This is a submittal package for the West Palm Beach VA Medical Center IR Lab Project, a medical equipment installation for surgical lights, booms, tables, and video integration systems provided by Hillrom/Baxter Surgical. The package includes equipment specifications, service selections, technical drawings, and pre-installation guides for the facility located in West Palm Beach, Florida.
The project specifies four primary equipment components: (A) 2130MML0 & V600H Anesthesia Boom with 32" flat panel bracket; (B) 2300MHLPH & HP190H Philips Monitor Boom with Helux Pro and radiation shield; (C) 2130MHLPH & HP190H Philips Monitor Boom with Helux Pro and radiation shield; and (D) 1865MHL3 Equipment Boom. The submittal includes detailed service selections for brake type (electric standard, with nitrogen gas or instrument air options), gas latch valve types (Tri-Tech manufactured, with Beacon Medaes available at additional charge), wire type (normal TEW-105 or isolated XHHW), duplex outlet types (Leviton red or ivory standard hospital grade 20A), and light/flat panel handle selections (sterilizable handles required). The standard lead time from signed authorization to delivery is 16 weeks. Pre-installation guides specify structural design loads of 2,148 N (485 lbs) maximum force and 3,104 Nm (2,290 ft-lb) maximum bending moment for surgical lights, with maximum horizontal deflection not exceeding 0.1" and angular deflection not exceeding 1/3°. The ceiling-mounted system requires a 14.5" x 14.5" rough opening with 5" mounting plate clearance above finished ceiling and 9" support substructure clearance. Equipment Management System (EMS) mounting systems require a 12" interstitial span and 24.5" x 24.5" ceiling opening. Medical gas risers, transformer enclosures, electrical conduit runs not exceeding 3 feet, and junction boxes are specified, with installation performed by the contractor while ceilings remain open. The package establishes customer responsibilities for site preparation, proper ceiling height confirmation, and scheduling installation services minimum 2 weeks in advance after site readiness verification.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4279-U Crosspoint Drive, Ladson SC 29456 | Phone 888.474.9359 hillrom.com
LIGHTS BOOMS TABLES
PARTNERSHIPS
WEST PALM BEACH VA MEDICAL CENTER
IR LAB PROJECT
WEST PALM BEACH, FL
11-25-2024
VIDEO INTEGRATION
Submittal Package Revision 04: 11/25/2024 : Page 1 of 45
Project: _________________________________________________________________________________
Hillrom Customer #: __________________________ Customer PO#: ______________________________
Hillrom Sales Order #: _________________________ Signed Document Due Date:____________________
Signed Documents to Delivery Lead Time: 16 WEEKS Delivery Date: _______________________________
Project Schedule:
To meet the Customer’s delivery expectations as indicated below, Hillrom requires this form to be completed prior to release for production. Hillrom makes every reasonable effort to meet customers’ delivery dates as stated in our Terms and Conditions. With standard lead times of 16 weeks, Hillrom needs this form signed by the Customer no later than the due date as indicated above. Any changes after the Customer’s signed date below may affect delivery dates, incur additional charges, restocking fees and/or require a new authorization form.
Approval:
Customer agrees that they have received the submittal package from Hillrom and approved the drawings and requests contained therein to be released for production. This approval includes but is not limited to (please check):
Ceiling Height Confirmation Equipment Management System Service Selections
Med Gas Latch Valve Type, Receptable Type, Wiring Type, Brake Gas Selection Accessories
Surgical Lights and Flat Panels Head Clearance Handle Types Flat Panel Types
Helion Configuration Checklist
Cables:
Hillrom will provide required cable and complete cable pulls as listed in submittal package, any additional cable pull will be provided by Customer. If union installation is required, please refer to Terms and Conditions.
Delivery:
Customer agrees to accept delivery of the complete order as indicated in the delivery date above. Customer should make Hillrom aware of any changes as soon as possible. If changes occur within 4 weeks of the delivery date, Customer agrees to accept delivery of the complete order and store product until installation.
Installation:
Services must be scheduled with Hillrom at least 2 weeks prior to installation. Installation services can not be scheduled until the Customer has properly prepared the site per Hillrom rough-in requirements and has confirmed the site readiness requirements as outlined in Hillrom Pre-Installation Guide(s).
Authorized Seller’s Signature Authorized Customer’s Signature
Authorized Seller’s Name/Title Authorized Customer’s Name/Title
Date Date
Submittal Package Revision 04: 11/25/2024 : Page 2 of 45
SERVICE SELECTIONS PAGE Department (Optional)__________________
4279-U Crosspoint Drive, Ladson SC 29456 Toll Free: (888) 474-9359 wwww.hillrom.com
Brake Type: Electric Brakes (Standard) Nitrogen Gas Instrument Air Gas
Gas Latch Valve Type: Manufactured by Tri-Tech (Beacon Medaes available upon request. Additional Charges Apply)
Select Latch Style:
Special Requirements: _________________________________________________
Wire Type Selection:
Normal, TEW-105 (black, white, green color wires)
Isolated, XHHW (brown, orange, green color wires)
Duplex Outlet Type/s: Manufactured by Leviton (Hubbell available upon Request. Additional Charges apply)
Red, Standard Hospital Grade, 20A
Ivory, Standard Hospital Grade, 20A
Other (ie. Tamperproof, GFCI, Illuminated available at additional charge)
Special Requirements: _________________________________________________
Duplex Circuit Label Type: Video Monitor Type:
Standard 3M Adhesive (by Trumpf Medical) Make: _________________________
Engraved Metal Face Plate (by electrician) Size: _________________________
Light/Flat Panel Handle Selection Type: Weight: _________________________
Sterilizable Handle *Must be included on quote*
Disposable adapter, Devon Green Slip on
Disposable adapter, Devon Green Screw on
Disposable adapter, DeRoyal Blue Slip on
CONFIRMED BY: ________________________________________________ Date: __________
Submittal Package Revision 04: 11/25/2024 : Page 3 of 45
AUX8
Iso Center
P
ATYATY
VB9
VB10
Level of floor ± 18" (6mm) within this area.
Unistrut height shall be set at 9'-6 12" above high point within this area.
Additional area to be leveled if foot end transfer is required
AD7
Safety Zone
Motorized Movement Area
Safety Zone
CC
Table Safety Zone
Ceiling Inlet
A
B C
Ceiling Inlet
Safety Zone
Safety Zone
6' -4
8'
-2 1 2"
C 1350
MD 26+
C 15
C
L 21
C 1800
L 21
C 1950
6' -1
1" 8'-103
4" 7'-81 2" 1'-8" 10'-8"
WEST PALM BEACH VA MC
IR LAB PROJECT
11-25-2024 05 JTH
940537-1
ROOM:
DWG. NO.:
DATE:
EQUIPMENT:
RELEASED FOR PRODUCTION
(SIGNATURE CONFIRMS ACKNOWLEDGEMT OF ALL DRAWING NOTES)
SIGNATURE:
DATE: INSTALLATION DATE: REV.:
4279-U Crosspoint Drive, Ladson SC 29456
Phone: 1-888-474-9359 www.hillrom.com
S/O NO.:
NOT TO SCALEThis drawing contains proprietary information and is property of Hillrom, Inc. It must not be reproduced in whole or in part without written permission from Hillrom, Inc., and is subject to return upon request.
IR LAB
A: 2130MML0 & V600H - ANESTHESIA BOOM, 32" FLAT
PANEL BRACKET
B: 2300MHLPH & HP190H - PHILIPS MONITOR BOOM,
HELUX PRO, RAD. SHIELD
C: 2130MHLPH & HP190H - PHILIPS MONITOR BOOM,
HELUX PRO, RAD. SHIELD
D: 1865MHL3 - EQUIPMENT BOOM
A C
D
B
Submittal Package Revision 04: 11/25/2024 : Page 4 of 45
AutoCAD SHX Text 32"
AutoCAD SHX Text R910
AutoCAD SHX Text R910
3D-view CSU
Customer ref. no:
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
A: 2130MML0 & V600H
-Field of application: Other -Internat.Standard: US
Order drawing no:
Print: 12.11.24
Submittal Package Revision 04: 11/25/2024 : Page 5 of 45
View CSU
Brake Type Legend:
1) electro pneumatic brake
2) mechanical friction brake, adjustable
3) pneumatic brake; 4) electro magnetic brake
CSU-flange Tandem OPL System flange tandem OPL additional information
Customer ref. no:
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
A: 2130MML0 & V600H
-Field of application: Other -Internat.Standard: US
Order drawing no:
Submittal Package Revision 04: 11/25/2024 : Page 6 of 45
-Field of application: surgery -Internat.Standard: US
Order drawing no:
940537
240927-35109-TUSM291HE
IR LAB
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
A: 2130MML0 & V600H
12.11.24
Customer ref. no:
Quotation no:
Room:
Project Customer:
TM order no:
Amount:
Released for production:
Date:
In shipment or price corrections
Signature:
Changes after release may cause delay
Print:
REF QTY P/N DESCRIPTION REF QTY CONDUIT DESCRIPTION (TYPE, CONDUIT DIAMETER)
E1 2 L1 SINGLE GANG, TBD
E2 2 L2 SINGLE GANG, TBD
E3 2 L3 SINGLE GANG, TBD
REF QTY P/N DESCRIPTION
REF CIRCUIT CONDUIT/
WIRE-NUT
# OF
RECEPTACLES
RECEPTACLE DESCRIPTION
(TYPE, COLOR, AMP) TYPE
C1 CIRCUIT 1 H1 / W1 2 DUPLEX, 20A, RED TBD
C2 CIRCUIT 2 H1 / W1 2 DUPLEX, 20A, RED TBD
C3 CIRCUIT 3 H1 / W1 2 DUPLEX, 20A, RED TBD
C4 CIRCUIT 4 H2 / W2 2 DUPLEX, 20A, RED TBD
C5 CIRCUIT 5 H2 / W2 2 DUPLEX, 20A, RED TBD
C6 CIRCUIT 6 H2 / W2 2 DUPLEX, 20A, RED TBD
C7 CIRCUIT 7 - - BOOM ACCESSORIES CIRCUIT -
REF QTY DESCRIPTION
VAC 3 VACUUM MEDICAL GAS OUTLET
O2 2 OXYGEN MEDICAL GAS OUTLET
MA 2 MEDICAL AIR GAS OUTLET
WAGD 1 WASTE ANESTHESIA GAS DISPOSAL OUTLET
N2O 1 NITROUS OXIDE MEDICAL GAS OUTLET
CO2 1 CARBON DIOXIDE MEDICAL GAS OUTLET
BRAKE GAS
EB 1 ELECTRIC BRAKES
ACCESSORY ITEMSA A ACCESSORY ITEMS E LOW VOLTAGE PREPARATIONS
C HIGH VOLTAGE CIRCUITS
GAS MEDICAL GAS SERVICES
LATCH VALVE TYPE: TO BE DETERMINED (CO2, N2, AND IA ARE DISS ONLY)
WIRING FOR ALL CIRCUITS: TO BE DETERMINED
FRONT
Media Package Length: Standard (1 meter)
WIRE-NUTW
BACK
BOTTOM
C5 C6C4 E2 E3W2C1 C2
WAGD
E1
CO2
W1
VAC
VAC
O2
MA
MA
O2
N2O
C3
VAC
Submittal Package Revision 04: 11/25/2024 : Page 7 of 45
Lights / flat panel / VPA
Load range / add. components VidiaPort
Pos. 1 VidiaPort Springarm 26 - Load Range Springarm *: 13-26 kg VidiaPort Monitor Holder single 420° (own weight: (5,5kg) Handle Kit: below
* Regard adapter + monitor weight!
Handles
Pos. 1 Amount of sterilizable central handle sets, ProductNr.:4025708 (3 handles per set):1
Product numbers
Registration type VidiaPort: acc.to MDR ProductNr: 4028110 - VidiaPort Ceiling Single ProductNr: 4028051 - Pre-Install Set VidiaPort
Customer ref. no:
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
A: 2130MML0 & V600H
-Field of application: Other -Internat.Standard: US
Order drawing no:
Print: 12.11.24
Submittal Package Revision 04: 11/25/2024 : Page 8 of 45 hellmaj2 Text Box
HANDLE TYPE - TO BE DETERMINED
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
B: 2300MHLPH & HP190H
-Field of application: Surgery -Internat.Standard: US
Order drawing no:
Submittal Package Revision 04: 11/25/2024 : Page 9 of 45
1) electro pneumatic brake
2) mechanical friction brake, adjustable
3) pneumatic brake; 4) electro magnetic brake
CSU-flange Tandem OPL System flange tandem OPL additional information
Customer ref. no:
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
B: 2300MHLPH & HP190H
-Field of application: Surgery -Internat.Standard: US
Order drawing no:
Submittal Package Revision 04: 11/25/2024 : Page 10 of 45
Wall control panel / Operating unit
Operating unit Helux Pro: WCP surface, with display / Third party integration Helux Pro: none
- Cable length wall control panel: 15m
- Empty conduit by customer with inner diameter 35mm
Handles
Pos. 1 Amount of sterilizable central handle sets, ProductNr.:4025708 (3 handles per set):1
Load range / add. components VidiaPort
Pos. 2 Springarm Mavig - Load Range Springarm *: 12-18kg Portegra2 Radiation Prot.
ProductNr: 1982311 - Mavig X-ray shield 78x90
* Regard adapter + monitor weight!
Electrical installation
Control board plate (Power Pack Supply Voltage: 100 - 240 V AC / 22 - 32 V DC) Required space (LxWxH): 300x215x110mm with 1 power supply line, 2 times 300x215x110mm with 2 power supply lines
Pos. 1 HeluxProK / Power supply line: 230V (1 power supply line) Max. power consumption: 160 VA at 24V / 100-240V
Product numbers
Registration type Helux Pro: acc.to MDR ProductNr: 4108210 - Helux Pro Ceiling Duo ProductNr: 4108051 - Pre-Install Set Helux Pro ProductNr: 4108041 - Electric PAP-Set Helux Pro
Filterboard
Pos. 1 Filterboard (included in delivery)
Customer ref. no:
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
B: 2300MHLPH & HP190H
-Field of application: Surgery -Internat.Standard: US
Order drawing no:
Print: 12.11.24
Submittal Package Revision 04: 11/25/2024 : Page 11 of 45 hellmaj2
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
C: 2130MHLPH & HP190H
-Field of application: Surgery -Internat.Standard: US
Order drawing no:
Submittal Package Revision 04: 11/25/2024 : Page 12 of 45
1) electro pneumatic brake
2) mechanical friction brake, adjustable
3) pneumatic brake; 4) electro magnetic brake
CSU-flange Tandem OPL System flange tandem OPL additional information
Customer ref. no:
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
C: 2130MHLPH & HP190H
-Field of application: Surgery -Internat.Standard: US
Order drawing no:
Submittal Package Revision 04: 11/25/2024 : Page 13 of 45
Wall control panel / Operating unit
Operating unit Helux Pro: WCP surface, with display / Third party integration Helux Pro: none
- Cable length wall control panel: 15m
- Empty conduit by customer with inner diameter 35mm
Handles
Pos. 1 Amount of sterilizable central handle sets, ProductNr.:4025708 (3 handles per set):1
Load range / add. components VidiaPort
Pos. 2 Springarm Mavig - Load Range Springarm *: 12-18kg Portegra2 Radiation Prot.
ProductNr: 1982311 - Mavig X-ray shield 78x90
* Regard adapter + monitor weight!
Electrical installation
Control board plate (Power Pack Supply Voltage: 100 - 240 V AC / 22 - 32 V DC) Required space (LxWxH): 300x215x110mm with 1 power supply line, 2 times 300x215x110mm with 2 power supply lines
Pos. 1 HeluxProK / Power supply line: 230V (1 power supply line) Max. power consumption: 160 VA at 24V / 100-240V
Product numbers
Registration type Helux Pro: acc.to MDR ProductNr: 4108210 - Helux Pro Ceiling Duo ProductNr: 4108051 - Pre-Install Set Helux Pro ProductNr: 4108041 - Electric PAP-Set Helux Pro
Filterboard
Pos. 1 Filterboard (included in delivery)
Customer ref. no:
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
C: 2130MHLPH & HP190H
-Field of application: Surgery -Internat.Standard: US
Order drawing no:
Print: 12.11.24
Submittal Package Revision 04: 11/25/2024 : Page 14 of 45 hellmaj2
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
D: 1865MHL3
-Field of application: Other -Internat.Standard: US
Order drawing no:
Submittal Package Revision 04: 11/25/2024 : Page 15 of 45
1) electro pneumatic brake
2) mechanical friction brake, adjustable
3) pneumatic brake; 4) electro magnetic brake
CSU-flange Tandem OPL System flange tandem OPL additional information
Customer ref. no:
Quotation no:
Room:
940537
240927-35109-TUSM291HE
IR LAB
Project:
Customer:
TM order no:
Amount:
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
Released for production:
Date:
Signature:
Changes after release may cause delay in shipment or price corrections
D: 1865MHL3
-Field of application: Other -Internat.Standard: US
Order drawing no:
Submittal Package Revision 04: 11/25/2024 : Page 16 of 45
-Field of application: surgery -Internat.Standard: US
Order drawing no:
940537
240927-35109-TUSM291HE
IR LAB
IR LAB PROJECT
WEST PALM BEACH VA MC, WEST PALM BEACH
D: 1865MHL3
12.11.24
Customer ref. no:
Quotation no:
Room:
Project Customer:
TM order no:
Amount:
Released for production:
Date:
In shipment or price corrections
Signature:
Changes after release may cause delay
Print:
REF QTY CONDUIT DESCRIPTION (TYPE, CONDUIT DIAMETER)
E1 2 L1 SINGLE GANG, TBD
E2 2 L2 SINGLE GANG, TBD
E3 2 L3 SINGLE GANG, TBD, 21.5MM OD CONDUIT
REF QTY P/N DESCRIPTION
REF CIRCUIT CONDUIT/
WIRE-NUT
# OF
RECEPTACLES
RECEPTACLE DESCRIPTION
(TYPE, COLOR, AMP) TYPE
C1 CIRCUIT 1 H1 / W1 2 DUPLEX, 20A, RED TBD
C2 CIRCUIT 2 H1 / W1 2 DUPLEX, 20A, RED TBD
C3 CIRCUIT 3 H1 / W1 2 DUPLEX, 20A, RED TBD
C4 CIRCUIT 4 H2 / W2 2 DUPLEX, 20A, RED TBD
C5 CIRCUIT 5 H2 / W2 2 DUPLEX, 20A, RED TBD
C6 CIRCUIT 6 H2 / W2 2 DUPLEX, 20A, RED TBD
C7 CIRCUIT 7 - - BOOM ACCESSORIES CIRCUIT -
REF QTY DESCRIPTION
VAC 3 VACUUM MEDICAL GAS OUTLET
CO2 1 CARBON DIOXIDE MEDICAL GAS OUTLET
N2P 1 NITROGEN CONTROL PANEL (1675402)
BRAKE GAS
EB 1 ELECTRIC BRAKES
ACCESSORY ITEMSA A ACCESSORY ITEMS E LOW VOLTAGE PREPARATIONS
C HIGH VOLTAGE CIRCUITS
GAS MEDICAL GAS SERVICES
LATCH VALVE TYPE: TO BE DETERMINED (CO2, N2, AND IA ARE DISS ONLY)
WIRING FOR ALL CIRCUITS: TO BE DETERMINED
SIDE B SIDE CSIDE A
Media Package Length: Standard (1 meter)
WIRE-NUTW
SIDE D
REF QTY P/N DESCRIPTION
A1 3 1636317 430mm SHELF
A2 3 2082226 Vac Slide, MPC MOUNTED
A3 1 1636396 ADDITIONAL CONTROL HANDLES
A4 1 1636391 430mm DRAWER, STORAGE
W1 E2
VAC
C5
VAC
W2
N2P
C6
A3
A2
VAC
C3
E1
C1
C2
A1 C4
A4
CO2
E3
Submittal Package Revision 04: 11/25/2024 : Page 17 of 45
PRE-INSTALLATION GUIDE
FOR CEILING MOUNTED HELUX PRO SURGICAL LIGHTS
(NEW CONSTRUCTION & RENOVATION)
Submittal Package Revision 04: 11/25/2024 : Page 18 of 45
Table of Contents
1.0 INTRODUCTION
1.1 PRE-INSTALLATION RESPONSIBILITIES
1.2 PROJECT COMPONENTS AND PRE-INSTALLATION PROCESS
1.3 SAFETY AND ENVIRONMENTAL CONSIDERATIONS
1.4 PALLET DIMENSION / CLEAR PATH REQUIREMENTS
2.0 HELUX PRO SURGICAL LIGHT AND FLAT PANEL SYSTEMS
2.1 MOUNTING SYSTEM CRITERIA (NEW CONSTRUCTION & RENOVATIONS)
2.1.1 Design Loads for Surgical Lights and Flat Panel Systems
2.1.2 Structural Deflection Criteria (Lights and Flat Panels)
2.1.3 Design Elevations for Rough-In
2.1.4 Baxter Surgical Light / Flat Panel Mounting Plate
2.2 ELECTRICAL REQUIREMENTS
2.2.1 Required Conduits for Transformers in Enclosures
2.2.2 Installation of Transformer Enclosures
2.2.3 Pre-Install Materials Isometric
2.2.4 Site Preparation for Helux Pro Light Wall Controls
2.2.5 Site Preparation for In- Llight Camera (if required)
A.0 APPENDIX
A.1 ROUGH-IN DRAWINGS AVAILABLE UPON REQUEST
A.2 CONTACT INFORMATION
Submittal Package Revision 04: 11/25/2024 : Page 19 of 45
1.0 Introduction
This document is a guide to explain the steps required to properly prepare a project site for installation of a Baxter Surgical ceiling suspended system. Covered within this guide are pre-installation requirements for surgical lights, flat panel systems, cameras and interface converters.
1.1 Pre-installation Responsibilities
Work required above the finished ceiling must be performed by the owner or owner designated contractor. All fixed attachments between Baxter Surgical mounting systems and building super-structures must be approved by the project engineer of record.
Baxter Surgical Technical Service will complete the installation following the conclusion of all required pre-installation activities as detailed within this guide.
1.2 Project Components and Pre-Installation Process
Component Specification Provided By:
Materials Provided By:
Installation Performed By:
Timeline / Project Phase
Structural Mounting Plates
Attachment, Substructure, and lateral bracing by
Structural Engineer of Record
Baxter Surgical
Lateral Bracing & Substructure (if
Req’d.) by Others
Contractor While ceilings are open
Transformer Enclosures
Contractor While ceilings are
Mains Power, Video, Data, and
Communication Cables w/ Required J-boxes &
Conduits
Owner or Electrical Contractor in accordance to Baxter Surgical rough-in material
Owner or Contractor Contractor While ceilings are open
Integration Cabling for Video and Endoscopy
Integration Company
Integration Company
Integration Company or
Baxter Surgical assist per contract
Terms and Conditions
Cables required at Baxter surgical 6 weeks prior to shipment or to field during install per contract Terms and Conditions
Light or Flat Panel Suspension
Based on overall construction schedule
Final Equipment Certifications –
Electrical
Local Codes, NEC, and NFPA Site Inspection
Electrical Contractor and / or local code inspector
Following equipment installation
Figure #1) Project Responsibility Matrix
Submittal Package Revision 04: 11/25/2024 : Page 20 of 45
1.3 Safety and Environmental Considerations
• Many components are heavy. Use extreme caution while unpacking shipping containers and installing equipment.
• All personnel working around energized circuits should be qualified and follow proper safety procedures.
• All Baxter Surgical supplied equipment must be stored in a clean dry environment prior to installation.
• Empty packaging material and debris must be disposed of by the owner in accordance with the governing regulations of local municipalities.
1.4 Pallet Dimension / Clear Path Requirements
Figure #2) Surgical Light and Flat Panel Suspension
• A clear path is required with acceptable turn radii.
• Elevator must be large enough to accommodate pallet size.
• Flooring protection, if required, will be provided by others.
Submittal Package Revision 04: 11/25/2024 : Page 21 of 45
2.0 HELUX PRO Surgical Light and Flat Panel Systems
Figure #3) Surgical Lights and Flat Panel Suspension
2.1 Mounting System Criteria (New Construction & Renovations)
For Baxter Surgical HELUX PRO surgical light and flat panel suspensions a substructure must be fabricated on-site by others to support the light and flat panel suspension system. Baxter Surgical will supply a system mounting plate for attachment to the substructure. The attachment method at this location must be approved by the structural engineer of record.
2.1.1 Design Loads for Surgical Lights and Flat Panel Systems
Fmax. 2,148 N (485 lbs) Mbmax. 3,104 Nm (2290 ft-lb)
Figure #4) Design Loads (Surgical Light and Flat Panel Systems)
The design loads as stated are representative of a maximum triple arm load configuration. Baxter Surgical recommends that all surgical light and flat panel structures are designed to this maximum condition to maintain flexibility for future project upgrades.
Quad arm systems will require additional loads.
2.1.2 Structural Deflection Criteria (Lights and Flat Panels)
• Maximum horizontal deflection of substructure at the attachment point of the Baxter Surgical mounting plate must not exceed 0.1” when subject to horizontal load of 100lbs.
• Maximum angular deflection of substructure at the attachment point of the Baxter Surgical mounting plate must not exceed 1/3° from level when subject to the design loads as specified by Baxter Surgical.
Submittal Package Revision 04: 11/25/2024 : Page 22 of 45
2.1.3 Design Elevations for Rough-In
The Baxter Surgical HELUX PRO surgical light and flat panel suspension system rough-in requirements are shown below in will have a flat ceiling cover Figure #5
Figure #5) Elevations for Light / Flat Panel with Flat Ceiling Cover
A flat ceiling cover will be used in all new construction and renovation projects, which will require the top of the Baxter Surgical light mounting plate to be 5” above the finished ceiling, and the support substructure, designed by others, to be 9” above the finished ceiling. The required cutout in the finished ceiling is 14.5” x 14.5” square +/- 1/2”.
Mounting Plate Installed Mounting Plate Installed without Ceiling Cover
Baxter Surgical Install with Ceiling Cover
Figure #6) Elevations for Light / Flat Panel with Flat Ceiling Cover
Submittal Package Revision 04: 11/25/2024 : Page 23 of 45
2.1.4 Baxter Surgical Light / Flat Panel Mounting Plate
Baxter Surgical will supply a light mounting plate to be installed by the contractor during the pre-installation phase of the project. The standard light mounting plate (P/N:
2078498) is used for all new construction projects. See Figure #7 Below.
Figure #7) Light Mounting Plates – Standard Light Mounting Plate
Baxter Surgical recommends using Qty. 4, 3/4” ASTM-A307 hardware to attach the Baxter Surgical light mounting plate to the sub-structure thru the Ø 20.5mm corner holes. This hardware specification needs to be approved by the structural engineer of record. The mounting holes in the plate are in a 10.24” square pattern, as shown in Figure #7.
Mounting plate will arrive with threaded rods and hardware attached. This is to be used at the time of Baxter Surgical installation. Please do not remove the hardware from the plate, if removal is required, please re-install the hardware prior to the light installation.
Submittal Package Revision 04: 11/25/2024 : Page 24 of 45
2.2 ELECTRICAL REQUIREMENTS
2.2.1 Required Conduits for Transformers in Enclosures
Figure #8) Required Conduit Runs for Transformers in Enclosures
Notes: Please note Figure #8 is a visual representation of required conduits. Project specific conduit runs are available upon request.
1) Total conduit runs from transformer enclosures to light mounts must not exceed 3’.
2) All fabricated structures, 120 VAC circuits, conduits, junction boxes, and whips, are provided and installed by others. Transformer enclosure(s) are provided by Baxter Surgical.
3) The shown conduit runs in Figure #8 do not incorporate any power requirements for flat panels, monitors or televisions. All fabricated structures, 120 VAC circuits, conduits, junction boxes and whips associated with flat panels, monitors and televisions shall be specified by the engineer of record and installed by others.
Submittal Package Revision 04: 11/25/2024 : Page 25 of 45
2.2.2 Installation of Transformer Enclosures
For new construction projects, surgical light power transformers will be in above ceiling enclosures. A separate transformer enclosure is required for each lamp head.
Transformer enclosures will be provided by Baxter Surgical. Transformer enclosures must be in an accessible location. An access panel is required in the finished ceiling for the transformer enclosure(s). Figure #9 shows the overall dimensions of the transformer enclosure.
Figure #9) Surgical Light Transformer Enclosures
Submittal Package Revision 04: 11/25/2024 : Page 26 of 45
2.2.3 Pre-Install Materials Isometric
Figure #10) Surgical Light Conduits, Mounting Plates, Enclosure and Access Panel
Notes:
1) Hardware for enclosure mounting is provided by others.
2) Transformer enclosure(s) must be mounted within 3’ of the center of the light mount and 2’ of the ceiling accessible through a 24”x24” access panel, see figure 10 above.
3) Enclosure must be mounted so the door opens horizontally.
4) Refer to Section 2.2.1 for required conduit runs.
Submittal Package Revision 04: 11/25/2024 : Page 27 of 45
2.2.4 Site Preparation for HELUX PRO Light Wall Controls
Site preparation and necessary trim work will be the onsite contractors’ responsibility. Wall control boxes will be surface mounted using anchors. Figure #11 shows the wall control rough-in and rigid conduit requirements. Additional details on conduit runs can be found in Figure #8.
Figure #11) Flush Wall Control Back Box Rough-in and Dimensions
1) Center of single gang junction box must be mounted 2.5” from right, see Figure
#11 above.
2) 1” Conduit and single gang junction box is provided and installed by others.
3) Light control touch pad and low voltage wiring is provided and installed by
Baxter Surgical during equipment installation.
4) Wall Control Dimensions (L x W x H) - 263 x 188 x 64 mm (10.3” x 7.4” x 2.5”)
Submittal Package Revision 04: 11/25/2024 : Page 28 of 45
2.2.5 Site Preparation for In-Light Camera
• Cabling from video refreshing unit, to the video system is by others.
o NOTE: Video refreshing unit is located inside transformer enclosure, above ceiling.
2.2.6 Site Preparation for Integrated Light Control (if required)
• 1” conduit from wall control to integration rack and cable is provided by others
• Connection inside wall control is RS-232
A.0 Appendix
A.1 Rough-in Drawings Available Upon Request
If needed, more information and drawings are available for the HELUX PRO Surgical Lights. Please contact Baxter Surgical Project Engineering with specific requests.
A.2 Contact Information
Baxter Service Hotline can be reached at (800) 445-3720.
Submittal Package Revision 04: 11/25/2024 : Page 29 of 45
EMS #110106 Pre-installation Guide File: 111110 Revision: D
PRE-INSTALLATION GUIDE
FOR CEILING MOUNTED EQUIPMENT
MANAGEMENT SYSTEM WITH 12” INTERSTITIAL
SPAN (CATALOG # 110106-FC)
Submittal Package Revision 04: 11/25/2024 : Page 30 of 45
Charleston, South Carolina
File: 111110, Rev: D Page 2 of 14
Table of Contents
1.0 INTRODUCTION
1.1 PRE-INSTALLATION RESPONSIBILITIES
1.2 PROJECT COMPONENTS AND PRE-INSTALLATION PROCESS
1.3 SAFETY AND ENVIRONMENTAL CONSIDERATIONS
1.4 PALLET DIMENSION / CLEAR PATH REQUIREMENTS
2.0 EQUIPMENT MANAGEMENT SYSTEM (EMS) MOUNTING SYSTEMS
2.1 12” (EMS) MOUNTING SYSTEMS
2.1.1 Design Loads for Equipment Management Systems (EMS)
2.1.2 Structural Deflection Criteria (EMS)
2.1.3 Attachment Methods for Hillrom Surgical EMS Mounting Systems
2.1.4 Interstitial Span
2.1.5 EMS Mounting System Components
2.1.6 Installation of Mounting System Components
2.1.7 Installation of Interface Plate for Med. Gas and Electrical Connections
2.1.8 EMS Electro-Pneumatic Braking System (gas braking system)
2.1.9 EMS Electro-Magnetic Braking System (electric braking system)
2.1.10 Rough Opening for Flat Ceiling Covers
A.0 APPENDIX
A.1 STANDARD ROUGH-IN DRAWINGS
A.2 CONTACT INFORMATION
A.3 TRI-TECH MEDICAL, INC.’S ‘MEDICAL GAS RISER INSTALLATION INSTRUCTIONS’
Submittal Package Revision 04: 11/25/2024 : Page 31 of 45
File: 111110, Rev: D Page 3 of 14
1.0 Introduction
This document is a guide to the steps that must be performed in order to properly prepare a project site for installation of a Hillrom Surgical ceiling suspended system. Covered within this guide are pre-installation requirements for Equipment Management Systems (EMS).
1.1 Pre-installation Responsibilities
Work required above the finished ceiling must be performed by the owner or owner designated contractor. All fixed attachments between Hillrom Surgical mounting systems and building super-structures must be approved by the project engineer of record. Hillrom Surgical Technical Service or owner provided labor will complete the installation following the conclusion of all required pre-installation activities as detailed within this guide.
1.2 Project Components and Pre-Installation Process
Component Specification Provided By
Materials Provided By
Installation Performed By
Timeline / Project Phase
Mounting Plates
Attachment, Substructure, and lateral bracing by
Structural Engineer of Record per Hillrom
Surgical specifications
Hillrom Surgical
Lateral Bracing & Substructure (if
Req’d) by Others
Contractor While ceilings are
Transformer Enclosures
Hillrom Surgical Hillrom Surgical Contractor
Mains Power, Video, Data, and Communication Cables w/ Required J-boxes &
Conduits
Owner or Electrical Contractor in accordance to Hillrom Surgical rough-in material
Owner or Contractor Contractor While ceilings are open
Integration Cabling for Video and Endoscopy
Integration Company
Integration Company
Integration Company or
Hillrom Surgical assist per contract Terms and Conditions
Cables required at Hillrom Surgical 6-weeks prior to shipment or to field during install per contract Terms and
Conditions
Medical Gas Risers Hillrom Surgical Hillrom Surgical Contractor
Final Equipment
Certifications – Med.
Gas and Electrical
Local Codes, NEC, and NFPA
Site Inspection Contractor and / or local code inspector
Following equipment installation
Figure #1) Project Responsibility Matrix
Submittal Package Revision 04: 11/25/2024 : Page 32 of 45
File: 111110, Rev: D Page 4 of 14
1.3 Safety and Environmental Considerations
• Many components are heavy. Use extreme caution while unpacking shipping containers and installing equipment.
• All personnel working around energized circuits should be qualified and following proper safety procedures.
• All Hillrom Surgical supplied equipment must be stored in clean, dry environments prior to installation.
• Empty packaging material and debris must be disposed of by the owner in accordance with the governing regulations of local municipalities.
1.4 Pallet Dimension / Clear Path Requirements
Figure #2) Packaged Boom
• A clear path is required with acceptable turn radii.
• Elevator must be large enough to accommodate pallet size.
• Flooring protection, if required, must be provided by others.
Submittal Package Revision 04: 11/25/2024 : Page 33 of 45
File: 111111 Rev: D Page 5 of 14
2.0 Equipment Management System (EMS) Mounting Systems
2.1 12” (EMS) Mounting Systems
Hillrom Surgical EMS mounting systems are OWNER / CONTRACTOR INSTALLED.
Attachment of these systems must be designed and approved by structural engineer of record.
Hillrom Surgical will not be responsible for testing or verification of mounting systems installation.
Figure #3) Hillrom EMS Mounting System - 110106
Hillrom Surgical offers pre-engineered mounting solutions for Equipment Management Systems (EMS). Hillrom Surgical EMS mounting systems are designed to a 4X factory of safety under the design loads as specified in Section 2.1.1.
2.1.1 Design Loads for Equipment Management Systems (EMS)
Fmax. 9,200 N (2067 lbf)
Mbmax. 12,500 Nm ( 9,220 ft-lbs)
Figure #4) Design Loads (EMS)
The design loads shown above represent the maximum loading scenario for any Hillrom Surgical ceiling mounted Equipment Management System (EMS). Hillrom Surgical recommends designing all mounts involving booms to this maximum condition in order to maintain flexibility for future product upgrades. Model specific design loads are also available from Hillrom Surgical Project Engineering upon request.
2.1.2 Structural Deflection Criteria (EMS)
• Maximum horizontal deflection of substructure at the attachment point of the Hillrom Surgical mounting plate must not exceed 0.1” when subject to horizontal load of 100lbs.
• Maximum angular deflection of substructure at the attachment point of the Hillrom Surgical mounting plate must not exceed 1/3° from level when subject to the design loads as specified by Hillrom Surgical.
Submittal Package Revision 04: 11/25/2024 : Page 34 of 45
File: 111111 Rev: D Page 6 of 14
2.1.3 Attachment Methods for Hillrom Surgical EMS Mounting Systems
Figure #5) Hillrom Surgical EMS Mounting System – Attachment Methods
The Hillrom Surgical 110106 EMS mounting system may be attached to the building superstructure in the following manners:
• Welded to superstructure or fabricated substructure.
• Bolted to superstructure or fabricated substructure.
• Anchored to structural concrete slab or structural composite deck.
1) The Structural Engineer of Record for the project is ultimately responsible for specifying and approving all attachment methods. This includes the specification of weldments, attachment hardware, concrete anchors, and any required lateral bracing. All hardware and / or anchors are provided by others.
2) A custom mounting plate may be required for direct anchorage into composite decks.
2.1.4 Interstitial Span
Interstitial span is defined by Hillrom Surgical as the distance between the room side of the finished ceiling and the top attachment point of the Hillrom Surgical provided mounting plate. The 110106 - FC System requires a distance of 12” +/- ¼”.
Figure #6) 12” Interstitial Span
RED IRON WITH 12” SYSTEM BOLTED WITH GASES AND ELECTRICAL PLUMBED TO MOUNT
Submittal Package Revision 04: 11/25/2024 : Page 35 of 45
File: 111111 Rev: D Page 7 of 14
2.1.5 EMS Mounting System Components
The following components are used to create Hillrom Surgical EMS mounting systems. Hillrom Surgical Project Management will provide the contractor with a project specific drawing prior to any mounting system installation.
Figure #7) EMS Mounting System (110106)
1. EMS Mounting Plate (110037) Used for attachment of the mounting system to the buildings structural deck or owner furnished sub-structure. (Figure 7, Page 8)
2. Threaded Rod Assembly (111030) The threaded rod assembly will be installed at the tapped locations on the mounting plate and tightened to 89 ft-lbs.
3. Interface Plate (110344) Used to attach medical gas risers and contractor provided electrical junction boxes. (Figure 8, Page 8)
4. M16 Hex Nut Hillrom Surgical will provide. Used for attachment of interface plate to threaded rod assembly.
5. Medical Gas Riser (part number to be determined per gas type) Used for connection between main supply line and Hillrom
Surgical EMS hose at line pressure. (Figure 8, Page 8)
6. Pneumatic Brake Gas Riser (not needed for electric brake) For non-electric brake systems, one gas riser (Nitrogen or
Instrument Air) is dedicated for the braking system. This line needs to be regulated between 55 – 70 psi. See section
2.1.6 for more details. (Figure 8, Page 8)
7. Junction Box (By Others) Interface Plate is designed to mount Raco 265
(4 -11/16” x 4 – 11/16” x 2 -1/8”) junction boxes as a basis of design. Junction boxes by different manufacturers that are equal to the Raco 265 are acceptable.
8. Small Transformer Enclosure (110773) Not pictured in Figure #4 - Required for electric portion of pneumatic braking system and internal boom low voltage components. See Section 2.1.6 for details(Figure 9, Page 9)
9. Large Transformer Enclosure (110106) Not pictured in Figure #4 – Required for electromagnetic transformer to power electric brakes. See Section 2.1.7 for details. (Figure 10, Page 10)
Submittal Package Revision 04: 11/25/2024 : Page 36 of 45
File: 111111 Rev: D Page 8 of 14
2.1.6 Installation of Mounting System Components
The Hillrom Surgical EMS mounting system is supplied by Hillrom Surgical but installed by others. Installation of the EMS mounting plate at the top of the system should be performed while the ceilings are open to ease installation. The complete mounting system will need to be installed prior to the completion of the medical gas and electrical supply lines.
The standard EMS mounting plate (110037) weighs approximately 100lbs. Therefore, two installers and a manual lift are required for a safe and proper installation.
The mounting location of the EMS mounting plate should be provided by the project architect, and the attachment method given by the structural engineer of record.
Figure #8) Exploded View Assembly Drawing for Catalog (110106)
The alignment of the EMS mounting plate should be parallel to the nearest wall or square to the floor plan of the room. If there is a ceiling grid present, the EMS mounting plate should be installed parallel to the grid in a 24.5” x 24.5” opening with no grid passing through the opening.
Notes:
1) The standard EMS mounting plate (110037) has (8) M22 tapped holes for attachment of the threaded rod assemblies. Eight threaded rod assemblies are required for every installation, and these must be installed with a torque of 89 ft-lbs. The threaded rod assemblies will be provided by Hillrom Surgical.
2) Do not use any thread locking agent on Hillrom Surgical mounting systems.
3) Please contact Hillrom Surgical Project Management for additional clarification.
1. EMS Mounting Plate
2. Threaded Rod Assembly
3. Interface Pate
4. M16 Hex Nut
5. Medical Gas Riser
6. Pneumatic Brake Gas
Riser (if applicable)
7. Junction Box (By Others)
Submittal Package Revision 04: 11/25/2024 : Page 37 of 45
File: 111111 Rev: D Page 9 of 14
2.1.7 Installation of Interface Plate for Med. Gas and Electrical Connections
The Interface Plate (110344) is designed to house the medical gas risers for connection between the main gas supply lines and the flexible hoses from the Hillrom Surgical equipment management system. The Interface Plate and medical gas risers are provided by Hillrom Surgical but installed by others. The Interface Plate also provides a mounting location for contractor supplied electrical junction boxes for terminating circuits. The Interface Plate is shipped flat, and the tabs that house the medical gas risers can be bent down to a vertical position.
Figure #9) Installing the Interface Plate and Med. Gas Risers
Gas risers are brazed into supply lines by others via a 1/2” OD copper connection. The gas riser is approximately 7” long. Gas risers have male DISS connections with internal check valves for connection to flexible hosing from the equipment management system, with the exception of Waste Anesthesia Gas Disposal and Medical Vacuum which do not have internal check valves.
DISS ends are required to point towards center of mount. Please find a copy Tri-Tech Medical, Inc.’s ‘Medical Gas Riser Installation Instructions’ attached for review. Please review this attachment prior to installation of the medical gas risers commencing as there are specific instructions and warnings that pertain to the medical gas risers. All gas risers should be installed per NFPA 99C or applicable local code. The 24 hour standing pressure test should be completed before equipment installation.
ELECTRICAL REQUIREMENTS / RESPONSIBILITIES FOR FINAL INSTALLATION:
During final installation of the equipment management systems, the flexible conduit containing the circuit wires from the support head will be left above ceiling, unattached to the junction box that was previously installed by the electrical contractor on the interface plate. The electrical contractor shall be responsible for attaching the flexible conduit to the junction box and making all necessary terminations. In addition, Hillrom Surgical will provide an 8 gauge chassis ground wire, which is required to be grounded to the bonded building, per local electrical code. The electrical contractor shall be responsible for final installation of the ground wire, in accordance with local code.
The Interface Plate is designed to mount Raco 265 (4-11/16” x 4-11/16” x 2-1/8”) junction boxes or similar.
Junction boxes are provided by others.
Medical gas risers are provided by Hillrom Surgical. A separate gas riser is provided for each gas outlet on the EMS.
Medical gas risers are installed by others, and the arrangement of the tubes can be field specified. The DISS connections must face the interior of the mount as shown in Picture #12. Medical gas inlet tubes must be installed horizontally.
Submittal Package Revision 04: 11/25/2024 : Page 38 of 45
File: 111111 Rev: D Page 10 of 14
Figure #7) EMS Mounting Plate (110037) The Standard EMS Mounting Plate weighs approximately 100lbs.
Figure #8) EMS Mounting System Components
Gas Risers Interface Plate
Submittal Package Revision 04: 11/25/2024 : Page 39 of 45
File: 111111 Rev: D Page 11 of 14
2.1.8 EMS Electro-Pneumatic Braking System (gas braking system)
Hillrom Surgical Equipment Management Systems can utilize an electro-pneumatic braking system to control arm positioning. This system has medical gas and electronic rough-in requirements:
Medical Gas Requirement:
A separate gas supply line must be added to each mount for the pneumatic portion of the braking system.
Hillrom Surgical will supply a gas riser (Nitrogen or Instrument Air) for each mount according to the type of gas that is selected for the pneumatic braking system. The pneumatic brake inlet tubes will be installed by others.
Notes:
1) Pneumatic braking systems can run on either Nitrogen or Instrument air.
2) Line pressure must be regulated by others to be between 55 – 70 psig. Regulator must be installed in an accessible location with visible gauge showing pressure. Pressure reducing valves shall be set to 55-70psi before installation of equipment.
3) Hillrom Surgical pneumatic braking systems use 0.004 ft^3 of gas per actuation.
4) The braking system is actuated approximately 3-4 times during positioning.
Electrical Requirement:
A small transformer enclosure must be mounted for each mount for the electronic portion of the braking system. Hillrom Surgical will supply the transformer enclosure to be installed by others.
Notes:
1) The small enclosure needs to be located in an accessible location within 3’ of the center of the equipment mount and 2’ of the ceiling. The enclosure shall be mounted so that the cover is positioned vertically. Mounting enclosures with the cover facing down is unacceptable. An access panel will be required in all gypsum wall board ceilings.
2) A contractor supplied whip is needed to connect the transformer enclosure to the corresponding mount.
3) The electrical contractor is responsible for providing 1 each 120 VAC Branch Circuit to the small transformer enclosure for power. The small transformer has a 2 amp max draw.
Figure #9). Small Transformer Enclosure (#110773)
Submittal Package Revision 04: 11/25/2024 : Page 40 of 45
File: 111111 Rev: D Page 12 of 14
2.1.9 EMS Electro-Magnetic Braking System (electric braking system)
Hillrom Surgical Equipment Management Systems can also utilize an electro-magnetic braking system to control arm positioning. This system has electronic rough-in requirements:
Electrical Requirement:
A large transformer enclosure must be mounted for each mount, per arm system. Hillrom Surgical will supply the large transformer enclosure to be installed by others.
Notes:
1) The large enclosure needs to be located in an accessible location within 3’ of the center of the equipment mount and 2’ of the ceiling. Enclosures will be mounted so the door opens horizontally.
Mounting enclosures with the door facing down is unacceptable. An access panel will be required in all gypsum wall board ceilings.
2) A contractor supplied whip is needed to connect the transformer enclosure to the corresponding mount.
3) The electrical contractor is responsible for providing 1 each 120 VAC Branch Circuit to the large transformer enclosure for power. The large transformer has a 3 amp max draw.
Figure #10). Large Transformer Enclosure (#110116)
Submittal Package Revision 04: 11/25/2024 : Page 41 of 45
File: 111111 Rev: D Page 13 of 14
2.1.10 Rough Opening for Flat Ceiling Covers
Figure #13) Side View of Catalog # 110106 Installed for Flat Ceiling Covers
The required opening in the finished ceiling when flat ceiling covers are being utilized is 24.5” x 24.5” +/- 1/8”, centered over the mounting system. Hillrom Surgical recommends that all framing members used to construct the rough opening in gypsum wallboard ceilings have a web width of 1 – 5/8” or less. If larger framing members are used, it will limit access to the medical gas inlet tube rough in locations on the interface plate. The ceiling cover (not shown for clarity) is installed by Hillrom during final installation, and is 25.2” x 25.2”. It is essential that the rough opening is accurate. The top attachment point of the Hillrom Surgical provided mounting plate must be installed 12” +/- ¼” above the room side of the finished ceiling.
A.0 Appendix
A.1 Standard Rough-in Drawings
A copy of the standard rough-in drawing for the equipment mounting system required for an 12” interstitial span (Catalog # 110106-FC) is included as an attachment for review and reference.
Project specific drawings for the equipment mounting systems will be provided for review and approval once the interstitial space is confirmed and provided to the Project Engineer at Hillrom Surgical.
In addition, a copy of Tri-Tech Medical, Inc.’s ‘Medical Gas Riser Installation Instructions’ is attached for review and reference. Please make sure that the attachment is reviewed by all parties prior to installation of the medical gas risers (medical gas inlet tubes) taking place.
A.2 Contact Information
Hillrom Surgical Project Engineering can be reached for further clarification at (888) 474- 9460 Toll Free, or (843) 534-0606.
Submittal Package Revision 04: 11/25/2024 : Page 42 of 45
File: 111111 Rev: D Page 14 of 14
A.3 Tri-Tech Medical, Inc.’s ‘Medical Gas Riser Installation Instructions’
Submittal Package Revision 04: 11/25/2024 : Page 43 of 45
B O
O M
M O
U N
TIN
G
P
LA
TE
C
O N
S U
LT TU
S
M
#: 110037 FO
R D
E
TA
ILS
I = 305
12.0 +/- 0.25
10.7
1.0 +/- 0.25 R
O U
G H
O P
E N
IN
G
[24.5 x 24.5 +/- 1/8"]
C E
ILIN
G
C O
V E
R [25.2"] S
Q U
A R
E
M O
U N
TIN
G
P
LA
TE
W
E
LD
E D
, B O
LTE
D
O
R A
N C
H O
R E
D
TO
S
TR
U C
TU
R
E
ATTAC
H
M
EN
T M
ETH
O D
S M U
ST BE
APPR
O
VED
BY EN
G
IN
EER
O F R
EC
O
R D
D
ESIG
N
LO
A D
F m ax: 9,200 N (2067 lbf)
M b m ax: 12,500 N m
(9,220 ft-lbs)
FIN
IS
H
D
C
ILIN
G
VIEW
'B
M
O U
N
TIN
G
SYSTEM
ELEVA
TIO
N S
VIEW
'A
ISO
M
ETR
IC
VIEW
O F M
O U
N
TIN
G
SYSTEM
(A
LL C
O M
PO
N
EN
TS IN
STA
LLED
B Y C
O N
TR
A
C
TO
R
M U
S T H
A V
E C
E
ILIN
G A
C C
E S
S P
A N
E L A
D
JA
C E
N
T TO
M O
U N
T.
P A
G E
C O
N
TE
N
TS
D W
G . N
O
D A
TE
M O
U N
T:
C A
T. N O
Q U
A N
TITY
O
N P
LA
N
R E
LE
A
S E
D
FO
R P
R O
D U
C
TIO
N (S
IG
N
A
TU
R E
C O
N
FIR
M S
A C
K N
O W
LE
D
G E
M T O
F A
LL D
R A
W
IN
G N
O
TE
S
S
IG
N A
TU
R
E
D A
TE
IN
S
TA
LLA
TIO
N
D A
TE
R E
V
Hill-Rom , Inc.
1046 LeG rand Blvd, Charleston, SC 29492
Phone: 1-888-474-9359 www.hillrom
.com
N O
T TO
S
C A
LE
TH
IS
D
R A
W
IN
G
IS
N O
T TO
B
E U
S E
D
FO
R C
O N
S
TR
U C
TIO
N
This drawing contains proprietary inform ation and is property of Hill-Rom , Inc. It m ust not be reproduced in whole or in part without written perm ission from Hill-Rom
, Inc., and is subject to return upon request.
S
TA
N D
A R
D D
R A
W
IN
G
FLA
T C O
V E
R
- B
O O
M M
O U
N
TIN
G S
Y S
TE
M
12" IN
TE
R S
TITIA
L S
P A
C E
M O
U N
TIN
G
S Y
S
TE
M
110106 111111
N S A W
07-10-2020
U
N
ITS
[In.]/m m
S .O
. N O
Submittal Package Revision 04: 11/25/2024 : Page 44 of 45
VIEW
'C
M
O U
N
TIN
G
SYSTEM
C O
M
PO
N
EN
TS
TIG
H
TE
N
M 16 N
U
TS
TO
52 ft-lbs
TIG
H
TE
N
M 22 x M
A
D A
P
TE
R N
U
TS
TO
89 ft-lbs
7 8
* M O
U N
TIN
G
PLA
TE W
ILL B
E SH
IPPED
PR
IO
R
TO
TH
E FO
LLO
W
IN
G M
A
TER
IA
LS
12 13 14109
LIST O
F R
EQ
U
IR
ED
M A
TER
IA
LS FO
R
110106, B O
O M
M O
U N
TIN
G
SYSTEM
N O
TE
S
A ) C om ponents for TR
U M
P F E
M S m ounting system s are
TR
U M
P F provided and installed by O
TH
E
R S
. If necessary, all hardw are required to attach the m ounting plate to structure is
P R
O V
ID
E
D B
Y O
TH
E
R S and IN S
TA
LLE
D B
Y O
TH
E
R S
TR
U M
P F recom m ends installation during the early phase of construction.
B ) E ngineer of record m ust approve all fabricated structures and attachm ent m ethods.
C ) M axim um horizontal deflection of anchor plate is 0.1" w ith a horizontal load of 100 lbs.
D ) M axim um angular deflection of 1/3 w hen structure is subjected to m odel specific load and m om ent.
E ) R equired opening in finished ceiling is 24.5" x 24.5" 1/8" centered. C eiling cover (not show
n) is installed by TR U
M P
F during final installation, and is 25.2" x 25.2". M
U S
T H A
V
C
ILIN
G A
C C
E S
S P
A N
E L A
D
JA
C E
N
T TO
M O
U N
T.
F) M 16 all thread at the bottom of the adjustable spacers m ust be adjusted to 1" above the room side of the finished ceiling before locking into place, as show n on S heet 1.
G ) G as risers are m ounted as show n w ith D
IS
S connections facing the interior of the m ount. S ervices are then brazed to
1/2" O D copper outside the support structure, above the finished ceiling. G as risers consist of gas specific D
IS
S nipples brazed to 1/2" O D copper tubing. G as risers m ust be installed horizontally.
H ) A ll gas risers have a color coded label according to N
FP
A requirem ents.
I) Junction boxes for electrical connections are provided by electrical contractor,…