S02 - Attachment 13 - Butler EHRM IU - Drawing - Electrical 4 of 6 R1.pdf
PDF 19 MB Posted
- Attached to
- EHRM | Butler VA HCS 529-22-700 | Construct Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77625R0057
About this file
These electrical engineering documents are detailed electrical panel schedules for the EHRM Infrastructure Upgrades project at the Butler VA Medical Center in Butler, Pennsylvania. The documents (specifically sheets 07EP701, 07EP702, 08EP701, 08EP702, 20EP701, 20EP702, and 20EP703) provide comprehensive electrical panel schedules for Buildings 07, 08, and 20, including existing and revised panel configurations.
Key technical details include notes about a 30-day panel study conducted to assess existing panel loads, with instructions for contractors to update panel circuit directories and reference the meter and load information schedule on sheet EP701. The documents specify requirements for digital power meters and surge protective devices, and include detailed circuit information such as circuit descriptions, phases, amperage, and voltage drop calculations. The electrical schedules are part of the 100% construction documents phase, issued on 11/30/2023, and are designed for a fully sprinklered infrastructure upgrade project at the VA Butler Healthcare facility.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
07EP701
BLDG 07 - ELECTRICAL
SCHEDULES 07
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
1 EXISTING PANEL LOADS UNKNOWN. 30-DAY PANEL STUDY HAS BEEN PERFORMED,
REFERENCE " METER SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFO.
REVISED PANEL SCHEDULE SHOWN FOR ADDED BRANCH CIRCUITS AND THEIR
RESPECTIVE LOAD. EXISTING CIRCUIT LOADS ARE UNKNOWN; REFERENCE "METER
AND LOAD INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR 30-DAY PANEL
STUDY FOR ADDITIONAL INFORMATION REGARDING EXISTING AND REVISED
OVERALL PANEL LOADING.
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1 2
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
INTEGRAL TO ELECTRICAL DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
Revisions: Date:
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:2 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
07EP702
BLDG 07 - ELECTRICAL
SCHEDULES 07
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1. VOLTAGE DROP INDICATES TOTAL VOLTAGE DROP FROM SOURCE PANEL TO
EQUIPMENT BEING FED.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
08EP701
BLDG 08 - ELECTRICAL
SCHEDULES 08
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
1 EXISTING PANEL LOADS UNKNOWN. 30-DAY PANEL STUDY HAS BEEN PERFORMED,
REFERENCE " METER SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFO.
REVISED PANEL SCHEDULE SHOWN FOR ADDED BRANCH CIRCUITS AND THEIR
RESPECTIVE LOAD. EXISTING CIRCUIT LOADS ARE UNKNOWN; REFERENCE "METER
AND LOAD INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR 30-DAY PANEL
STUDY FOR ADDITIONAL INFORMATION REGARDING EXISTING AND REVISED OVERALL
PANEL LOADING.
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1 2
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
08EP702
BLDG 08 - ELECTRICAL
SCHEDULES 08
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1. VOLTAGE DROP INDICATES TOTAL VOLTAGE DROP FROM SOURCE PANEL TO
EQUIPMENT BEING FED.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:3 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
20EP701
BLDG 20 - ELECTRICAL
SCHEDULES 20
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1 EXISTING PANEL LOADS UNKNOWN. 30-DAY PANEL STUDY HAS BEEN PERFORMED,
REFERENCE " METER SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFO.
REVISED PANEL SCHEDULE SHOWN FOR ADDED BRANCH CIRCUITS AND THEIR
RESPECTIVE LOAD. EXISTING CIRCUIT LOADS ARE UNKNOWN; REFERENCE "METER
AND LOAD INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR 30-DAY PANEL
STUDY FOR ADDITIONAL INFORMATION REGARDING EXISTING AND REVISED
OVERALL PANEL LOADING.
1 2
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:4 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
20EP702
BLDG 20 - ELECTRICAL
SCHEDULES 20
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:5
:4 a m
B
IM
/5
-2
-7
V A
P A
E H
R M
I n fr a U p g ra d e D e s ig n B u tl e r/ V
A B
U T
L E
R
G E
N E
R A
L S
H E
E T
S .r v t
20EP703
BLDG 20 - ELECTRICAL
SCHEDULES 20
DCW/LRL JFO/JGD
100% CONSTRUCTION
DOCUMENTS
11/30/2023
529-22-700EHRM INFRASTRUCTURE
UPGRADES - BUTLER
VA Butler Healthcare, 325 New Castle Road, Butler, Pa.
16001
1 EXISTING PANEL LOADS UNKNOWN. 30-DAY PANEL STUDY HAS BEEN PERFORMED,
REFERENCE " METER SCHEDULE" ON SHEET EP701 FOR ADDITIONAL INFO.
REVISED PANEL SCHEDULE SHOWN FOR ADDED BRANCH CIRCUITS AND THEIR
RESPECTIVE LOAD. EXISTING CIRCUIT LOADS ARE UNKNOWN; REFERENCE "METER
AND LOAD INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR 30-DAY PANEL
STUDY FOR ADDITIONAL INFORMATION REGARDING EXISTING AND REVISED
OVERALL PANEL LOADING.
GENERAL NOTES (FOR THIS SHEET ONLY)
KEY NOTES (FOR THIS SHEET ONLY)
1 2
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. VOLTAGE DROP INDICATES TOTAL VOLTAGE DROP FROM SOURCE PANEL TO
EQUIPMENT BEING FED.
3. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE "METERING AND LOAD
INFORMATION SCHEDULE" LOCATED ON SHEET EP701 FOR OVERALL PANEL LOAD.
"REVISED" PANEL SCHEDULES ON THIS SHEET ARE SHOWN FOR ADDED BRANCH
CIRCUIT SIZING ONLY.
4. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
File details come from the government source that posted it. Updated .