S02 - Attachment 12 - Butler EHRM IU - Drawing - Electrical 3of 6 R1.pdf
PDF 18 MB Posted
- Attached to
- EHRM | Butler VA HCS 529-22-700 | Construct Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77625R0057
About this file
These electrical schedule drawings detail infrastructure upgrade plans for the VA Butler Healthcare facility in Butler, Pennsylvania. The documents are part of project 529-22-700 and include electrical panel schedules for Buildings 02, 04, and 06, showing existing and revised circuit configurations. Key technical notes indicate that panel circuit directories must be updated, digital power meters and surge protective devices are integral to electrical distribution equipment, and a 30-day panel study has been performed to assess existing and proposed electrical loads. The drawings are 100% construction documents prepared by Spees Design Build, dated 11/30/2023, and are marked as fully sprinklered, indicating compliance with fire safety standards. The electrical schedules provide detailed circuit-level information, including circuit descriptions, ratings, and voltage drop calculations for various electrical panels across multiple buildings.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:0 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
02EP701
BLDG 02 - ELECTRICAL
SCHEDULES 02
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1 2
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
INTEGRAL TO ELECTRICAL DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
Revisions: Date:
1 EXISTING PANEL LOADS UNKNOWN. 30-DAY PANEL STUDY HAS BEEN PERFORMED,
REFERENCE " METER SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFO.
REVISED PANEL SCHEDULE SHOWN FOR ADDED BRANCH CIRCUITS AND THEIR
RESPECTIVE LOAD. EXISTING CIRCUIT LOADS ARE UNKNOWN; REFERENCE "METER
AND LOAD INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR 30-DAY PANEL
STUDY FOR ADDITIONAL INFORMATION REGARDING EXISTING AND REVISED
OVERALL PANEL LOADING.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
02EP702
BLDG 02 - ELECTRICAL
SCHEDULES 02
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
2. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
INTEGRAL TO ELECTRICAL DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
Revisions: Date:
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:3 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
02EP703
BLDG 02 - ELECTRICAL
SCHEDULES 02
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
1 EXISTING PANEL LOADS UNKNOWN. 30-DAY PANEL STUDY HAS BEEN PERFORMED,
REFERENCE " METER SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFO.
REVISED PANEL SCHEDULE SHOWN FOR ADDED BRANCH CIRCUITS AND THEIR
RESPECTIVE LOAD. EXISTING CIRCUIT LOADS ARE UNKNOWN; REFERENCE "METER
AND LOAD INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR 30-DAY PANEL
STUDY FOR ADDITIONAL INFORMATION REGARDING EXISTING AND REVISED
OVERALL PANEL LOADING.
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1 2
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. VOLTAGE DROP INDICATES TOTAL VOLTAGE DROP FROM SOURCE PANEL TO
EQUIPMENT BEING FED.
3. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
4. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:4 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
04EP701
BLDG 04 - ELECTRICAL
SCHEDULES 04
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
1 EXISTING PANEL LOADS UNKNOWN. 30-DAY PANEL STUDY HAS BEEN PERFORMED,
REFERENCE " METER SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFO.
REVISED PANEL SCHEDULE SHOWN FOR ADDED BRANCH CIRCUITS AND THEIR
RESPECTIVE LOAD. EXISTING CIRCUIT LOADS ARE UNKNOWN; REFERENCE "METER
AND LOAD INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR 30-DAY PANEL
STUDY FOR ADDITIONAL INFORMATION REGARDING EXISTING AND REVISED
OVERALL PANEL LOADING.
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1 2
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:4 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
04EP702
BLDG 04 - ELECTRICAL
SCHEDULES 04
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1. VOLTAGE DROP INDICATES TOTAL VOLTAGE DROP FROM SOURCE PANEL TO
EQUIPMENT BEING FED.
2. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:5 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
06EP701
BLDG 06 - ELECTRICAL
SCHEDULES 06
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
1 EXISTING PANEL LOADS UNKNOWN. 30-DAY PANEL STUDY HAS BEEN PERFORMED,
REFERENCE " METER SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFO.
REVISED PANEL SCHEDULE SHOWN FOR ADDED BRANCH CIRCUITS AND THEIR
RESPECTIVE LOAD. EXISTING CIRCUIT LOADS ARE UNKNOWN; REFERENCE "METER
AND LOAD INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR 30-DAY PANEL
STUDY FOR ADDITIONAL INFORMATION REGARDING EXISTING AND REVISED
OVERALL PANEL LOADING.
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1 2
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:0 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
06EP702
BLDG 06 - ELECTRICAL
SCHEDULES 06
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1. VOLTAGE DROP INDICATES TOTAL VOLTAGE DROP FROM SOURCE PANEL TO
EQUIPMENT BEING FED.
File details come from the government source that posted it. Updated .