This document is a set of mechanical engineering drawings for the Butler VA Healthcare System Infrastructure Upgrades project. The drawings include detailed mechanical plans, schedules, and technical specifications for multiple buildings (Buildings 02, 04, 06, 07, 08, 20, 21, 30, 46, 47, and 48), with a primary focus on mechanical systems, HVAC, fire protection, and infrastructure improvements.
Key technical details include installation of new HVAC equipment such as ductless split cooling units, variable refrigerant volume units, air handling units, exhaust fans, and specialized systems for a data center. The drawings cover comprehensive mechanical system upgrades including piping plans, equipment schedules, control systems, and technical details for installations. The project involves mechanical, electrical, and infrastructure upgrades across multiple buildings at the Butler VA Medical Center, with a focus on improving environmental control, cooling, and support systems for various medical and administrative spaces.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING SYMBOLS
ROOM NUMBER (ALPHA-NUMERIC)
ITEM (AC UNIT SHOWN)
SCHEDULED EQUIPMENT NUMBER
BUILDING NO. WHERE EQUIPMENT IS
LOCATED
CHILLED WATER RETURN
CHILLED WATER SUPPLY
DRAIN LINE
CHS
CHR
D
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
PIPE UP
PIPE DOWN
PENDENT SPRINKLER
FIRE SPRINKLER SYMBOLS
CONTROLS SYMBOLS
ROOM THERMOSTAT / TRANSMITTER -
WALL MOUNT
ROOM HUMIDISTAT (MOISTURE) /
TRANSMITTER - WALL MOUNT
01-AC-#-####
MOISTURE SENSOR - FLOOR MOUNTED
UPRIGHT SPRINKLER WITH GUARD
LEGEND
EXTENT OF DEMOLITION
POINT OF CONNECTION
TEMPERATURE SENSOR (TEMPTRAK)TT
T
H
M
R REFRIGERANT SENSOR - WALL MOUNTED
REFRIGERANT SUCTION AND LIQUID LINERS/RL
HVAC SYMBOLS
TEE PIPE DOWN
CONDENSING UNIT CONCRETE PADS
(GROUND MOUNTING)
UPRIGHT SPRINKLER
COLD WATER CW
HOT WATER SUPPLYHWS
HOT WATER RETURNHWR
FREEZE PROTECTION VALVE
FIRE DEPARTMENT CONNECTION
SUPPLY DIFFUSER
RETURN
REGISTER OR GRILLE
EXHAUST
REGISTER OR GRILLE
CIRCULAR SUPPLY DIFFUSER
R INCLINED RISE, IN DIRECTION OF FLOW
ARCHITECT / ENGINEER
AIR CONDITIONING
ABOVE FINISHED FLOOR
BACK FLOW PREVENTER
BRITISH THERMAL UNIT PER HOUR
BALL VALVE
CUBIC FEET PER MINUTE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
COMPUTER ROOM AIR CONDITIONING
CONDENSING UNIT
COLD WATER
DRAIN LINE
DIRECT DIGITAL CONTROLS
DUCT MOUNTED SMOKE DETECTOR
EXISTING
EXHAUST AIR
ELECTRICAL ENGINEER
EXHAUST FAN
EXHAUST GRILLE
FROM ABOVE
FLOOR DRAIN
FAHRENHEIT
FUEL OIL RETURN
FUEL OIL SUPPLY
HIGH LEVEL
MECHANICAL ENGINEER
OUTSIDE AIR
PINTS PER DAY
RETURN AIR
RETURN DIFFUSER
REFRIGERANT SUCTION AND LIQUID LINE
SUPPLY AIR
SUPPLY DIFFUSER
SUPPLY FAN
TRANSFER FAN
TO ABOVE
TO BELOW
VARIABLE AIR VOLUME
VOLUME DAMPER
VARIABLE REFRIGERANT FLOW
VARIABLE REFRIGERANT VOLUME
A/E
AC
AFF
BFP
BTUH
BV
CFM
CHR
CHS
CRAC
CU
CW
D
DDC
DSD
E
EA
EE
EF
EG
F/A
FD
F
FOR
FOS
H/L
ME
OA
PPD
RA
RD
RS/RL
SA
SD
SF
TF
T/A T/B
VAV
VD
VRF
VRV
ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
M-001
MECHANICAL GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
11/30/2023
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND
SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.
B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION.
C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
E) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING
DAMAGED.
F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
8. INSTALL GRAVITY DRAIN PIPING WITH A MINIMUM OF 1/8" PER LINEAR FOOT (1%)
SLOPE.
9. FURNISH AND INSTALL SECONDARY CONDENSATE CONTAINMENT SYSTEM (PIPE IN
PIPE). THIS APPLIES TO ALL CONDENSATE DRAIN PIPING FOR THE PROJECT.
10. ALL CONTROLS LABELING, CONTROL SEQUENCINGS, PROGRAMING, MATERIALS,
EQUIPMENT SCHEDULES, AND PROTOCOLS SHALL BE SUBMITTED TO THE VA FOR
APPROVAL.
1. ALL TELECOM ROOMS WITH EXISTING QUICK RESPONSE SPRINKLERS SHALL HAVE
THE QUICK RESPONSE SPRINKLER HEAD REPLACED WITH STANDARD
RESPONSE SPRINKLER HEADS. TELECOM ROOMS ARE CONSIDERED ORDINARY
HAZARD GROUP 1 FOR SPRINKLER HEAD DENSITY.
2. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE
SPRINKLER PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. REFER TO SPECIFICATION 21 13 13 FOR SPRINKLER HEAD DENSITY HAZARD CLASSES
FOR THE NEW MCR BUILDING AND TELECOM ROOMS IMPACTED IN THIS PROJECT.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
6. CONTRACTOR SHALL HAVE A LICENSED FIRE PROTECTION ENGINEER STAMP ON ALL
FIRE PROTECTION SHOP DRAWINGS.
FIRE PROTECTION GENERAL NOTES
Revisions: Date: 11/30/202311/30/23
SHOWN AREA
PROJECT
NORTH
1 2 3 4 5 6 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
G
H
I
J
EXIST. MECH.
B005
EXIST. MECHANICAL
B006
ELEC.
B004
EXIST. ELEVATOR
EXIST. CUST./RISER
B012
EXIST. MECHANICAL
B010
EXIST. MECHANICAL
2-819
EXIST. TOILET
B011
STAIR B
COOK'S OFFICE
B023
SUBSISTENCE STORAGE
B024
SUPPLY STORAGE
B001
DIETARY OFFICE
B003
ELEC.
B002A
TRAY ASSEMBLY
CART COOLER
B022
COOLER
B021
FREEZER
B020
KITCHEN PREP.
B019
CLO
B014A
DOCK STAGING
B018
CONTAMINATED WASTE
B015
TRASH COLLECTION
B016
CAN WASH
B017
EXIST. SERVICE TUNNEL
B014
NEW SERVICE TOWER
CART STAGING
B007
EXIST CORRIDOR
B013 DISH WASH
B008
TE
B08
02M-400
02M-400
02M-400
02M-400
B08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02M-100
BUILDING 02 - LEVEL 00 - OVERALL
FLOOR PLAN 02
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
PROJECT
NORTH
KEY PLAN
1/8" = 1'-0"1
LEVEL 00 - FLOOR PLAN
Revisions: Date:
10/11/2023
Issue Date
11/30/2023
11/30/202311/30/23
NORTH
1 2 3 4 5 6 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
E
G
H
I
J
WOMEN'S RESTROOM
EXIST. TOILET
EXIST. ADHC OFFICE
EXIST. STAIRS A
EXIST. ADHC/OFFICE
EXIST. CLC NURSING SUPPORT
EXIST. OFFICE
TR
TC110
ICRA ELEC. CART
EXIST. VESTIBULE
100C
EXIST MECH. CHASE
122BJANITOR
EXIST. STORAGE
EXIST. NURSE
EXIST. RESTROOM
125 EXIST. STAIRS B
119B
POLICE/SECURITY
VENDING AREA
EXIST. ELEVATOR
SEATING AREA
EXIST. VESTIBULE
MEN'S RESTROOM
117 PSYCHOLOGIST
EXIST. STAIR C
CHAPLAIN OFFICE
EXAM ROOM #2
EXAM ROOM #1
EUCHARISTIC
114A
CLEAN LINEN
SOLID LINEN
MULTI USE
EXIST. LOBBY
100A
CHAPEL
EXIST. CORRIDOR
100B
EXIST. CORRIDOR
CORRIDOR
CHAPLAIN OFFICE
ENCLOSED ELECTRICAL
GENERATOR
OFFICE UNASSIGNED
02M-401
02M-401
02M-401
02M-401
TC110
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02M-101
BUILDING 02 - LEVEL 01 - OVERALL
FLOOR PLAN 02
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
PROJECT
NORTH
1/8" = 1'-0"1
LEVEL 01 - FLOOR PLAN
KEY PLAN
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
NORTH
1 2 3 4 5 6 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
G
H
I
J
NURSE
NURSE
EXIST. TOILET
NURSE
EXIST. STAIR A
TR
STORAGE
RESPIRATORY THERAPY
MULTI PURPOSE
EMS
SPS
PYXIS
NURSE STORAGE
FIRE & ALARM SECURITY
EXIST. STAIR B
EMS/SEWING UNIFORM
EQUIPMENT WASH
KITCHEN SUPERVISOR
210EXIST ELEVATOR
EXIST VESTIBULE
BA-104Y
MECH. EXIST. CHASE
BA-104Z
MIT CART STORAGE
FOOD SERVICE DIRECTOR
SERV. ASSIT.
PORTABLE STOR.
EMS OFFICE
EMS EQUIPMENT
MEN EXIST. R.R.
WOMEN EXIST. R.R.
JAN.
WHEELCHAIR REPAIR
EXIST STAIR C
BIOMED
EMS KITCHEN/BREAK
CORRIDOR
02M-402
02M-402
02M-402
02M-402
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02M-102
BUILDING 02 - LEVEL 02 - OVERALL
FLOOR PLAN 02
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
PROJECT
NORTH
1/8" = 1'-0"1
LEVEL 02 - FLOOR PLAN
KEY PLAN
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
NORTH
B03
D E F G H
B C I J K LA
MECH RM
B02
CORRIDOR
EMERGENCY LIGHTING RM
B02A
TRANSFORMER RM
B01
LAUNDRY
B05
TRUNK STORAGE (TE)
B03
CRAWL SPACE
B04
STORAGE
B03 A
STAIR - S
04M-400
04M-400
04M-400
04M-400
TRUNK STORAGE (TE)
B03
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 04M-100
BUILDING 04 - LEVEL 00 - OVERALL
FLOOR PLAN 04
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
KEY PLAN
1/4" = 1'-0"1
LEVEL 00 - FLOOR PLAN
PROJECT
NORTH
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
NORTH
F G
A B C D E
H I
LAUNDRY
TR
105B
MECHANICAL ROOM
LOUNGE
RESTROOM/SHOWER
108A
LINEN ROOM
LOCKER ROOM
STORAGE
RESTROOM/SHOWER ROOM
107A
LOCKER ROOM
OFFICE
CLOSET
105A
06M-401
06M-401
06M-401
06M-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 06M-101
BUILDING 06 - LEVEL 01 - OVERALL
FLOOR PLAN 06
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
KEY PLAN
1/8" = 1'-0"1
LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
NORTH
A B C D E F G H
BOILER PLANT
B01
BOILER PLANT
B01
B02
07M-400
07M-400
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 07M-100
BUILDING 07 - LEVEL 00 - OVERALL
FLOOR PLAN 07
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
Revisions: Date:
KEY PLAN
B01
3/16" = 1'-0"2
LEVEL 00 - FLOOR PLAN
PROJECT
NORTH
10/11/2023
Issue Date
10/11/2023
Issue Date
NORTH
100A & 101
A B C D E F G H
BOILER ROOM
OFFICE
TE
101A
EMERGENCY GENERATOR
ELECTRICAL VAULT
OFFICE
102A
SUMMER BOILER ROOM
103A
STORAGE
LOCKER ROOM
105A
LOCKER ROOM
RESTROOM/SHOWER ROOM
105AA
DEAERATOR
102B
LOCKSHOP
CORRIDOR
100B
07M-401
07M-401
07M-401
07M-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 07M-101
BUILDING 07 - LEVEL 01 - OVERALL
FLOOR PLAN 07
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
3/16" = 1'-0"1
LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
KEY PLAN
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
UP
PROJECT
NORTH
A B C D
FILE STORAGE
101A
VALVE ROOM
MH
ENTRY
TE
PRIVATE OFFICE
EXISTING SHED
COMPRESSOR
MAINTENANCE SHOP
ELECTRICAL CLOSET
102A
BREAK AREA
LOCKER ROOM
TOILER ROOM
108A
CHANGING AREA
08M-401
08M-401
08M-401
08M-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 08M-101
BUILDING 08 - LEVEL 01 - FLOOR
PLAN 08
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
3/32" = 1'-0"1
LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
KEY PLAN
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
HA B C E F G I J
ATRIUM
TR
417A
PAT. ROOM
E110
TOILET
E110.1
WASHINGTON COURTYARD
STOR.
W129.3
SEATING AREA
C-13.1
CORR.
C-13
SEATING AREA
C-12.1
THERAPY
W130
VISITOR BEDROOM
W132
DATA
W131
PAT. ROOM
W101
TOILET
W101.1
TOILET
W128.1
PAT. ROOM
W128
SPD
W135
EQUIPMENT
STORAGE
W134
SPA
W133
TOILET
W133.1
TOILET
W137
CONFERENCE
W138
OFFICE
W139
CONSULT
W140
CLERICAL
W136
SUN ROOM
W116
ATTIC ACCESS
W112
FAMILY DINING
W123
WARMING
KITCHEN
W124
ELEC.
W125
STORAGE
W105
JAN. CL.
W104
SOILED RM.
W103
MED./TREAT.
W107
CORR
ELEC.
E114
FAMILY DINING
E116
WARMING
KITCHEN
E115
MED./TREAT.
E104
SOILED
E108
STAFF
TLT.
E105
JAN. CL.
E107
STORAGE
E106
CLEAN
SUPPLY
W142
SUN ROOM
E123
ATTIC ACCESS
E127
BARIATRIC
TOILET
E128.1
BARIATRIC PAT. ROOM
E128PAT. ROOM
E126
TOILET
E126.1
TOILET
E125.1
PAT. ROOM
E125
PAT. ROOM
E113
TOILET
E113.1
PAT. ROOM
E117
TOILET
E117.1
PAT. ROOM
E118
TOILET
E118.1
PAT. ROOM
E119
TOILET
E119.1
TOILET
E121.1
PAT. ROOM
E121
PAT. ROOM
E120
TOILET
E120.1
PAT. ROOM
E102
TOILET
E102.1
TOILET
E109.1
PAT. ROOM
E109
TOILET
E111.1
PAT. ROOM
E111
TOILET
E112.1
PAT. ROOM
E112
BARIATRIC PAT. ROOM
E101
BARIATRIC
TOILET
E101.1
STAFF BREAK
W141
PAT. ROOM
W127
TOILET
W127.1
PAT. ROOM
W126
TOILET
W126.1
PAT. ROOM
W114
TOILET
W114.1
PAT. ROOM
W113
TOILET
W113.1
TOILET
W122.1
PAT. ROOM
W122
TOILET
W121.1
PAT. ROOM
W121
TOILET
W120.1
ATTIC
ACCESS
W129.1
PAT. ROOM
W120
TOILET
W118.1
PAT. ROOM
W118
PAT. ROOM
W119 TOILET
W119.1
PAT. ROOM
W109
TOILET
W109.1
PAT. ROOM
W102
TOILET
W102.1
CORR.
C-15
BARIATRIC PAT. ROOM
W111
BARIATRIC
TOILET
W111.1
BARIATRIC PAT. ROOM
W110
BARIATRIC
TOILET
W110.1
NURSE
E103
DINING
E122
LIVING
E124
NURSE
W106
DINING
W117
LIVING
W115
CORR.
C-12
MULTIPURPOSE
W129
20M-401
20M-401
20M-401
20M-401
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 20M-101
BUILDING 20 - LEVEL 01 - FLOOR
PLAN A 20
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/16" = 1'-0"1
LEVEL 01 - FLOOR PLAN A
PROJECT
NORTH
KEY PLAN
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
O
L
K
M
N
P
DINING
S121
PAT. RM.
S122
TR
220A
ATRIUM ENCLOSED AREA
PAT. RM.
N123
PAT. RM.
N124
TLT.
N124.1
TLT
N125.1
PAT. RM.
N125
PAT. RM.
N126
TLT.
N126.1
TLT.
N123.1
TLT.
N122.1
PAT. RM.
N122
FAMILY DINING
N119
WARMING
KITCHEN
N118
PAT. RM.
N116
TLT.
N116.1
ELEC.
N117
PAT. RM.
N115
TLT.
N115.1
PAT. RM.
N114
TLT.
N114.1
TLT.
N113.1
PAT. RM.
N113
PAT. RM.
N112
TLT.
N112.1
SOILED
N111
MED./ TREAT
N107
JAN. CL.
N110
STORAGE
N108
PAT. RM.
N104
TLT.
N104.1
PAT. RM.
N102
TLT.
N102.1
PUBLIC TLT.
W176
PUBLIC TLT.
W177
VEST.
W100
CONFERENCE
W178
PAT. RM.
N105
TLT.
N105.1
PAT. RM.
N103
TLT.
N103.1
PAT. RM.
N101
TLT.
N101.1
SPA
W179
STAFF TLT.
W180
NURSE MGR.
W181
CONSULT/FILES
W182
STOR
STAFF
W183
SPA TLT.
W112.1
BLDG. STOR
W184
ELEC.
W185
EQUIP. STOR.
W186DATA
W187
SPD STOR.
W188
CLEAN
W189
MECH/ELEC
W190
JAN. CL.
W191
MULTI-PURPOSE
W192
STORAGE
W193
ELEC.
W194
STORAGE
W195
ATTIC
ACCESS
W129.2
TLT.
W196
STORAGE
W197
STOR
W198
CORR.
C-3
CLERICAL
W199
RECEPTION
W200
WAIT
W201
CORR.
C-1
ATRIUM COURTYARD
ATRIUM
CORR.
C-10
NURSE
N106
SEATING AREA
C-5.1
CORR.
C-5
CORR.
W202
DINING
N121
LIVING
N120
CORR.
C-9
CORR.
C-2
GAME ROOM
W126
ELEC.
S117
WARMING
KITCHEN
S118
FAMILY DINING
S119
MED./TREAT
S107
STORAGE
W129.4
PAT. RM.
S102
TLT.
S102.1
PAT. RM.
S104
TLT.
S104.1
TLT.
S101.1
PAT. RM.
S101
PAT. RM.
S103
TLT.
S103.1
PAT. RM.
S112
TLT.
S112.1
ATTIC
ACCESS
S110.1
SOILED
S111
STAFF TLT.
321A
STORAGE
TLT.
S115.1
PAT. RM.
S115
PAT. RM.
S114
TLT.
S114.1
TLT.
S113.1
PAT. RM.
S113
PAT. RM.
S116
TLT.
S116.1
PAT. RM.
S126
TLT.
S126.1
PAT. RM.
S125
TLT.
S125.1
PAT. RM.
S124
TLT.
S124.1
PAT. RM.
S123
TLT.
S123.1
TLT.
S122.1
TLT.
S105.1
NURSE
S106
JAN. CL.
LIVING
S120
Room
C-11
MECH./ ELEC.
W123
STUDY
W128
MULTIPURPOSE
W129
CORR
C-4
CORR.
C-11
STORAGE
W129.1
CORRIDOR
C-8
CORRIDOR
C-6
CORRIDOR
C-7
20M-411
20M-411
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 20M-111
BUILDING 20 - LEVEL 01 - FLOOR
PLAN B 20
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/16" = 1'-0"1
LEVEL 01 - FLOOR PLAN B
PROJECT
NORTH
KEY PLAN
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
EXT. TR
PROJECT
NORTH
A
B
C
D
E
F
G
H
I
J
K
L
M
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
VESTIBULE
D-121
TR
D-119A
GROUP THERAPY
D-119
VESTIBULE
D-100
LOBBY
D-101
CLERICAL
D-102
DIRECTOR'S OFFICE
D-103
STORAGE
D-104
STAFF
D-105
CORRIDOR
D-106
GROUP THERAPY
D-107
STOR
D-108
STUDENT OFFICE
D-109
PROG. COORD. OFFICE
D-110
OFFICE
D-111
OFFICE
D-112
OFFICE
D-113
OFFICE
D-114
OFFICE
D-115
OFFICE
D-116
OFFICE
D-117
CORR.
D-118
GROUP THERAPY
D-120
CORRIDOR
D-122
GROUP THERAPY
D-123
WOMEN
D-124
DINING
D-125
CORRIDOR
D-126
WARMING KITCHEN
D-127
PHONE
D-128
PHONE
D-129
CUST. COORD
D-130
STOR.
D-131
STAFF TLT.
D-132
STAFF TLT.
D-133
ART
D-134
OCC. THER. KITCHEN
D-135
RECREATION
D-136
REC. THER. OFFICE
D-137
COMP
D-138
RESOURCE LIBRARY
D-139
STOR.
D-140
SPD STOR.
D-141
PHYS. THER
D-142
STOR.
D-143
CORRIDOR
D-144
DOCK
D-145
LINEN HOLD
D-146
DATA
D-147
SWITCHGEAR
D-148
ELEC.
D-149
STOR.
D-150
MECHANICAL EQUIPMENT
D-151
P/ FP
D-152
VENDING
D-153
SPECIMEN TOILET
D-154
NURSE PRACTITIONER
D-155
PHONE
D-156
EXAM
D-157
NURSE
D-158
JAN. CL.
D-159
MEDS
D-160
DOM. ASSIST
D-161 MEN
D-162
21M-401
21M-401
21M-401
21M-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 21M-101
BUILDING 21 - LEVEL 01 - FLOOR
PLAN 21
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/8" = 1'-0"1
LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
KEY PLAN
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
105A
SHOWN AREA
PROJECT
NORTH
1A 1 2 3 4 5
A
B
C
30M-401
30M-401
30M-401
30M-401
SWITCHGEAR
EMERGENCY GENERATOR
CONTROL ROOM
TE
105A
TOILET ROOM
SHOWER ROOM
BREAK ROOM
WORKSHOP
PARTS STORAGE
EQUIPMENT ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 30M-101
BUILDING 30 - LEVEL 01 - FLOOR
PLAN 30
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/8" = 1'-0"1
LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
KEY PLAN
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
NORTH
101A
B C E F H I J K
A D G L NM
100C
FEMALE RESTROOM
TELEPHONE CLOSET
CHIEF ENGINEER
TR
101D
PLOTTER/FILES ROOM
101A
CARPENTER'S SHOP
STORAGE
123A--
122A
STORAGE
STORAGE
120A
PAINT SHOP
119B
PAINT SHOP
STORAGE
MECHANICAL ROOM
119A
STORAGE
118A
LOUNGE/LUNCH ROOM
100SA
MAINTENANCE LEADER
SUPERVISORY PROGRAM
SPECIALIST
BUDGET ANALYST
100S
UTILITIES SYSTEM/ OPERATIONS
SUPERVISOR
KITCHEN
MALE RESTROOM
COPY ROOM
BENEFICIARY TRAVEL/ASST.
TRANSPORTATION
CONFERENCE ROOM
100E
ENVIRO. PROTECTION SPEC.
ENGINEERING TECH./AUTOCAD
ENGINEER TECH.
100W
ENGINEER
CONFERENCE ROOM
SAFETY OFFICER
101B
OFFICE
101C
46M-401
46M-401
46M-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 46M-101
BUILDING 46 - LEVEL 01 - FLOOR
PLAN 46
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1" = 10'-0"2
LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
Revisions: Date:
KEY PLAN
10/11/2023
Issue Date
10/11/2023
Issue Date
PROJECT
NORTH
A B C D E F G H I J K L M N O P
47M-401
47M-401
47M-401
47M-401
PESTICIDE STORAGE
102A
EQUIPMENT STORAGE
102D
LOUNGE/BREAK
102B
STOARGE
102C
STORAGE
105CA
STORAGE
105B
EQUIPMENT STORAGE
OFFICE
103A
FOYER
MECHANICAL ROOM
DRUG VAULT
105C
BREAK ROOM
PURCHASING AGENT
105EB
INVENTORY MANAGER
105EA
PURCHASING AGENT
105E
SUPERVISOR OFFICE
105D
TELEPHONE CLOSET
105A
LOADING DOCK
ENGINEERING PRIMARY GIP
STORAGE
IT STORAGE
105G
HOUSE KEEPING INVENTORY
LOADING DOCK
101A
RECEIVING AREA
OFFICE STORAGE
105GA
MALE RESTROOM
105FA
FOYER
105F
105FB
RESTROOM/SHOWER
105FC
TE
105H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 47M-101
BUILDING 47 - LEVEL 01 - FLOOR
PLAN 47
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
KEY PLAN
1" = 10'-0"1
LEVEL 01 - FLOOR PLAN
Revisions: Date:
PROJECT
NORTH
10/11/2023
Issue Date
10/11/2023
Issue Date
TE
100CA
CLOSET
111A
CORRIDOR
KITCHEN
CHIEF SLEEPING
SLEEPING
SLEEPING
MECH
DAYROOM
SLEEPING
SLEEPING
CAPTAIN SLEEPING
BATHROOM
BATHROOM
DAYROOM
OFFICE
OFFICE
TOILET
LOBBY
TRUCK GARAGE
LOCKERS
UTLITY
A B C D E F G H I
10 11
48M-401
48M-401
100CA
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 48M-101
BUILDING 48 - LEVEL 01 - FLOOR
PLAN 48
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/8" = 1'-0"1
LEVEL 01 - FLOOR PLAN
KEY PLANPROJECT
NORTH
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
2.1
LEVEL 01
0' - 0"
24"x40" 24"x40" 24"x40"
SERVER RACK
CABINET VERTICAL
EXHAUST DUCT
(18"x18")
(TYPICAL)
137-CRAC-02-114
137-CRAC-02-114
2.63 2
LEVEL 0
ROOF PLAN
23' - 0"
"x
"x
60"x24" 60"x24"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED M-301
DATA CENTER - SECTION VIEW
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/2" = 1'-0"1
DATA CENTER - SECTION
GENERAL NOTES
1. ALL PIPING AND DUCTWORK IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.
CONTRACTOR SHALL LOCATE ALL PIPING, DUCTWORK, AND VAV BOXES IN THE
VERTICAL CEILING SPACES TO OPTIMIZE EASE OF ACCESS.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
6. ALL EQUIPMENT HYDRONIC RUNOUTS SHALL MATCH THE UNIT CONNECTION SIZE(S),
UNLESS OTHERWISE SHOWN.
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
2 11.82.1
0' - 0"
RAIN CAP
GENERATOR
FLEXIBLE DUCT
CONNECTORS
BACKDRAFT
DAMPER
137-BD-03
137-L-02
137-CS-01-116
6"Ø VTR
137-FT-01-116
137-EF-01-116
VENTILATED THIMBLE
ASSEMBLY
EXHAUST AIR
EXHAUST AIR
LEVEL 01
0' - 0"
MEZZANINE
11' - 6"
EXHAUST AIR
2.6
1.8 2.1
LEVEL 01
0' - 0"
SUPPLY AIR
SUPPLY AIR
D
FOR
FOS
137-FPS-01-116
FLEXIBLE DUCT
CONNECTORS
137-SF-01-116
SDS
LEVEL 01
0' - 0"
MEZZANINE
11' - 6"
2.6
Level 01 0' - 0"
ROOF PLAN
20' - 0"
MEZZANINE
11' - 6"
LEVEL 01
0' - 0"
AB
MOTORIZED
DAMPER
17' - 0 1/4"
"1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED M-302
GENERATOR ROOM - SECTION
VIEW 137
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/4" = 1'-0"1
GENERATOR ROOM EXHAUST FAN - SECTION
1/4" = 1'-0"2
GENERATOR ROOM INTAKE FAN - SECTION
1/4" = 1'-0"3
GENERATOR ROOM - SECTION VEW
GENERAL NOTES
1. ALL PIPING AND DUCTWORK IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.
CONTRACTOR SHALL LOCATE ALL PIPING, DUCTWORK, AND VAV BOXES IN THE
VERTICAL CEILING SPACES TO OPTIMIZE EASE OF ACCESS.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
6. ALL EQUIPMENT HYDRONIC RUNOUTS SHALL MATCH THE UNIT CONNECTION SIZE(S),
UNLESS OTHERWISE SHOWN.
Revisions: Date:
KEYNOTES #
HORIZONTAL DISTANCE FROM TOP OF FLUE TO ROOF SHALL BE A MINIMUM OF 10' 0"
PER NFPA 211.
VERTICAL DISTANCE FROM ROOF TO TOP OF FLUE SHALL BE A MINUMUM OF 3' 0"
PER NFPA 211.
10/11/2023
Issue Date
10/11/2023
Issue Date
FFL
0' - 0"
DD
LEVEL 01
0' - 0"
SUPPLY AIR
D
RS/RL
HWR
HWS
FPW
D
CHS
CW
CW
CHR
FFL
0' - 0"
ROOF LEVEL
12' - 6"
D
LEVEL 01
0' - 0"
MEZZANINE
11' - 6"
SUPPLY AIR
RETURN AIR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED M-303
HALLWAY BY MECH ROOM -
SECTION VIEW 137
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
3/4" = 1'-0"1
HALLWAY BY MECH ROOM - SECTION
GENERAL NOTES
1. ALL PIPING AND DUCTWORK IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.
CONTRACTOR SHALL LOCATE ALL PIPING, DUCTWORK, AND VAV BOXES IN THE
VERTICAL CEILING SPACES TO OPTIMIZE EASE OF ACCESS.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
6. ALL EQUIPMENT HYDRONIC RUNOUTS SHALL MATCH THE UNIT CONNECTION SIZE(S),
UNLESS OTHERWISE SHOWN.
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
0' - 0"
EXHAUST AIR
SUPPLY AIR
OUTSIDE AIR
D
FD
SS
137-AHU-01-109
137-RH-01
137-BD-01
MOTORIZED DAMPER
FLEXIBLE DUCT
CONNECTORS
FLEXIBLE DUCT
CONNECTOR
FLEXIBLE DUCT
CONNECTOR
2.6D
LEVEL 01
0' - 0"
SUPPLY AIR
EXHAUST AIR
137-AHU-01-109
RETURN AIR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED M-304
MECHANICAL ROOM TOWARDS
AHU - SECTION VIEW 137
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
GENERAL NOTES
1. ALL PIPING AND DUCTWORK IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY.
CONTRACTOR SHALL LOCATE ALL PIPING, DUCTWORK, AND VAV BOXES IN THE
VERTICAL CEILING SPACES TO OPTIMIZE EASE OF ACCESS.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
6. ALL EQUIPMENT HYDRONIC RUNOUTS SHALL MATCH THE UNIT CONNECTION SIZE(S),
UNLESS OTHERWISE SHOWN.
1/2" = 1'-0"1
MECHANICAL ROOM TOWARDS AHU - SECTION A
Revisions: Date:
1/2" = 1'-0"2
MECHANICAL ROOM TOWARDS AHU - SECTION B
10/11/2023
Issue Date
10/11/2023
Issue Date
B08
PROJECT
NORTH
CART COOLER
B022
T
M
H
FREEZER
B020
DOCK STAGING
B018
TE
B08
4 5 6
I
J
(E) 3/4"Ø HWS
(E) 3/4"Ø HWR
KITCHEN PREP.
B019
3/4"Ø CHS
3/4"Ø CHR
COOLER
B021
02-FCU-01-B08
CHS
CHR
C H
R C
H S
CHS
CHR
18"x10"
18"x10"
9 10
D
D
D
3/4"Ø
FREEZER
B020
TE
B08
DOCK STAGING
B018
4 5
I
J
RGS
18"x10"
900 CFM
SDS
18"x10"
900 CFM
4 5
I
J
3/4"Ø HOT WATER HEATING SUPPLY
3/4"Ø HOW WATER HEATING RETURN
FREEZER
B020
DOCK STAGING
B018
4 5
I
J
FREEZER
B020
DOCK STAGING
B018
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02M-400
BUILDING 02 - LEVEL 00 - DEMO,
FLOOR PLANS & RCPS 02
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/4" = 1'-0"3
RM B08 - FLOOR PLAN
1/4" = 1'-0"4
RM B08 - RCP
1/4" = 1'-0"1
RM B018 - DEMO FLOOR PLAN
1/4" = 1'-0"2
RM B018 - DEMO RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
INSTALL NEW CHILLED WATER TYPE DUCTED FCU AND ASSOCIATED DUCTWORK.
SEE EQUIPMENT SCHEDULES ON SHEET M-602.
FURNISH AND INSTALL NEW CHILLED WATER SUPPLY AND RETURN PIPE AS PER
MANUFACTURER REQUIREMENTS. PROVIDE PIPE INSULATION FOR CHILLED WATER
LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE SIZES
SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION FOR ALL CONDENSATE
LINES PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER
SPECIFICATION SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
DEMO EXISTING UNIT HEATER AND RETAIN FOR RE-INSTALLATION.
RE-INSTALL UNIT HEATER. SEE KEYNOTE #5.
EXISTING QUICK RESPONSE SPRINKLER TO REMAIN.
INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN UPRIGHT POSITION. INSTALL
NEW BRANCH LINE, TIE-IN TO NEAREST EXISTING MAIN.
INSTALL NEW SIDEWALL RETURN GRILLE. SEE EQUIPMENT SCHEDULE ON SHEET
M-602.
INSTALL NEW SIDEWALL SUPPLY DIFFUSER. SEE EQUIPMENT SCHEDULE ON SHEET
M-602.
CONDENSATE LINE TO BE ROUTED TO THE EXISTING FLOOR SINK. SEE "INDIRECT
DRAIN FLOOR SINK DRAIN DETAIL" ON SHEET M-501.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
E
G
T
E
G
TR
TC110
EXIST. VESTIBULE
100C
EXIST. CORRIDOR
100B
M
T H
EXIST. OFFICE
02-AC-01-TC110
CORRIDOR
3/4"Ø
6 9
C
E
G
02-CU-01-TC110
1/4"Ø, 5/8"Ø
(E) 2"Ø
P-01
ICRA ELEC. CART
VENDING AREA
MULTI USE
3/4"Ø
D
11 12
02-CU-02-204
3/8"Ø, 5/8"Ø6
C W
C W
C W
R L /R
S
R L /R
S
TR
TC110
EXPOSED
EXIST. VESTIBULE
100C
EXIST. CORRIDOR
100B
E
G
TC110
SHOWN AREA
PROJECT
NORTH
I.T.
TC110
ICRA ELEC. CART
EXIST. VESTIBULE
100C
EXIST. CORRIDOR
100B
EXIST. OFFICE
CORRIDOR
I.T.
TC110
EXIST. VESTIBULE
100C ICRA ELEC. CART
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02M-401
BUILDING 02 - LEVEL 01 - DEMO,
FLOOR PLANS & RCPS 02
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/4" = 1'-0"1
RM TC110 - DEMO FLOOR PLAN
1/4" = 1'-0"2
RM TC110 - DEMO RCP
1/4" = 1'-0"3
RM TC110 - FLOOR PLAN
1/4" = 1'-0"4
RM TC110 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMO EXISTING FAN COIL UNIT.
DEMO EXISTING SPRINKLER. DEMO SPRINKLER BRANCH PIPE BACK TO MAIN.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. ALL NEW SPRINKLER
PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW STANDARD RESPONSE
SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE GUARD.
INSTALL NEW DUCTLESS SPLIT COOLING UNIT. SEE EQUIPMENT SCHEDULES ON
SHEET M-601.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER. LINE SET SHALL BE AT A HEIGHT OF 12' AFF.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION FOR ALL CONDENSATE
LINES PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER
SPECIFICATION SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
CONDENSATE TO BE DISCHARGED TO THE GROUND. TERMINATE CONDESATE PIPING
WITH A DOWNTURNED ELBOW 12" ABOVE FINISHED GRADE.
SEE ''CONDENSING UNIT WALL MOUNT SUPPORT DETAIL'' ON SHEET M-501.
ROUTE REFRIGERANT AND CONDENSATE LINE DOWN TO 1'-0" ABOVE GRADE LEVEL
BEFORE PENETRATING WALL.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL REFRIGERATION LINE-
SET COVER TO CONCEAL REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO
COORDINATE COLOR WITH VA COR.
DEMO EXISTING THERMOSTAT. TURN OVER TO COR.
FURNISH AND INSTALL NEW ANTI-SIPHON FREEZELESS WALL HYDRANT. SEE
EQUIPMENT SCHEDULES ON SHEET M-603. CONNECT TO NEAREST EXISTING WATER
SUPPLY LINE.
EXISTING HYDRONIC HOT AND CHILLED WATER PIPING, TO REMAIN.
F/A, FOR CONTINUATION SEE SHEET 02M-402.
DEMO HYDRONIC PIPE SERVING FCU BACK TO MAIN. DEMO CONDENSATE PIPING
SERVING FCU.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
3 4
G
H
T
C H
S C
H R
H W
S H
W R
(E) CHS, CHR
HWS, HWR
D
3 4
G
H
T H
M
TR
STORAGE
EXIST. STAIR A
02-AC-02-204
EMS
MULTI PURPOSE
3 4 5 6
E
G
H
RL/RS
D
R L /R
S D
R L /R
S
D
SPS
PYXIS
CORRIDOR
R
1/4"Ø, 1/2"Ø
02-AC-03-204
3/4"Ø
3/8"Ø, 5/8"Ø
14 2
(E) CHS,CHR
HWS,HWR
T/B, FOR
CONTINUATION SEE
SHEET 02M-101a
RL & RS PIPE AT H/L
(BELOW WINDOWS)
TR
EXPOSED
EXIST. STAIR A
STORAGE
MULTI PURPOSE
3 4
E
G
H
CORRIDOR
SHOWN AREA
PROJECT
NORTH
STORAGE
STORAGE
EXIST. STAIR A
STORAGE
EXIST. STAIR A
STORAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02M-402
BUILDING 02 - LEVEL 02 - DEMO,
FLOOR PLANS & RCPS 02
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/4" = 1'-0"1
RM 204 - DEMO FLOOR PLAN
1/4" = 1'-0"2
RM 204 - DEMO RCP
1/4" = 1'-0"3
RM 204 - FLOOR PLAN
1/4" = 1'-0"4
RM 204 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING UNIT. SEE EQUIPMENT
SCHEDULE ON SHEET M-601.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER. LINE SET SHALL BE AT A HEIGHT OF 12' AFF.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION FOR ALL CONDENSATE
LINES PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER
SPECIFICATION SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL REFRIGERATION LINE-
SET COVER TO CONCEAL REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO
COORDINATE COLOR WITH VA COR.
DEMO EXISTING THERMOSTAT. TURN OVER TO COR.
DEMO CEILING SUPPLY DIFFUSER. DEMO BRANCH DUCTWORK BACK TO MAIN. CAP
AND SEAL DUCTWORK AT MAIN.
DEMO CEILING SUPPLY SLOT DIFFUSER. DEMO BRANCH DUCTWORK BACK TO MAIN.
CAP AND SEAL DUCTWORK AT MAIN.
DEMO CEILING RETURN GRILLE. DEMO BRANCH DUCTWORK BACK TO MAIN. CAP AND
SEAL DUCTWORK AT MAIN.
DEMO CEILING EXHAUST GRILLE. DEMO BRANCH DUCTWORK BACK TO MAIN. CAP
AND SEAL DUCTWORK AT MAIN.
DEMO EXISTING FAN COIL UNIT. DEMO HYDRONIC PIPING BACK TO MAIN. DEMO
CONDENSATE PIPE.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW
STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1 FT. ABOVE
FINISHED FLOOR.
CAP EXISTING CONDENSATE DRAIN LINE IN CEILING SPACE.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
B03
PROJECT
NORTH
D E F
TRUNK STORAGE
(TE)
B03
CORRIDOR
CRAWL SPACE
B04
T H
3/4"Ø
04-AC-01-B03B
D
LAUNDRY
B05
C W
(E) 3/4"Ø
D
11P-01
D E F
TRUNK STORAGE
(TE)
B03
CRAWL SPACE
B04CORRIDOR
LAUNDRY
B05
D E F
C W
(E)3/4"Ø
STORAGE
B03 A
CORRIDOR
CRAWL SPACE
B04
TRUNK STORAGE
B03
LAUNDRY
B05
D E F
1 2
STORAGE
B03 A
TRUNK STORAGE
B03
CORRIDOR
CRAWL SPACE
B04
LAUNDRY
B05
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 04M-400
BUILDING 04 - LEVEL 00 - DEMO,
FLOOR PLANS & RCPS 04
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/4" = 1'-0"3
RM B03B - FLOOR PLAN
1/4" = 1'-0"4
RM B03B - RCP
1/4" = 1'-0"1
RM B03 - DEMO FLOOR PLAN
1/4" = 1'-0"2
RM B03 - DEMO RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMO EXISTING QUICK RESPONSE SPRINKLER.
EXISTING QUICK RESPONSE SPRINKLER TO REMAIN.
ALL NEW SPRINKLER PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW
STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION.
PROVIDE VERTIV VRC AIR CONDITIONER. SEE EQUIPMENT SCHEDULE ON SHEET
M-602.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION FOR ALL CONDENSATE
LINES PER SPECIFICATION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
CONDENSATE LINE TO BE ROUTED TO THE EXISTING FLOOR SINK SANITARY
LINE. SEE "INDIRECT DRAIN FLOOR SINK DETAIL" ON SHEET M-501.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL REFRIGERATION LINE-
SET COVER TO CONCEAL REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO
COORDINATE COLOR WITH VA COR.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
EXISTING DRAIN PIPE TO REMAIN.
DEMO EXISTING WALL HYDRANT.
FURNISH AND INSTALL NEW ANTI-SIPHON FREEZELESS WALL HYDRANT. SEE
EQUIPMENT SCHEDULES ON SHEET M-603. CONNECT TO EXISTING COLD WATER
SUPPLY PIPING.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date: 11/30/23
NORTH
A B C
LOUNGE
LAUNDRY
TR
TH
3/4"Ø 1/4"Ø, 5/8"Ø 3 4 7
06-AC-01-102
06-CU-02-102
M
105B
MECHANICAL
ROOM
LOUNGE
1/4"Ø, 5/8"Ø 3
R S
/R L
R S
/R L
R S
/R L
D
RS/RL
OFFICE
A B C
TR
LOUNGE
LAUNDRY
10 10
EXPOSED
A B C
LOADING DOCK
LOUNGE
LAUNDRY
A B C
LOUNGE
LAUNDRY
LOADING DOCK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 06M-401
BUILDING 06 - LEVEL 01 - DEMO,
FLOOR PLANS & RCPS 06
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/4" = 1'-0"3
RM 102 - FLOOR PLAN
1/4" = 1'-0"4
RM 102 - RCP
1/4" = 1'-0"1
RM 102 - DEMO FLOOR PLAN
1/4" = 1'-0"2
RM 102 - DEMO RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMO EXHAUST FAN.
INSTALL NEW DUCTLESS SPLIT COOLING UNIT. SEE EQUIPMENT SCHEDULES ON
SHEET M-601.
INSTALL NEW REFRIGERANT LINES AS PER MANUFACTURER REQUIREMENTS
(INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL
REFRIGERANT LINES PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT
PER SPECIFICATION SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY
APPLICABLE TO BASIS OF DESIGN MANUFACTURER. LINE SET SHALL BE AT A HEIGHT
OF 12' AFF.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION FOR ALL CONDENSATE
LINES PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER
SPECIFICATION SECTION 23 05 11.
ROUTE REFRIGERANT LINE DOWN TO 1'-0" ABOVE FINISHED FLOOR AFTER
PENETRATING WALL.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL REFRIGERATION LINE-
SET COVER TO CONCEAL REFRIGERANT AND CONDENSATE PIPING. CONTRACTOR
TO COORDINATE COLOR WITH VA COR.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
CONDENSATE TO BE DISCHARGED TO THE GROUND. TERMINATE CONDESATE PIPING
WITH A DOWNTURNED ELBOW 12" ABOVE FINISHED GRADE.
SEE "CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL" ON SHEET M-501.
INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN UPRIGHT POSITION. INSTALL
NEW BRANCH LINE, TIE-IN TO NEAREST EXISTING MAIN.
ROUTE CONDENSATE LINE DOWN TO 1'-0" ABOVE FINISHED FLOOR BEFORE
PENETRATING WALL.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
5. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER
HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
10/11/2023
Issue Date
10/11/2023
Issue Date
B
BOILER PLANT
B01
B02
1 1
DCW
(E) 2-1/2"Ø
EXISTING STEAM PIPE
EXISTING STEAM
CONDENSATE PIPE
B C D
BOILER PLANT
B01B02
DCW
(E)2-1/2"Ø
CW
C W
3/4"Ø
4 43 3
EXISTING STEAM PIPE
4 3
EXISTING STEAM
CONDENSATE PIPE
B01
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .