This drainage report details the stormwater management design for the new Medical Center Renovation (MCR) building at the Butler VA Medical Center in Pennsylvania. The document, prepared by WSP USA Inc., provides a comprehensive analysis of pre- and post-development site conditions, focusing on managing stormwater runoff in compliance with federal, state, and local regulations. The project site is 0.85 acres, currently used for equipment storage, and will be transformed with the addition of a new building, concrete sidewalks, and asphalt pavement.
The report outlines the stormwater management strategy, which includes a 4,275 sq ft rain garden/bioretention facility designed to control the 2-year, 24-hour storm event runoff volume. The design meets requirements from the Energy Independence and Security Act (EISA) Section 438, Pennsylvania Stormwater Best Management Practices Manual, and local Butler Township regulations. The rain garden will capture and infiltrate runoff from the building roof and pavement, with an overflow structure directing excess water to an existing drainage channel. The infiltration rate of 2.40 inches per hour was deemed suitable, and the design provides 5,686 cubic feet of storage volume, exceeding the required 4,641 cubic feet.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAINAGE REPORT
100% DESIGN SUBMISSION
VA BUTLER EHRM PROJECT
NEW MCR BUILDING
VA CAMPUS, BUTLER, PENNSYLVANIA
AE Project Number: 529-22-700 WSP Project Number: 31800188.005
19 October 2023
Prepared by Peter Bailey, P.E.
1 GENERAL DESCRIPTION
1.1 PURPOSE
The purpose of this report is to detail the drainage design and calculations that were performed for the new MCR Building site development as part of the overall EHRM project at the Butler PA VA Campus. This document includes the following:
• Pre-development and post-development conditions
• Design storm event
• Calculations for sizing of rain garden onsite storm water management
1.2 PROJECT SITE
The project site for the MCR building is located on the west side of the Butler VA campus next to building 30. The site is bordered by an existing drainage ditch to the north, wooded area to the west and existing gravel storage and stockpile areas to the south. The site is currently used for equipment storage next to the loading dock on the west side of building 30. The existing ground coverage is mainly compacted gravel surrounded by pervious areas on the perimeter. See vicinity map (exhibit 1) in Appendix A.
The Butler VA campus is not located within a mapped floodplain. See FEMA Flood Insurance Rate Map in Appendix A.
1.3 DESIGN CRITERIA
The following design criteria were utilized for the preparation of the drainage calculations and report:
• Site Design Manual, U.S. Department of Veterans Affairs, rev April 1, 2021
• Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act, December 2009
• Township of Butler, PA Chapter 242 Stormwater Management, Article VII Design Criteria
• Butler County Act 167 County-Wide Stormwater Management Plan, June 2010 (rev December 2010)
• Pennsylvania Stormwater BMP Manual, December 30, 2006
• Pennsylvania Department of Environmental Protection, Erosion and Sediment Pollution Control Program Manual, March 2012
1.4 DESIGN METHODOLOGY
The EPA developed the technical guidance in EISA 438 to outline storm water runoff requirements for federal development or redevelopment projects. Any project on a federal facility with a footprint that exceeds 5,000 square feet are subject to these requirements. The intent is to maintain or restore the pre-development site hydrology during the development or redevelopment process. Implementation of EISA 438 is commonly achieved using green infrastructure/low impact development (GI/LID) best management practices (BMPs). The stormwater management design and calculations for the new MCR building followed EISA 438.
The VA site design manual (PG 18-10) requires local stormwater management and permitting requirements to be researched. All applicable local requirements must be considered and the more stringent requirement between federal, state, and local regulations shall be used.
The onsite storm water management for this project was designed in accordance with the Pennsylvania Stormwater Best Management Practices Manual (Penn BMP manual).
2 PRE & POST-DEVELOPMENT
CONDITIONS
2.1 Pre-Development Condition
In the predevelopment condition, the site is a mix of gravel and pervious surfaces. The Penn BMP manual requires all existing gravel surfaces to be modeled as pervious for design, so the area is assumed to be entirely pervious. In the MCR building project boundary, this equates to 0.85 acres of grass/forested pervious surface. pervious surface.
See pre-development Exhibit 2 in the Appendix A.
2.2 Post-Development Condition
The post-development condition consists of all site improvements to the existing that have taken place after construction completion. Site development for the new MCR building includes the following:
• Impervious surfaces: MCR building roof, concrete sidewalks, and asphalt pavement.
• Pervious surfaces: Landscaping restoration areas adjacent to MCR building and hardscape improvements.
See post-development Exhibit 3 in the Appendix A.
3 DESIGN STORM EVENT
3.1 Rainfall Data
The rainfall estimates for Pennsylvania are based on the NOAA Atlas 14 precipitation estimates updated in 2004. The design criteria for stormwater management and drainage facilities for this area is listed in Chapter 242 of the Township of Butler code.
The design storm event used for the MCR building project is the Soil Conservation Service Type II, twenty-four-hour rainfall distribution consistent with the following table:
Return Interval (year)
24-hour Rainfall Total (inches)
5 3.30
100 5.03
3.2 Time of Concentration
Existing Condition
The existing time of concentration for this project was calculated using the NRCS’s Lag Equation:
Time of Concentration = Tc = [ ( Tlag / 0.6 ) * 60 ] (min)
Where:
Tlag = Lag time (hours)
L = Hydraulic length of watershed (feet)
Y = Average overland slope of watershed (percent)
S = Maximum retention in watershed as defined by: S = [(1,000/CN)-10]
CN = NRCS curve number for watershed
See predeveloped Tc calculations in Appendix B.
Developed Condition
Due to the relatively small project footprint, the developed time of concentration was assumed at 5 minutes.
4 STORMWATER MANAGEMENT
CALCULATIONS
4.1 Low Impact Development (LID) BMP Selection
Due to the presence of pollution generating impervious surfaces to be constructed for this project, a water quality treatment BMP is required. The LID BMP selected for this project is a rain garden/bioretention facility (BMP 6.4.5 in Penn BMP manual). This BMP is located west of the new MCR building and asphalt pavement area. The roof runoff will be tightlined and directed into the rain garden by piped inlet and rip rap pads. Due to the flat grades on the site, the new pavement area will be graded to surface flow into the rain garden. For the higher runoff storm events, the rain garden has an overflow structure that will release the excess runoff into the existing drainage channel north of the site.
4.2 Rain Garden Design Calculations
The stormwater calculation process in the Penn BMP manual was followed to design the rain garden. General site information, identify applicable sensitive natural resources to be protected, and non-structural BMPs were determined. Then volume control guideline 1 was used for the rain garden. Peak rate mitigation wasn’t applicable to the site as the small site exemption was met. Water Quality compliance was met with primary and secondary BMPs for nitrate.
According to the geotechnical investigation, the site is generally underlain by fill consisting of silt, clay, sand, and rock fragments over stiff silt, clay, rock fragments, and carbonaceous rock fragments. The stabilized infiltration rate was measured at 2.40 inches per hour, therefore infiltration is feasible for this site.
See Penn BMP manual worksheets, spreadsheet calculations, and applicable exhibits of the stormwater design calculations in Appendix B.
APPENDIX A
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
U.S. Department of Veterans Affairs
VA BUTLER EHRM PROJECT
NEW MCR BUILDING
EXHIBIT 1
VICINITY MAP
PROJECT
LOCATION
NOT TO SCALE
A S
TR
EE
T
BUILDING
W
W W
G
E E
E E
CO
M
M
CO
M
M
SD
SD
SD
SD
SD
CD
COMM
SA
NBUILDING
X X
X
X
X
X
X X
X X X
E
E
E
E
SD
SAN
SD
E
E
E
E
E
G
SD
SD
W
COMM
E
E
E
E
PRE-DEVELOPED AREA
AREA TYPE AREA (ACRE)
IMPERVIOUS 0
PERVIOUS 0.85
TOTAL 0.85
EXISTING CONDITIONS EXHIBIT
PROPERTY LINE
EXISTING
DRAINAGE DITCH
PROJECT
LIMITS
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
U.S. Department of Veterans Affairs
VA BUTLER EHRM PROJECT
NEW MCR BUILDING
EXHIBIT 2
EXISTING CONDITIONS EXHIBIT
SCALE: 1" = 50'
*PRE-DEVELOPED AREA MODELED AS ALL PERVIOUS
Tc FLOWPATH
A S
TR
EE
T
BUILDING
W
W W
G
E E
E E
CO
M
M
CO
M
M
SD
SD
SD
SD
SD
CD
COMM
SA
NBUILDING
X X
X
X
X
X
X X
X X X
E
E
E
E
SD
SAN
SD
E
E
E
E
E
G
SD
SD
W
COMM
E
E
E
E
W
W
W
W
W
W
C(B)
C(B) C(B)
C(B) C(
B)
C( B)
C( B)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(A
C( A)
C( A)
C(A)
C (A
C(
A)
SD
C(B)
C
(ISP)
C(ISP)
SD
C (A)
C (A)
C(A)
C(A)
C(A)
C
(ISP)
C
(ISP)
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
U.S. Department of Veterans Affairs
DEVELOPED AREA
AREA TYPE AREA (ACRE)
IMPERVIOUS 0.60
PERVIOUS 0.25
TOTAL 0.85
DEVELOPED CONDITIONS EXHIBIT
NEW MCR
BUILDING
PROPOSED
RAIN GARDEN
VA BUTLER EHRM PROJECT
NEW MCR BUILDING
EXHIBIT 3
DEVELOPED CONDITIONS EXHIBIT
SCALE: 1" = 50'
OUTFALL TO
EXISTING
DRAINAGE DITCH
FLOWPATH
APPENDIX B
Existing Condition Tc Calculation
VA Butler EHRM Project - New MCR Building
NRCS Lag Equation:
Time of Concentration = Tc = [ ( Tlag / 0.6 ) * 60 ] (min)
Where:
0.04 Tlag = Lag time (hrs)
138 L = Hydraulic length of watershed (feet)
5.8 Y = Average overland slope of watershed (percent)
4.08 S = Maximum retention in watershed as definded by:
S = [ ( 1,000 / CN ) - 10 ]
71 CN = NRCS curve number for watershed
3.5 Tc (min)
5.0 Tc (min), minimum used for design
Pennsylvania Stormwater Best Management Practices Manual Chapter 8
363-0300-002 / December 30, 2006 Page 28 of 46
Map Existing Conditions and Sensitive Natural Resources
Determine applicable Non-Structural
BMPS
No Yes
Recommended to use Flow Chart B (Primary Control
Guideline 1 - CG 1)
Complete Worksheet 1 General Site Information
Complete Worksheet 2 to determine credits for protecting sensitive Natural Resources
Complete Worksheet 3 for Non-Structural BMP credit
Is the development site a Mining Area, Urban Redevelopment Area, Brownfield
Area, or a small site with minimal disturbance and imperviousness
Recommended to use Flow Chart C (Primary Control
Guideline 2 - CG 2)
VA Butler EHRM Project MCR Building Storm Calcs
363-0300-002 / December 30, 2006 Page 29 of 46
Date:
Project Name:
Municipality:
County:
Total Area (acres):
Major River Basin:
http://www.dep.state.pa.us/dep/deputate/watermgt/wc/default.htm#newtopics
Watershed:
Sub-Basin:
Nearest Surface Water(s) to Receive Runoff:
Chapter 93 - Designated Water Use:
http://www.pacode.com/secure/data/025/chapter93/chap93toc.html
Impaired according to Chapter 303(d) List? Yes http://www.dep.state.pa.us/dep/deputate/watermgt/wqp/wqstandards/303d-Report.htm No
List Causes of Impairment:
Is project subject to, or part of:
Municipal Separate Storm Sewer System (MS4) Require ments? Yes
No
Existing or planned drinking water supply? Yes
No
If yes, distance from proposed discharge (miles):
Approved Act 167 Plan? Yes
No
Existing River Conservation Plan? Yes http://www.dcnr.state.pa.us/brc/rivers/riversconservation/planningprojects/ No
Worksheet 1. General Site Information INSTRUCTIONS: Fill out Worksheet 1 for each waters hed http://www.dep.state.pa.us/dep/deputate/watermgt/wc/Subjects/StormwaterManagem ent/Approved_1.html http://www.dep.state.pa.us/dep/deputate/watermgt/wc/Subjects/StormwaterManagem ent/GeneralPermits/default.htm
11 Oct 2023
VA Butler EHRM Project - Proposed MCR Building
Butler Township
Butler County
0.85 AC
Ohio River Basin
Slippery Rock, Connoquenessing
Little Connoquenessing Creek
Little Connoquenessing Creek (small watershed)
(large watershed)
WWF
X
X
X
X
363-0300-002 / December 30, 2006 Page 30 of 46
INSTRUCTIONS:
Steep Slopes, over 25%
Other:
Other:
TOTAL EXISTING:
Natural Drainage Ways
Steep Slopes, 15% - 25%
TOTAL AREA
(Ac.)
MAPPED?
yes/no/n/a
Floodplains
Riparian Areas
Wetlands
Woodlands
PROTECTED
AREA (Ac.)
EXISTING NATURAL
SENSITIVE RESOURCE
Worksheet 2. Sensitive Natural Resources
Waterbodies
1. Provide Sensitive Resources Map according to non-structural BMP 5.4.1 in Chapter 5. This map should identify wetlands, woodlands, natural drainage ways, steep slopes, and other sensitive natural areas.
2. Summarize the existing extent of each sensitive resource in the Existing Sensitive Resources Table (below, using Acres). If none present, insert 0.
3. Summarize Total Protected Area as defined under BMPs in Chapter 5.
4. Do not count any area twice. For example, an area that is both a floodplain and a wetland may only be considered once.
N/A for this project
363-0300-002 / December 30, 2006 Page 31 of 46
1.1 Ac.
1.2 Ac.
3.1 Ac.
TOTAL Ac.
Site Area minus Protected
Area
3.1 Minimum Soil Compaction
Lawn ft2 x 1/4" x 1/12 = ft3
Meadow ft2 x 1/3" x 1/12 = ft3
3.3 Protect Existing Trees
For Trees within 100 feet of impervious area:
Tree Canopy ft2 x 1/2" x 1/12 = ft3
5.1 Disconnect Roof Leaders to Vegetated Areas
For runoff directed to areas protected under 5.8.1 and 5.8.2
Roof Area ft2 x 1/3" x 1/12 = ft3
For all other disconnected roof areas
Roof Area ft2 x 1/4" x 1/12 = ft3
5.2 Disconnect Non-Roof impervious to Vegetated Area s
For Runoff directed to areas protected under 5.8.1 and 5.8.2
Impervious Area ft2 x 1/3" x 1/12 = ft3
For all other disconnected roof areas
Impervious Area ft2 x 1/4" x 1/12 = ft3 ft3
* For use on Worksheet 5
Worksheet 3. Nonstructural BMP Credits
Area of Protected Sensitive/Special Value Features (see WS 2)
Area of Riparian Forest Buffer Protection
Area of Minimum Disturbance/Reduced Grading
PROTECTED AREA
Stormwater Management Area
This is the area that requires stormwater management
TOTAL NON-STRUCTURAL VOLUME CREDIT*
VOLUME CREDITS
5,556 116
363-0300-002 / December 30, 2006 Page 32 of 46
S ee
G ui de lin e:
V ol um e
C re di ts fo r
D et en tio n R ou tin g"
FLOW CHART B
Control Guideline 1 Process
Estimate Net Increase in Runoff Volume for 2-year/24 hour storm
Worksheet 4
Reduce Runoff Volume with Non-Structural BMPs
Determine Structural BMPs
Determine Structural and Non- Structural BMP Credits
Worksheet 5
Can 2-yr/24 hour volume increase be managed with structural and non-structural BMPs?
Secondary Control Guideline (CG 2) applies
Demonstrate Peak Rate Mitigation
1-year to 100-year
Increase size and/or number of BMPs
Small Site Exemption (Worksheet 6)
Model with Volume Diversion
Model with Composite BMPs
Model with Tt/Tc Adjustment
Yes No
Other Method
Or
Or
Or
Or
363-0300-002 / December 30, 2006 Page 33 of 46
PROJECT:
Drainage Area:
2-Year Rainfall: in
Total Site Area: acres Protected Site Area: acres Managed Area: acres
Existing Conditions:
Cover Type/Condition Soil Area Area CN S Ia Q
Runoff 1 Runoff
Volume 2
Type (sf) (ac) (0.2*S) (in) (ft 3) W oodland Meadow Impervious
TOTAL:
Developed Conditions:
Cover Type/Condition Soil Area Area CN S Ia Q
Runoff 1 Runoff
Volume 2
Type (sf) (ac) (0.2*S) (in) (ft 3)
TOTAL:
2-Year Volume Increase (ft3):
2-Year Volume Increase = Developed Conditions Runof f Volume - Existing Conditions Runoff Volume
1. Runoff (in) = Q = (P - 0.2S)2 / (P+ 0.8S) where
P = 2-Year Rainfall (in)
S = (1000/ CN)-10
2. Runoff Volume (CF) = Q x Area x 1/12
Q = Runoff (in)
Area = Land use area (sq. ft)
Note: Runoff Volume must be calculated for EACH la nd use type/condition and HSGl.
The use of a weighted CN value for volume calculati ons is not acceptable.
WORKSHEET 4 . CHANGE IN RUNOFF VOLUME FOR 2-YR STOR M EVENT
See attached spreadsheet for calculations
WORKSHEET 4
PROJECT: VA Butler EHRM - New MCR Building
Drainage Area:
2-Year Rainfall (in) 3.3 Butler Township Development Code
Total Site Area: 0.85 acres
Protected Site Area: 0 acres
Managed Area: 0 acres
Existing Conditions:
Cover Type/Condition
Soil
Type
Area
(sf)
Area
(ac) CN S
Ia
(0.2*S)
Q
Runoff
(in)
Runoff
Volume
(ft
Woodland C 0 0.00 71 4.08 0.82 0.94 0
Meadow C 37053 0.85 71 4.08 0.82 0.94 2899
Impervious C 0 0.00 71 4.08 0.82 0.94 0
TOTAL: 37053 0.85 2.82 2899
Developed Conditions:
Cover Type/Condition
Soil
Type
Area
(sf)
Area
(ac) CN S
Ia
(0.2*S)
Q
Runoff
(in)
Runoff
Volume
(ft
Roof C 5419 0.12 98 0.20 0.04 3.07 1385
Concrete Sidewalk C 1154 0.03 98 0.20 0.04 3.07 295
Asphalt Pavement C 19389 0.45 98 0.20 0.04 3.07 4956
Landscape/Pervious C 11091 0.25 74 3.51 0.70 1.10 1020
TOTAL: 37053 0.85 10.31 7656
2-Year Volume Increase (cf ): 4757
BMP Length 185
BMP Width 20
BMP Area 4275
BMP 6.4.5: Rain Garden / Bioretention
1. surface storage area volume (CF)
Bed Area (sq ft) 4275
Average Design Water Depth 1.0 (6" sediment storage)
2a. Infiltration Volume
Bed Bottom area (sq ft) 4275
Infiltration design rate (in/hr) 0.8
Infiltration period (hr) 24
2b. Volume
Bed Bottom area (sq ft) 4275 soil mix bed depth 1.5 void space 0.22 grass mix on lightly compacted topsoil
Storage Volume (CF) Provided 5686
363-0300-002 / December 30, 2006 Page 34 of 46
PROJECT:
SUB-BASIN:
Proposed BMP Area Storage Volume
(ft 2) (ft 3)
6.4.1 Porous Pavement
6.4.2 Infiltration Basin
6.4.3 Infiltration Bed
6.4.4 Infiltration Trench
6.4.5 Rain Garden/Bioretention
6.4.6 Dry Well / Seepage Pit
6.4.7 Constructed Filter
6.4.8 Vegetated Swale
6.4.9 Vegetated Filter Strip
6.4.10 Berm
6.5.1 Vegetated Roof
6.5.2 Capture and Re-use
6.6.1 Constructed W etlands
6.6.2 Wet Pond / Retention Basin
6.6.3 Dry Extended Detention Basin
6.6.4 Water Quality Filters
6.7.1 Riparian Buffer Restoration
6.7.2 Landscape Restoration / Reforestation
6.7.3 Soil Amendment
6.8.1 Level Spreader
6.8.2 Special Storage Areas
Other
Total Structural Volume (ft 3):
Structural Volume Requirement (ft 3):
DIFFERENCE
(Required Control Volume minus Non-structural Credi t)
WORKSHEET 5 . STRUCTURAL BMP VOLUME CREDITS
Non-structural Volume Credit (ft 3) - from Worksheet 3 :
Required Control Volume (ft 3) - from Worksheet 4 :
Structural Volume Reqmt (ft 3)
See attached spreadsheet for calculations
WORKSHEET 5
PROJECT: Butler VA EHRM - New MCR Building
SUB-BASIN:
Required Control Volume (ft3) - from Worksheet 4: 4757
Non-structural Credit (ft3) - from Worksheet 3: 116
Structural Volume Requirement (ft3) 4641
Proposed BMP
Area
(ft2)
Storage
Volume
(ft3)
6.4.1 Porous Pavement 0 0
6.4.2 Infiltration Basin 0 0
6.4.3 Infiltration Bed 0 0
6.4.4 Infiltration Trench 0 0
6.4.5 Rain Garden / Bioretention 4275 5686
6.4.6 Dry Well / Seepage Pit 0 0
6.4.7 Constructed Filter 0 0
6.4.8 Vegetated Swale 0 0
6.4.9 Vegetated Filter Strip 0 0
6.4.10 Berm 0 0
6.5.1 Vegetated Roof 0 0
6.5.2 Capture and Re-use 0 0
6.6.1 Constructed Wetlands 0 0
6.6.2 Wet Pond / Retention Basin 0 0
6.6.3 Dry Extended Detention Basin 0 0
6.6.4 Water Quality Filters 0 0
6.7.1 Riparian Buffer Restoration 0 0
6.7.2 Landscape Restoration / Reforestation 0 0
6.7.3 Soil Amendment 0 0
6.8.1 Level Spreader 0 0
6.8.2 Special Storage Areas 0 0
Other 0 0
Total Structural Volume Provided (ft3): 5686
Structural Volume Requirement (ft3): 4641
DIFFERENCE 1045
363-0300-002 / December 30, 2006 Page 35 of 46
The 2-Year/24 Hour Runoff Volume increase must be met in BMPs designed in accordance with Manual Standards
Total Site Impervious Area may not exceed 1 acre.
Maximum Development Area is 10 acresis 5 Acres
Maximum site impervious cover is 50%.
No more than 25% Volume Control can be in Non-structural BMPs
Infiltration BMPs must have an infiltration of at least 0.5 in/hr.
Site Area Percent
Impervious Total
Impervious
5 acre 20% 1 acre
2 acre 50% 1 acre
1 acre 50% 0.5 acre
0.5 acre 50% 0.25 acre
The following conditions must be met for exemption from peak rate analysis for small sites under CG-1:
WORKSHEET 6 . SMALL SITE / SMALL IMPERVIOUS AREA
EXCEPTION FOR PEAK RATE MITIGATION CALCULATIONS
X
X
363-0300-002 / December 30, 2006 Page 40 of 46
Flow Chart D Water Quality Process
Is 90% of the disturbed area controlled by a
BMP?
Show use of specific nitrate prevention / reduction BMPs (Worksheet 10); TSS and TP requirements met
Does design comply with CG 1 or CG 2 requirements for volume control?
NoYes
No
Yes
Complete Worksheet 12 Pollutant Load Estimate
Complete Worksheet 13 Pollutant Load Reduction for
BMPs
Water Quality Compliance
Yes
No
Show use of specific BMPs for Pollutant Prevention
(Worksheet 11)
Water Quality Compliance
Yes
363-0300-002 / December 30, 2006 Page 41 of 46
PRIMARY BMPs FOR NITRATE:
YES NO
SECONDARY BMPs FOR NITRATE:
WORKSHEET 10. WATER QUALITY COMPLIANCE FOR NITRATE
Structural BMP 6.4.9 - Vegetated Filter Strip
Structural BMP 6.6.1 - Constructed Wetland
NS BMP 5.4.3 - Protect / Utilize Natural Drainage F eatures
NS BMP 5.6.2 - Minimize Soil Compaction
Structural BMP 6.4.5 - Rain Garden / Bioretention
Structural BMP 6.4.8 - Vegetated Swale
Structural BMP 6.7.1 - Riparian Buffer Restoration
Structural BMP 6.7.2 - Landscape Restoration
NS BMP 5.9.1 - Street Sweeping / Vacuuming
Structural BMP 6.7.3 - Soils Amendment/Restoration
Structural BMP 6.7.1 - Riparian Buffer Restoration
Structural BMP 6.7.2 - Landscape Restoration
NS BMP 5.4.1 - Protect Sensitive / Special Value Fe atures
Does the site design incorporate the following BMPs to address nitrate pollution? A summary "yes" rating is achieved if at least 2 Primary BMPs for n itrate are provided across the site or 4 secondary BMPs for nitrate are provided across the site (or t he
NS BMP 5.6.3 - Re-Vegetate / Re-Forest Disturbed Ar eas (Native Species)
NS BMP 5.4.2 - Protect / Conserve / Enhance Riparia n Buffers
NS BMP 5.5.4 - Cluster Uses at Each Site
NS BMP 5.6.1 - Minimize Total Disturbed Area
X
X
X
X
2 Primary BMPs and 3 Secondary BMPs --> Water Quality Compliance
ELK
TIOGA
ERIE
YORK
CENTRE
POTTER
BERKS
PIKE
LYCOMING
MCKEAN
WAYNE
BEDFORD
BRADFORD
INDIANA
CLINTON
WARREN
BUTLER
LUZERNE
SOMERSET
CLEARFIELD
FAYETTE
BLAIR
BUCKS
CRAWFORD
LANCASTER
PERRY
CHESTER
MERCER
FRANKLIN
CAMBRIA
ADAMS
MONROE
GREENE
CLARION
VENANGO
HUNTINGDON
SCHUYLKILL
WASHINGTON
ALLEGHENY
DAUPHIN
WESTMORELAND
FULTON
BEAVER
JEFFERSON
SUSQUEHANNA
MIFFLIN
FOREST
ARMSTRONG
UNION
JUNIATA
SULLIVAN
COLUMBIA
LEHIGH
CARBON
WYOMING
SNYDER
CUMBERLAND
CAMERON
LEBANON
LACKAWANNA
MONTGOMERY
LAWRENCE
NORTHUMBERLAND
NORTHAMPTON
DELAWARE
MONTOUR
PHILADELPHIA
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
PENNSYLVANIA'S MAJOR RIVER BASINS
Jack Hill, Resources Management Section, 9/17/2014 0 50 10025
Milesµ Gunpowder Watershed Northeast / Elk River Watershed Ohio River Basin
Erie Watershed / Great Lakes Basin Genesee Watershed / Great Lakes Basin Delaware River Basin
Potomac River Basin Susquehanna River Basin
OHIO RIVER
BASIN
SUSQUEHANNA RIVER
BASIN
DELAWARE RIVER
BASIN
POTOMAC RIVER
BASIN
GREAT LAKES BASIN
(ERIE WATERSHED)
GUNPOWDER
WATERSHED
ELK / NORTHEAST
WATERSHED
GREAT LAKES BASIN
(GENESEE WATERSHED)
Butler VA Site
Slippery Rock Creek
Connequessing Creek
Beaver River
Ohio River
Butler VA EHRM Project New MCR Building
File details come from the government source that posted it. Updated .