These mechanical control drawings are technical specifications for infrastructure upgrades at the Butler VA Healthcare Center in Butler, Pennsylvania. The documents detail mechanical control systems for various equipment, including CRAC units, generator room fans, fan coil units, hydronic unit heaters, and telecommunication enclosure cooling units. The drawings, numbered M-704 through M-708, provide detailed control diagrams, points lists, and sequences of operation for each system, specifying technical parameters such as airflow rates, temperature control settings, and integration with building management systems. Drawing M-801 includes a pressure map plan for the data center, showing airflow and ventilation configurations for different rooms and spaces within the facility. The documents are part of a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside construction project with an estimated value between $20-50 million, focused on upgrading the facility's mechanical infrastructure.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL CONTROLS IV
MGH/JW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
Revisions: Date:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
POINTS LIST FOR CRAC UNITS (CRAC 01 & 02)2
SCALE: NTS
CRAC UNIT CHILLED WATER AND COLD WATER
SCALE: NTS
PIPING CONNECTIONS (CRAC 01 & 02) CRAC UNIT CONTROL DIAGRAM (CRAC 01 & 02)4
SCALE: NTS
SEQUENCE OF OPERATION FOR CRAC UNITS (CRAC 01 & 02)1
SCALE: NTS
M-704 10/11/2023
100% CONSTRUCTION
DOCUMENTS
LB/CY/EA/JJ/MA
10/11/2023
Issue Date
10/11/2023
Issue Date
11/30/2023
11/30/202311/30/23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
M-705
MECHANICAL CONTROLS V
MGH/JW
Revisions: Date:
SEQUENCE OF OPERATION FOR GENERATOR ROOM FANS (SF-01 & EF-01)1
SCALE: NTS
POINTS LIST FOR GENERATOR ROOM FANS (SF-01 & EF-01)2
SCALE: NTS
GENERATOR ROOM EXHAUST FAN CONTROL DIAGRAM3
SCALE: NTS
10/11/2023
100% CONSTRUCTION
DOCUMENTS
LB/CY/EA/JJ/MA
10/11/2023
Issue Date
10/11/2023
Issue Date
MECHANICAL CONTROLS VI
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
Revisions: Date:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
SEQUENCE OF OPERATION FOR COOLING ONLY FAN COIL UNIT1
SCALE: NTS
POINTS LIST FOR COOLING ONLY FAN COIL UNIT2
SCALE: NTS
COOLING ONLY FAN COIL UNIT CONTROL DIAGRAM3
SCALE: NTS
M-706 10/11/2023
100% CONSTRUCTION
DOCUMENTS
HOT WATER PUMP CONTROL DIAGRAM (HWP-01)3
SCALE: NTS
HOT WATER PUMP CONTROL DIAGRAM (HWP-01)2
SCALE: NTS
SEQUENCE OF OPERATIONS FOR HOT WATER PUMP (HWP-01) 1
SCALE: NTS
LB/CY/EA/JJ/MA
10/11/2023
Issue Date
10/11/2023
Issue Date
MECHANICAL CONTROLS VII
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
Revisions: Date:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
SEQUENCE OF OPERATION FOR HYDRONIC UNIT HEATER (UH-01)1
SCALE: NTS
POINTS LIST FOR HYDRONIC UNIT HEATER (UH-01)2
SCALE: NTS
HYDRONIC UNIT HEATER CONTROL DIAGRAM (UH-01)3
SCALE: NTS
10/11/2023
100% CONSTRUCTION
DOCUMENTS
M-707
LB/CY/EA/JJ/MA
10/11/2023
Issue Date
10/11/2023
Issue Date
NEW
SEQUENCE OF OPERATION
THE DUCTLESS SPLIT SHALL OPERATE CONTINUOUSLY TO
MAINTAIN A SPACE TEMPERATURE OF 75°(ADJ).
SHOW TEMPERATURE AND HUMIDITY AT THE GRAPHIC
DISPLAY. PROVIDE TEMPERATURE TRENDS.
PROVIDE ALARM FOR TEMPERATURE ABOVE 80°F.
PROVIDE ALARM FOR MOISTURE SENSED ON FLOOR.
SHOW RACK TEMPERATURE AND HUMIDITY (SEE PLANS
FOR NUMBER OF RACKS PER TR)
DDC
CONTROLLER
DUCTLESS SPLIT
M FLOOR MOISTURE
TIE INTO EXISTING BMS
MOUNTED HIGH
ON WALL
T1
FLOOR
W
AL
L
(COORDINATE MOUNTING
HEIGHT WITH CONDITIONS
OF THE SPACE)
H
H SPACE HUMIDITY
T1
SPACE TEMP
M
RACK 1 TEMP/HUM
RACK 1 TEMP/HUM
PDU-1 PDU-2
RACK PDU'S - SEE PLANS FOR
NUMBER OF RACKS PER TR.
A.I.
A.I.
A.I.
D.O.
A.I.
A.I.
REFRIGERANT A.I.R
R
REFRIGERANT SENSOR
SHALL BE INSTALLED
AT A HEIGHT OF NOT
MORE THAN 1 FT. FROM
FINISHED FLOOR LEVEL
SEQUENCE OF OPERATION
THE INTEGRATED COOLING UNIT SHALL OPERATE
CONTINUOUSLY TO MAINTAIN A RACK TEMPERATURE OF
75°(ADJ). SHOW TEMPERATURE AND HUMIDITY AT THE
GRAPHIC DISPLAY. PROVIDE TEMPERATURE TRENDS.
PROVIDE ALARM FOR TEMPERATURE ABOVE 80°F.
PROVIDE ALARM FOR MOISTURE SENSED ON FLOOR.
SHOW RACK TEMPERATURE AND HUMIDITY (SEE PLANS
FOR NUMBER OF RACKS PER TR)
DDC
CONTROLLER
M FLOOR MOISTURE
TIE INTO EXISTING BMS
FLOOR
W
AL
L
M
RACK 1 TEMP/HUM
RACK 1 TEMP/HUM
PDU-1 PDU-2
RACK PDU'S - SEE PLANS FOR
NUMBER OF RACKS PER TR.
A.I.
A.I.
A.I.
D.O.
A.I.
A.I.
A.I.
INTEGRATED COOLING UNIT FOR WALL
MOUNTED TELECOMMUNICATION
ENCLOSURE. MOUNT COOLING UNIT IN
ENCLOSURE PER MANUFACTURERS
INSTRUCTIONS.
MECHANICAL CONTROLS VIII
MGH/JW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
Revisions: Date:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
10/11/2023
100% CONSTRUCTION
DOCUMENTS
TELECOMMUNICATION ROOM CONTROL DIAGRAM1
SCALE: NTS
TELECOMMUNICATION ENCLOSURE INTEGRATED COOLING UNIT CONTROL DIAGRAM2
SCALE: NTS
M-708
LB/CY/EA/JJ/MA
10/11/2023
Issue Date
10/11/2023
Issue Date
SA: 1700 CFM
RA: 1650 CFM
DC-106(+)
F U
T U
R E
SA: 220 CFM
RA: 170 CFM
DC-107/113(+)
S T
O R
A G
E
S E
C U
R E
S T
O R
A G
E
SA: 750
EA: 700
DC-114 (+)
D A
T A
C E
N T
E R
SA: 750 CFM
RA: 700 CFM
DC-112 (+) U
P
A C
K
IN
G /P
A C
K
IN
G
S T
A G
IN
G
/C O
R R
ID
O
R
AHU-01-109
VAV-03-112
VAV-01-106 VAV-02-107/113
VAV-04-118
RH-01
RH-02
SA: 340 CFM
RA: 290 CFM
DC-118 (+)
W A
L K
W A
Y
S A
R A
EA
SA
O A
SA
SA SA
SA
RARA
RA
RA
VAV-10-114
SA: 100 CFM
RA: 50 CFM
DC-105(+) E
N
T R
A N
C E
R O
O M
1SA: 1050 CFM
EA: 1050 CFM
DC-116 (0)
G E
N E
R A
T O
R R
O O
M
SA: 100 CFM
RA: 50 CFM
DC-108(+) E
N
T R
A N
C E
R O
O M
VAV-07-105
SA
RA
VAV-09-116
SA
EA
VAV-08-108
SA: 100 CFM
RA: 100 CFM
DC-115 (0)
F
IR
E R
IS
E
R
SA: 1140 CFM
RA: 1140 CFM
DC-110 (0)
E L E
C T
R
IC
A L
SA: 250 CFM
RA: 250 CFM
DC-109 (0)
M E
C H
A N
IC
A
L
VAV-05-115
VAV-06-110
L-02
RH-03
E A
SA: 25,000 CFM
EA: 25,050 CFM
DC-116 (-)
G E
N E
R A
T O
R R
O O
M
L-01
SAEA
L-02
GENERATOR ENABLED GENERATOR DISABLED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa. 16001
529-22-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED M-801
DATA CENTER - PRESSURE MAP
PLAN 137
MGH/JW LB/CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
10/11/2023
1/4" = 1'-0"1
DATA CENTER - PRESSURE MAP PLAN
Revisions: Date:
Issue Date
10/11/2023
Issue Date