOMMUNICATIONS ROOM. REFER TO ENLARGED FLOOR PLANS FOR

ADDITIONAL INFORMATION.

PROVIDE TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR (TEBC) TO

CONNECT TBB TO SBB. MINIMUM SIZE SHALL BE 6 AWG.

PROVIDE SECONDARY BONDING BUSBAR (SBB). PROVIDE TELECOMMUNICATIONS

EQUIPMENT BONDING CONDUCTOR TO BOND SBB TO THE FOLLOWING EQUIPMENT:

DATA RACK, CABLE TRAY, TR CONDUITS, ELECTRICAL PANEL, ETC. REFERENCE

SHEET EP504 FOR ADDITIONAL BONDING INFORMATION.

PROVIDE TELECOMMUNICATIONS BONDING CONDUCTOR (TBC) TO BOND TO

BUILDING ELECTRICAL SERVICE EQUIPMENT GROUNDING BUSBAR. MINIMUM

CONDUCTOR SIZE SHALL BE 3 AWG.

PROVIDE (1) 1" CONDUIT WITH 1 AWG GND (MINIMUM) FROM SBB TO PBB AS

INDICATED.

1. ALL BONDING CONDUCTORS, INCLUDING TBB, SHALL FOLLOW SIZING

REQUIREMENTS SPECIFIED IN ANSI/TIA-607-D.

2. CONTRACTOR SHALL PROVIDE ALL REQUIRED BONDING, CONDUCTORS, AND

PATHWAYS AS REQUIRED. PROVIDE ALL PATCHING, REPAIR AND FIREPROOFING

FOR REMOVAL OF ALL EXISTING EQUIPMENT AND CONDUCTORS AS REQUIRED .

KEY NOTES (FOR THIS SHEET ONLY)

Revisions: Date:

PBB

P

RM 105H

CONTRACTOR SHALL PROVIDE ALL REQUIRED BONDING, CONDUCTORS, AND

PATHWAYS REQUIRED FOR THE TELECOMMUNICATIONS SYSTEM BONDING. ALL

EXISTING TELECOMMINCATIONS BONDING FOR EQUIPMENT BEING REMOVED SHALL

BE DEMOLISHED. PROVIDE ALL PATCHING, REPAIR AND FIREPROOFING

FOR REMOVAL OF ALL EXISTING EQUIPMENT AND CONDUCTORS AND NEW

INSTALLATIONS AS REQUIRED .

XF T12-SEC

208V, 0A Isc 3P: 9357 A

2-CBL-MDP

Length: 70 ft

(1) 500 kcmil

2-BUS-MAIN TAP

208V, 0A Isc 3P: 7588 A

2-CBL-ATS MDP-ECB (N)

(1) 500 kcmil Length: 5 ft

2-CB-ATS MDP-ECB (N)

GE

Model: TJD Trip: 300 A

2-BUS-ATS MDP-ECB (N)

208V, 300A Isc 3P: 7461 A

2-CBL-ATS ELEV-ECB (N)

(1) 500 kcmil Length: 5 ft

2-CB-ATS ELEV-ECB (N)

GE

Model: TJD Trip: 300 A

2-BUS-ATS ELEV-ECB (N)

208V, 300A Isc 3P: 7489 A

2-CBL-ATS LS-ECB (N)

(1) 2 AWG

Length: 5 ft

2-CBL-ATS MDP (N)

(1) 500 kcmil Length: 20 ft

2-CBL-ATS ELEV (N)

(1) 500 kcmil Length: 25 ft

2-BUS-ATS MDP (N)

208V, 0A Isc 3P: 6992 A

2-BUS-ATS ELEV (N)

208V, 0A Isc 3P: 7036 A

2-CBL-ATS MDP-ECB (E)

(1) 500 kcmil Length: 5 ft

2-CB-ATS MDP-ECB (E)

SIEMENS

Model: JXD6-A Trip: 300 A

2-BUS-ATS MDP-ECB (E)

208V, 300A Isc 3P: 7555 A

2-CBL-ATS MDP (E)

(1) 500 kcmil Length: 25 ft

2-BUS-ATS MDP (E)

208V, 0A Isc 3P: 6992 A

E N

2-ATS-ELEV

300 A

E N

2-CBL-ATS ELEV-ECB (E)

(1) 500 kcmil Length: 5 ft

2-CB-ATS ELEV-ECB (E)

SIEMENS

Model: JXD6-A Trip: 300 A

2-BUS-ATS ELEV-ECB (E)

208V, 300A Isc 3P: 7555 A

2-CBL-ATS ELEV (E)

(1) 500 kcmil Length: 20 ft

2-BUS-ATS ELEV (E)

208V, 0A Isc 3P: 7098 A

2-BUS-GEN TAP

208V, 0A Isc 3P: 7678 A

2-CBL-ATS LS-ECB (E)

(1) 2 AWG

Length: 5 ft

2-CB-ATS LS-ECB (E)

SIEMENS

Model: ED2 Trip: 100 A

2-BUS-ATS LS-ECB (E)

208V, 100A Isc 3P: 7449 A

2-CBL-ATS LS (E)

(1) 2 AWG

Length: 25 ft

2-BUS-ATS LS (E)

208V, 0A Isc 3P: 6248 A

2-BUS-ATS ELEV (L)

208V, 0A Isc 3P: 7036 A

2-CB-ELEV

GE

Model: TFJ Trip: 200 A

2-CBL-ELEV DISC

(1) 3/0 AWG

Length: 100 ft

2-CB-ELEV DISC

GE

Model: SFHA Trip: 175 A

2-BUS-ELEV DISC

208V, 175A Isc 3P: 5191 A

2-CBL-ELEV

(1) 2/0 AWG

Length: 25 ft

2-BUS-ELEV P4

208V, 0A Isc 3P: 4824 A

2-ELEV P4

50 hp

46.6 kW

2-CB-ATS LS-ECB (N)

SIEMENS

Model: ED2 Trip: 100 A

2-BUS-ATS LS-ECB (N)

208V, 100A Isc 3P: 7293 A

2-CBL-ATS LS (N)

(1) 2 AWG

Length: 30 ft

2-BUS-ATS LS (N)

208V, 0A Isc 3P: 5717 A

2-ATS-LS

150 A

2-BUS-ATS LS (L)

208V, 0A Isc 3P: 5717 A

2-CBL-LS B2

(1) 2 AWG

Length: 8 ft

2-CB-LS B2-MAIN

SIEMENS

Model: BLH Trip: 100 A

2-BUS-LS B2

208V, 250A Isc 3P: 5370 A

2-CB-LS B2-1

SIEMENS

Model: HBL Trip: 60 A

2-CBL-LS B2-1

(1) 3 AWG

Length: 70 ft

2-CB-G2-MAIN

SQUARE D

Model: QO-VH Trip: 100 A

2-BUS-G2

208V, 100A Isc 3P: 3126 A

TO 2-ATS-MDP

(02EP602)

TO 2-ATS-MDP

(02EP602)

100A 3P

LS

ENCLOSED CB

G

600A 3P

1200A 3P

TO BLDG 20

20-CB-EDP-MAIN

(20EP601)

XF T12

150kVA, Z% 4.43 Pri: 4160V Sec: 208V Isc 3P: 8517 A

GEN 2/20

400KW

208V

3PH

TO FU-XF T12

(02EP604)

1 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:4

:5 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

02EP601

BLDG 02 - ONE-LINE DIAGRAM -

EXISTING - PART 1 OF 4 02

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

GENERAL NOTES

KEY NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLANS,

AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO

COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR

TO IMPLEMENTATION.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

4. NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY HAVE WORK SHOWN; ALL ONE-

LINE DRAWINGS HAVE BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE

PURPOSES.

- NTS

1 BLDG 02 - ONE-LINE DIAGRAM - EXISTING - PART 1 OF 4

METERING NOTES

1 METERING POINT: EXISTING ATS "2-ATS-ELEV". REFERENCE "METERING AND LOAD

INFORMATION SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFORMATION.

METERING POINT: EXISTING ATS "2-ATS-LS". REFERENCE "METERING AND LOAD

INFORMATION SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFORMATION.

2-CB-ATS EDP-ECB (N)

SQUARE D

Model: MG Trip: 800 A

2-BUS-ATS EDP-ECB (N)

208V, 800A Isc 3P: 18418 A

2-CBL-ATS EDP (N)

(2) 600 kcmil Length: 10 ft

E N

2-ATS-EDP

800 A

Open

2-BUS-AHU 2

208V, 0A Isc 3P: 5770 A

2-BUS-EDP

208V, 1200A Isc 3P: 15857 A

E N

2-ATS-MDP

300 A

S

P

2-BUS-PICNIC

208V, 100A Isc 3P: 1078 A

2-BUS-ATS EDP (N)

208V, 0A Isc 3P: 17704 A

2-BUS-ATS EDP (L)

208V, 0A Isc 3P: 17704 A

2-CBL-EDP

(2) 600 kcmil Length: 30 ft

TO BLDG 20

20-CBL-SWBD1-3

(20EP601)

2-CB-EDP-2

SQUARE D

Model: MG Trip: 600 A

2-CB-EDP-1

SQUARE D

Model: QJ Trip: 175 A

2-CBL-EDP-1

(1) 2/0 AWG

Length: 125 ft

2-CBL-EDP-2

(2) 350 kcmil Length: 8 ft

2-CB-KPA1-MAIN

SQUARE D

Model: LD Trip: 600 A

2-BUS-KPA1

208V, 600A Isc 3P: 15370 A

2-CBL-KPA2

(2) 350 kcmil Length: 5 ft

2-BUS-KPA2

208V, 600A Isc 3P: 15079 A

2-CBL-KPA3

(2) 350 kcmil Length: 5 ft

2-BUS-KPA3

208V, 600A Isc 3P: 14799 A

2-BUS-ATS MDP (L)

208V, 0A Isc 3P: 6992 A

2-CBL-MDPC

(1) 500 kcmil Length: 50 ft

2-CBL-MDPA

(1) 500 kcmil Length: 10 ft

2-CB-MDPA-MAIN

SIEMENS

Model: JXD6-A Trip: 400 A

2-BUS-MDPA

208V, 400A Isc 3P: 6779 A

2-CB-MDPA-3

SIEMENS

Model: HBL Trip: 70 A

2-CB-MDPA-2

SIEMENS

Model: QJH2 Trip: 200 A

2-CB-MDPA-1

SIEMENS

Model: BLH Trip: 100 A

2-CBL-MDPA-3

(1) 3 AWG

Length: 75 ft

2-CBL-MDPA-2

(1) 4/0 AWG

Length: 8 ft

2-CBL-MDPA-1

(1) 2 AWG

Length: 200 ft

CONTINUE TO BLDG 132

132-CB-SMOKE-MAIN

CONTINUE TO BLDG 31

31-BUS-GEN EYE WASH

2-CB-MDPA-MAIN

SIEMENS

Model: QJH2 Trip: 225 A 2-CB-MDPC-MAIN

CUTLER-HAMMER

Model: HKD Trip: 400 A

2-BUS-MDPB

208V, 250A Isc 3P: 6572 A

2-CB-MDPB-1

SIEMENS

Model: BL Trip: 30 A

2-CB-MDPB-2

SIEMENS

Model: BL Trip: 60 A

2-CBL-MDPB-1

(1) 8 AWG

Length: 125 ft

2-CBL-MDPB-2

(1) 6 AWG

Length: 100 ft

2-CB-EV A-MAIN

GE

Model: THQB Trip: 60 A

2-BUS-EV A

208V, 60A Isc 3P: 1919 A

2-CB-MDPC-1

CUTLER-HAMMER

Model: HFD Trip: 225 A

2-CB-MDPC-2

CUTLER-HAMMER

Model: HFD Trip: 225 A

2-CB-MDPC-3

CUTLER-HAMMER

Model: HFD Trip: 225 A

2-BUS-MDPC

208V, 400A Isc 3P: 6040 A

2-CB-MDPC-4

CUTLER-HAMMER

Model: HFD Trip: 225 A

2-CBL-MDPC-1

(1) 4/0 AWG

Length: 60 ft

2-CBL-MDPC-2

(1) 4/0 AWG

Length: 100 ft

2-CBL-MDPC-3

(1) 4/0 AWG

Length: 75 ft

2-CBL-MDPC-4

(1) 4/0 AWG

Length: 15 ft

2-CB-PP B-MAIN

CUTLER-HAMMER

Model: EDB Trip: 225 A

2-XF HUMID-PRI

208V, 0A Isc 3P: 5734 A

2-BUS-PP B

208V, 225A Isc 3P: 4740 A

2-XF-HUMID

75kVA, Z% 5.06 Pri: 208V Sec: 480V

Isc 3P: 5734 A

2-XF HUMID-SEC

208V, 0A Isc 3P: 1040 A

2-CBL-HUMID DISC

(1) 1 AWG

Length: 8 ft

2-FU-HUMID DISC

GOULD SHAWMUT

Model: TRS Trip: 125 A

2-BUS HUMID-DISC

480V, 125A Isc 3P: 1036 A

2-CBL-HUMID

(1) 1 AWG

Length: 200 ft

2-BUS HUMID

480V, 0A Isc 3P: 954 A

2-CBL-MDPC-2 TAP

208V, 0A Isc 3P: 4413 A

2-CBL-PP 2A

(1) 4/0 AWG

Length: 20 ft

2-CBL-PP 1A

(1) 4/0 AWG

Length: 5 ft

2-CB-PP 2A-MAIN

CUTLER-HAMMER

Model: EDB Trip: 225 A

2-CB-PP 1A-MAIN

CUTLER-HAMMER

Model: EDB Trip: 225 A

2-BUS-PP 2A

208V, 225A Isc 3P: 4181 A

2-BUS-PP 1A

208V, 225A Isc 3P: 4353 A

2-CB-PP 2A-1

CUTLER-HAMMER

Model: QBHW Trip: 100 A

2-CB-PP 1A-1

CUTLER-HAMMER

Model: QBHW Trip: 100 A

2-CBL-PP 2A-1

(1) 2 AWG

Length: 5 ft

2-CBL-PP 1A-1

(1) 2 AWG

Length: 5 ft

2-CB-PP 2B-MAIN

CUTLER-HAMMER

Model: QBHW Trip: 100 A

2-CB-PP 1B-MAIN

CUTLER-HAMMER

Model: QBHW Trip: 100 A

2-BUS-PP 2B

208V, 100A Isc 3P: 4068 A

2-BUS-PP 1B

208V, 100A Isc 3P: 4233 A

2-CBL-ATS EDP (E)

(2) 600 kcmil Length: 175 ft

2-BUS-ATS EDP (E)

208V, 0A Isc 3P: 6106 A

TO BLDG 20

20-BUS-BLDG 2 DISC

(20EP601)

CONTINUE TO SHEET 02-BUS-ATS MDP (N)

(02EP602)

2-CBL-MDPC-1 TAP

208V, 0A Isc 3P: 4958 A

2-CBL-MP A

(1) 4/0 AWG

Length: 225 ft

2-CBL-MP B

(1) 4/0 AWG

Length: 5 ft

2-CB-MP A-MAIN

CUTLER-HAMMER

Model: EDB Trip: 225 A

2-CB-MP B-MAIN

CUTLER-HAMMER

Model: EDB Trip: 225 A

2-BUS-MP A

208V, 225A Isc 3P: 2891 A

2-BUS-MP B

208V, 225A Isc 3P: 4884 A

SPACE (3P)

(X6)

TO BUS-ATS MDP (E)

(02EP601)

SPACE

(X6)

2-BUS-KPA4

208V, 100A

2-CB-EDP-3

Trip: 100 A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:4

:5 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

02EP602

BLDG 02 - ONE-LINE DIAGRAM -

EXISTING - PART 2 OF 4 02

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

GENERAL NOTES

KEY NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLANS,

AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO

COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR

TO IMPLEMENTATION.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

4. NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY HAVE WORK SHOWN; ALL ONE-

LINE DRAWINGS HAVE BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE

PURPOSES.

- NTS

1 BLDG 02 - ONE-LINE DIAGRAM - EXISTING - PART 2 OF 4

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET

02EP612 FOR ADDITIONAL INFORMATION .

METERING NOTES

3 METERING POINT: EXISTING ATS "2-ATS-MDP". REFERENCE "METERING AND LOAD

INFORMATION SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFORMATION.

METERING POINT: EXISTING ATS "2-BUS-EDP" MAIN. REFERENCE "METERING AND

LOAD INFORMATION SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFORMATION.

METERING POINT: EXISTING PANEL "2-BUS-MDPC" MAIN. REFERENCE "METERING

AND LOAD INFORMATION SCHEDULE" ON SHEET EP701 FOR ADDITIONAL

INFORMATION.

MV-CBL-FEEDER 2-4

(1) 4/0 AWG

Length: 450 ft

MV-CBL-FEEDER 2-2

(1) 4/0 AWG

Length: 100 ft

MV-CBL-FEEDER 2-1

(1) 4/0 AWG

Length: 100 ft

RLY-FEEDER 2

BASLER

Model: BE1-851

CB-FEEDER 2

SQUARE D

Model: VR-05025-12

CB-FEEDER 5

SQUARE D

Model: VR-05025-12

CB-FEEDER 1

SQUARE D

Model: VR-05025-12

RLY-FEEDER 5

BASLER

Model: BE1-851

RLY-FEEDER 1

BASLER

Model: BE1-851

MV-CBL-FEEDER1-1

(1) 4/0 AWG

Length: 1150 ft

TO 99-BUS-

MSC 1

CB-MV NORMAL

SQUARE D

Model: VR-05025-12

RLY-MV NORMAL-GF

BASLER

Model: BE1-951

RLY-MV NORMAL

BASLER

Model: BE1-951

CBL-UTILITY 1

(1) 500 kcmil Length: 75 ft

XF T1-SEC

4160V, 0A Isc 3P: 5940 A

XF-T1

2500 kVA, Z% 5.75 Pri: 25000V

Sec: 4160V Isc 3P: 4948 A

FU-XF-T1

COOPER

Model: NX, 80C

Trip: 80 A

XF T1-PRI

25000V, 0A Isc 3P: 2707 A

UTIL-PREFERRED

25000 V SC Contribution SLG 1446.0 A

SC Contribution 3P 2626.0 A

CB-MV ALTERNATE

SQUARE D

Model: VR-05025-12

RLY-MV ALTERNATE-GF

BASLER

Model: BE1-951

RLY-MV ALTERNATE

BASLER

Model: BE1-951

CBL-UTILITY 2

(1) 500 kcmil Length: 75 ft

XF T2-SEC

4160V, 0A Isc 3P: 3252 A

XF-T2

2500 kVA, Z% 5.75 Pri: 12470V

Sec: 4160V Isc 3P: 3252 A

FU-XF-T2

S&C Model: Positrol, 100T

Trip: 100 A

XF T2-PRI

12470V, 0A Isc 3P: 2283 A

UTIL-ALTERNATE

12470 V SC Contribution SLG 1795.0 A

SC Contribution 3P 2283.0 A

Open

P

S

P

S

TO BLDG 6

XF-T5

(06EP601)

FU-XF-T5

COOPER

Model: 108C12

Trip: 50 A

XF T5-PRI

4160V, 0A Isc 3P: 5710 A

MV-CBL-FEEDER 2-5

(1) 4/0 AWG

Length: 25 ft

6-MV SPLICE

4160V, 0A Isc 3P: 5730 A

TO BLDG 7

7-XF-TX1

(07EP601)

7-XF TX1-PRI

4160V, 0A Isc 3P: 5787 A

7-BUS-PP 7 MV

4160V, 600A Isc 3P: 5792 A

7-CBL-XF PP7

(1) 4/0 AWG

Length: 5 ft

7-FU-MV MAIN

SQUARE D

Model: GDM, 125E

Trip: 125 A

MV-CBL-FEEDER 2-3

(1) 4/0 AWG

Length: 25 ft

7-MV SPLICE

4160V, 0A Isc 3P: 5813 A

TO BLDG 30

XF-T7

(30EP601)

XF T7-PRI

4160V, 0A Isc 3P: 5638 A

MV-CBL-FEEDER 6-1

(1) 500 kcmil Length: 575 ft

RLY-FEEDER 6

BASLER

Model: BE1-851

CB-FEEDER 6

SQUARE D

Model: VR-05025-12

MV-CBL-FEEDER 3-1

(1) 4/0 AWG

Length: 800 ft

RLY-FEEDER 3

BASLER

Model: BE1-851

CB-FEEDER 3

SQUARE D

Model: VR-05025-12

7-BUS-MV SWGR

4160V, 1200A Isc 3P: 5896 A

MV-CBL-FEEDER 3-2

(1) 4/0 AWG

Length: 400 ft

MV-CBL-FEEDER 3-4

(1) 4/0 AWG

Length: 275 ft

TO BLDG 21

XF-T6

(21EP601)

TO BLDG 47

XF-T8

(47EP601)

FU-XF T6(2)

COOPER

Model: ELSP

Trip: 160 A

FU-XF T6(1)

COOPER

Model: 353C17

Trip: 140 A

XF T6-PRI

4160V, 0A Isc 3P: 4986 A

MV-CBL-FEEDER 3-5

(1) 4/0 AWG

Length: 25 ft

BUS-MSC 3B

4160V, 0A Isc 3P: 5002 A

BUS-MSC 3A

4160V, 0A Isc 3P: 5275 A

XF T8-PRI

4160V, 0A Isc 3P: 5239 A

FU-XF T8(2)

COOPER

Model: ELSP

Trip: 80 A

FU-XF T8(1)

COOPER

Model: 108C11

Trip: 40 A

MV-CBL-FEEDER 3-3

(1) 2 AWG

Length: 25 ft

TO XF T4-PRI

(02EP604)

TO BUS-MSC 3C

(02EP604)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:4

:0 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

02EP603

BLDG 02 - ONE-LINE DIAGRAM -

EXISTING - PART 3 OF 4 02

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

GENERAL NOTES

KEY NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLANS,

AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO

COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR

TO IMPLEMENTATION.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

4. NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY HAVE WORK SHOWN; ALL ONE-

LINE DRAWINGS HAVE BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE

PURPOSES.

- NTS

1 BLDG 02 - ONE-LINE DIAGRAM - EXISTING - PART 3 OF 4

Open

FU-XF T14-PRI (A)

COOPER

Model: NX, 200C

Trip: 200 A

XF T14-PRI

4160V, 0A Isc 3P: 4391 A

FU-XF T14-PRI (B)

COOPER

Model: NX, 200C

Trip: 200 A

TO BLDG 20

XF-T14

(20EP601)

TO BLDG 2

XF-T12

(02EP601)

MV-CBL-FEEDER 2-7

(1) 4/0 AWG

Length: 275 ft

FU-XF T12

COOPER

Model: ELX, 30C

Trip: 30 A

XF T12-PRI

4160V, 0A Isc 3P: 4433 A

MV-CBL-FEEDER 2-8

(1) 4/0 AWG

Length: 200 ft

99-CBL-MSC 2C-4

(1) 4/0 AWG

Length: 400 ft

99-BUS-MSC 2C

4160V, 0A Isc 3P: 4776 A

TO 99-BUS-MSC 2C

MV-CBL-FEEDER 2-6

(1) 4/0 AWG

Length: 900 ft

TO BLDG 5

5-CBL-MDP

(2) 500 kcmil Length: 25 ft

XF T4-SEC

208V, 0A Isc 3P: 21732 A

XF-T4

225 kVA, Z% 2.30 Pri: 4160V

Sec: 208V Isc 3P: 21732 A

P

S

FU-XF-T4

COOPER

Model: 358C14

Trip: 65 A

XF T4-PRI

4160V, 0A Isc 3P: 5381 A

MV-CBL-FEEDER 3-6

(1) 4/0 AWG

Length: 350 ft

MV-CBL-FEEDER 3-8

(1) 4/0 AWG

Length: 275 ft

MV-CBL-FEEDER 3-9

(1) 4/0 AWG

Length: 700 ft

BUS-MSC 3D

4160V, 0A Isc 3P: 4618 A

XF T13-PRI

4160V, 0A Isc 3P: 4244 A

FU-XF T13(1)

COOPER

Model: 361C04CB

Trip: 100 A

FU-XF T13(2)

COOPER

Model: ELSP

Trip: 160 A

TO BLDG 33

TO BLDG 4

XF-T3

(04EP601)

MV-CBL-FEEDER 3-7

(1) 4/0 AWG

Length: 50 ft

BUS-MSC 3C

4160V, 0A Isc 3P: 4827 A

XF T3-PRI

4160V, 0A Isc 3P: 4796 A

FU-XF T3(1)

COOPER

Model: 108C12

Trip: 50 A

FU-XF T3(2)

COOPER

Model: ELSP

Trip: 100 A

TO 6-MV SPLICE

(02EP603)

TO BUS-MSC 3B

(02EP603)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:4

:0 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

02EP604

BLDG 02 - ONE-LINE DIAGRAM -

EXISTING - PART 4 OF 4 02

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

GENERAL NOTES

KEY NOTES

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLANS,

AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO

COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR

TO IMPLEMENTATION.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

4. NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY HAVE WORK SHOWN; ALL ONE-

LINE DRAWINGS HAVE BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE

PURPOSES.

- NTS

1 BLDG 02 - ONE-LINE DIAGRAM - EXISTING - PART 4 OF 4

XF T12-SEC

Isc 3P: 9357 A

2-CBL-MDP

Length: 70 ft

(1) 500 kcmil

2-BUS-MAIN TAP

208V, 0A Isc 3P: 7588 A

2-CBL-ATS MDP-ECB (N)

(1) 500 kcmil Length: 5 ft

2-CB-ATS MDP-ECB (N)

GE

Model: TJD Trip: 300 A

2-BUS-ATS MDP-ECB (N)

208V, 300A Isc 3P: 7461 A

2-CBL-ATS ELEV-ECB (N)

(1) 500 kcmil Length: 5 ft

2-CB-ATS ELEV-ECB (N)

GE

Model: TJD Trip: 300 A

2-BUS-ATS ELEV-ECB (N)

208V, 300A Isc 3P: 7489 A

2-CBL-ATS LS-ECB (N)

(1) 2 AWG

Length: 5 ft

2-CBL-ATS MDP (N)

(1) 500 kcmil Length: 20 ft

2-CBL-ATS ELEV (N)

(1) 500 kcmil Length: 25 ft

2-BUS-ATS MDP (N)

208V, 0A Isc 3P: 6992 A

2-BUS-ATS ELEV (N)

208V, 0A Isc 3P: 7036 A

2-CBL-ATS MDP-ECB (E)

(1) 500 kcmil Length: 5 ft

2-CB-ATS MDP-ECB (E)

SIEMENS

Model: JXD6-A Trip: 300 A

2-BUS-ATS MDP-ECB (E)

208V, 300A Isc 3P: 7555 A

2-CBL-ATS MDP (E)

(1) 500 kcmil Length: 25 ft

2-BUS-ATS MDP (E)

208V, 0A Isc 3P: 6992 A

E N

2-ATS-ELEV

300 A

E N

2-CBL-ATS ELEV-ECB (E)

(1) 500 kcmil Length: 5 ft

2-CB-ATS ELEV-ECB (E)

SIEMENS

Model: JXD6-A Trip: 300 A

2-BUS-ATS ELEV-ECB (E)

208V, 300A Isc 3P: 7555 A

2-CBL-ATS ELEV (E)

(1) 500 kcmil Length: 20 ft

2-BUS-ATS ELEV (E)

208V, 0A Isc 3P: 7098 A

2-BUS-GEN TAP

208V, 0A Isc 3P: 7678 A

2-CBL-ATS LS-ECB (E)

(1) 2 AWG

Length: 5 ft

2-CB-ATS LS-ECB (E)

SIEMENS

Model: ED2 Trip: 100 A

2-BUS-ATS LS-ECB (E)

208V, 100A Isc 3P: 7449 A

2-CBL-ATS LS (E)

(1) 2 AWG

Length: 25 ft

2-BUS-ATS LS (E)

208V, 0A Isc 3P: 6248 A

2-BUS-ATS ELEV (L)

208V, 0A Isc 3P: 7036 A

2-CB-ELEV

GE

Model: TFJ Trip: 200 A

2-CBL-ELEV DISC

(1) 3/0 AWG

Length: 100 ft

2-CB-ELEV DISC

GE

Model: SFHA Trip: 175 A

2-BUS-ELEV DISC

208V, 175A Isc 3P: 5191 A

2-CBL-ELEV

(1) 2/0 AWG

Length: 25 ft

2-BUS-ELEV P4

208V, 0A Isc 3P: 4824 A

2-ELEV P4

50 hp

46.6 kW

2-CB-ATS LS-ECB (N)

SIEMENS

Model: ED2 Trip: 100 A

2-BUS-ATS LS-ECB (N)

208V, 100A Isc 3P: 7293 A

2-CBL-ATS LS (N)

(1) 2 AWG

Length: 30 ft

2-BUS-ATS LS (N)

208V, 0A Isc 3P: 5717 A

2-ATS-LS

150 A

2-BUS-ATS LS (L)

208V, 0A Isc 3P: 5717 A

2-CBL-LS B2

(1) 2 AWG

Length: 8 ft

2-CB-LS B2-MAIN

SIEMENS

Model: BLH Trip: 100 A

2-BUS-LS B2

208V, 250A Isc 3P: 5370 A

2-CB-LS B2-1

SIEMENS

Model: HBL Trip: 60 A

2-CBL-LS B2-1

(1) 3 AWG

Length: 70 ft

2-CB-G2-MAIN

SQUARE D

Model: QO-VH Trip: 100 A

2-BUS-G2

208V, 100A Isc 3P: 3126 A

TO 2-ATS-MDP

(02EP612)

TO 2-ATS-MDP

(02EP612)

100A 3P

LS

ENCLOSED CB

G

600A 3P

1200A 3P

TO BLDG 20

20-CB-EDP-MAIN

20EP611

XF T12

150 KVA, Z% 4.43

Pri: 4160V Sec: 208V lsc 3P: 8517 A

TO FU-XF T12

(02EP614)

GEN 2/20

400KW

208V

3PH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

/0

/2

:4

:1 a m

B

IM

/5

-2

-7

V A

P A

E H

R M

I n fr a U p g ra d e D e s ig n B u tl e r/ V

A B

U T

L E

R

G E

N E

R A

L S

H E

E T

S .r v t

02EP611

BLDG 02 - ONE-LINE DIAGRAM -

REVISED - PART 1 OF 4 02

DCW/LRL JFO/JGD

100% CONSTRUCTION

DOCUMENTS

11/30/2023

529-22-700EHRM INFRASTRUCTURE

UPGRADES - BUTLER

VA Butler Healthcare, 325 New Castle Road, Butler, Pa.

16001

GENERAL NOTES

KEY NOTES

- NTS

1 BLDG 02 - ONE-LINE DIAGRAM - REVISED - PART 1 OF 4

1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES

FOUND SHALL BE REPORTED TO THE ENGINEER.

2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLANS,

AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO

COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR

TO IMPLEMENTATION.

3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.

4. NOT ALL ONE-LINE DIAGRAM DRAWING SHEETS MAY HAVE WORK SHOWN; ALL ONE-

LINE DRAWINGS HAVE BEEN INCLUDED IN THIS DRAWING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .