S02 - Attachment 10 - Butler EHRM IU - Drawing - Electrical 1 of 6 R1.pdf
PDF 20 MB Posted
- Attached to
- EHRM | Butler VA HCS 529-22-700 | Construct Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77625R0057
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:5 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
EPG001
ABBREVIATIONS, GENERAL
NOTES, AND SHEET INDEX -
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
S H E E T I N D E XG E N E R A L N O T E SA B B R E V I A T I O N S
1PH SINGLE-PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/C AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
AF AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR AVAILABLE
FAULT CURRENT
AFCI ARC-FAULT CURRENT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AH AMPERE HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMB AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BRKR BREAKER
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/
OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
C/B CIRCUIT BREAKER
CL CONNECTOR LIGHTING
CLF CURRENT LIMITING FUSE
CLG CEILING
CO CONDUIT ONLY
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CUR CURRENT
DB DECIBEL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DDC DIRECT DIGITAL CONTROLS
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DP DISTRIBUTION PANEL
DMR SW DIMMER SWITCH
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EL ELEVATION OR EXISTING TO BE RELOCATED
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER/EM EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
EN EXISTING IN NEW LOCATION
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
EPRF EXPLOSION PROOF
ER EXISTING TO REMAIN
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST(E) EXISTING
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FCIO FURNISHED BY CONTRACTOR,
INSTALLED BY OWNER
FOIC FURNISHED BY OWNER,
INSTALLED BY CONTRACTOR
FIXT FIXTURE
FLA FULL LOAD AMPS
FLUOR FLUORESCENT
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
G ELECTRICAL GROUND
GEN GENERATOR
GFCI GROUND FAULT
CIRCUIT INTERRUPTER
GFP GROUND FAULT PROTECTION
GND GROUND
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
IG ISOLATED GROUND
IESNA ILLUMINATION ENGINEERING
SOCIETY OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT AMPERE
KVAH KILOVOLT AMPERE PER HOUR
KVAR KILOVOLT AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KWHM KILOWATT HOUR METER
LCP LIGHTING CONTROL PANEL
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MS MOTOR STARTER
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT
NA NOT APPLICABLE
NAC NOTIFICATION APPLIANCE CABINET
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT, N NEUTRAL
NFC NOT FOR CONSTRUCTION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OL OVERLOAD
OS OCCUPANCY SENSOR
P POLE
PB PULL BOX
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PIV POST INDICATOR VALVE
PF POWER FACTOR
PH PHASE
PNL PANEL
PS POWER SUPPLY
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
R EXISTING TO BE REMOVED
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RM ROOM
RMC RIGID METAL CONDUIT
RMS ROOT MEAN SQUARE
REQD REQUIRED
SAC SMALL APPLIANCE CIRCUIT
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SM SMART METER
SPD SURGE PROTECTIVE DEVICE
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD OR SB SWITCHBOARD
SWGR OR SG SWITCHGEAR
TEL TELEPHONE
TR TAMPER RESISTANT
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER
POWER SUPPLY
UTIL UTILITY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT/WEATHERPROOF
(WHILE IN USE)
WH WATER HEATER
WP/W WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
1. THESE "GENERAL NOTES" SHALL APPLY TO ALL DRAWINGS WITHIN THIS DRAWING SET.
2. IF THE SPECIFICATIONS OR DRAWINGS CONFLICT WITH EACH OTHER THE MORE STRINGENT CRITERIA/SCOPE OF WORK SHALL BE REQUIRED.
3. BLACKENED OR BOLDED EQUIPMENT INDICATES THE EQUIPMENT SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR. ITEMS NOT DIRECTLY FURNISHED BY THE CONTRACTOR SHALL HAVE A DESIGNATION SUCH AS OFCI (OWNER FURNISHED CONTRACTOR INSTALLED), OFOI (OWNER FURNISHED OWNER INSTALLED), OR NIC (NOT IN CONTRACT. GRAY OR GRAY-SCALED EQUIPMENT SHALL BE ASSUMED TO BE EXISTING OR SHOWN FOR EQUIPMENT LOCATION COORDINATION.
4. EXISTING CIRCUITS ASSOCIATED WITH THE PROJECT AREA OF WORK ARE TO BE DE-ENERGIZED DURING CONSTRUCTION.
5. ALL ELECTRICAL WORK SHALL BE COMPLETED WITH ALL PROXIMATE ELECTRICAL CIRCUITS DE-ENERGIZED (i.e. A NEW BREAKER OR CIRCUIT CANNOT BE ADDED TO A PANEL UNLESS THE PANEL IS COMPLETELY DE-ENERGIZED), OR THE CONTRACTOR MUST COMPLY WITH NFPA 70E FOR WORK ON ENERGIZED SERVICE. THE VA WILL DETERMINE IF THE ELECTRICAL SERVICE CAN BE SHUT DOWN OR IT WILL HAVE TO BE WORKED HOT DEPENDING ON THE CRITICALITY OF THE AREA BEING AFFECTED. IF THE WORK MUST BE DONE WITH THE SERVICE LIVE, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED PROTECTIVE TOOLS, EQUIPMENT, AND CLOTHING, AND MUST FOLLOW THE JOB SPECIFIC WORK PLAN PREPARED BY THE CONTRACTOR AND APPROVED BY THE VA. WORK THAT REQUIRES SHUTTING DOWN ELECTRICAL SERVICE MAY HAVE TO BE
ACCOMPLISHED DURING OTHER THAN NORMAL DUTY HOURS.
6. PROVIDE RACEWAYS AND CONDUCTORS/CABLING FROM LUMINAIRES TO THEIR CORRESPONDING CONTROL DEVICES AS INDICATED ON PLANS.
7. LUMINAIRE INSTALLATIONS AND LAYOUTS SHALL BE COORDINATED WITH ALL OBSTACLES, EQUIPMENT AND ARCHITECTURAL FEATURES.
8. WHERE NOT SPECIFICALLY INDICATED ON DRAWINGS, BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM FOR RUNS EQUAL TO OR LESS THAN 65 FEET AND 10 AWG MINIMUM FOR RUNS GREATER THAN 65 FEET. RACEWAYS AND CONDUCTORS SHALL BE SIZED AND QUANTIFIED TO SERVE AND CONTROL APPLICABLE EQUIPMENT WITH VOLTAGE DROP NO GREATER THAN THREE PERCENT. CONDUCTOR SIZE SHALL BE INCREASED TO COMPENSATE FOR DERATING REQUIRED PER NEC 310.15 WHERE MORE THAN THREE CURRENT CARRYING CONDUCTORS WITHIN ONE RACEWAY; CONDUCTOR AMPACITIES SHALL BE TAKEN FROM THE 75°C COLUMN. INDIVIDUAL CIRCUITS SHALL NOT SHARE
NEUTRAL CONDUCTORS.
9. MINIMUM CONDUIT SIZE SHALL BE 1” FOR EXTERIOR AND UNDERGROUND CONDUIT. MINIMUM CONDUIT SIZE SHALL BE 3/4” FOR INTERIOR CONDUIT. ADDITIONAL CONDUCTORS FOR UNSWITCHED HOT CONDUCTOR TO LUMINAIRES WITH EMERGENCY BATTERY POWERED BACKUP UNITS OR TRANSFER DEVICES SHALL BE PROVIDED. ALL CONDUIT SHALL BE CONCEALED. THE ABOVE COMMENTS SHALL BE ADHERED TO UNLESS OTHERWISE NOTED ON THE DRAWINGS.
10. EMERGENCY LIGHTING OR EQUIPMENT CIRCUITS SHALL BE ROUTED INDEPENDENT FROM OTHER CIRCUIT TYPES; ENSURE NEC 700.10 REQUIREMENTS ARE MET.
11. PROVIDE ALL CONDUIT AND WIRE FOR ALL CIRCUITS INDICATED AND/OR NOTED ON THE DRAWINGS AND/OR SPECIFICATIONS. ALL AUXILIARY OR REQUIRED APPURTENANCES
FOR PROVIDED EQUIPMENT SHALL BE PROVIDED WITH ALL CONNECTIONS AS REQUIRED.
12. ALL EQUIPMENT AND DEVICES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL DISTRIBUTION EQUIPMENT, RECEPTACLES, DATA OUTLETS, AND SPECIAL SYSTEM DEVICES, SHALL HAVE THEIR EXACT LOCATION COORDINATED WITH ARCHITECTURAL DRAWINGS AND ALL TRADES PRIOR TO COMMENCING WORK.
13. COORDINATE WITH LIGHTING MANUFACTURER FOR ALL LIGHTING CONTROL EQUIPMENT AND APPURTENANCES; PROVIDE ANY ADDITIONAL SENSORS TO PROVIDE FULL COVERAGE OF THE SPACE AS REQUIRED. ALL CONDUIT, WIRE, POWER SUPPLIES, AND APPURTENANCES REQUIRED FOR THE LIGHTING CONTROL SYSTEM SHALL BE PROVIDED
TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL SYSTEM.
14. ALL EXTERIOR MOUNTED RECEPTACLES AND LUMINAIRE INSTALLATIONS SHALL COORDINATE EXACT LOCATIONS WITH ARCHITECTURAL SHEETS. ADDITIONALLY, WHERE MASONRY IS USED, SMOOTH BLOCK SHALL BE UTILIZED TO PROVIDE A PROPER MOUNTING SURFACE TO ALL EQUIPMENT; RECEPTACLES SHALL BE INSTALLED FLUSH.
15. ALL CONDUIT/SLEEVE FLOOR AND WALL PENETRATIONS SHALL BE SEALED WITH FIRE RATED ASSEMBLIES, CAULKING, AND APPURTENANCES. ELECTRICAL BOXES LOCATED IN
FIRE RATED WALLS SHALL BE RATED FOR USE IN FIRE RATED WALLS.
16. ALL EQUIPMENT AND INSTALLATION METHODS SHALL BE LISTED AND LABELED PER NEC, UL LISTED, OR REVIEWED EQUAL.
17. FOR ALL EQUIPMENT, COORDINATE WITH ALL TRADES (ARCHITECTURAL, MECHANICAL, PLUMBING, ETC) FOR ELECTRICAL REQUIREMENTS AND INSTALLATION LOCATIONS PRIOR
TO INSTALLATION.
18. ALL LOW-VOLTAGE SYSTEM CABLING NOT RAN IN CONDUIT TO WALL MOUNTED DEVICE SHALL HAVE A MINIMUM 1"C ROUTED FROM DEVICE THROUGH WALL INTO THE ACCESSIBLE CEILING SPACE; CABLING SHALL NOT BE ROUTED IN WALLS OR IN AN INACCESSIBLE LOCATION WITHOUT CONDUIT.
19. GFCI RECEPTACLES SHALL BE PROVIDED WITHIN 6’ OF A SINK/OR WATER SOURCE, WITHIN DAMP ROOMS, OR WHEN MOUNTED OUTDOORS/EXTERIOR TO THE BUILDING.
20. NO STRUCTURAL MEMBERS SHALL BE CUT, DRILLED, OR NOTCHED WITHOUT PRIOR WRITTEN CONSENT FROM THE STRUCTURAL ENGINEER OR ARCHITECT.
21. ALL FINAL LOCATIONS AND ARRANGEMENTS OF LIGHTING FIXTURES SHALL BE OBTAINED FROM THE ARCHITECTURAL REFLECTED CEILING PLAN.
22. LIGHTING FIXTURES WITH MORE THAN TWO LAMPS SHALL HAVE TWO OUTER LAMPS CONTROLLED WITH ONE SWITCH AND INNER LAMP(S) CONTROLLED BY A SECOND SWITCH.
23. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR SIZED PER NEC TABLE 250.122. ALL WIRING IS BASED ON Cu COPPER PER NEC TABLE 310.15(B)(16), USING 75°C AMPACITIES FOR FEEDERS.
24. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.
25. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE DEVICE AND REMOVE WIRING COMPLETELY
FROM THE ABANDONED CONDUITS.
26. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE DEVICE. COMPLETELY REMOVE ALL ABANDONED WIRING.
27. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
28. ALL PENETRATIONS SHALL BE PERMITTED, LOGGED, AND INSPECTED BY VA BUTLER HCS FIRE DEPARTMENT PRIOR TO FINAL CLOSURE.
29. ALL SURGE PROTECTION DEVICES (SPD) AND DIGITAL POWER METERS (DPM) PROVIDED SHALL BE INTEGRAL TO THE EQUIPMENT IT IS PROTECTING / MONITORING, UNLESS
OTHERWISE NOTED.
30. ALL MODIFIED OR PROVIDED RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT LABELING LOCATED DIRECTLY ON THE WALL PLATE; IE: "P4-1", PANEL "4", CIRCUIT "1". REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
EPG001 - ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
EPG002 - ELECTRICAL LEGENDS
EPS001 - ELECTRICAL FACILITY SITE PLAN
EPS002 - ENLARGED SITE - ELECTRICAL PLAN
02EP100 - BLDG 02 - LEVEL 00 - ELECTRICAL PLAN
02EP101 - BLDG 02 - LEVEL 01 - ELECTRICAL PLAN
02EP102 - BLDG 02 - LEVEL 02 - ELECTRICAL PLAN
04EP100 - BLDG 04 - LEVEL 00 - ELECTRICAL PLAN
06EP101 - BLDG 06 - LEVEL 01 - ELECTRICAL PLAN
07EP100 - BLDG 07 - LEVEL 00 - ELECTRICAL PLAN
07EP101 - BLDG 07 - LEVEL 01 - ELECTRICAL PLAN
08EP101 - BLDG 08 - LEVEL 01 - ELECTRICAL PLAN
20EP101 - BLDG 20 - LEVEL 01 - ELECTRICAL PLAN
21EP101 - BLDG 21 - LEVEL 01 - ELECTRICAL PLAN
21EP102 - BLDG 21 - LEVEL 02 - LIGHTNING PROTECTION PLAN
30EP101 - BLDG 30 - LEVEL 01 - ELECTRICAL PLAN
46EP101 - BLDG 46 - LEVEL 01 - ELECTRICAL PLAN
47EP101 - BLDG 47 - LEVEL 01 - ELECTRICAL PLAN
48EP101 - BLDG 48 - LEVEL 01 - ELECTRICAL PLAN
137EL101 - BLDG 137 - LIGHTING PLAN
137EP101 - BLDG 137 - POWER PLAN
137EP102 - BLDG 137 - POWER PLAN - MECHANICAL EQUIPMENT
137EG101 - BLDG 137 - GROUNDING PLAN
137ELP101 - BLDG 137 - LIGHTNING PROTECTION PLAN
21EP201 - BLDG 21 - EXTERIOR ELEVATION PLANS
137EP201 - BLDG 137 - NORTH EXTERIOR ELEVATION PLAN
137EP202 - BLDG 137 - EAST EXTERIOR ELEVATION PLAN
137EP203 - BLDG 137 - SOUTH EXTERIOR ELEVATION PLAN
137EP204 - BLDG 137 - WEST EXTERIOR ELEVATION PLAN
02EP400 - BLDG 02 - LEVEL 00 - ENLARGED ELECTRICAL PLANS
02EP401 - BLDG 02 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
02EP402 - BLDG 02 - LEVEL 02 - ENLARGED ELECTRICAL PLANS
04EP400 - BLDG 04 - LEVEL 00 - ENLARGED ELECTRICAL PLANS
06EP401 - BLDG 06 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
07EP401 - BLDG 07 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
08EP401 - BLDG 08 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
20EP401a - BLDG 20 - LEVEL 01 - ENLARGED ELECTRICAL PLANS 20EP401b - BLDG 20 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
21EP401 - BLDG 21 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
30EP401 - BLDG 30 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
46EP401 - BLDG 46 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
47EP401 - BLDG 47 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
48EP401 - BLDG 48 - LEVEL 01 - ENLARGED ELECTRICAL PLANS
EP501 - ELECTRICAL DETAILS
EP502 - ELECTRICAL DETAILS
EP503 - ELECTRICAL DETAILS
EP504 - ELECTRICAL DETAILS
EP505 - ELECTRICAL DETAILS
EP506 - ELECTRICAL DETAILS
EP507 - ELECTRICAL DETAILS
EP508 - ELECTRICAL DETAILS
EP509 - ELECTRICAL DETAILS
EP510 - ELECTRICAL DETAILS
02EP601 - BLDG 02 - ONE-LINE DIAGRAM - EXISTING - PART 1 OF 4
02EP602 - BLDG 02 - ONE-LINE DIAGRAM - EXISTING - PART 2 OF 4
02EP603 - BLDG 02 - ONE-LINE DIAGRAM - EXISTING - PART 3 OF 4
02EP604 - BLDG 02 - ONE-LINE DIAGRAM - EXISTING - PART 4 OF 4
02EP611 - BLDG 02 - ONE-LINE DIAGRAM - REVISED - PART 1 OF 4
02EP612 - BLDG 02 - ONE-LINE DIAGRAM - REVISED - PART 2 OF 4
02EP613 - BLDG 02 - ONE-LINE DIAGRAM - REVISED - PART 3 OF 4
02EP614 - BLDG 02 - ONE-LINE DIAGRAM - REVISED - PART 4 OF 4
04EP601 - BLDG 04 - ONE-LINE DIAGRAM - EXISTING
04EP611 - BLDG 04 - ONE-LINE DIAGRAM - REVISED
06EP601 - BLDG 06 - ONE-LINE DIAGRAM - EXISTING
06EP611 - BLDG 06 - ONE-LINE DIAGRAM - REVISED
07EP601 - BLDG 07 - ONE-LINE DIAGRAM - EXISTING
07EP611 - BLDG 07 - ONE-LINE DIAGRAM - REVISED
08EP601 - BLDG 08 - ONE-LINE DIAGRAM - EXISTING
08EP611 - BLDG 08 - ONE-LINE DIAGRAM - REVISED
20EP601 - BLDG 20 - ONE-LINE DIAGRAM - EXISTING - PART 1 OF 4
20EP602 - BLDG 20 - ONE-LINE DIAGRAM - EXISTING - PART 2 OF 4
20EP603 - BLDG 20 - ONE-LINE DIAGRAM - EXISTING - PART 3 OF 4
20EP604 - BLDG 20 - ONE-LINE DIAGRAM - EXISTING - PART 4 OF 4
20EP611 - BLDG 20 - ONE-LINE DIAGRAM - REVISED - PART 1 OF 4
20EP612 - BLDG 20 - ONE-LINE DIAGRAM - REVISED - PART 2 OF 4
20EP613 - BLDG 20 - ONE-LINE DIAGRAM - REVISED - PART 3 OF 4
20EP614 - BLDG 20 - ONE-LINE DIAGRAM - REVISED - PART 4 OF 4
21EP601 - BLDG 21 - ONE-LINE DIAGRAM - EXISTING
21EP611 - BLDG 21 - ONE-LINE DIAGRAM - REVISED
30EP601 - BLDG 30 - ONE-LINE DIAGRAM - EXISTING
30EP611 - BLDG 30 - ONE-LINE DIAGRAM - REVISED
46EP601 - BLDG 46 - ONE-LINE DIAGRAM - EXISTING
46EP611 - BLDG 46 - ONE-LINE DIAGRAM - REVISED
47EP601 - BLDG 47 - ONE-LINE DIAGRAM - EXISTING
47EP611 - BLDG 47 - ONE-LINE DIAGRAM - REVISED
48EP601 - BLDG 48 - ONE-LINE DIAGRAM - EXISTING
48EP611 - BLDG 48 - ONE-LINE DIAGRAM - REVISED
137EP601 - BLDG 137 - ONE-LINE DIAGRAM
EP701 - ELECTRICAL SCHEDULES
EP702 - ELECTRICAL SCHEDULES
02EP701 - BLDG 02 - ELECTRICAL SCHEDULES
02EP702 - BLDG 02 - ELECTRICAL SCHEDULES
02EP703 - BLDG 02 - ELECTRICAL SCHEDULES
04EP701 - BLDG 04 - ELECTRICAL SCHEDULES
04EP702 - BLDG 04 - ELECTRICAL SCHEDULES
06EP701 - BLDG 06 - ELECTRICAL SCHEDULES
06EP702 - BLDG 06 - ELECTRICAL SCHEDULES
07EP701 - BLDG 07 - ELECTRICAL SCHEDULES
07EP702 - BLDG 07 - ELECTRICAL SCHEDULES
08EP701 - BLDG 08 - ELECTRICAL SCHEDULES
08EP702 - BLDG 08 - ELECTRICAL SCHEDULES
20EP701 - BLDG 20 - ELECTRICAL SCHEDULES
20EP702 - BLDG 20 - ELECTRICAL SCHEDULES
20EP703 - BLDG 20 - ELECTRICAL SCHEDULES
21EP701 - BLDG 21 - ELECTRICAL SCHEDULES
21EP702 - BLDG 21 - ELECTRICAL SCHEDULES
30EP701 - BLDG 30 - ELECTRICAL SCHEDULES
30EP702 - BLDG 30 - ELECTRICAL SCHEDULES
46EP701 - BLDG 46 - ELECTRICAL SCHEDULES
47EP701 - BLDG 47 - ELECTRICAL SCHEDULES
47EP702 - BLDG 47 - ELECTRICAL SCHEDULES
48EP701 - BLDG 48 - ELECTRICAL SCHEDULES
48EP702 - BLDG 48 - ELECTRICAL SCHEDULES
137EP701 - BLDG 137 - ELECTRICAL SCHEDULES
137EP702 - BLDG 137 - ELECTRICAL SCHEDULES
137EP703 - BLDG 137 - ELECTRICAL SCHEDULES
137EP704 - BLDG 137 - ELECTRICAL SCHEDULES
Revisions: Date:
SECTION
SHEET WHERE SECTION
IS TAKEN FROM
SECTION LETTER
DETAIL NUMBER
SHEET ON WHICH DETAIL APPEARS
DETAIL AREA
XXX CONDUIT & WIRE TAG
(REFER TO CONDUIT AND WIRE SCHEDULE)
XX FAULT CURRENT TAG
(3 PH, SYM AMPS)
KEY NOTE
XXX
FIGURE OR PHOTO
DETAIL NUMBER
IF PHOTO, ARROW DENOTES
DIRECTION TAKEN
SHEET WHERE DETAIL IS TAKEN FROM
DETAIL/PLAN
DETAIL/PLAN NUMBER
XXX
A
XXX
A
XXX
SHEET WHERE SECTION
IS TAKEN FROM
SCALE
SECTION LETTER
1 METERING NOTE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:4 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
EPG002
ELECTRICAL LEGENDS
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
D I V 2 6 - L E G E N D
PE
DS
X
X
X
ALL INTERIOR AREAS TO HAVE MANUAL 0N/AUTO OFF LIGHTING
CONTROL WITH THE USE OF DUAL TECHNOLOGY OCCUPANCY SENSORS.
EXCEPT WHERE A WALL SWITCH OCCUPANCY SENSOR IS NOTED.
PHOTO ELECTRIC SENSOR
DAYLIGHT SENSOR FOR DAYLIGHT HARVESTING
CONTROL. SENSOR SHALL BE CEILING MOUNTED.
RECEPTACLE, SINGLE WITH SWITCH
RECEPTACLE, SPECIAL PURPOSE
A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.
B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.
C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.
D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.
E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.
F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.
G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.
H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.
RECEPTACLE, SWITCHED DUPLEX
DROP CORD, SINGLE CONVENIENCE OUTLET, 3-WIRE,
GROUNDING TYPE, 20A, W/#12 CONDUCTORS IN FLEXIBLE
CORD (CENTER LINE OF OUTLET: 6'-6" [1981mm] AFF. MINIMUM).
ELECTRICAL STRIP MOLD (OUTLETS ON 2'-0" [610mm]
CENTERS OR AS DESIGNATED ON DRAWINGS), MTD
3'-6" [1067mm] AFF OR AS INDICATED.
SWITCH
F = FUSED SWITCH K = KEY OPERATED
L = LOCK LM= LOW VOLTAGE MASTER
M = MANUAL MOTOR STARTING MC= MOMENTARY CONTACT
MP= MOTOR SNAP WITH PILOT LIGHT P = WITH PILOT LIGHT
(THERMAL TYPE)
PB= PUSH BUTTON STATION RC= REMOTE CONTROL
WP= WEATHER PROOF X = EXPLOSION PROOF
SWITCH (# SUBSCRIPT AS INDICATED BELOW):
BLANK = SINGLE POLE 2 = DOUBLE POLE
3 = THREE-WAY 4 = FOUR-WAY
D = DIMMER K = KEY OPERATED
LV= LOW VOLTAGE P = WITH PILOT LIGHT
LM= LOW VOLTAGE MASTER RC= REMOTE CONTROL
PB= PUSH BUTTON STATION WP= WEATHER PROOF
T = TIMER OPERATED Mo= OCCUPANCY SENSOR
LIGHTING, ONE HEAD EMERGENCY BATTERY POWER
LIGHTING, TWO HEAD EMERGENCY BATTERY POWER
LIGHTING, THREE HEAD EMERGENCY BATTERY POWER
EXIT SIGN, WALL MOUNTED WITH DIRECTIONAL
ARROWS AND FACES AS SHOWN
EXIT SIGN, CEILING MOUNTED WITH
DIRECTIONAL ARROWS AND FACES AS SHOWN
LIGHT FIXTURE, SURFACE MOUNTED, 2'x2';
LETTER INDICATES TYPE.
LIGHT TRACK WITH HEADS AS SHOWN
LIGHT FIXTURE, BOLLARD
LIGHTING
x = LUMINAIRE SWITCH ZONE (ANY LOWER CASE LETTER APPLIES)
E
S
S
OS
J
G E N E R A L S Y M B O L
EMERGENCY NORMAL
G
SWITCH, MULTIPOSITION
SWITCH, SINGLE BREAK
FUSE
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
SWITCH, FUSED
DRAWOUT AIR CIRCUIT BREAKER
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
DELTA CONNECTION
TRANSFORMER
WYE CONNECTION
EARTH GROUND
JUNCTION BOX
PULL BOX
GENERATOR, POWER
BATTERY
CAPACITOR
RELAY; NUMBER INDICATES RELAY TYPE
50 = INSTANTANEOUS OVER CURRENT OR RATE-OF-RISE
51 = AC-TIME OVER CURRENT
67 = AC-DIRECTIONAL OVER CURRENT
86 = LOCKING OUT
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
METER
AMMETER
VOLTMETER
WATTMETER
WATT-HOUR METER
TRANSFORMER, PLAN
LADDER CABLE TRAY
PULL BOX
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DUPLEX WITH GROUND FAULT CIRCUIT INTERRUPTER
RECEPTACLE, QUADRUPLEX
RECEPTACLE, SINGLE
POWER
PB
T
PB
CONDUIT OR EQUIPMENT TO BE REMOVED
CONDUIT HOME RUN 3/4"C, 2#12 & 1#12 GND. UNLESS SHOWN
OTHERWISE. (EXAMPLE SHOWN: TO PANEL P1, CIRCUIT 3)
CONDUIT HOME RUN - SEE CONDUIT AND WIRE SCHEDULE
CONDUIT CONCEALED IN WALL, CEILING, UNDER FLOOR, IN
FLOOR SLAB, OR ROUTED UNDERGROUND
CONDUIT CONCEALED WHERE POSSIBLE, OTHERWISE EXPOSED
EXTRA-HARD USAGE FLEXIBLE CORD
FLEXIBLE CONDUIT
CONDUIT TURNED UP OR TOWARD
CONDUIT TURNED DOWN OR AWAY
CONDUIT CAPPED
XXXX
P1-3
J
M
A
V
W
WH
X X
X X
X X
X X
X X
X X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X = DENOTES LUMINAIRE TAG NAME
RECESSED DOWNLIGHT FIXTURE
LIGHT FIXTURE, RECESSED, 2'x4'
LIGHT FIXTURE, RECESSED, 1'x4'
LIGHT FIXTURE, RECESSED, 1'x8'
LIGHT FIXTURE, RECESSED, 2'x2'
LIGHT FIXTURE, SURFACE MOUNTED, 2'x4'
LIGHT FIXTURE, SURFACE MOUNTED, 1'x4'
LIGHT FIXTURE, SURFACE MOUNTED, 1'x8'
LIGHT FIXTURE, SURFACE MOUNTED, 2'x2'
STRIP LIGHTING, 4' LONG
LIGHT FIXTURE, WALL MOUNTED
STREET LIGHT WITH BRACKET
LIGHT POLE, ONE LUMINAIRE
LIGHT POLE, TWO LUMINAIRES
LIGHT POLE, POST TOP MOUNT LUMINAIRE
LIGHTING WALL PACK, EXTERIOR BUILDING
THESE ARE GENERAL LEGENDS. NOT ALL SYMBOLS MAY BE SHOWN.
REFERENCE PLANS FOR ALL UTILIZED SYSMBOLS.
INSULATED TAP
GROUNDING ROD WITH TEST WELL
LIGHTNING AIR TERMINAL
X = DESCRIPTION
E = EMERGENCY POWER OFF (OFF)
X
BUS DUCT - ONE-LINE DIAGRAM
CIRCUIT BREAKER
1.38A
(LEASED
S LO
P
E D O
W N @
2%
ONLYONLY
V A
N
MECHANICAL
YARD
G ENERATOR
YARD
1152 SF
DA TA CENTER
167 SF
ENTRANCE R OO M
#1
107 SF
FUTURE
92 SF
STORAGE
156 SF
ENTRANCE R OO M
#2
87 SF
MECH
87 SF
ELEC
43 SF
STAGING
75 SF
UN PACKI NG/
PAC KING
107 SF
SECURE
STORAGE
25 SF
FIRE RISER
EPS002
0 1600" 3200"
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:0 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A P
A
D A
T A
C E
N T
E R
E
L S
D B
.r v t
EPS001
ELECTRICAL FACILITY SITE PLAN
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
- 1 : 1600
1 ELECTRICAL FACILITY SITE PLAN
GENERAL NOTES
KEY NOTES
1. PLAN INCLUDED FOR OVERALL SITE REFERENCE.
H O S P
IT
AL
HOSPITAL ROAD
H O S P
IT
AL
R
AD
HO
SP
ITA
L
HOSPITAL
SECOND STREET
R O A D
"A
S
TR
EE
T
STREET
FIRST
STREET
FIRST
FIRST
STREET
"B
ST
RE
ET
"B
ST
EE
T
FOURTH STREET
FIRST STREET
H O S P
IT
AL
R O A D
H O
SP
ITAL
R O A D
H O
SP
IT
AL
RO
AD
HOSPITAL ROAD
STREET
SECOND
RO
AD
RO
AD
EE
T
N E W
C A
S T L E
R O
A D
MAIN BUILDING
T R A N S
IT
IO
N A L
L
IV
IN
G
C E N T E R
5A
30 CLC
30EP101
137EP101
137-P-01
1CONTINUE TO GRINDER
PUMP CONTROL PANEL
SEE SHEET 137EP101
AREA SHOWN
DATA CENTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:3 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A P
A
D A
T A
C E
N T
E R
E
L S
D B
.r v t
EPS002
ENLARGED SITE - ELECTRICAL
PLAN -
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES
- 1/16" = 1'-0"
1 ENLARGED SITE - ELECTRICAL PLAN
TRUE
NORTH
KEY PLAN
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL
BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER
TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL
BOX PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX
LOCATIONS WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. FOR ALL TELECOMMUNICATIONS BONDING CONNECTIONS, REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EP510.
GRINDER PUMP ASSEMBLY. PROVIDE CONDUIT AND WIRING FROM PUMP CONTROL
PANEL AS REQUIRED FOR ALL POWER AND CONTROL DEVICES INCLUDING FLOATS
AND PUMPS PER MANUFACTURER'S REQUIREMENTS. REFERENCE CIVIL SHEET
CU150 FOR ADDITIONAL INFORMATION.
Revisions: Date:
8'0 16' 32'
TRUE
NORTH
J
J J
J J
H O S P
IT
AL
HOSPITAL ROAD
H O S P
AD
HO
SP
ITA
L
HOSPITAL
SECOND STREET
R O A D
EE
T
STREET
FIRST
STREET
FIRST
FIRST
STREET
"B
ST
RE
ET
EE
T
FOURTH STREET
FIRST STREET
H O S P
IT
AL
R O A D
H O
SP
ITAL
R O A D
H O
SP
IT
AL
RO
AD
HOSPITAL ROAD
STREET
SECOND
RO
AD
RO
AD
EE
T
TO I-79
EVANS CITY
N E W
C A
S T L E
R O
A D
MAIN BUILDING
T R A N S
IT
IO
N A L
L
IV
IN
G
C E N T E R
5A
30 CLC
AREA SHOWN
D U
M P
S T
E R
C A
R D
B O
A R
D C
R U
S H
E R
DOCK
LEVELER
DOCK
LEVELER
EXIST. MECH.
B005
EXIST. MECHANICAL
B006
ELEC.
B004
EXIST. ELEVATOR
EXIST. CUST./RISER
B012
EXIST. MECHANICAL
B010
EXIST. MECHANICAL
2-819
EXIST. TOILET
B011
STAIR B
COOK'S OFFICE
B023
SUBSISTENCE STORAGE
B024
SUPPLY STORAGE
B001
DIETARY OFFICE
B003
ELEC.
B002A
TRAY ASSEMBLY
CART COOLER
B022
COOLER
B021
FREEZER
B020
KITCHEN PREP.
B019
CLO
B014A
DOCK STAGING
B018
CONTAMINATED WASTE
B015
TRASH COLLECTION
B016
CAN WASH
B017
EXIST. SERVICE TUNNEL
B014
NEW SERVICE TOWER
CART STAGING
B007
EXIST CORRIDOR
B013
DISH WASH
B008
02EP400
02EP400
02EP400
02EP400
2-BUS-MDPC
MDPB-B2
MDPA-B2
LS-B2ATS-LS
TRANSFORMER
ATS-MAIN
ATS-ELEV
DISC. SWITCH
2PPB
2MPB
BEVA
JUNCTION BOX
JUNCTION BOX
JUNCTION
BOX
ATS-EDP
2-BUS-EDP
KPA1
KPA3
KPA2
KPA1
KPA2
KPA3
EDP-2
TE
B08
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
D
E
F
G
H
I
J
C
P-C-2-819A
P-N-B004
CONTINUE TO PANEL "02-TC110B"
REFERENCE SHEET 02EP401
CONTINUE TO PANEL "02-TC110A"
REFERENCE SHEET 02EP401
CONTINUE TO TE B08 SIDE B RCPT
REFERENCE SHEET 02EP400
02-P-07
02-P-02
02-P-04
02-P-05
02-P-01
02-P-03
02-P-06
CONTINUE TO PANEL "02-B08A"
REFERENCE SHEET 02EP400
02-P-08
PRIMARY BONDING
BUSBAR (PBB)
EP504
BLDG 02
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:0
:2 p m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ E
E
B ld g
.r v t
02EP100
BLDG 02 - LEVEL 00 - ELECTRICAL
PLAN 02
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
KEY NOTES
KEY PLAN
GENERAL NOTES
TRUE
NORTH
- 1" = 10'-0"
1 BLDG 02 - LEVEL 00 - ELECTRICAL PLAN 0 10' 20'
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION
OF MILLWORK.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL
BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH
ARCHITECTURAL DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL
BOX PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX
LOCATIONS WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. FOR ALL TELECOMMUNICATIONS BONDING CONNECTIONS, REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EP510.
MODIFIED EQUIPMENT. PROVIDE FEEDERS AS INDICATED.
PROVIDE TBC AS SHOWN. REFERENCE TELECOMMUNICATIONS BONDING RISER
DIAGRAM ON SHEET EP510 FOR ADDITIONAL INFORMATION.
CONTINUE TBB TO TR SBBs. REFERENCE TELECOM BONDING RISER DIAGRAM ON
SHEET EP510 FOR ADDITIONAL INFORMATION.
Revisions: Date:
3 CONTINUE TBB TO TR SBBs. REFERENCE TELECOMMUNICATIONS BONDING RISER
DIAGRAM ON SHEET EP510 FOR ADDITIONAL INFORMATION.
J
H O S P
IT
AL
HOSPITAL ROAD
H O S P
AD
HO
SP
ITA
L
HOSPITAL
SECOND STREET
R O A D
EE
T
STREET
FIRST
STREET
FIRST
FIRST
STREET
"B
ST
RE
ET
EE
T
FOURTH STREET
FIRST STREET
H O S P
IT
AL
R O A D
H O
SP
ITAL
R O A D
H O
SP
IT
AL
RO
AD
HOSPITAL ROAD
STREET
SECOND
RO
AD
RO
AD
EE
T
TO I-79
EVANS CITY
N E W
C A
S T L E
R O
A D
MAIN BUILDING
T R A N S
IT
IO
N A L
L
IV
IN
G
C E N T E R
5A
30 CLC
170 SF
WOMEN'S
RESTROOM
31 SF
EXIST.
TOILET
156 SF
EXIST. ADHC
OFFICE
139 SF
EXIST.
STAIRS A
148 SF
EXIST.
ADHC/OFFICE
652 SF
EXIST. CLC
NURSING
SUPPORT
152 SF
EXIST.
OFFICE
110 SF
TR
TC110
49 SF
ICRA ELEC.
CART
138 SF
EXIST.
VESTIBULE
100C
46 SF
EXIST MECH.
CHASE
122B
106 SF
JANITOR
125 SF
EXIST.
STORAGE
128 SF
EXIST.
NURSE
99 SF
EXIST.
RESTROOM
158 SF
EXIST.
STAIRS B
140 SF
119B
109 SF
POLICE/SECURITY
268 SF
VENDING
AREA
81 SF
EXIST.
ELEVATOR
194 SF
SEATING
AREA
101 SF
EXIST.
VESTIBULE
146 SF
MEN'S
RESTROOM
148 SF
PSYCHOLOGIST
140 SF
EXIST. STAIR
C
164 SF
CHAPLAIN
OFFICE
160 SF
EXAM ROOM
#2
149 SF
EXAM ROOM
#1
85 SF
EUCHARISTIC
114A93 SF
CLEAN LINEN
92 SF
SOLID LINEN
826 SF
MULTI USE
151 SF
EXIST.
LOBBY
100A
266 SF
CHAPEL
1102 SF
EXIST.
CORRIDOR
100B
1063 SF
EXIST.
CORRIDOR
516 SF
CORRIDOR
162 SF
CHAPLAIN
OFFICE
240 SF
ENCLOSED
ELECTRICAL
GENERATOR
143 SF
OFFICE
UNASSIGNED
15 SF
02EP401
02EP401
02EP401
02EP401
JUNCTION BOX
2PP1B
2PP1A
J. BOX
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
D
E
F
G
H
I
J
C
02-CU-01-TC110
CONTINUE TO 02-AC-01-TC110
REFERENCE SHEET 02EP401
02-CU-02-204
CONTINUE TO PANEL "2-TC110A"
REFERENCE SHEET 02EP401
CONTINUE TO PANEL "2-TC110B"
REFERENCE SHEET 02EP401
CONTINUE TO PANEL "2-204B"
REFERENCE SHEET 02EP402
CONTINUE TO PANEL "2-204A"
REFERENCE SHEET 02EP402
02-P-06 02-P-03
02-P-12
CONTINUE TO "02-TC110A"
REFERENCE SHEET 02EP401
02-P-10
02-P-11
02-P-13
CONTINUE TO 02-AC-02-204 & 02-AC-03-204
REFERENCE SHEET 02EP402
CONTINUE TO "02-204A"
REFERENCE SHEET 02EP402
AREA SHOWN
BLDG 02
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
LEGEND:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:0
:2 p m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ E
E
B ld g
.r v t
02EP101
BLDG 02 - LEVEL 01 - ELECTRICAL
PLAN 02
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
KEY PLAN
GENERAL NOTES
TRUE
NORTH
- 1" = 10'-0"
1 BLDG 02 - LEVEL 01 - ELECTRICAL PLAN 0 10' 20'
PROJECT
NORTH
Revisions: Date:
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION
OF MILLWORK.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL
BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH
ARCHITECTURAL DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL
BOX PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX
LOCATIONS WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. FOR ALL TELECOMMUNICATIONS BONDING CONNECTIONS, REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EP510.
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT
AS REQUIRED PER MANUFACTURER'S INSTRUCTION. COORDINATE WITH
MECHANICAL CONTRACTORS AS REQUIRED.
S P
IT
AL
HOSPITAL ROAD
H O S P
AD
HO
SP
ITA
L
HOSPITAL
SECOND STREET
R O A D
EE
T
STREET
FIRST
STREET
FIRST
FIRST
STREET
"B
ST
RE
ET
EE
T
FOURTH STREET
FIRST STREET
H O S P
IT
AL
R O A D
H O
SP
ITAL
R O A D
H O
SP
IT
AL
RO
AD
HOSPITAL ROAD
STREET
SECOND
RO
AD
RO
AD
EE
T
TO I-79
EVANS CITY
N E W
C A
S T L E
R O
A D
MAIN BUILDING
T R A N S
IT
IO
N A L
L
IV
IN
G
C E N T E R
5A
30 CLC
NURSE
NURSE
EXIST. TOILET
NURSE
EXIST. STAIR A
400 TR
STORAGE
RESPIRATORY THERAPY
MULTI PURPOSE
EMS
SPS
PYXIS
NURSE STORAGE
FIRE & ALARM SECURITY
EXIST. STAIR B
EMS/SEWING UNIFORM
EQUIPMENT WASH
KITCHEN SUPERVISOR
EXIST ELEVATOR
EXIST VESTIBULE
BA-104Y
MECH. EXIST. CHASE
BA-104Z
MIT CART STORAGE
FOOD SERVICE DIRECTOR
SERV. ASSIT.
PORTABLE STOR.
EMS OFFICE
EMS EQUIPMENT
MEN EXIST. R.R.
WOMEN EXIST. R.R.
JAN.
WHEELCHAIR REPAIR
EXIST STAIR C
BIOMED
EMS KITCHEN/BREAK
02EP402
02EP402
02EP402
02EP402
2PP2B
2PP2A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
D
E
F
G
H
I
J
C
CORRIDOR
1569 SF
AREA SHOWN
BLDG 02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:0
:2 p m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ E
E
B ld g
.r v t
02EP102
BLDG 02 - LEVEL 02 - ELECTRICAL
PLAN 02
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
KEY PLAN
GENERAL NOTES
TRUE
NORTH
- 1" = 10'-0"
1 BLDG 02 - LEVEL 02 - ELECTRICAL PLAN 0 10' 20'
PROJECT
NORTH
Revisions: Date:
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION
OF MILLWORK.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL
BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH
ARCHITECTURAL DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL
BOX PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX
LOCATIONS WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. FOR ALL TELECOMMUNICATIONS BONDING CONNECTIONS, REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EP510.
F A
C P
H O S P
IT
AL
HOSPITAL ROAD
H O S P
AD
HO
SP
ITA
L
HOSPITAL
SECOND STREET
R O A D
EE
T
STREET
FIRST
STREET
FIRST
FIRST
STREET
"B
ST
RE
ET
EE
T
FOURTH STREET
FIRST STREET
H O S P
IT
AL
R O A D
H O
SP
ITAL
R O A D
H O
SP
IT
AL
RO
AD
HOSPITAL ROAD
STREET
SECOND
RO
AD
RO
AD
EE
T
TO I-79
EVANS CITY
N E W
C A
S T L E
R O
A D
MAIN BUILDING
T R A N S
IT
IO
N A L
L
IV
IN
G
C E N T E R
5A
30 CLC
B C D E F G H I J K LA
MECH RM
B02
CORRIDOR
EMERGENCY
LIGHTING RM
B02A
TRANSFORMER
RM
B01
LAUNDRY
B05
CRAWL SPACE
B04
STORAGE
B03 A
STAIR - S
04EP400
04EP400
04EP400
04EP400
120/208V, 3 PHASE
4 WIRE PANELBOARD "4A"
120/208V, 3 PHASE,
4 WIRE PANELBOARD "M"
PANEL 4-BUS-4
MTS
ATS-LS
LS-B4
DT SWITCH
ATS - A4
TRUNK STORAGE
(TE)
B03
CONTINUE TO
SHEET 04EP400
04-P-02
EP504
PRIMARY BONDING
BUSBAR (PBB)
BLDG 04
A SIDE POWER
B SIDE POWER
LEGEND:
SHEET SHALL PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
AREA SHOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:1
:1 p m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ E
E
B ld g
.r v t
04EP100
BLDG 04 - LEVEL 00 - ELECTRICAL
PLAN 04
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
KEY PLAN
GENERAL NOTES
TRUE
NORTH
- 1/4" = 1'-0"
1 BLDG 04 - LEVEL 00 - ELECTRICAL PLAN 2'0 4' 8'
PROJECT
NORTH
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION
OF MILLWORK.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL
BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH
ARCHITECTURAL DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL
BOX PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX
LOCATIONS WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. FOR ALL TELECOMMUNICATIONS BONDING CONNECTIONS, REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EP510.
MODIFIED EQUIPMENT. PROVIDE FEEDERS AS INDICATED.
PROVIDE TBC AS SHOWN. REFERENCE TELECOMMUNICATIONS BONDING RISER
DIAGRAM ON SHEET EP510 FOR ADDITIONAL INFORMATION.
CONTINUE TBB TO TR SBBs. REFERENCE TELECOM BONDING RISER DIAGRAM ON
SHEET EP510 FOR ADDITIONAL INFORMATION.
Revisions: Date:
3 CONTINUE TBB TO TR SBBs. REFERENCE TELECOMMUNICATIONS BONDING RISER
S P
IT
AL
HOSPITAL ROAD
H O S P
AD
HO
SP
ITA
L
HOSPITAL
SECOND STREET
R O A D
EE
T
STREET
FIRST
STREET
FIRST
FIRST
STREET
"B
ST
RE
ET
EE
T
FOURTH STREET
FIRST STREET
H O S P
IT
AL
R O A D
H O
SP
ITAL
R O A D
H O
SP
IT
AL
RO
AD
HOSPITAL ROAD
STREET
SECOND
RO
AD
RO
AD
EE
T
TO I-79
EVANS CITY
N E W
C A
S T L E
R O
A D
MAIN BUILDING
T R A N S
IT
IO
N A L
L
IV
IN
G
C E N T E R
5A
30 CLC
AREA SHOWN
BLDG 06&48
A B C D E F G
8.19.1
300kVA TRANSFORMER
4160V-208/120V, 3⌀, 4W
06EP401
06EP401
06EP401
06EP401
CONTINUE TO 06-AC-01-102
REFERENCE SHEET 06EP401
CONTINUE TO "06-102A"
REFERENCE SHEET 06EP401
PANEL '6-BUS-C'
PANEL '6-BUS-MDP'
PANEL 'B/6'
PANEL 'A/6'
06-CU-02-1021
06-P-02
06-P-04
06-P-03
TR
LOUNGE
CLOSET
105A
105B
MECHANICAL
ROOM
OFFICE
LAUNDRY
LINEN ROOM
STORAGE
LOCKER
ROOM
RESTROOM/SHOWER
ROOM
107A
LOCKER
ROOM
RESTROOM/SHOWER
108A
RESTROOM/SHOWER
ROOM
107A
CONTINUE TO PANEL "06-102B"
REFERENCE SHEET 06EP401
CONTINUE TO PANEL "06-102A"
REFERENCE SHEET 06EP401
06-P-01
06-P-05
DISC.
SWITCH
DISC.
SWITCH
PRIMARY BONDING
BUSBAR (PBB)
EP504
A SIDE POWER
B SIDE POWER
LEGEND:
SHEET SHALL PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:2
:5 p m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ E
E
B ld g
.r v t
06EP101
BLDG 06 - LEVEL 01 - ELECTRICAL
PLAN 06
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
KEY PLAN
GENERAL NOTES
TRUE
NORTH
- 1" = 10'-0"
1 BLDG 06 - LEVEL 01 - ELECTRICAL PLAN
0 10' 20'
PROJECT
NORTH
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION
OF MILLWORK.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL
BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH
ARCHITECTURAL DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL
BOX PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX
LOCATIONS WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
9. FOR ALL TELECOMMUNICATIONS BONDING CONNECTIONS, REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EP510.
PROVIDE CONDUIT AND WIRE FROM CONDENSING TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH
MECHANICAL CONTRACTOR AS REQUIRED.
MODIFIED EQUIPMENT. PROVIDE FEEDERS AS INDICATED.
PROVIDE TBC AS SHOWN. REFERENCE TELECOMMUNICATIONS BONDING RISER
DIAGRAM ON SHEET EP510 FOR ADDITIONAL INFORMATION.
CONTINUE TBB TO TR SBBs. REFERENCE TELECOM BONDING RISER DIAGRAM ON
SHEET EP510 FOR ADDITIONAL INFORMATION.
Revisions: Date:
4 CONTINUE TBB TO TR SBBs. REFERENCE TELECOMMUNICATIONS BONDING RISER
S P
IT
AL
HOSPITAL ROAD
H O S P
AD
HO
SP
ITA
L
HOSPITAL
SECOND STREET
R O A D
EE
T
STREET
FIRST
STREET
FIRST
FIRST
STREET
"B
ST
RE
ET
EE
T
FOURTH STREET
FIRST STREET
H O S P
IT
AL
R O A D
H O
SP
ITAL
R O A D
H O
SP
IT
AL
RO
AD
HOSPITAL ROAD
STREET
SECOND
RO
AD
RO
AD
EE
T
TO I-79
EVANS CITY
N E W
C A
S T L E
R O
A D
MAIN BUILDING
T R A N S
IT
IO
N A L
L
IV
IN
G
C E N T E R
5A
30 CLC
BOILER PLANT
B01
B02
(E) PNL 'B1'
NEW PNL 'A'
(E) PNL 'X'
PNL 'LS'
(E) 150kVA XFMR 240-120/208V
(E) ATS#1 208V 800A
(E) PNL 'B'
(E) ATS#2 240V
800A
(E) ATS-LS XFMR
(E) ATS-LS 150A
XFMR-SEWAGE
B C D E F G H
CONTINUE TO PANEL ''07-101AA''
REFERENCE SHEET 07EP401
07-P-01
CONTINUE TO
SHEET 07EP401
07-P-02
BLDG 07
A SIDE POWER
B SIDE POWER
SHEET SHALL BE PRINTED
IN COLOR TO PROVIDE
ALL INFORMATION
LEGEND:
AREA SHOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0 /2
:3
:1 p m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ E
E
B L
D G
.r v t
07EP100
BLDG 07 - LEVEL 00 - ELECTRICAL
PLAN 07
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .