S06 - Amendment 0004 - RFI Q 35 - AppendixE 2of4-Suggeted Boring Locations.pdf

PDF 1 MB Posted

Attached to
EHRM | Butler VA HCS 529-22-700 | Construct Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77625R0057
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a technical drawing (C-150) for the Butler PA EHRM Infrastructure Upgrades project, specifically showing proposed boring locations for a new data center building at the Veterans Health Care System in Butler, Pennsylvania. The drawing, prepared at 65% design development stage by Spees Design Build and WSP USA Inc., details five suggested boring locations: four around the proposed data center building (including locations at the SW corner of the loading dock, SW and NW corners of Building 30, and a mechanical yard generator pad) and one additional proposed boring location for a Building 21 addition. The drawing includes infrastructure details such as existing drainage channels, utility markings for communication, gas, water, and sewer lines, and various proposed fiber pathways and underground handholes.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM | Butler VA HCS 529-22-700 | Construct Infrastructure Upgrades, newest first.
File Type Posted
S06 - Amendment 0005 - Butler EHRM IU - WD - PA20250079 7.18.2025.pdf PDF
S06 - 36C77625R0057 0005.pdf PDF
S06 - 36C77625R0057 0004.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixE 1of4-Geotech Report.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixE 4of4-Summary of Subsurface Explorations.pdf PDF
S06 - Amendment 0004 - RFI Q 25 - Electrical Equipment List - Equipment Evaluation.xlsx XLSX spreadsheet
S06 - Amendment 0004 - RFI Q 35 - AppendixD Subsurface Utility Locate Campus Exterior Fiber Routes-230818.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixD Subsurface Utility Locate Buidling21-230323.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixK Drainage Report-231130.pdf PDF
S06 - Amendment 0004 - Technical Questions and VA Responses - EHRM IU - Butler VAMC.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixC - MCR Topo-Utility Survey.pdf PDF
S06 - Amendment 0004 - RFI Q 35 - AppendixE 3of4-Boring Logs.pdf PDF
S06 - 36C77625R0057 0003.pdf PDF
S06 - Amendment 0002 - Attachment 1 - Site Visit Sign In - Butler EHRM.pdf PDF
S06 - 36C77625R0057 0002.pdf PDF
S06 - Attachment 4 - Butler EHRM IU - Drawing - Telecom 1 of 2 R 1 6-17-2025.pdf PDF
S06 - Attachment 1 - Butler EHRM IU - Specs 6-17-2025.pdf PDF
S06 - 36C77625R0057 0001.pdf PDF
S02- Attachment 1 - Butler EHRM IU - Specs.pdf PDF
S02 - Attachment 4 - Butler EHRM IU - Drawing - Telecom 1 of 2 R 1.pdf PDF
S02 - Attachment 5 - Butler EHRM IU - Drawing - Telecom 2 of 2 R 1.pdf PDF
S02 - Attachment 7 - Butler EHRM IU - Drawing - Mechanical 2 of 2 R 1.pdf PDF
S02 - Attachment 9 - Butler EHRM IU - Drawing - Structural 1 of 1 R 1.pdf PDF
S02 - Attachment 12 - Butler EHRM IU - Drawing - Electrical 3of 6 R1.pdf PDF
S02 - Attachment 14 - Butler EHRM IU - Drawing - Electrical 5 of 6 R1.pdf PDF
S02 - Attachment 2 - Butler EHRM IU - Drawing - Civil 1 of 2 R2.pdf PDF
S02 - Attachment 3 - Butler EHRM IU - Drawing - Civil 2 of 2 R1.pdf PDF
S02 - Attachment 6 - Butler EHRM IU - Drawing - Mechanical 1 of 2 R 1.pdf PDF
S02 - Attachment 17 - Butler EHRM IU - VA HCS MCP.pdf PDF
S02 - Attachment 20 - Butler EHRM IU - PCRA form.pdf PDF
S02 - Attachment 8 - Butler EHRM IU - Drawing - Arch R1.pdf PDF
S02 - Attachment 10 - Butler EHRM IU - Drawing - Electrical 1 of 6 R1.pdf PDF
S02 - Attachment 13 - Butler EHRM IU - Drawing - Electrical 4 of 6 R1.pdf PDF
S02 - Attachment 16 - Butler EHRM IU - Asbestos Survey.pdf PDF
S02 - Attachment 18 - Butler EHRM IU - WD - PA20250079 3.28.2025.pdf PDF
S02 - Attachment 22 - Limitations on Subcontracting.pdf PDF
S02 - Attachment 19 - Butler EHRM IU - J and A.pdf PDF
S02 - 36C77625R0057.pdf PDF
S02 - Attachment 11 - Butler EHRM IU - Drawing - Electrical 2 of 6 R1.pdf PDF
S02 - Attachment 15 - Butler EHRM IU - Drawing - Electrical 6 of 6 R1.pdf PDF
S02 - Attachment 21 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
S02 - Attachment 23 - Butler Site Visit Map.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING

COMM

COMM

COMM

SD

SD

SD

C (B)

C (B)

C (B)

C (B)

C (B)

C (B)

C (B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B) C(B)

C(B)

C(B

C(B

C( B)

C( B)

C( B)

C( B)

C( B)

C(A)

C(A)

C(A)

C(A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C(A)

C (B)

C (B)

C (B)

C (B)

C (B)

C (B)

C (B)

C (B)

C (B)

C (A)

C (A)

C(A)

C(A)

C(A)

C(A)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

VETERANS HEALTH CARE SYSTEM - BUTLER, PA

XXX-XX-XXX

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

WSP USA Inc.

Suite 300 Federal Way, WA 98003-2600

TEL: (206) 431-2300

FAX: (206) 431-2250

33301 9th Avenue South

C-150

PROPOSED MCR BUILDING

LAYOUT

Checker Author

65% DESIGN

DEVELOPMENT

XX/XX/20XX

Revisions: Date:

LEGEND

PROPOSED SIDE A FIBER PATHWAY

PROPOSED SIDE A UNDERGROUND HANDHOLE

PROPOSED SIDE B FIBER PATHWAY

PROPOSED SIDE B UNDERGROUND HANDHOLE

C(B)

C(A)

1" = 10' scale feet

2010010

STS

ST

S

ST

S

X

X

30"

DECD.

30" DECD.

30" DECD.

36" DECD.

NF.

4"

DECD.

STREET

B S

TR

EE

T BUILDING

BUILDING

BUILDING

D

FH

LP-6

LP-150

LP-151

LP-152

LP-30

LP-5

HPS

HPS

HP

S

HPS

HPS

HPS

HPC

HPC

HP

C HPC

HPC

HPC

LPC

LPC

LP

C LPC

LPC

LPCGAS

GAS

GAS

GAS

GAS

4"

DECD.

4"

DECD.

GAS

GAS

GAS

GAS

GAS

GAS

HPSHPCLPC

GAS

C O

M M

C O

M M

C O

M M

C O

M M

COM

M

COM

M

G W

SAN

SAN

CMH

#224

C

CMH

#229

C

FH-24

ST STMH

#815

SAN

S

SSWR MH

(INACTIVE)

SSWR MH

(INACTIVE)

SD

SD

E

EMH

SD

DM

D

SD

DMH

D

DMH

D

SD

SD

SD

LP-148

PA

RK

IN

G

LO

T 1

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C (B)

C (B)

C(B)

C(A)

C(A) C(A)

C(A)

C( A)

C( B)

C( B

C(A)

C(A)

C(A)

C(B)

C(B)

C(B)

C(B)

C(B)

Butler PA EHRM Project New Data Center Building

Proposed Boring Locations

53'-7 3/4"

56'-1 1/2"

'-1

38'-3 1/4"

Proposed Data Center Building

SW Corner of loading dock

SW Corner of Building 30

NW Corner of Building 30

Suggested Boring Location #1

Suggested Boring Location #2

Mechanical Yard

Generator Pad

Existing Drainage Channel

Suggested Infiltration Boring

Suggested Boring Location

Proposed Boring for Building 21 Addition

Sheets and Views
C-150

File details come from the government source that posted it. Updated .