S02 - Attachment 3 - Butler EHRM IU - Drawing - Civil 2 of 2 R1.pdf
PDF 20 MB Posted
- Solicitation number
- 36C77625R0057
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
AAF AIR ASSISTED FIBER
ABAN ABANDONED
APROX APPROXIMATELY
APWA AMERICAN PUBLIC WORKS
ASSOCIATION
ASPH ASPHALT CONCRETE
AVE AVENUE
AWWA AMERICAN WATER WORKS
ASSOCIATION
BLDG BUILDING
BMP BEST MANAGEMENT
PRACTICES
BOT BOTTOM
BVC BEGIN VERTICAL CURVE
CL or ℄ CENTERLINE
CDF CONTROLLED DENSITY FILL
CFS CUBIC FEET PER SECOND
CLR CLEAR
CM CENTIMETER
CMP CORRUGATED METAL PIPE
COMM COMMUNICATION(S)
CONC PORTLAND CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPEP CORRUGATED
POLYETHELENE PIPE (N-12)
CSBC CRUSHED SURFACING BASE
COURSE
CSTC CRUSHED SURFACING TOP
COURSE
CTR CENTER
CY CUBIC YARDS
DDCV DOUBLE DETECTOR CHECK
VALVE
DI DUCTILE IRON
DIA or Ø DIAMETER
DWG DRAWING
E EAST
EA EACH
EG EXISTING GROUND
ELEC ELECTRICAL
ELEV ELEVATION
EP EDGE OF PAVEMENT
ESMT EASEMENT
EVC END VERTICAL CURVE
EXIST EXISTING
FG FINISH GRADE
FL FLANGE
FM FORCE MAIN
FT FEET
HDPE HIGH DENSITY
POLYETHYLENE PIPE
HP HIGH POINT
HMA HOT MIX ASPHALT
HORIZ HORIZONTAL
HWY HIGHWAY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH(ES)
LBS POUNDS
LF LINEAR FEET
LT LEFT
LP LOW POINT
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
N NORTH
NAD NORTH AMERICAN DATUM
NAVD NORTH AMERICAN
VERTICAL DATUM
NE NORTHEAST
NOM NOMINAL
NTS NOT TO SCALE
NW NORTHWEST
OC ON CENTER
OD OUTSIDE DIAMETER
OSP OUTSIDE PLANT
OS1 OPTICAL SINGLEMODE
FIBER (LEGACY STANDARD)
OS2 OPTICAL SINGLEMODE
FIBER (LATEST STANDARD)
OVHD OVERHEAD
PC POINT OF CURVATURE
PE PROJECT ENGINEER
PI POINT OF HORIZONTAL
INTERSECTION
PHH PHYSICAL HAND HOLE
POC POINT ON CURVE
POB POINT OF BEGINNING
POP POINT OF PRESENCE
PPM PARTS PER MILLION
PROP PROPOSED
PT POINT OR POINT OF
TANGENCY
PVC POLYVINYL CHLORIDE PIPE
PVI POINT OF VERTICAL
INTERSECTION
R RADIUS
RJ RESTRAINED JOINT
RT RIGHT
S SOUTH
SD STORM DRAIN
SDCB STORM DRAIN CATCH BASIN
SDCO STORM DRAIN CLEANOUT
SDMH STORM DRAIN MANHOLE
SE SOUTHEAST
SEC SECTION
SF SQUARE FOOT
SMFO SINGLE MODE FIBER
OPTICS
SPEC SPECIFICATION
SS SANITARY SEWER
SSFM SANITARY SEWER FORCE
MAIN
SSMH SANITARY SEWER MANHOLE
ST STREET
STA STATION
STD STANDARD
SW SOUTHWEST
SWPPP STORMWATER POLLUTION
PREVENTION PLAN
TAN TANGENT POINT
TDR TELECOMMUNICATIONS
DISTRIBUTION ROOM
TESC TEMPORARY EROSION &
SEDIMENT CONTROL
TOC TOP OF CURB
TR TELECOMMUNICATIONS
ROOM
TYP TYPICAL
UFC UNIFIED FACILITIES
CRITERIA
UG UNDERGROUND
VC VERTICAL CURVE
VERT VERTICAL
W WEST or WATER
WM WATER METER
WSEL WATER SURFACE
ELEVATION
W/ WITH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
FULLY SPRINKLERED
A/E:ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HWY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
GENERAL NOTES:
1. CONTRACTOR MUST COMPLY WITH ALL LOCAL, STATE AND FEDERAL LAWS PERTINENT TO THE
WORK, AND AS DESCRIBED IN THE SPECIFICATIONS AND ON THESE DESIGN DRAWINGS. ALL
WORKMANSHIP AND MATERIALS MUST BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIARIZED WITH THE EXISTING
CONDITIONS AND VERIFYING CONSISTENCY WITH DESIGN DRAWINGS AND SPECIFICATIONS. THE
CONTRACTOR MUST REPORT ANY DISCREPANCY TO THE CONTRACTING OFFICER IMMEDIATELY
AND AWAIT FURTHER INSTRUCTIONS.
3. IT MUST BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL APPLICABLE PERMITS, LICENSES AND CERTIFICATES, AND MAKE ALL REQUIRED AGENCY NOTIFICATIONS TO COMPLETE THE PROJECT. COMPLIANCE MUST BE AT ALL LEVELS: FEDERAL, STATE, AND LOCAL RELATING TO
THE PERFORMANCE OF THE WORK.
4. PRIOR TO BEGINNING WORK AND PROCURING MATERIALS THAT COULD BE IMPACTED,
CONTRACTOR SHALL INSPECT AND CONFIRM ALL POINTS OF CONNECTIONS TO EXISTING
UTILITIES OR SYSTEMS. POTHOLE WHERE NECESSARY TO VERIFY THE DRAWINGS AGAINST ALL
APPLICABLE EXISTING CONDITIONS. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY UPON
DISCOVERY OF UNFORESEEN SITE CONDITIONS OR DISCREPANCIES.
5. CALL THE UNDERGROUND LOCATE LINE (811) A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATIONS, AND HIRE PRIVATE UTILITY LOCATE COMPANY TO CONFIRM PRESENCE OF
EXISTING BURIED UTILITIES PRIOR TO EXCAVATION. LOCATIONS OF EXISTING UTILITIES SHOWN
HEREIN HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS
AND SHOULD BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE PLANS.
6. UTILITY SYSTEMS MUST BE CONSTRUCTED ACCORDING TO APPROVED PLANS. ANY SIGNIFICANT
DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE
CONTRACTING OFFICER.
6. CONTRACTOR SHALL PREPARE CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) IN ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE REQUIREMENTS AND
OBTAIN PERMIT FOR PROPOSED WORK. CONTRACTOR SHALL MAINTAIN AND UPDATE SWPPP AS
REQUIRED THROUGHOUT CONSTRUCTION. A COPY OF THE APPROVED CONSTRUCTION SWPPP
MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
7. CONTRACTOR MUST TAKE ALL POSSIBLE CARE TO PROTECT PERSONAL AND ADJACENT
PROPERTY AND TO ENSURE THE SAFETY OF THOSE INVOLVED DIRECTLY OR INDIRECTLY WITH
THE WORK.
8. THE CONTRACTOR MUST PERFORM ANY AND ALL CUTTING, PATCHING, REPAIRING, RESTORING
AND THE LIKE NECESSARY TO RETURN ALL SURFACES AFFECTED BY THE WORK TO THEIR
ORIGINAL CONDITION.
9. DEMOLITION MUST BE TO THE LIMITS SHOWN ON THE PLANS. THE DEMOLITION LIMITS DEPICTED
IN THE PLANS ARE BASED ON THE SITE CONDITIONS AT THE TIME OF THE DESIGN SURVEY.
DEMOLITION LIMITS MAY VARY DEPENDING ON CHANGED SITE CONDITIONS AT THE TIME OF
CONSTRUCTION.
10. EXISTING PAVEMENT, LANDSCAPING, SURFACE OR SUBSURFACE FACILITIES, WITHIN OR
ADJACENT TO THE CONTRACTOR'S WORK AREA OR INDICATED ON THE PLANS TO REMAIN MUST
BE PROTECTED FROM DAMAGE. ANY FACILITIES DAMAGED BY THE CONTRACTOR'S ACTIVITIES
MUST BE IMMEDIATELY REPAIRED TO MATCH ITS ORIGINAL CONDITION AND THE SATISFACTION
OF THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
11. ALL MATERIALS MUST BE NEW MATERIALS AND PURCHASED IN ACCORDANCE WITH THE BUY
AMERICAN ACT.
12. WRITTEN DIMENSIONS IN SCHEDULES AND DRAWINGS TAKE PRECEDENCE OVER SCALED
DRAWINGS. DO NOT SCALE DRAWINGS, AND BRING ALL DISCREPANCIES TO THE ATTENTION OF
THE CONTRACTING OFFICER AND AWAIT FURTHER INSTRUCTIONS.
13. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE CONSTRUCTION PHASING AND
STAGING. NO ADDITIONAL COST TO THE OWNER MUST BE PERMITTED FOR THE RELOCATION OF
TRAILERS, STORED MATERIAL, REMOVAL AND REINSTALLATION OF BARRICADES, FENCING, OR
ANY OTHER INCIDENTAL ITEMS THAT ARE REQUIRED AND NECESSARY TO ACCOMPLISH THE
WORK UNDER THIS CONTRACT. COMPLETE RESTORATION BETWEEN CONSTRUCTION PHASES IS
REQUIRED, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.
14. THE CONTRACTOR MUST NOTIFY VA OF ANY WORK TO BE PERFORMED IN CONFINED SPACE.
CONTRACTOR MUST CREATE AND SUBMIT INDIVIDUAL CONFINED SPACE WORK PLAN.
CONTRACTOR MUST RECEIVE APPROVAL FROM VA PRIOR TO BEGINNING WORK.
15. ANY U.S.G.S. OR CAMPUS SURVEY MONUMENTS WITHIN THE LIMITS OF DEMOLITION OR
CONSTRUCTION MUST BE PROTECTED. IF A MONUMENT IS IN DANGER OF BEING DESTROYED
AND HAS NOT BEEN PROPERLY REFERENCED IN THE PLANS, THE CONTRACTOR MUST
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER. CONTRACTOR MUST REPAIR ANY DAMAGED
BENCH MARKS IN ACCORDANCE WITH N.O.A.A. NATIONAL GEODETIC SURVEY GUIDELINES, AND
TO THE SATISFACTION OF THE FACILITY'S G.I.S. BENCHMARK REPRESENTATIVE.
16. CONTRACTOR MUST PROVIDE AND MAINTAIN ACCESS, AT ALL TIMES DURING CONSTRUCTION, TO ALL EXISTING FACILITIES AND THOSE THAT MAY BE UNDER CONSTRUCTION IN THE IMMEDIATE
VICINITY. FIRE TRUCK ACCESS MUST NOT BE BLOCKED.
17. THE CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR DETERMINING THE ADEQUACY OF
EXISTING STRUCTURES AND UTILITIES TO SUPPORT CONSTRUCTION EQUIPMENT AND LOADS.
18. ALL DEVIATIONS FROM THESE PLANS MUST BE RECORDED ON A SET OF "AS-BUILT" OR RECORD
REDLINE DRAWINGS. THE CONTRACTOR MUST SUBMIT "AS-BUILT" REDLINE DRAWINGS TO THE
CONTRACTING OFFICER.
19. ALL DEMOLITION MATERIAL, INCLUDING PAVEMENT AND EXCESS SOIL, EXCEPT AS NOTED IN THE CONTRACT DRAWINGS / SPECIFICATIONS AND / OR SPECIFIED BY THE CONTRACTING OFFICER, MUST BECOME THE PROPERTY OF THE CONTRACTOR AND BE COMPLETELY REMOVED FROM VA
CAMPUS AND DISPOSED OF BY THE CONTRACTOR.
20. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN
SHORING AND BRACING NECESSARY TO PROTECT WORKERS, UTILITIES AND OTHER
IMPROVEMENTS AND EXCAVATIONS PER STATE AND FEDERAL REGULATIONS. THE CONTRACTOR
SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF TEMPORARY SHORING AND BRACING.
EXISTING DATA NOTES:
21. THE EXISTING INFORMATION SHOWN ON THESE DRAWINGS HAVE BEEN PREPARED BASED UPON
INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, GOVERNMENT CANNOT ENSURE ACCURACY AND THUS IS NOT RESPONSIBLE FOR THE
ACCURACY OF THAT INFORMATION OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN
INCORPORATED INTO THESE DRAWINGS AS A RESULT.
22. THE ENGINEER ASSUMES NO LIABILITY FOR DAMAGES TO ANY UTILITIES DURING CONSTRUCTION.
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO REPAIR ANY DAMAGES THAT MAY OCCUR
DURING CONSTRUCTION.
23. THE CONTRACTOR MAY CONDUCT TEST PITS (POTHOLE) TO VERIFY EXISTING CONDITIONS. THE
CONTRACTOR SHALL COORDINATE ALL TEST PITS WITH THE COR.
RESTORATION NOTES:
1. RESTORATION MUST BE IN ACCORDANCE WITH VA AND UFC REQUIREMENTS.
2. RESTORE ALL DISTURBED AREAS AS SHOWN ON PLANS OR AS DIRECTED BY THE CONTRACTING
OFFICER.
3. REPAIR ALL UTILITIES DAMAGED BY CONSTRUCTION IN ACCORDANCE WITH CONTRACTING
OFFICER'S REQUIREMENTS.
4. CONTRACTOR MUST RESTORE THE SITE AND ALL OTHER PHYSICAL FEATURES TO MATCH
EXISTING CONDITIONS WHERE CONSTRUCTION WORK IS PERFORMED.
DEMOLITION NOTES:
1. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND
PROPERTY; TO MINIMIZE INTERFERENCE WITH USE OF ADJACENT AREAS, UTILITIES AND
STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE
PASSAGE TO AND FROM SUCH ADJACENT AREAS OR STRUCTURES.
2. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES,
WARNING LIGHTS, AND OTHER SIMILAR ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL
PERSONNEL DURING DEMOLITION AND REMOVAL OPERATIONS.
3. MAINTAIN FENCES, BARRICADES, LIGHTS AND OTHER SIMILAR ITEMS AROUND EXPOSED
EXCAVATIONS UNTIL SUCH EXCAVATIONS HAVE BEEN COMPLETELY FILLED.
4. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH
WATER TO KEEP DUST TO A MINIMUM. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR
OBJECTIONABLE CONDITIONS SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING OR POLLUTION.
VACUUM AND DUST THE WORK AREA DAILY.
5. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE
AND EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE
WORK. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGES TO
EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE
MEDICAL CENTER; AND DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED
BY THE CONTRACTING OFFICER REPRESENTATIVE (COR). THE CONTRACTOR SHALL
COORDINATE THE WORK WITH ALL OTHER WORK AND SHALL CONSTRUCT AND MAINTAIN
SHORING, BRACING, AND SUPPORTS AS REQUIRED. THE CONTRACTOR SHALL ENSURE THAT
STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FOR
INCREASING STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS
A RESULT OF ANY CUTTING, REMOVAL, OR DEMOLITION WORK PERFORMED.
6. DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO BE REMOVED.
7. REMOVE ABANDONED OUTSIDE UTILITY LINES THAT WOULD INTERFERE WITH INSTALLATION
OF NEW UTILITY LINES AND NEW CONSTRUCTION.
8. COMPLETELY DEMOLISH AND REMOVE BUILDINGS AND STRUCTURES, INCLUDING ALL
APPURTENANCES RELATED OR CONNECTED THERETO, AS NOTED BELOW:
8.A. AS REQUIRED FOR INSTALLATION OF NEW UTILITY SERVICE LINES.
8.B. TO FULL DEPTH WITHIN AN AREA DEFINED BY HYPOTHETICAL LINES LOCATED 5 FT (1500
MM) OUTSIDE BUILDING LINES OF NEW STRUCTURES.
9. ALL WASTE DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE
SITE AND LAWFULLY DISPOSED OF. DEBRIS, INCLUDING BRICK, CONCRETE STONE, METALS
AND SIMILAR MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE
DISPOSED OF BY THE CONTRACTOR DAILY, OFF THE MEDICAL CENTER TO AVOID
ACCUMULATION AT THE DEMOLITION SITE. MATERIALS THAT CANNOT BE REMOVED DAILY
SHALL BE STORED IN AREAS SPECIFIED BY THE CONTRACTING OFFICERS REPRESENTATIVE.
CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF MATERIALS UNCOVERED DURING
ANY PART OF THE WORK APPEAR TO BE CONTAMINATED. ALL LOCAL, STATE AND FEDERAL
LAWS SHALL PREVAIL IN THE EVENT OF CONTAMINATED MATERIALS.
10. BREAK UP CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL FROM
PRESENT LOCATION INTO PIECES NOT EXCEEDING 24 INCHES (600 MM) SQUARE TO PERMIT
DRAINAGE. CONTRACTOR SHALL DISPOSE OF DEBRIS IN COMPLIANCE WITH APPLICABLE
FEDERAL, STATE AND LOCAL PERMITS, RULES AND/OR REGULATIONS.
TRAFFIC MANAGEMENT NOTES:
1. ALL ROADWAYS MUST REMAIN OPEN DURING CONSTRUCTION, UNLESS OTHERWISE APPROVED
BY THE CONTRACTING OFFICER. ROADWAY CLOSURE DURING CONSTRUCTION REQUIRES THE
CONTRACTOR SUBMIT A TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL IN ADVANCE. IF
REQUIRED, ALL TEMPORARY TRAFFIC CONTROL DEVICES MUST BE IN ACCORDANCE WITH THE
MOST CURRENT EDITION OF "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS
AND HIGHWAYS".
2. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE MOVING LANE ALONG ROADWAYS AT
ALL TIMES, EXCEPT WHERE GIVEN PERMISSION BY THE VAMC AND CONTRACTING OFFICERS
REPRESENTATIVE.
3. THE CONTRACTOR SHALL PROVIDE ALL SIGNAGE, BARRICADES, CAUTION TAPE, CONES AND
BARRELS REQUIRED TO FACILITATE A SAFE LANE OR SIDEWALK CLOSURE.
4. PEDESTRIAN ACCESS SHALL BE MAINTAINED AND MANAGED DURING SIDEWALK AND
CROSSWALK CLOSURES.
5. ACCESS TO ALL ROADWAYS, DRIVEWAYS AND LOADING RAMPS SHALL BE MAINTAINED DAILY
AFTER CONSTRUCTION ACTIVITIES HAVE CONCLUDED.
6. THE CONTRACTOR SHALL COORDINATE ANY ROADWAY, DRIVEWAY, LOADING RAMP AND/OR
SIDEWALK CLOSURES WITH THE VAMC PRIOR TO PERFORMING WORK.
GENERAL UTILITY NOTES:
1. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST VERTICALLY AND
HORIZONTALLY FIELD LOCATE BY POTHOLING AND SURVEY ALL PROPOSED UTILITY CONFLICTS
AND CROSSINGS. IF THE EXISTING UTILITY LOCATION DIFFERS FROM WHAT IS SHOWN ON THE
PLANS, THE CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER AND/OR CONTRACTING
OFFICER'S REPRESENTATIVE IMMEDIATELY AND AWAIT FURTHER INSTRUCTIONS.
2. THE CONTRACTOR IS ADVISED THAT ALL EXISTING UNDERGROUND UTILITIES, CABLES, DUCTS, MANHOLES, ETC. (UNDERGROUND FACILITIES) SHOWN ON PLANS WERE LOCATED USING THE
BEST INFORMATION AVAILABLE. INFORMATION SHOWN ON THE DRAWING CONCERNING TYPE,
SIZE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR
ALL-INCLUSIVE, AND IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS
RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITIES. CONTRACTOR MUST BE
RESPONSIBLE FOR CONTACTING GOVERNMENT UTILITY OWNERS TO IDENTIFY UNDERGROUND
UTILITIES AND/OR CABLES WITHIN THE PROJECT LIMITS AND STAGING AREAS. THE CONTRACTOR
MUST ASSIST UTILITY OWNERS IN EFFORTS TO FIELD VERIFY UNDERGROUND UTILITIES.
CONTRACTOR MUST ALSO REVIEW ALL UTILITIES WITH THE CAMPUS MAINTENANCE STAFF PRIOR
TO BEGINNING WORK. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, THE
CONTRACTOR MUST CONDUCT A FIELD UTILITY LOCATION SURVEY USING ELECTRONIC,
MAGNETIC OR OTHER UNDERGROUND UTILITY LOCATING PRACTICES. UTILITY OWNERS MUST BE
NOTIFIED AND MUST HAVE THE OPTION TO ACCOMPANY THIS FIELD INVESTIGATION.
EXPLORATORY EXCAVATIONS IN THE VICINITY OF EXISTING UNDERGROUND UTILITIES,
PARTICULARLY THOSE ASSOCIATED WITH OPERATING NAVIGATIONAL AIDS, MUST BE CARRIED
OUT WITH HAND TOOLS UNTIL THE EXACT CHARACTER AND LOCATION OF SUCH FACILITIES ARE DETERMINED. ALL INFORMATION SO OBTAINED FROM THIS UTILITY LOCATION SURVEY MUST BE
FURNISHED TO THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER'S REPRESENTATIVE
AND THE A/E PRIOR TO CONSTRUCTION.
3. ALL UNDERGROUND CABLE, UTILITIES, AND ASSOCIATED STRUCTURES MUST BE PROTECTED
FROM DAMAGE BY THE CONTRACTOR. ANY DAMAGE TO EXISTING UNDERGROUND CABLES
AND/OR UTILITIES CAUSED BY THE CONTRACTOR (REGARDLESS OF WHETHER THEY WERE
LOCATED OR NOT BY THE BASE, UTILITY COMPANY, ETC.) MUST BE REPAIRED BY THE
CONTRACTOR AT THE CONTRACTOR'S OWN EXPENSE AND TO THE SATISFACTION OF THE UTILITY OWNER'S AUTHORIZED REPRESENTATIVES. ALL EXISTING UTILITIES, CABLE, DUCTS, EQUIPMENT, DEVICES, ETC. OUTSIDE THE AREA OF DEMOLITION OR CONSTRUCTION LIMITS WHICH ARE
DAMAGED OR DISRUPTED AS A RESULT OF THE CONTRACTOR'S OPERATIONS, MUST BE
IMMEDIATELY REPAIRED AT THE EXPENSE OF THE CONTRACTOR AND TO THE SATISFACTION OF
THE UTILITY OWNER'S AUTHORIZED REPRESENTATIVE.
4. ALL UTILITY OUTAGES MUST BE SCHEDULED AND APPROVED THROUGH THE CONTRACTING
OFFICER OR THE DESIGNATED UTILITY OWNER REPRESENTATIVE PER THE APPLICABLE OUTAGE
NOTIFICATION REQUIREMENTS.
5. UNLESS ALREADY SPECIFIED IN THE CONTRACT DRAWINGS, CONTRACTOR MUST RETROFIT ALL EXISTING UTILITY ACCESS POINTS TO BRING FLUSH WITH FINISHED SURFACE WITHIN AREAS OF
WORK IN WHICH THE EXISTING GRADE IS MODIFIED BY CONSTRUCTION. THIS WORK IS
CONSIDERED PART OF THE CONTRACTED SCOPE, AND APPLIES TO EXISTING UTILITIES THAT ARE
NOT TO BE DEMOLISHED OR ABANDONED WITHIN THE PROJECT LIMITS.
6. ALL MATERIALS, WORKMANSHIP, AND TESTING MUST BE IN ACCORDANCE WITH THE
REQUIREMENTS OF THE CONTRACT SPECIFICATIONS.
7. FIELD VERIFY LOCATION (INCLUDING POT HOLING FOR VERTICAL DEPTH) OF EXISTING UTILITIES
AND INVERT ELEVATIONS OF THE POINT OF CONNECTION PRIOR TO CONSTRUCTION.
8. COMPRESSIBLE MATERIALS:
FOR USE IN AREAS ABOVE BURIED PIPES WHERE OTHER PIPES ARE CROSSING WITH LESS THAN
1'-0" VERTICAL SEPARATION OR WHERE CALLED OUT ON DRAWINGS: POLYETHYLENE PLASTIC
FOAM IN ACCORDANCE WITH FEDERAL SPECIFICATION PPP-C-1752C, TYPE 1, CLASS 2, SUCH AS "ETHAFOAM". AT PIPE CROSSINGS, MATERIAL SHALL BE A MIN OF 2-INCH THK, 2-FT WIDE, AND 4-FT LONG, BUT SHALL BE A MINIMUM OF 6-IN WIDER THAT OUTSIDE DIAMETER OF PIPE ON EACH
SIDE.
9. GATE VALVES INSTALLED UNDER PAVEMENT SHALL HAVE A 2-INCH OPERATING NUT AND VALVE BOX W/ COVER FLUSH WITH ASPHALT SURFACE. GATE VALVES INSTALLED IN AREAS WHERE THE SURFACE IS OTHER THAN ASPHALT OR CONCRETE, TOP OF VALVE BOX SHALL BE EMBEDDED IN A CAST-IN-PLACE COLLAR THAT IS 3'-0" MIN SQUARE BY 8-INCHES THICK PLACED ON 4-INCH THK
(MIN) COMPACTED BASE COURSE WITH SURFACE FLUSH WITH EXISTING GRADE
10. TESTING OF ALL INSTALLED UTILITY LINES AND STRUCTURES MUST BE IN ACCORDANCE WITH
CONTRACT SPECIFICATIONS.
11. ANY REVISIONS TO THESE PLANS, ONCE APPROVED BY THE ENGINEER OF RECORD, MUST BE
REVIEWED AND RE-APPROVED BY THE CONTRACTING OFFICER.
12. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR UTILITY TRENCH SAFETY INCLUDING SHORING
(IF REQUIRED) DESIGNED BY A REGISTERED ENGINEER AND WORKER SAFETY WHILE WORKING
WITHIN THE TRENCH.
GRADING & BACKFILL NOTES:
1. BACKFILL MATERIAL MUST NOT CONTAIN PETROLEUM PRODUCTS, OR SUBSTANCES WHICH ARE
HAZARDOUS, DANGEROUS, TOXIC, OR WHICH OTHERWISE VIOLATE ANY STATE, FEDERAL. OR
LOCAL LAW, ORDINANCE, CODE, REGULATION, RULE, ORDER, OR STANDARD.
2. GENERAL SITE BACKFILL MATERIAL MUST MEET THE VA REQUIREMENTS FOR EARTHWORK.
3. SLOPE FINISH GRADE SURFACES UNIFORMLY BETWEEN ELEVATIONS SHOWN ON DRAWINGS
UNLESS SPECIFIED OTHERWISE. GRADE AREAS TO ELIMINATE LOW SPOTS AND MAINTAIN
POSITIVE DRAINAGE.
SECURITY:
1. THE CONTRACTOR MUST COMPLY WITH ALL REQUIREMENTS OF THE VA SECURITY PROGRAM.
2. THE CONTRACTOR MUST BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR'S PERSONNEL OF
THE VA SECURITY REQUIREMENTS. ALL NEW CONTRACTOR EMPLOYEES MUST BE BRIEFED ON
THESE REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.
PB RDM
CIVIL SHEET INDEX AND GENERAL
NOTES
CS001
N/A
100% CONSTRUCTION
DOCUMENTS
BUTLER, PA
EHRM INFRASTRUCTURE
UPGRADES
529-22-700
10/11/2311/30/23
SD
S
W E
C
STE C
C
W W
W
D D
D
CORE
SAMPLE
CORE
SAMPLE
CORE
SAMPLE
D
S
S
S
E E
E
CORE
SAMPLE
BUILDING 20
BUILDING 2
CORE
SAMPLE
S
C
E
E E
ST
E
D
D
S
E
C
D
E E
S
D
E
D
D
D
D D
D
C
E E
S
S
ST
ST
HOSPITAL ROAD
HOSPITAL ROAD
HOSPITAL ROAD
1ST STREET
1ST STREET
2ND STREET
2ND STREET
HOSPITAL ROAD
NEW CASTLE ROAD (SR. 0356)
NEW CASTLE ROAD (SR. 0356)
NEW CASTLE ROAD (SR. 0356)
B STREET
B S
TR
EE
T
B S
TR
EE
T
B STREET
CORE
SAMPLE
CORE
SAMPLE
HOSPITAL ROAD
HO
SP
IT
AL
R
OA
D
HOSPITAL ROAD
A S
TR
EE
T
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
5A
BUILDING
BUILDING 46
BUILDING 7
BUILDING 66
BUILDING 8
BUILDING 6
BUILDING 9BUILDING 10
BUILDING 48
TRANSITIONAL
LIVING
CENTER
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BR
ICK
O
VE
RP
AS
S
CORE
SAMPLE
CORE
SAMPLE
CORE
SAMPLE
ST
FH
GV
ST
ST
ST
ST
S
ST
ST
S
E
W
CHWRCHWSCHWRCHWS
W
W
W
W
W
HPS
HPC
LPC
COMM
COMM
CORE
SAMPLE
CORE
SAMPLE
HPS
HPS
HPC
HPC
LPC
LPC
CO
M
M
CO
M M
C
COMM
COMM
COMM
COMM
COMM
COMM
W
E
E
E
EEE
CORE
SAMPLE
W
E
D D
E
CORE
SAMPLE
CORE
SAMPLE
S
F
G W
W
W W
W
W
W
CO
M
M
COMM
SD
CO
M
M
G
W
W
W
F
F
SAN
SA
N
SA
N
SAN
SA
N
C
C
C
C
C
C
C
C
C
C
SST
HPC
HPC
HPC
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
CPD
CPD
CP
D
CP
D
LPC
LPC
LPC
LPC
HPC
CPD
HPS
HPS
HPC
HPC
LPC
LPC
LPC
LPC
LPC
HPS
HPS
HPS
HP
S
HPS
HPS
HPS
CPD
HPC
LPC
HPC
CP
D
ST
ST
ST
ST
D
S
S
S
S
SAN
S
SAN
SAN
SAN
SAN
S
S
S
SD
SD
SD
EE
SD
D
D
D
D
D
C STREET
CLC
(COMMUNITY LIVING CENTER)
CORE
SAMPLE
DOCKBUILDING
X
X
X X
E
ATRIUM
G
U
U U U
COM
M
CO
M
M
E
E
E
E
E
E E
E
E
E
E
G
G
G
G
G
HP
C
LP
C
SD
SD
W
W
W
W
W
F
W E
E
E
E
E
C O
M M
C O
M M
C O
M M
C(B)
C(ISP)
C(ISP)
W
W
C( B)
C (B
C(B)
C(B)
C(B)
C
(IS
P)
C(B)
C(B)
C(B)
C(ISP)
C(ISP)
C(ISP)
C(B)
C(B
C(ISP)
C(IS
P)
C(B) C(B)
C(ISP)
C(ISP)
C(B)
C(B) C(B)
C(ISP)
C(ISP) C(ISP)
C( B)
C(
IS
P)
C(ISP)
C(ISP)
C(B) C(B)
C (B
C(B)
C(B)
C(B)
C(ISP) C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C (B)
C(ISP)
C(ISP)
C(ISP)
COM
C(A)
C(A)
C( A)
C( A)
C( A)
C(A)
C(A)
C(A)
C(A)
C(A) C(A)
C(A)
C(A)
C(A)
C(A)
C (A)
C(A)
C
(ISP)
1" = 100' feet
200100100 0 scale
BUTLER VA GENERAL NOTES:
1. THE CONTRACTOR SHALL NOTIFY "PA ONE CALL" (1-800-242-1776) AT LEAST 72 HOURS PRIOR TO EXCAVATION. THE
CONTRACTOR SHALL FOLLOW MCM SC-20.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS, STATE AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS WHEN CONSTRUCTION IS BEING PERFORMED ADJACENT TO BUILDING ENTRANCES/WALKWAYS.
3. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS AND/OR
FIRE HYDRANTS WITHOUT APPROPRIATE PERMITS AND/OR PERMISSIONS.
4. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
5. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF SIX (6) INCHES OF TOPSOIL.
THESE ARES SHALL BE IMMEDIATELY SEEDED AND STABILIZED.
6. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
7. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER.
8. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES OR CONSTRUCTION FENCE
DAILY. NO OPEN TRENCHES SHALL BE LEFT UNATTENDED.
9. THE CONTRACTOR IS RESPONSIBLE FOR ALL FIELD MEASUREMENTS. THE GOVERNMENT WILL NOT BE HELD RESPONSIBLE FOR BIDDING ERRORS MADE OR FOR THE FAILURE TO ADEQUATELY INSPECT THE JOB SITE FOR EXISTING
CONDITIONS, DIMENSIONS, AND GRADES.
10. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES BEFORE COMMENCING OR PROCEEDING WITH WORK.
11. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS, SEWER, ELECTRIC AND OTHER UTILITIES SHALL BE
MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION.
13. CONSTRUCTION ACTIVITIES SHALL NOT CONFLICT WITH THE VAMC OPERATIONS AND EMPLOYEE/PATIENT PARKING. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE VAMC POLICE DEPARTMENT AND COR. WORK AFFECTING BUILDING ENTRANCES, WALKWAYS, LOADING AREAS, PARKING, ETC. SHALL BE COORDINATED AND SCHEDULED WITH
THE VAMC.
14. THE CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO
EXCEPTION ALLOWED**
15. ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE RESET BY A
PROFESSIONAL LICENSED SURVEYOR AT THE CONTRACTOR'S EXPENSE.
16. THE CONTRACTOR SHALL PROTECT THE VA PROPERTY FROM DUST AND DAMAGE AT ALL TIMES. ANY RESULTING DAMAGE TO THE VA PROPERTY SHALL BE IMMEDIATELY CORRECTED BY THE CONTRACTOR AT THE CONTRACTOR'S
EXPENSE.
17. ANY REQUIRED PAVEMENT RESTORATION TO ANY PARKING LOT THAT HAS BEEN PAVED WITHIN THE LAST TWO YEARS SHALL BE RESTORED FOR THE ENTIRE LIMITS OF THE LOT. ANY REQUIRED PAVEMENT RESTORATION TO ANY SECTION OF ROADWAY THAT HAS BEEN PAVED WITHIN THE LAST TWO YEARS SHALL BE RESTORED AT FULL WIDTH OF THE
ROADWAY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
FULLY SPRINKLERED
A/E:ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HWY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
CONTRACTORS ACCESS & STORAGE AREAS:
1. THE CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER FOR EXACT LOCATION OF
STAGING AREA(S) TO BE USED DURING CONSTRUCTION FOR STORAGE / STOCKPILING OF
MATERIALS. CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER PRIOR TO OCCUPYING
STAGING AREA. THE CONTRACTOR MUST VERIFY WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE OF ANY CHANGES IN STAGING / LAYDOWN AREAS THAT MAY HAVE OCCURRED
AFTER PLANS WERE ISSUED.
2. UPON COMPLETION OF THE WORK, THE STAGING AREAS MUST BE CLEANED AND RESTORED TO
THEIR ORIGINAL CONDITION.
3. CONTRACTOR MUST PROVIDE TEMPORARY SECURITY FENCING AROUND THE CONSTRUCTION
STAGING AREAS WHERE REQUIRED BY COR. CONTRACTOR MUST BE AWARE OF THE VERTICAL
HEIGHTS OF OBJECTS NEAR FENCE LINES; NO EQUIPMENT OR MATERIAL MUST BE PLACED NEAR
FENCE LINES THAT WOULD ALLOW THE FENCE TO BE SCALED. MAINTAIN A 10 FOOT MINIMUM
SEPARATION FROM ALL FENCES FROM STOCKPILES, PARKED VEHICLES, OR OTHER MATERIALS
WHICH COULD BE CLIMBED. POST A METALLIC SIGN DISPLAYING THE CONTRACTOR'S 24 HOUR
EMERGENCY CONTACT NUMBER.
4. ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE SITE MUST USE THE ACCESS POINT AS DETERMINED BY THE COR. ALL ASSOCIATED FEES AND COST MUST BE PAID BY CONTRACTOR
AND ARE CONSIDERED INCIDENTAL TO THE VARIOUS BID ITEMS.
5. CONTRACTOR MUST BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE CONSTRUCTION
AND STAGING AREAS. THE TRAFFIC CONTROL MEASURES MUST BE DIRECTED AND APPROVED BY
THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER'S REPRESENTATIVE.
6. CONTRACTOR MUST COORDINATE LOCATION(S) OF SOIL STOCKPILE AREAS WITH THE
CONTRACTING OFFICER IN ADVANCE OF CONSTRUCTION START. AT A MINIMUM, SOIL STOCKPILES
WILL CONSIST OF CLEAN IMPORTED FILL, AND EXCAVATED SOILS WAITING FOR REUSE OR
OFF-SITE DISPOSAL, AND STOCKPILES MUST BE ADEQUATELY SEPARATED FROM EACH OTHER
WITHIN THE STOCKPILE AREA(S).
CONTRACTOR'S VEHICLES:
1. CONTRACTOR'S VEHICLES MUST BE IN GOOD WORKING ORDER. CONTRACTOR'S PERSONNEL MUST
PARK WITHIN THE CONTRACTOR'S STAGING AREA OR AREAS APPROVED BY THE COR.
2. ALL TRUCKS AND/OR ASSOCIATED VEHICLE HAULING TOOLS, LABOR, EQUIPMENT, MATERIAL OR
DEBRIS ON THE VA CAMPUS MUST BE EQUIPPED AND PREPARED TO PREVENT SPILLAGE OF
DEBRIS DURING TRANSPORTATION. TRUCK BEDS MUST BE SWEPT CLEAN BEFORE LEAVING THE
WORK AREA. SIDEBOARDS MUST BE KEPT IN IN GOOD REPAIR. UNDER NO CIRCUMSTANCES MUST
A VEHICLE BE LOADED BEYOND ITS LEGAL LIMITS OR HIGHER THAN THE SIDEBOARDS.
PB RDM
OVERALL CIVIL SITE PLAN
CS100
N/A
100% CONSTRUCTION
DOCUMENTS
BUTLER, PA
EHRM INFRASTRUCTURE
UPGRADES
SD
SD
SD
SD
SD
SD
HOSPITAL ROAD
A S
TR
EE
T
BUILDING
CORE
SAMPLE
W
W
W
W
W
W
W W W
W
W
W
W
W W
W W
W
G
G
G
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
G
G
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
CD
CD
CD
COMM
E
COMM
COMM
COMM
F
F
SA
N
SA
N
SA
N
E
E
CD
BUILDING
G
G
X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
E
E
E
E
E
E
E
E
E
E
E
E
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN
SD
SD
SD
COMM
E
E
E E
E E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
G
G
G
G
G
G
G
SAN
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
W W
W W
W
W W
W
W
W
W
E
CO
M
M
CO
M
M
COMM
CO
M
M
E
E
E
E
E
E
E
E
E
E
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C(B)
C (B
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C( B)
C( B)
C( B)
C( B)
C( B)
C( B)
C( B)
C( B)
C( B)
C (B
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C (B)
C(B) C(B)
C(B) C(B)
C(B) C(B)
C(B) C(B)
C(B) C(B)
C(B) C(B)
C(B)
C(B)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
SAN
SD
C(A)
C(A
C(A
C(A
C(A
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C( A)
C( A)
C( A)
C( A)
C( A)
C(A)
C(A)
C(A)
C(A
C(A
C (A
C (A
C (A
C( A)
C( A)
C(A) C(A)
C(A) C(A)
C(A) C(A)
C(A)
C( A)
C( A)
C( A)
SD
SD
SD
SD
SD
SD
SD
C (B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C( B)
C
(ISP)
C
(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(
IS
P)
SD
SD
SD
SD
SD
C(A)
C (A)
C (A)
C (A)
C (A)
C (A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A) C(A)
C(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
N: 568314.87 E: 1360718.73
N: 568389.04 E: 1360694.80
N: 568409.29 E: 1360773.12
N: 568464.48 E: 1360758.85
N: 568486.27 E: 1360748.05
N: 568412.88 E: 1360767.03
N: 568475.10 E: 1360704.84
N: 568401.71 E: 1360723.82
N: 568324.92 E: 1360701.67
N: 568386.69 E: 1360685.70
N: 568469.76 E: 1360664.22
N: 568472.11 E: 1360673.32
N: 568479.94 E: 1360703.59
N: 568281.21 E: 1360770.07
N: 568288.47 E: 1360773.86
N: 568296.98 E: 1360777.30
N: 568296.28 E: 1360778.90
N: 568319.92 E: 1360790.50
N: 568349.10 E: 1360804.01
N: 568353.54 E: 1360805.67
N: 568357.29 E: 1360820.19
N: 568470.74 E: 1360783.06
N: 568463.23 E: 1360754.01
N: 568483.45 E: 1360779.77
N: 568475.94 E: 1360750.72
5'
1" = 20' scale feet
4020020
LEGEND
EXISTING ASPHALT PAVEMENT
PROPOSED ASPHALT PAVEMENT
PROPOSED CONCRETE SIDEWALK
73.5'
PROPERTY LINE
SITE KEYNOTES
PROPOSED MCR BUILDING, SEE ARCHITECTURAL PLANS
PROPOSED GENERATOR ROOM, SEE ARCHITECTURAL PLANS
PROPOSED MECHANICAL YARD, SEE ARCHITECTURAL PLANS
PROPOSED RAIN GARDEN, SEE SHEET CG152
PROPOSED CONCRETE SIDEWALK, SEE DETAIL B1 ON SHEET CU160
PROPOSED ASPHALT PAVEMENT, SEE DETAILS C1 AND C4 ON SHEET CU160
PROPOSED GUARD POSTS, SEE DETAIL E9 ON SHEET CU160
EXISTING STORM DRAIN TO REMAIN, CONTRACTOR TO PROTECT IN PLACE
EXISTING LOADING DOCK TO REMAIN, CONTRACTOR TO PROTECT IN PLACE
EXISTING CONCRETE WALL TO REMAIN
SAWCUT LINE, CONTRACTOR TO PROVIDE A SMOOTH, CLEAN EDGE FOR
MATCHING INTO EXISTING PAVEMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
FULLY SPRINKLERED
A/E:ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HWY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
EXISTING LIGHT POLE TO REMAIN, CONTRACTOR TO PROTECT IN PLACE
21'
15'
9.5' 7'
PB RDM
MCR BUILDING SITE PLAN
CS150
N/A
100% CONSTRUCTION
DOCUMENTS
BUTLER, PA
EHRM INFRASTRUCTURE
UPGRADES
S
W E
C
STE C
C
W W
W
D D
D
CORE
SAMPLE
CORE
SAMPLE
CORE
SAMPLE
D
S
S
S
E E
E
CORE
SAMPLE
BUILDING 20
BUILDING 2
CORE
SAMPLE
S
C
E
E E
ST
E
D
D
S
E
C
D
E E
S
D
E
D
D
D
D D
D
C
E E
S
S
ST
ST
HOSPITAL ROAD
HOSPITAL ROAD
HOSPITAL ROAD
1ST STREET
1ST STREET
2ND STREET
2ND STREET
HOSPITAL ROAD
NEW CASTLE ROAD (SR. 0356)
NEW CASTLE ROAD (SR. 0356)
NEW CASTLE ROAD (SR. 0356)
B STREET
B S
TR
EE
T
B S
TR
EE
T
B STREET
CORE
SAMPLE
CORE
SAMPLE
HOSPITAL ROAD
HO
SP
IT
AL
R
OA
D
HOSPITAL ROAD
A S
TR
EE
T
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
5A
BUILDING
BUILDING 46
BUILDING 7
BUILDING 66
BUILDING 8
BUILDING 6
BUILDING 9BUILDING 10
BUILDING 48
TRANSITIONAL
LIVING
CENTER
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BUILDING
BR
ICK
O
VE
RP
AS
S
CORE
SAMPLE
CORE
SAMPLE
CORE
SAMPLE
ST
FH
GV
ST
ST
ST
ST
S
ST
ST
S
E
W
CHWRCHWSCHWRCHWS
W
W
W
W
W
HPS
HPC
LPC
COMM
COMM
CORE
SAMPLE
CORE
SAMPLE
HPS
HPS
HPC
HPC
LPC
LPC
CO
M
M
CO
M M
C
COMM
COMM
COMM
COMM
COMM
COMM
W
E
E
E
EEE
CORE
SAMPLE
W
E
D D
E
CORE
SAMPLE
CORE
SAMPLE
S
F
G W
W
W W
W
W
W
CO
M
M
COMM
SD
CO
M
M
G
W
W
W
F
F
SAN
SA
N
SA
N
SAN
SA
N
C
C
C
C
C
C
C
C
C
C
SST
HPC
HPC
HPC
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
CPD
CPD
CP
D
CP
D
LPC
LPC
LPC
LPC
HPC
CPD
HPS
HPS
HPC
HPC
LPC
LPC
LPC
LPC
LPC
HPS
HPS
HPS
HP
S
HPS
HPS
HPS
CPD
HPC
LPC
HPC
CP
D
ST
ST
ST
ST
D
S
S
S
S
SAN
S
SAN
SAN
SAN
SAN
S
S
S
SD
SD
SD
EE
SD
D
D
D
D
D
C STREET
CLC
(COMMUNITY LIVING CENTER)
CORE
SAMPLE
DOCKBUILDING
X
X
X X
E
ATRIUM
G
U
U U U
COM
M
CO
M
M
E
E
E
E
E
E E
E
E
E
E
G
G
G
G
G
HP
C
LP
C
SD
SD
W
W
W
W
W
F
W E
E
E
E
E
C O
M M
C O
M M
C O
M M
C(B)
C(ISP)
C(ISP)
W
W
C( B)
C (B
C(B)
C(B)
C(B)
C
(IS
P)
C(B)
C(B)
C(B)
C(ISP)
C(ISP)
C(ISP)
C(B)
C(B
C(ISP)
C(IS
P)
C(B) C(B)
C(ISP)
C(ISP)
C(B)
C(B) C(B)
C(ISP)
C(ISP) C(ISP)
C( B)
C(
IS
P)
C(ISP)
C(ISP)
C(B) C(B)
C (B
C(B)
C(B)
C(B)
C(ISP) C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C (B)
C(ISP)
C(ISP)
C(ISP)
COM
C(A)
C(A)
C( A)
C( A)
C( A)
C(A)
C(A)
C(A)
C(A)
C(A) C(A)
C(A)
C(A)
C(A)
C(A)
C (A)
C(A)
C
(ISP)
1" = 100' feet
200100100 0 scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
FULLY SPRINKLERED
A/E:ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HWY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
NEAT LINE, TYP
TRENCH WIDTH (TYP.)
DUCT BANK TRENCH TESC DETAIL (TYP.)E8
CG100 SCALE: NTS
PERIMETER PROTECTION, TYP.LIMITS OF
CONSTRUCTION
FIBER DUCTBANK (TYP.)
SOIL STOCKPILE AREA
NOTE:
CONTRACTOR SHALL INSTALL INLET PROTECTION ON AREA CATCH BASINS IN THE DUCT BANK VICINITY
TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING DOWNSTREAM STORM DRAIN SYSTEM.
PB RDM
OVERALL EROSION CONTROL PLAN
CG100
N/A
100% CONSTRUCTION
DOCUMENTS
BUTLER, PA
EHRM INFRASTRUCTURE
UPGRADES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
FULLY SPRINKLERED
A/E:ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HWY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
SPECIES:
(PERMANENT-STEEP SLOPE)
NOTE:
IF ANY REVISIONS TO THE SEEDING SPECIFICATIONS ARE REQUIRED, THE CONTRACTOR SHALL CONTACT THE CONTRACT OFFICE REPRESENTATIVE TO OBTAIN GUIDANCE ON ALTERNATIVE SEEDING SPECIFICATIONS.
(PERMANENT)
(TEMPORARY) ANNUAL RYEGRASS
%PURE LIVE SEED: 98 %
APPLICATION RATE: 40 LB./ACRE
FERTILIZER TYPE: 10-10-10 (X-X-X)
FERTILIZER APPL. RATE: 150 LB./ACRE
LIMING RATE: 1 T./ACRE
MULCH TYPE: HAY OR STRAW
MULCHING RATE: 3 T./ACRE
SPECIES: PENN LAWN FINE FESCUE, KENTUCKY BLUE,
%PURE LIVE SEED: 98 %
APPLICATION RATE: 109 (PENN LAWN FINE FESCUE) LB./ACRE
FERTILIZER TYPE: 10-20-20 (X-X-X)
FERTILIZER APPL. RATE: 1,000 LB./ACRE
LIMING RATE: 6 T./ACRE
MULCH TYPE: HAY OR STRAW
MULCHING RATE: 3 T./ACRE
PERENNIAL RYEGRASS
ANCHOR MATERIAL: WOOD CELLULOSE
ANCHORING METHOD: BLOWN
RATE OF ANCHOR MATERIAL APPL.: 1,500
SEEDING SEASON DATES: MARCH 15 - JUNE 1
LB./ACRE
AUGUST 1 - OCTOBER 15
SPECIES: WINTER RYE, TALL FESCUE, RED FINE FESCUE
%PURE LIVE SEED: 100 %
APPLICATION RATE: 112 (WINTER RYE) LB./ACRE
FERTILIZER TYPE: 10-10-20 (X-X-X)
FERTILIZER APPL. RATE: 1,000 LB./ACRE
LIMING RATE: 6
T./ACRE
MULCH TYPE: HAY OR STRAW
MULCHING RATE: 3
ANCHOR MATERIAL: NON ASPHALTIC
ANCHORING METHOD: BLOWN
RATE OF ANCHOR MATERIAL APPL.: 50
SEEDING SEASON DATES: MARCH 15 - MAY 15
LB./ACRE
AUGUST 16 - OCTOBER 15
174 (KENTUCKY BLUE) LB./ACRE
65 (PERENNIAL RYEGRASS) LB./ACRE
T./ACRE
60 (TALL FESCUE) LB./ACRE
15 (RED FINE FESCUE) LB./ACRE
3'- 0"
WIRE INTO THE TRENCH.
EXTENSION OF FABRIC AND
FABRIC
FILTER
WIRE
GROUND LINE
3'
MI
N.
THAN 36" ABOVE GRADE
FABRIC HEIGHT LESS
3. ATTACH THE FILTER BARRIER FABRIC TO THE
WIRE FENCE AND EXTEND IT INTO THE TRENCH.
4. BACKFILL AND COMPACT THE
EXCAVATED SOIL.
12-1/2 GAUGE MIN.
6" MAX.
MESH SPACING
4"POST-IMBED 3'
STEEL OR WOOD
6' MAX.
THE POSTS.
2. STAPLE WIRE FENCING TO
TRENCH UPSLOPE ALONG THE LINE OF POSTS.
1. SET POSTS AND EXCAVATE A 4" x 4"
FILTER BARRIER
BARRIER TYPICAL FIBER ROLL INSTALLATION
N.T.S.
4' MAX
VERTICAL SPACING
MEASURED ALONG
THE FACE OF THE
SLOPE VARIES
BETWEEN 10' AND
20'
4' MAXFIBER
ROLLS
SLOPE VARIES
4' MAX
NOTE: INSTALL FIBER ROLL
ALONG A LEVEL CONTOUR.
4' MAX
NTS
PLACE A LAYER OF
GEOTEXTILE FABRIC
OVER DRAIN OPENINGS
AND ANCHOR WITH
GRAVEL BAGS
4"
TYP
MIN. 2
BAGS
HIGH
GRAVEL BAGS (TYP)
MIN. 5" THICK
SECTION A-A
1/2" MIN, TYP
ISOMETRIC VIEWCROSS SECTION
1. ACCUMULATED SEDIMENT ON OR AROUND A PROTECTED INLET MUST
BE REMOVED IMMEDIATELY. SEDIMENT MUST NOT BE REMOVED BY
FLUSHING.
2. REPLACE CATCH BASIN INSERT WHEN THE SEDIMENT HAS FILLED
ONE-THIRD OF THE AVAILABLE STORAGE. THE INSERT MUST BE
INSPECTED FREQUENTLY AND REPLACED AS NEEDED, OR AS DIRECTED
BY THE CONTRACTING OFFICER.
GRATE
FRAME
FILTERED WATER
SEDIMENT AND DEBRIS
OVERFLOW BYPASS
TRIM GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
GRATE
RETRIEVAL SYSTEM
OVERFLOW BYPASS
SEDIMENT
AND DEBRIS
FILTERED WATER
STORM DRAIN INLET
PROTECTION,
ECOLOGY BMP C220
GEOTEXTILE FABRIC PROTECTION AT
INLET
GRAVEL BAG INSTALLATION
NEAR INLET
STORM DRAIN INLET
PROTECTION NOTES:
4" M
AX
" M
IN
INSTALL A FIBER ROLL
NEAR WHERE IT
TRANSITIONS INTO A
STEEPER SLOPE
3/4" X 3/4" WOOD STAKES
4' MAX SPACING
FIBER ROLL 8" MIN
R=24"
A
A
TEMPORARY EROSION AND SEDIMENT CONTROL NOTES:
1. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) FACILITIES. REFER TO THE
APPLICABLE DRAWINGS AND THE SPECIFICATIONS FOR PLANS AND DETAILS THAT DESCRIBE THE MINIMUM TESC FEATURES REQUIRED.
AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHALL REVISE TESC FACILITIES AND CONFIGURATIONS AS NECESSARY TO ENSURE COMPLETE SILTATION CONTROL AND THAT NO SEDIMENT LADEN WATER ENTERS THE
NATURAL OR PIPED DRAINAGE SYSTEM.
2. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY ITS ACTIVITIES AND TO PROVIDE ADDITIONAL TESC FACILITIES THAT MAY BE NEEDED TO PROTECT THE SITE, ADJACENT LAND AND EXISTING DRAINAGE FEATURES. REMOVE TESC FACILITIES AT COMPLETION OF THE
PROJECT.
3. TEMPORARY EROSION/WATER POLLUTION PREVENTION MEASURES MUST BE REQUIRED IN ACCORDANCE WITH THE CURRENT ENVIRONMENTAL PROTECTION AGENCY'S (EPA) CONSTRUCTION STORMWATER GENERAL PERMIT AND THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION EROSION AND SEDIMENT POLLUTION CONTROL PROGRAM MANUAL. DURING THE COURSE OF CONSTRUCTION, IT MUST BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY ITS ACTIVITIES AND TO PROVIDE ADDITIONAL TESC FACILITIES THAT MAY BE NEEDED TO
PROTECT THE SITE, ADJACENT LAND, AND EXISTING DRAINAGE FEATURES.
4. THE CONTRACTOR SHALL ENSURE THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN ON THESE DRAWINGS PROVIDE ADEQUATE CONTROL SO THAT NO SEDIMENT LADEN WATER LEAVES THE SITE. THE CONTRACTOR MUST INSTALL ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT PROPERTIES, SENSITIVE AREAS, NATURAL WATER COURSES, AND/OR
STORM DRAINAGE SYSTEMS TO ENSURE COMPLETE SILTATION CONTROL.
5. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY THE OWNER AND SHALL INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS. ALL TEMPORARY EROSION CONTROL MEASURES MUST BE
MAINTAINED FOR THE DURATION OF PROJECT CONSTRUCTION.
6. THE BMP FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS.
7. PROVIDE STRAW WATTLE AND COMPOST FILTER SOCK SEDIMENT CONTROL MEASURES OR OTHER APPROVED PERIMETER PROTECTION SEDIMENT CONTROL MEASURES FOR EXISTING DRAINAGE CHANNELS NEARBY OR ADJACENT TO THE PROJECT SITE.
8. THE BMP FACILITIES MUST BE INSPECTED DAILY AND AFTER STORM EVENTS BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. WRITTEN RECORDS MUST BE KEPT OF MONTHLY REVIEWS.
9. THE CONTRACTOR MUST BE RESPONSIBLE FOR CLEANING DIRT, MUD, AND OTHER CONSTRUCTION DEBRIS, WHICH MAY ACCUMULATE ON PAVED STREETS ADJACENT TO THE SITE AS A RESULT OF THE CONSTRUCTION ACTIVITY. AS A MINIMUM, DIRT, MUD AND OTHER
DEBRIS MUST BE REMOVED FROM PAVEMENT AT THE CLOSE OF EACH CONSTRUCTION DAY.
10. EXPOSED SLOPES AND SURFACES MUST BE STABILIZED FROM SEDIMENT TRANSPORT USING APPROVED BMPS UNTIL THE SITE HAS BEEN STABILIZED AND THE CONTRACTING OFFICER APPROVES THE REMOVAL OF SLOPE STABILIZATION MEASURES.
11. THE CONTRACTOR MUST BE RESPONSIBLE TO ENSURE THAT NO SEDIMENT LADEN RUNOFF LEAVES THE CONSTRUCTION SITE, WORK AREA, OR HAUL ROUTES. THE CONTRACTOR MUST SUBMIT A SEDIMENT AND WATER POLLUTION PREVENTION PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL PRIOR TO BEGINNING ANY WORK.
12. THE CONTRACTOR MUST BE RESPONSIBLE FOR DEWATERING OF ANY EXCAVATION DURING INCLEMENT WEATHER. DEWATERING WATER MUST BE TESTED AND DISPOSED OF IN ACCORDANCE WITH STATE ENVIRONMENTAL REQUIREMENTS ACCORDING TO THE
APPROVED SWPPP PLAN.
13. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ONCE THE SITE IS STABILIZED AFTER CONSTRUCTION
COMPLETION.
TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS
THIS PROJECT SHALL FOLLOW THE PENN STATE PUBLICATION, "EROSION CONTROL AND CONSERVATION PLANTINGS ON NONCROPLAND", AS THE STANDARD TO USE FOR SELECTION OF SPECIES, SEED SPECIFICATIONS, MIXTURES, LIMING AND FERTILIZING, TIME OF SEEDING, AND SEEDING METHODS. SPECIFICATIONS FOR THESE ITEMS MAY ALSO BE OBTAINED FROM PENN DOT'S PUBLICATION # 408, SECTION 804 OR BY CONTACTING THE APPLICABLE COUNTY CONVERSATION DISTRICT. UPON SELECTION OF A REFERENCE, THAT REFERENCE SHOULD BE USED TO PROVIDE ALL SPECIFICATIONS FOR SEEDING, MULCHING, AND SOIL AMENDMENTS. THE FOLLOWING SPECIFICATION WILL BE
USED FOR THIS PROJECT:
TEMPORARY SEDIMENT FENCEC6
CG101 SCALE: NTS
TEMPORARY FIBER ROLLC9
CG101 SCALE: NTS
TEMPORARY GRAVEL BAG INSTALLATIONF5
CG101 SCALE: NTS
TEMPORARY INLET PROTECTIONF8
CG101 SCALE: NTS
PB RDM
EROSION CONTROL GENERAL
NOTES AND DETAILS
CG101
N/A
100% CONSTRUCTION
DOCUMENTS
BUTLER, PA
EHRM INFRASTRUCTURE
UPGRADES
A S
TR
EE
T
BUILDING
G
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
SD
COMM
BUILDING
X X X X X X
X
X
X
X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
E
E
E
E
E
E
E
E
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN
SD
SD
SD
COMM
E
E
E
E
SD
SD
SD
SD
E
E
E
E
E
E
E
E
E
1280 1280 1279
W
W
W
G
G
C
SD
SD
SD
SD
SD
G
G
G
SD
SD
W
W
1" = 20' scale feet
4020020
LEGEND
PROPOSED CONSTRUCTION FENCE
PROPOSED CLEARING LIMITS / LIMITS OF CONSTRUCTION
PROPOSED PERIMETER PROTECTION
PROPOSED STORM DRAIN INLET PROTECTION
PROPOSED TEMPORARY SEDIMENT TRAP
SF
X
X
X
X
X
X
X
X
TESC KEYNOTES
PROPOSED MCR BUILDING PAD
PROPOSED CONSTRUCTION FENCE
PROPOSED CONSTRUCTION ENTRANCE W/ LOCKABLE GATE
PROPOSED CONTRACTOR STAGING AREA
PROPOSED TEMPORARY SEDIMENT TRAP
PROPOSED CLEARING LIMITS
PROPOSED PERIMETER PROTECTION, SEE DETAILS C6 AND C9 ON SHEET CG101
PROPOSED STORM DRAIN INLET PROTECTION, SEE DETAILS F5 AND F8 ON SHEET CG101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
FULLY SPRINKLERED
A/E:ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HWY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
1" = 10' scale feet
2010010
MCR BUILDING TESC PLANF2
CG150
BUILDING 21 TESC PLANF8
CG150
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
BUILDING 21
EXTERNAL TR ADDITION
SF
SF
SF
SF
SF
SF
PB RDM
MCR BUILDING EROSION CONTROL
PLAN
CG150
N/A
100% CONSTRUCTION
DOCUMENTS
BUTLER, PA
EHRM INFRASTRUCTURE
UPGRADES
SD
SD
SD
SD
SD
SD
HOSPITAL ROAD
A S
TR
EE
T
BUILDING
CORE
SAMPLE
W
W
W
W
W
W
W W W
W
W
W
W
W W
W W
W
G
G
G
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
G
G
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
CD
CD
CD
COMM
E
COMM
COMM
COMM
F
F
SA
N
SA
N
SA
N
E
E
CD
BUILDING
G
G
X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
E
E
E
E
E
E
E
E
E
E
E
E
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN
SD
SD
SD
COMM
E
E
E E
E E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
G
G
G
G
G
G
G
SAN
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
W W
W W
W
W W
W
W
W
W
E
CO
M
M
CO
M
M
COMM
CO
M
M
E
E
E
E
E
E
E
E
E
E
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C(B)
C (B
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C( B)
C( B)
C( B)
C( B)
C( B)
C( B)
C( B)
C( B)
C( B)
C (B
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C (B)
C(B) C(B)
C(B) C(B)
C(B) C(B)
C(B) C(B)
C(B) C(B)
C(B) C(B)
C(B)
C(B)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
SAN
SD
C(A)
C(A
C(A
C(A
C(A
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C( A)
C( A)
C( A)
C( A)
C( A)
C(A)
C(A)
C(A)
C(A
C(A
C (A
C (A
C (A
C( A)
C( A)
C(A) C(A)
C(A) C(A)
C(A) C(A)
C(A)
C( A)
C( A)
C( A)
SD
SD
SD
SD
SD
SD
SD
C (B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C( B)
C
(ISP)
C
(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(
IS
P)
SD
SD
SD
SD
SD
C(A)
C (A)
C (A)
C (A)
C (A)
C (A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A) C(A)
C(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
1280 1280 1279
TA: 1281.00
TC: 1282.35
TC/TA: 1282.30
TC: 1282.30
TA: 1284.00
FL: 1281.50
FL: 1282.07
FL: 1281.07
TA/ME: 1282.33±
TA: 1280.30
TA/ME: 1281.93±
TA/ME: 1281.92±
TA/ME: 1281.83±
TA/ME: 1281.81±
TA: 1282.00
TA: 1282.00
TC/TA: 1282.30
4:1
3:1
3:
3:1
3:1
TC: 1282.35
TC: 1282.35
TC: 1282.35
TC/TA: 1282.30
SD
SD
C (B)
SD
SD
SD
SD
SD
SD
SD
SD
SD
C (A)
C (A)
C (A)
C (A)
C (A)
C (A)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP) TC/TA: 1281.97
TC/TA: 1281.97
TC/TA: 1282.30
TC/TA: 1282.30
TC: 1282.02
TG: 1281.80
TC/TA: 1282.30
TC: 1282.02
TC: 1282.02
TC: 1282.02
TC: 1282.35
TC: 1282.35
TC: 1282.35
TC: 1282.02
TC: 1282.02
1" = 20' scale feet
4020020
LEGEND
PROPOSED CONTOUR
PROPOSED STORM DRAIN LINE
PROPOSED STORM DRAIN INLET
PROPOSED STORM DRAIN CLEANOUT
PROPOSED ASPHALT SWALE
FINISH FLOOR ELEVATION
MATCH EXISTING
FINISH GRADE
TOP OF GRATE
TOP OF CONCRETE
TOP OF ASPHALT
FLOWLINE
SD
GRADING AND DRAINAGE KEYNOTES
PROPOSED MCR BUILDING
PROPOSED ROOF DRAIN CLEANOUT
FG = 1282.32
IE = 1280.99, 6" ADS N-12 SE
53 LF 6" ADS N-12 ROOF DRAIN LINE @ S = 1.0% MIN.
PROPOSED ROOF DRAIN CLEANOUT
FG = 1282.32
IE = 1280.46, 6" ADS N-12 SW
49 LF 6" ADS N-12 ROOF DRAIN LINE @ S = 1.0% MIN.
PROPOSED ROOF DRAIN CLEANOUT
FG = 1282.32
IE = 1279.97, 6" ADS N-12 NE & SW
47 LF 6" ADS N-12 ROOF DRAIN LINE @ S = 1.0% MIN.
PROPOSED RIP RAP PAD W/ 6" INLET PIPE
IE = 1279.50
PROPOSED ROOF DRAIN CLEANOUT
FG = 1282.10
IE = 1280.58, 6" ADS N-12 NW
PROPOSED ROOF DRAIN CLEANOUT
FG = 1282.10
IE = 1280.46, 6" ADS N-12 SW
12 LF 6" ADS N-12 ROOF DRAIN LINE @ S = 1.0% MIN.
96 LF 6" ADS N-12 ROOF DRAIN LINE @ S = 1.0% MIN.
PROPOSED MECHANICAL YARD AREA DRAIN
ZURN Z897-24 TYPE 304 STAINLESS STEEL CATCH BASIN (OAE)
WITH P817-FS-24X24 FABRICATED SLOTTED GRATE, STAINLESS STEEL (OAE)
TG = 1281.80
IE = 1279.97, 6" ADS N-12 SW
14 47 LF 8" ADS N-12 MECHANICAL YARD DRAIN LINE @ S = 1.0% MIN.
15 PROPOSED RAIN GARDEN, SEE SHEET CG152
FFE
ME
FG
TG
TC
TA
FL
DAYLIGHT LINE /
LIMITS OF GRADING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
FULLY SPRINKLERED
A/E:ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HWY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Inc.
33301 9th Avenue South Suite 300 Federal Way, WA 98003-2600
TEL: (206) 431-2300
FAX: (206) 431-2250
16 PROPOSED FLOW CONTROL STRUCTURE, SEE DETAIL C1/CG152
17 38 LF 8" ADS N-12 PIPE @ S = 1.0% MIN
18 PROPOSED 8" OUTLET PIPE
IE = 1275.00
FFE 1282.35
1" = 10' scale feet
2010010
MECHANICAL YARD GRADINGF6
CG151 SCALE: 1" = 10'
MECHANICAL YARD,
SEE F6 THIS SHEET
PB RDM
MCR BUILDING GRADING AND
DRAINAGE PLAN
CG151
N/A
100% CONSTRUCTION
DOCUMENTS
BUTLER, PA
EHRM INFRASTRUCTURE
UPGRADES
X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
E
E
SD
SD
SD
SAN
SAN
SD
SD
SD
SD
SD
E
E
W
W
W
W
W
W
W
W
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
SAN
SD
SD
SD
SD
SD
SD
SD
SD
C (B)
C(B)
C(B)
C(B)
C(B)
C(B)
C
(ISP)
C
(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
SD
SD
SD
SD
SD
C(A)
C (A)
C (A)
C (A)
C (A)
C (A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
1280 1280 1279
4:1
3:1
3:
3:1
3:1
1" = 20' scale feet
4020020
18" MIN. MODIFIED SOIL /
PLANTING MIX
DESIGN WATER SURFACE
ELEVATION
3' BENCH
(TYP.)
BOTTOM WIDTH PER PLAN
3:1 SIDE SLOPES
(TYP.)
3:1 SIDE SLOPES
(TYP.)
3' BENCH
(TYP.)
3:1 SIDE SLOPES
(TYP.)
RAIN GARDEN TYPICAL SECTIONF7
CG152 SCALE: NTS
8" OUTLET PIPE
3:1 SIDE SLOPES
(TYP.)
RAIN GARDEN FLOW CONTROLB2
CG152 SCALE: NTS
PIPE INVERT PER PLAN
6" INLET PIPE @ S=1.0% MIN.
RAIN GARDEN INLET PIPE (TYP.)D7
CG152 SCALE: NTS
ADS NYLOPLAST 8" LIGHT
DUTY DOME 0899CGD (OAE)
FLOW CONTROL STRUCTURE
ADS NYLOPLAST 8" DRAIN BASIN
2808AG (OAE)
TOP = 1279.50
IE OUT = 1277.50, 8" (NW)
INVERT PER PLAN
RIP RAP PAD
(TYP.)
BUILDING FACE
CLEANOUT
CONCRETE WALKASPHALT PAVEMENT
DESIGN WATER SURFACE
ELEVATION
RIP RAP PAD
8" OULET PIPE
IE = 1275.00
RAIN GARDEN BMP
SURFACE AREA = 4,093 SF
TOP ELEVATION = 1280.00
BOTTOM ELEVATION = 1279.00
DESIGN WATER SURFACE
ELEVATION = 1279.50
LEVEL SPREADER INLET
TOP WIDTH PER PLAN
MOUND UP DIRT AS
NEEDED TO MAINTAIN
MINIMUM PIPE COVER
DESIGN WATER SURFACE
ELEVATION
EDGE OF PAVEMENT
(LOW POINT)
LEVEL SPREADER INLETB7
CG152 SCALE: NTS
1-2" DROP FROM EDGE OF
PAVEMENT (TYP)
UNCOMPACTED
SUBGRADE
LINE SIDES AND BOTTOM
OF GRAVEL PAD WITH
NON-WOVEN GEOTEXTILE
FABRIC
UNIFORMLY GRADED, CLEAN WASHED
COARSE AGGREGATE (ASSHTO #3)
GRAVEL DISSIPATION PAD, SIZE PER PLAN
12" M
IN
FLOW
FLOW
FLOW
FLOW
FLOW
FLOW
8.
5'
10'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .