This document is a facility requirements drawing set for the OR1 NEO-IP Series System installation at VA Medical Center West Palm Beach, FL, prepared by Karl Storz Endoscopy-America. The drawings are coordination and planning documents (not for construction) that specify technical facility requirements, electrical infrastructure, equipment specifications, and site readiness conditions necessary for integrating the OR1 NEO-IP integrated operating room system.

The facility requirements encompass comprehensive audiovisual and electrical infrastructure including an A/V equipment rack (WRK-3727 medium rack with 900 lbs seismic load capacity), conduit riser systems, junction boxes, power receptacles (20A circuits at 120VAC for rack and display power), data/telecommunications connectivity, ceiling-mounted speaker assemblies (six TCM-XA speakers with grille assemblies), and specialized wall-mounted equipment including touch panels, displays, microphones, and interface boxes. Equipment specifications include detailed thermal and power load data (e.g., NEO-IP 48 assembly with 1185 BTU heat load, AIDA printer with 1160 BTU, medical UPS with 304 BTU/hr), dimensional drawings, and interface requirements. Critical facility constraints mandate equipment operation between 32°F to 104°F ambient temperature with surrounding air not exceeding 90°F, requiring proper ventilation. The site readiness checklist establishes prerequisites including completed conduit installation with pull strings, energized permanent power, ceiling speaker cutout preparation, wall mount installation, network cable termination, boom equipment installation and powering, and owner-furnished equipment availability before Karl Storz deployment crew arrival. All construction work including conduit, electrical outlets, millwork, and structural support is specified as the client's contractor responsibility unless otherwise noted.

View the file

Other files

File Type Posted
S06 Attachment_Updated Price Cost Schedule 4-30-2026_1 Page.docx DOCX document
S06 Attachment_Updated Statement of Work_BB 548-CSI-139_04-30-2026_22 Pages.pdf PDF
36C24826Q0453 0003.docx DOCX document
S06 Attachment_548-CSI-139 WPB Renovate IR Cath Lab_Addendum 01_2026-04-24_28 Pages.pdf PDF
S06 Attachment_Pneumatic Tube Stations Transfer Stations_2 Pages.pdf PDF
S06 Attachment_VA WPB Cath Lab 100 DWGS R1 - 11-17-20_17 Pages.pdf PDF
S06 Attachment_548-CSI-139 RFI_Responses_7 Pages.pdf PDF
S06 Attachment_Site Visit Sign In Sheet - 548-CSI-139 Renovate IR CathLab Walk-Through_1 Page.pdf PDF
36C24826Q0453 0002.docx DOCX document
S02 Attachment 25_230923 Direct-Digital Control System for HVAC- rev041326_71 Pages.pdf PDF
36C24826Q0453 0001.docx DOCX document
S02 Attachment 26_BAS Facility Standards_16 Pages.pdf PDF
S02 Attachment 24_EMR_1 Page.pdf PDF
S02 Attachment 21_Price Cost Schedule_1 Page.docx DOCX document
S02 Attachment 09_1-AHU-60 Ventilation Calc_1 Page.pdf PDF
S02 Attachment 08_1-AHU-60 Load Calc_1 Page.pdf PDF
S02 Attachment 20_PPQ_4 Pages.pdf PDF
S02 Attachment 07_CD Specifications_100 percent_dated 10.01.2025_548-CSI-139 WPB Renovate IR Cath Lab_897 Pages.pdf PDF
36C24826Q0453_1.docx DOCX document
S02 Attachment 19_WD FL20260220 dated 01-02-2026_5 pages.pdf PDF
S02 Attachment 17_N-SOU240607_3 Pages.pdf PDF
S02 Attachment 16_940537-Submittal-05_45 Pages.pdf PDF
S02 Attachment 15_940537-Submittal-04_45 Pages.pdf PDF
S02 Attachment 13_0124003_100 percent CD Structural Calculations_38 Pages.pdf PDF
S02 Attachment 12_0124003 Medical Gas Pressure Drop Calcs_6 Pages.pdf PDF
S02 Attachment 11_EX 1-AHU-25 Ventilation Calc_1 Page.pdf PDF
S02 Attachment 01_Statement of Work_BB 548-CSI-139_03-31-2026_22 Pages.pdf PDF
S02 Attachment 23_VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_2 Pages.pdf PDF
S02 Attachment 22_Base Offer Price Breakdown_1 Page_Excel Form.xlsx XLSX spreadsheet
S02 Attachment 18_SLD211033-1 West Palm Beach VA Hybrid_LAYOUT_Rev 4_2 Pages.pdf PDF
S02 Attachment 10_EX 1-AHU-25 Load Calc_1 Page.pdf PDF
S02 Attachment 06_Narrative_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_57 Pages.pdf PDF
S02 Attachment 05_CD Drawings_100 percent_dated 10.01.2025_548-CSI-139 WPB Renovate IR Cath Lab_71 Pages.pdf PDF
S02 Attachment 04_Cx Plan_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_55 Pages.pdf PDF
S02 Attachment 03_Cx Procurement_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_1 Page.pdf PDF
S02 Attachment 02_Asbestos Report - 548-CSI-139 WPB Renovate IR Cath Lab_36 Pages.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLOT STAMP:SATRE, SHAUN |DATE: 5/21/2025 10:31 AM

C O

V E

R S

H E

E T

VA Medical Center West Palm Beach, FL

INDEX OF DRAWINGS KARL STORZ ENDOSCOPY-AMERICA

STAFFORD, TEXAS

REVS NOTES:

0. INITIAL RELEASE 2024/11/06

1. UPDATE PER NEW BACKGROUNDS

2. REMOVE FUTURE NOTE & CAMERA

DRAWING ACCEPTANCE SIGN-OFF

NAME:_______________________SIGNATURE:__________________________

TITLE:________________________DATE:_____________

Customer or customer's representative has reviewed and approved the drawings which will be used as the basis for the conduit and electrical requirements for installation of the KARL STORZ Integration Equipment.

AV.IP.6.0.0 COVER SHEET

AV.IP.6.1.1 LEGENDS, SCHEDULES & RISERS

AV.IP.6.2.1 REQUIREMENTS DETAILS #1

AV.IP.6.3.1 OVERALL FLOOR PLAN - L - Partial

AV.IP.6.4.01 FLOOR PLAN & RCP - IR LAB #1

AV.IP.6.5.01 KARL STORZ PROJECT MANAGEMENT REQUIREMENTS

IR LAB #1

FACILITY REQUIREMENTS

OR1 NEO - IP SERIES SYSTEM®

DATE:

PLT SC

DATE:REVISIONS:

us ed fo r t he p ro je ct a nd s ite s pe ci fic al ly

Id en tif ie d he re in a nd is n ot to b e us ed o n an y ot he r p ro je ct

It is to b e re tu rn ed u po n re qu es t.

Th is d ra w in g is th e pr op er ty o f K A

R L

S

TO

R Z

E N

D O

S C

O P

Y, a nd is n ot to b e re pr od uc ed o r c op ie d in w ho le o r i n pa rt.

I t i s on ly to b e

C O

N

FI

D E

N

TI

A L

- N O

T

TO

B E

D

IS

TR

IB

U

TE

D O

U

TS

ID

E

O F

K A

R L

S

TO

R Z

AVIP_20180502

DRAWING NUMBER

CHK. BY:

OF

DATE:

JOB NO.

STAFFORD, TX 77477-5753

13803 N. PROMENADE

FX. 281.566.4109

PH. 281.566.4100

ENG. BY:

DRAWN BY:

FILE NAME:

VA

M ed ic al C en te r - W es t P al m

B ea ch , F

L

2024/11/06

2410-08-AVIP

KS-2410-08

O R

N

E O

-I P

S E

R

IE

S S

Y S

T E

M F A

C

IL

IT

Y

R E

Q U

IR

E

M E

N T S

N.T.S

SSatre

6.0.0F O

R C

O O

R D

IN

A

T

IO

N O

N L Y

N

O T F

O R

C O

N S

T R

U C

T

IO

N

AV.IP.

The designs shown on these drawings are planning concept designs only, are not drawn to scale, are not drawn as architectural plans or detailed engineering drawings, do not represent fully detailed working designs, and do not represent or incorporate detailed structural or engineering analysis.

These drawings are provided "as-is" and are intended to be used only as planning concept guides, and not for any other purpose. All warranties and representations of any kind, whether expressed, implied or statutory, including warranties of merchantability and fitness for a particular purpose, with regard to the designs or drawings by a recipient in any manner other than as herein intended. Any recipient of these drawings hereby agrees to indemnify KARL STORZ against any and all claims, liability, damages and costs (including attorneys' fees) arising out of, or resulting from, any use of these designs or drawings other than as herein intended.

0 REV. 0 2024/11/06

1 REV. 1 2024/12/03

2 REV. 2 2025/05/21

2 REVS REC. FROM D.S. ON 2025/05/21

A/V EQUIPMENT RACK (AVR): RACK SUPPLIED BY STOR=. STRUCTURAL SUPPORT BY C.C.(NOT STOR=)

RACK POWER RECEPTACLE: LOCATED AT A/V RACK FOR STOR= RACK POWER AND ASSOCIATED A/V EQUIPMENT. RACK RECEPTACLE TO BE

PROMINENTLY LABELED

RACK POWER

DISPLAY POWER RECEPTACLE AT RACK: LOCATED AT RACK FOR BOOM MOUNTED DISPLAYS AND/OR TOUCH PANELS WITH REMOTE ��VDC

POWER SUPPLIES. DISPLAY RECEPTACLE SHALL BE PROMINENTLY LABELED

DISPLAY POWER

BOOM JUNCTION BOXES: MOUNT ADJACENT TO BOOM SUPPORT STRUCTURE. PROVIDE CEILING ACCESS BELOW BOXES IF CEILING SPACE AT BOX LOCATION IS INACCESSIBLE AFTER FINISHED CEILING IS INSTALLED. SEE BOOM JUNCTION BOX DETAIL.

POWER CIRCUITS & RECEPTACLES IN EQUIPMENT HANDLER BOOMS: STOR= EQUIPMENT TYPICALLY REQUIRES (�)��A, 1��VAC CIRCUITS WITH (�) RECEPTACLES EACH. SEE BOOM SUPPLIER DRAWINGS FOR ELECTRICAL REQUIREMENTS AT BOOMS.

DATA/TELEPHONE BOX: DATA AND TELECOM CONNECTIVITY REQUIRED FOR STOR= INTEGRATION. PROVIDE SUITABLE IDENTIFICATION LABELS.

SEE TELECOM/DATA SCHEDULE FOR REQUIREMENTS.

BOOM MOUNTED SURGICAL LIGHT CAMERA: CONDUIT FROM THE SURGICAL LIGHT CAMERA CONTROL UNIT (VIDEO/CONTROL) OUTPUTS TO THE NURSE STATION IS REQUIRED FOR STOR= INTEGRATION. VERIFY OUTPUT LOCATION WITH SURGICAL LIGHT CAMERA CONTROL UNIT SUPPLIER.

SHEET NOTES �

NEO�IP BASE(AVR) EQUIPMENT

IN EQUIPMENT ROOM

J 1.�

JUNCTION BOX SCHEDULE

J�BOX � SI=E(MINIMUM) TYPE (NOTE 1 BELOW) MOUNTING/COMMENT (NOTE � BELOW)

J�1.� ��� X ��� X �� D

(MINIMUM)

NEMA 1, SCREW COVER,

EQUAL TO HOFFMAN A�SE SERIES

WALL, FLUSH, SI=E ACCORDING TO CONDUITS

REQUIREMENTS

J�BM.� �� X �� X �� D

NEMA 1, SCREW COVER,

EQUAL TO HOFFMAN A�SE SERIES

ABOVE CEILING, ADJACENT TO BOOM, ACCESS REQUIRED

JUNCTION BOX SCHEDULE NOTES:

1. ALL BOXES AND COVER PLATES ARE PROVIDED BY THE CLIENT

S CONTRACTOR UNLESS NOTED OTHERWISE.

�. MOUNTING REQUIREMENTS SHOWN ARE THE DEFAULT REQUIREMENTS UNLESS OTHERWISE NOTED/DETAILED.

POWER & HEAT LOAD SCHEDULE PER SYSTEM (1 SYSTEMS PER A/V RACK)

CIRCUIT

REF. �

VOLTS AMP DESTINATION LOAD

ELECT LOAD

(WATTS)

HEAT LOAD

(BTU)

1 1�� VAC �� RECEPTACLE # A/V RACK A/V RACK(IP) 11�1.�� ����.1�

� 1�� VAC �� RECEPTACLES # A/V RACK (�)DISPLAYS ��� 11��.�1

� 1�� VAC �� RECEPTACLES # NSTP & AIDA NSTP/AIDA/PRINTER 11�� ����.��

� 1�� VAC �� RECEPTACLES # WALL DISPLAY(S) (�)LCD ��� 1���.��

POWER SCHEDULE NOTES:

1. ALL A/V POWER CIRCUITS MUST COME FROM THE SAME ELECTRICAL PANEL THAT PROVIDES POWER TO THE PATIENT

VICINITY OUTLETS, BOOMS AND SERVICE COLUMNS

�. ALL A/V POWER CIRCUITS ARE TO HAVE FULL SI=E DEDICATED NEUTRALS.

�. CIRCUITS SHOWN ARE FOR DEDICATED USE WITH STOR= EQUIPMENT ONLY

�. A/V CIRCUITS SHALL BE ON THE SAME PHASE AND FEED FROM THE SAME ISOLATED POWER PANEL THAT FEEDS ALL THE

PATIENT�CRITICAL EQUIPMENT.

�. CIRCUIT BREAKER TRIP CURVE CHARACTERISTICS SHALL BE EQUAL TO OR GREATER THAN SQUARE�D QOB�HM SERIES.

A/V SYSTEM CONDUIT RISER

SCALE: N.T.S.

DATA SCHEDULE (CLIENT CABLING BY C.C.)

RUN � LOCATION C.C. TO PROVIDE

D1 DT OUTLET AT RACK (�) HOSPITAL NETWORK (FOR STOR= NETWK EQUIP/VIDEO CONF.) RJ���

D� DT OUTLET AT AIDA (�) HOSPITAL NETWORK (FOR STOR= NETWK EQUIP/VIDEO CONF.) RJ���

DATA TELECOM SCHEDULE NOTES:

1. CONNECTIONS REQUIRED FOR VIDEO STREAMING, REMOTE SUPPORT AND SOFTWARE UPDATE DELIVERY.

SYMBOL LEGEND

SYMBOL DESCRIPTION BOX (NOTE 1 BELOW) MOUNTING/COMMENT

CEILING ACCESS PANEL (NOTE � BELOW) FOR REQUIRED ACCESS TO BOXES ABOVE CLG.

EQUIPMENT LABEL DENOTES EQUIPMENT AT LOCATION SHOWN

CONDUIT OR CABLE RUN � CONDUIT/CABLE RUN REFERENCE �

CONDUIT STUB OUT CONDUIT STUB OUT WITH BUSHING

A/V IN/OUTPUT WALL BOX �S, TR�1G, 1G�B.C.P. WALL, FLUSH, RECEPTACLE HT., SEE �/AV.IP.�.�.1

A/V IN/OUTPUT WALL BOX �S, TR�1G, 1G�B.C.P. WALL, FLUSH, ��� A.F.F. HT., SEE �/AV.IP.�.�.1

A/V WALL DISPLAY WALL BOX �S, TR�1G, 1G�B.C.P. WALL, FLUSH, SEE ��/AV.IP.�.�.1

A/V PLASTIC WALL BOX �S, TR�1G, 1G�B.C.P. (PLASTIC) WALL, FLUSH, ��� A.F.F. HT., SEE �/AV.IP.�.�.1

JUNCTION BOX SEE J�BOX SCHEDULE SEE J�BOX SCHEDULE

CEILING SPEAKER CUTOUT (PER TEMPLATE) HOLE CUT IN SHEET ROCK BY C.C.(NOT STOR=). CUTOUT TEMPLATE

PROVIDED BY STOR=. SEE �/AV.IP.�.�.1

SURGICAL IN LIGHT CCU OUTPUT SEE VENDOR SPECIFICATIONS COORDINATE W/SURGICAL LIGHT VENDOR

DATA DROP A/R, TYPICAL 1G WALL, FLUSH, RECEPTACLE HT. (NOTE �)

DUPLEX POWER RECEPTACLE A/R, TYPICAL 1G WALL, FLUSH, RECEPTACLE HT.

QUAD POWER RECEPTACLE A/R, TYPICAL �G WALL, FLUSH, RECEPTACLE HT.

AP

1G

1G���

1G�D

1G�P

J

S1

ILC

SYMBOL LEGEND NOTES

1. ALL BOXES AND COVER PLATES ARE PROVIDED BY THE CLIENT

S CONTRACTOR UNLESS NOTED OTHERWISE.

�. MOUNTING REQUIREMENTS SHOWN ARE THE DEFAULT REQUIREMENTS UNLESS OTHERWISE NOTED/DETAILED.

�. BOXES/OUTLETS/RECEPTACLES LOCATED ABOVE THE CEILING MUST BE WITHIN 1� INCHES OF THE CEILING AND BE ACCESSIBLE FROM THE

SPACE BELOW. CLIENT / C.C. TO PROVIDE SUITABLE CEILING ACCESS PANELS AT DEVICE LOCATIONS. (ACCESS PANELS EQUAL TO WILLIAMS

BROS. MODEL WBFRC).

�. �RECEPTACLE HEIGHT� DENOTES MOUNTING HEIGHT OF REGULAR RECEPTACLES SPECIFIED FOR THIS PROJECT.

SWITCH HEIGHT� DENOTES MOUNTING HEIGHT OF REGULAR SWITCHES SPECIFIED FOR THIS PROJECT.

�. SEE DATA/TELECOM SCHEDULE FOR CLIENT CABLING REQUIREMENTS.

�. SEE STOR= STREAMCONNECT SYSTEM REQUIREMENTS FOR CLIENT REQUIREMENTS.

�. C.C. TO SUSPEND SPEAKER ASSEMBLY FROM STRUCTURE ABOVE CEILING.

�. BOX/OUTLET NUMBER: �1.�� FIRST NUMBER DENOTES BOX/OUTLET NUMBER. ��� DENOTES ROOM SEQUENCE.

BOX TYPES:

1G SINGLE GANG METALLIC BACK BOX (MINIMUM DEPTH ��1/��).

�G � GANG METALLIC BACK BOX (MINIMUM DEPTH ��1/��).

�G � GANG METALLIC BACK BOX (MINIMUM DEPTH ��1/��).

�S �� X �� SQUARE BACK BOX WITH TRIM RING AS NOTED (MINIMUM DEPTH ��1/��).

TR�1G TRIM RING FOR MOUNTING 1 GANG PLATE.

TR��G TRIM RING FOR MOUNTING � GANG PLATE.

�G�B.C.P. BLANK COVER PLATE, METALLIC, GANG SI=E AS DENOTED BY �.

RA

CK

J

UN

CT

IO

N

BO

X

C

�A

1G�P

BT/AUDIO

INPUT

.�1

1� 1/

C

TO

P W

R

CK

T

1�

1G�D

��� WALL

DISPLAY

.�1

FLEX

W

IR

E

OU

T

OF

C

ON

DU

IT

(T

YP

IC

AL

J�

BM

D

P1

J

DP .�

EQUIPMENT

HANDLER

BOOM

J�

BM

B

IMAGING

DISPLAY/

SHIELD/LIGHT

BOOM

J�

BM

C

IMAGING

DISPLAY/

SHIELD/LIGHT

BOOM

J�

BM

A

P�

J

DP .�

ANESTHESIA

BOOM

TO

P

W R

CK

T

1G

TOUCH

PANEL

OUTLET

.�1.�

1� 1/

C

CONTROL ROOM

1� 1/

C

1� 1/

C

1� 1/

C

1� 1/

C

1� 1/

C

TO

P W

R

CK

T

TO

D

AT

A

(D

(S

EE

D

AT

A

SC

HE

DU

LE

1G

AIDA/PRT

INPUT

1� 1/

C

1�

A

1G

PACS

INPUT

TO

P

W R

CK

T

(D

IS

PL

AY

P W

R)

(R

AC

K

PW

R)

TO

D

AT

A

(D 1)

(S

EE

D

AT

A

SC

HE

DU

LE

) TO

P W

R

CK

T

S1

S1

S1

S1

�A

�B �C 1/

C

1/

C

1/

C

1/

C

CEILING

SPEAKERS

FINISHED FLOOR

FINISHED CEILING

NSTPNSTP

NOTES:

1. MAXIMUM �� FT. CONDUIT LENGTH (1�� FT. CABLE LENGTH) ON RUNS FROM RACK TO OR EQUIPMENT.

�. SEE FIBER TRUNK & PATCH PANEL SPECIFICATIONS IF CONDUIT/CABLE LENGTH EXCEEDS MAXIMUMS.

�. DEDICATED � PPò � � PPò, MAX.� �,� PP GROUND WIRE FROM GROUND PANEL TO A/V RACK PROVIDED BY C.C. (NOT STOR=).

�. C.C. TO PROVIDE SCREW/PLATE ISOLATION GASKETS WHERE REQUIRED.

�. KARL STOR= OR INTEGRATION EQUIPMENT MUST OPERATE BETWEEN ���F TO 1���F. THE AIR TEMPERATURE AROUND THE EQUIPMENT

(CABINET/ENCLOSURE) SHOULD NOT EXCEED ���F TO ENSURE THAT THE EQUIPMENT DOES NOT EXCEED THE 1���F MAXIMUM OPERATING TEMPERATURE.

GENERAL NOTES & ABBREVIATIONS

GENERAL CONDUIT & BOX NOTES

1. C.C. TO PROVIDE BLANK COVER PLATES FOR ALL JUNCTION BOXES.

�. C.C. TO PROVIDE SCREW/PLATE ISOLATION GASKETS WHERE REQUIRED.

�. C.C. TO PROVIDE CABLE PROTECTION BUSHINGS ON ALL BOXES AND CONDUIT STUB�OUTS.

�. ALL CONDUIT TO BE MINIMUM �/�� METALLIC U.N.O.

�. MAXIMUM LENGTH FOR FLEX CONDUIT IF USED FOR STOR= A/V CABLING IS �� FEET.

�. EXTRA PULL BOX IS REQUIRED AFTER BENDS TOTAL ����

�. CONDUITS TO BE DE�BURRED, CLEANED, CAPPED, AND FURNISHED WITH NYLON PULL ROPE.

�. CONDUIT STUB�OUTS, JUNCTION BOXES, AND OUTLETS SHALL BE SUITABLY LABELED FOR IDENTIFICATION OF FUNCTION, J�BOX �, AND/OR

CONDUIT NUMBER.

GENERAL NOTES:

1. THESE DRAWINGS ARE FOR REQUIREMENTS REFERENCE ONLY. NOT FOR CONSTRUCTION.

�. SUPPLY AND INSTALLATION OF ALL CONDUIT, POWER CIRCUITS, BACK BOXES, ELECTRICAL DEVICES, ELECTRICAL WIRING IS TO BE PROVIDED BY THE

CLIENT

S ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE.

�. KARL STOR= OR INTEGRATION EQUIPMENT MUST OPERATE BETWEEN ���F TO 1���F. THE AIR TEMPERATURE AROUND THE EQUIPMENT

(CABINET/ENCLOSURE) SHOULD NOT EXCEED ���F TO ENSURE THAT THE EQUIPMENT DOES NOT EXCEED THE 1���F MAXIMUM OPERATING

TEMPERATURE.

�. BE AWARE THE ´ABOVE THE CEILINGµ LOCATION HAS MANY RESTRICTIONS RELATED TO PLENUM RATED CABLES, MOUNTING DEVICES AND STERILE

FIELD =ONES.

ABBREVIATIONS:

A.F.F. ABOVE FINISHED FLOOR

A/R AS REQUIRED

B.C.P. BLANK COVER PLATE

B.F.C. BELOW FINISHED CEILING

C.C. CLIENT

S CONTRACTOR (NOT KARL STOR=)

C.P. COVER PLATE

CRE CONTROL ROOM EQUIPMENT

HT. HEIGHT

I.P. ISOLATED PWR. (UNGROUNDED NEUTRAL PWR)

NSE NURSE STATION EQUIPMENT

NSTP NURSE STATION TOUCH PANEL

N/A NOT APPLICABLE

N/R NOT REQUIRED

N/U NOT USED

O.F.E. OWNER FURNISHED EQUIPMENT

O.R. OPERATING ROOM

RJB RACK JUNCTION BOX

S.F. STERILE FIELD

T.B.D. TO BE DETERMINED

U.N.O. UNLESS NOTED OTHERWISE

SLC SURGICAL LIGHT CAMERA

MIN. MINIMUM

CKT CIRCUIT

AVR

1� 1/

C

1G

PHILLIPS

IN/OUTPUTS

IM

AG

IN

G

VE

ND

ER

CA

BL

E

DU

CT

IN

G M

AY

BE

US

ED

IN

L

IE

U

OF

S

PE

C.

C

�A

1G���

WIRELESS

MIC

INPUT

.�1

C

1G���

PTT MIC

INPUT

.�1

1� 1/

C

1�

1G

HIS

INPUT

S1

S1

A 1/

C

1/

C

CEILING

SPEAKERS

1� 1/

C

TO

P W

R

CK

T

1�

1G�D

��� WALL

DISPLAY

1� 1/

C

1�

1G

HIS

INPUT

1G

DISPLAY

POWER

1G

1� C

1� C

PLOT STAMP:SATRE, SHAUN _DATE: �/�1/���� 1�:�� AM

L E

G E

N D

S S

C H

E D

U L E

S

R

IS

E R

S

DATE:

PLT SC

DATE:REVISIONS:

us ed fo r t he p ro je ct a nd s ite s pe ci fic al ly

Id en tif ie d he re in a nd is n ot to b e us ed o n an y ot he r p ro je ct

It is to b e re tu rn ed u po n re qu es t.

Th is d ra w in g is th e pr op er ty o f K A

R L

S

TO

R Z

E N

D O

S C

O P

Y, a nd is n ot to b e re pr od uc ed o r c op ie d in w ho le o r i n pa rt.

I t i s on ly to b e

C O

N

FI

D E

N

TI

A L

- N O

T

TO

B E

D

IS

TR

IB

U

TE

D O

U

TS

ID

E

O F

K A

R L

S

TO

R Z

AVIPB��1�����

TKH GHVLJQV VKRZQ RQ WKHVH GUDZLQJV DUH SODQQLQJ FRQFHSW

GHVLJQV RQO\, DUH QRW GUDZQ WR VFDOH, DUH QRW GUDZQ DV

DUFKLWHFWXUDO SODQV RU GHWDLOHG HQJLQHHULQJ GUDZLQJV, GR QRW

UHSUHVHQW IXOO GHWDLO ZRUNLQJ GHVLJQV, DQG GR QRW UHSUHVHQW RU

LQFRUSRUDWH GHWDLO VWUXFWXUDO RU HQJLQHHULQJ DQDO\VLV. TKHVH

GUDZLQJV DUH SURYLGHG �DV�LV� DQG DUH LQWHQGHG WR EH XVHG

RQO\ DV SODQQLQJ FRQFHSW JXLGHV, DQG QRW IRU DQ\ RWKHU

SXUSRVH. AOO ZDUUDQWLHV DQG UHSUHVHQWDWLRQV RI DQ\ NLQG,

ZKHWKHU H[SUHVVHG, LPSOLHG RU VWDWXWRU\, LQFOXGLQJ ZDUUDQWLHV

RI PHUFKDQWDELOLW\ DQG ILWQHVV IRU D SDUWLFXODU SXUSRVH, ZLWK

UHJDUG WR WKH GHVLJQV RU GUDZLQJV E\ D UHFLSLHQW LQ DQ\

PDQQHU RWKHU WKDQ DV KHUHLQ LQWHQGHG. AQ\ UHFLSLHQW RI WKHVH

GUDZLQJV KHUHE\ DJUHHV WR LQGHPQLI\ KARL STOR= DJDLQVW DQ\

DQG DOO FODLPV, OLDELOLW\, GDPDJHV DQG FRVWV (LQFOXGLQJ

DWWRUQH\V

IHHV) DULVLQJ RXW RI, RU UHVXOWLQJ IURP, DQ\ XVH RI

WKHVH GHVLJQV RU GUDZLQJV RWKHU WKDQ DV KHUHLQ LQWHQGHG.

DRAWING NUMBER

CHK. BY:

OF

DATE:

JOB NO.

STAFFORD, TX 77477-5753

13803 N. PROMENADE

FX. 281.566.4109

PH. 281.566.4100

ENG. BY:

DRAWN BY:

FILE NAME:

� REV. � ����/11/��

1 REV. 1 ����/1�/��

� REV. � ����/��/�1

VA

M

HG

LF

DO

C

HQ

WH

U � W

HV

W P

DO

P

B

HD

FK

, F

L

2024/11/06

2410-08-AVIP

KS-2410-08

O R

N E

O

I P

S E

R

IE

S S

Y S

T E

M F A

C

IL

IT

Y

R E

Q U

IR

E

M E

N T S

N.T.S

SSatre

6.1.1F O

R C

O O

R D

IN

A

T

IO

N O

N L Y

N

O T F

O R

C O

N S

T R

U C

T

IO

N

AV.IP.

SIDE VIEW ISO VIEW

TOP VIEW

(WxHxD): 4.6"[117] x 2"[51] x 6.3"[160]

NOTE:

1. MIC WIRE 10' APPR.

2. MIC NECK 14"

PUSH-TO-TALKPTT

DETAIL - DESK TOP MIC

SCALE: N.T.S

'H'

FRONT VIEW

'W'

SIDE VIEW

'D'

NODE

StreamConnect Node (WxHxD): 5.9"[149] x 1.1"[29] x 8"[203]

MAX. WT. (LOADED) : 2.5 LBS

HEAT LOAD: 102.4 BTU

SCALE: N.T.S

DETAIL - StreamConnect NODE

OUTLET

MOUNT

14" [356]

SIDE VIEW FRONT VIEW

TYPICAL MOUNTING

HEIGHT = 6'-0" [1828] A.F.F.

FLOOR

BRACKET

STRUCTURE BLOCKING

NOTES:

1. DIMENSIONS FOR REFERENCE ONLY

2. C.C. TO PROVIDE ANCHORAGE TO SUPPORT DISPLAY & BRACKET.

3. C.C. TO MOUNT BRACKET TO STRUCTURE. (BRACKET SUPPLIED BY STORZ)

1G-D 4IN X 4IN BACKBOX

DUPLEX RECEPTACLE

'EQ' 'EQ'

WALL MOUNTED LCD DISPLAY

MODEL DIMENSION WEIGHT POWER VESA

FW65BZ40H 57.09"[1470] W x 32.8"[833] H x 2.76"[70] D 48.94LBS 214W(0.5W) 300x300mm

TYPE DESCRIPTION WEIGHT DEPTH

ST660 TILT: +15, -5 DEGREES 8LBS 2.6"

SEE OSHPD "OPM-0211-13" FOR ANCHORAGE(CA)

BRAVIA

SONY

DETAIL - WALL MOUNTED 4K DISPLAY - 65"

SCALE: N.T.S

DISP

DVI FIBER TXTX/RX

HEAT LOAD: 17.06 BTU

NOTES:

1. 3.57" W x 1.58" H x .65" D

DETAIL - Module-DVI-Fiber TX/RX

SCALE: N.T.S

9" [229]

5.4" [138]

CANARYBOXCANB

FRONT VIEW SIDE VIEW

WT. : 2 lbs (951g)(w/DESK STAND) HEAT LOAD: 27 BTU/hr4.2"

[108]

PLATE FRONT

CANARYBOX AUDIO

FROM CANARY

TO CANARY

NOTE: CANARYBOX SHOWN WITH 1G WALL/BOOM PLATE

PLATE SIDE

DETAIL - CANARYBOX & 1G WALL PLATE

SCALE: N.T.S

4" [103]

FRONT VIEW

7.2" [183]

TOP VIEW

4.6" [117]

WMR

WIRELESS MIC REC

MAX. WT. : 10.1 oz

MAX. PWR: .55 W

HEAT LOAD: 1.9 BTU

DETAIL - WIRELESS MIC RECEIVER

SCALE: N.T.S

J RACK J-BOX(J-1.#)

1.#

DISPLAY PWR

RACK PWR

D1

24.3" [616] 27.6" [702]

FRONT VIEW

WRK-3727

TOP VIEW

.9

CA

ST

ER

S)

A/V RACKAVR

NOTE:

1. WEIGHT & HEAT LOADS VARIES BASE

ON SYSTEM REQUIREMENTS.

2. CASTER BASE RACK REQUIRES 8" MIN.

ON ALL SIDES FOR COOLING.

3. AFFIXED RACK REQUIRES 24" MIN. ON

BACK & ONE SIDE FOR SERVICE.

SEISMIC CERTIFIED LOAD

CAPACITY: 900 lbs.

.9

SIDE VIEW

DETAIL - WRK-37-27 RACK (MEDIUM)

SCALE: N.T.S

B-MIC

FRONT VIEW

BOOM MICROPHONE

SEE SPEC SHEET FOR MORE DETAILS

15" [380]

GN50E

DET - BOOM MICROPHONE

SCALE: N.T.S

FRONT

SDI

SIDE

(HxWxD): 3.9"[99] x 2.8"[71] x 1.9"[48]HD/3G/12G-SDI

SCALE: N.T.S

DET - HD/3G/12G-SDI WPLT

'H'

FRONT VIEW

'W'

SIDE VIEW

'D'

NODE

StreamConnect Node (WxHxD): 5.9"[149] x 1.1"[29] x 8"[203]

MAX. WT. (LOADED) : 2.5 LBS

HEAT LOAD: 102.4 BTU

SCALE: N.T.S

DET - StreamConnect NODE

NEO 4K SYSTEM

6" [152]

CABLE

CLEAR

AVR

0]

6" MINIMUM CABLE CLEARANCE

REQUIRED

FRONT VIEW SIDE VIEW

TOP VIEW

9.1" [230]

MAX. WT. (LOADED) : 34.9 LBS

HEAT LOAD: 950 BTU

Air Humidity: 10%-80% RH, non-condensing

17.3" [440] 18" [457]

NOTE:

1.DEDICATED 4 mm² - 6 mm² MAX.Ø 5,9 MM

GROUND WIRE FROM GROUND PANEL

PROVIDED BY C.C. (NOT STORZ).

DET - NEO IP

SCALE: N.T.S

MIN

CABLE

CLEAR

POWER SUPPLY

6"

PS16B

9]

6" MINIMUM CABLE CLEARANCE

REQUIRED

FRONT VIEW SIDE VIEW

TOP VIEW

2.

1"

[5 3]

MAX. WT. (LOADED) : 9.6 LBS

HEAT LOAD: 655 BTU

17.3" [440] 16" [407]

B

DET - NEO PS16B

SCALE: N.T.S

NEO-IP 48 ASSM

6" [152] CABLE CLEAR

ASSM

.7

6]

FRONT VIEW SIDE VIEW

TOP VIEW

WEIGHT(UNLOAD):6.85 lbs MAX. WT.(LOAD): 25.6 lbs

(SWITCHER INSIDE

HEAT LOAD: 1185 BTU)

17.6" [447]

27.8" [706]

NOTES:

1. NOISE DAMPENING HOUSING FOR

SWITCHER.

3.4" [86]

DET - NEO-IP 48 ASSEMBLY

SCALE: N.T.S

UPM WITH ISOLATION

TRANSFORMER

SIDE VIEW

TOP VIEW

3.4" [86]17.3" [438] 20.7" [526]

6" [152]

CABLE

CLEAR

WEIGHT: 65 LBS.

PWR: 89 WATTS

HEAT LOAD: 304 BTU/HR

3" CLEARANCE ON ALL SIDES FOR

PROPER VENTILATION

FRONT VIEW

POWERVAR 58100-28R/58144-28R

DET - MEDICAL UPM

SCALE: N.T.S

UPM

8.1" [207]

FRONT VIEW

SONY UP-DR80MD

12.5" [317]

SIDE VIEW

SONY UP-DR80MD

16.8" [427]

TOP VIEW

SONY UP-DR80MD

.8

5]

AIDA PRINTER

MAX. WT. (LOADED) : 25.3 LBS

HEAT LOAD: 1160 BTU

NOTES:

1. 3" [76] MIN. CABLE CLEARANCE

APTR

NOTES:

1. CONNECTED TO AIDA THRU USB CABLE

DET - AIDA PRINT (SONY)

SCALE: N.T.S

7.6" [192]

FRONT VIEW

12" [305]

SIDE VIEW

14.9" [378]

TOP VIEW

.9

8]

IMAGE CAPTURE

MAX. WT. (LOADED) : 37.6 LBS

HEAT LOAD: 2757 BTU

AIDA

NOTES:

1. SHOWN WITH XPAND

6" [152]

CABLE

CLEAR

12" SmartScreen

AIDA WD 300

DET - AIDA BELLA

SCALE: N.T.S

'H'

FRONT VIEW

'W'

SIDE VIEW

Sager Electronics P/N: GSM120A-12-KS for (NEO IP TC1 & TC+)

'D'

NEO IP TCx & TC+ POWER SUPPLY (WxHxD): 1.4"[36] x 2.6"[66] x 6.6"[168]

HEAT LOAD: 102W - 348 BTU/HR

PWR

NOTES:

1. Output plug (Power 6 Pin Dual Row with Locking clip) Molex 39-01-2060

2. Mating plug (on TCx/TC+) Molex 39-01-3063

3. Customer side not provided with power supply

2 3 1 4

POWER LED

DET - NEO IP TCx/TC+ PWR SUPPLY

SCALE: N.T.S

NURSE STATION TOUCH PANELNSTP

NOTES:

1. (WxHxD): 23"[584] x 13.8"[368] x 4.4"[112] WITHOUT STAND

2. MAX. WT.: 20.8 LBS WITHOUT STAND

3. MOUNTING: VESA 100

'H'

FRONT VIEW

24" TOUCH PANEL

'W'

(WxHxD): 23"[584] x 16.4"[417] x 7.4"[188]

MAX. WT.: 25 LBS

POWER CONSUMPTION: <40W (MAX.)

MOUNTING: VESA 100

SIDE VIEW

24" TOUCH PANEL

'D'

WM101

+-MENU

DET - 24" NS TOUCH PANEL

SCALE: N.T.S

NEO IP THERMAL SPECS:

1. NEO IP SYSTEM COMPONENTS HAVE BEEN TESTED AND CERTIFIED TO PERFORM

RELIABLY AT A MAXIMUM AMBIENT AIR TEMPERATURE OF 40°C (104° F). THAT

MEANS THAT THE AIR TEMPERATURE AROUND THE NEO IP SYSTEM

COMPONENTS (SURROUNDING AIR TEMPERATURE ONE INCH DISTANCE FROM

THE COMPONENT CASES, NOT EXHAUST FAN OPENINGS) SHOULD NOT EXCEED

104°F. (THAT SAID…THE DEVICES WILL OPERATE ABOVE 104°F. AMBIENT BUT

WE CANNOT GUARANTEE FOR HOW LONG.)

2. NEO IP COMPONENTS CANNOT BE PLACED INSIDE SMALL CLOSED AREAS WITH

NO AIRFLOW…THIS WILL CAUSE A SLOW RISE IN TEMPERATURE POTENTIALLY

EXCEEDING THE MAX OPERATING TEMPERATURE OF 104°F.…. VENTILATION

MUST BE PROVIDED….INSTALLATION OF DOOR OR DRAWER COVER GRATES

ALLOW OUTSIDE ROOM AIR TO PASS THROUGH THE DOOR OR DRAWER COVER

INTO THE ENCLOSED AREA WHERE NEO IP COMPONENTS ARE INSTALLED.

3. SEE NEO IP SERVICE MANUAL FOR PROVIDE ADDITIONAL INSTRUCTIONS

CONCERNING THIS SUBJECT.

DET - NEO IP THERMAL SPECS

SCALE: N.T.S

FRONT SIDE

NOTE:

WUIS3619 FAILSAFE/2N1 PLATE

2N1 FRONT

2 N 1

POWER

VIDEO

DISPLAY

PORT

HDMI

SCALE: N.T.S

DET - ENDO CAMERA BOOM PLATES

REMOVABLE COVER

MIN. 18" X 18"[457]

ACCESS PANEL

WITHIN 3'[915] OF

A/V JUNCTION BOX

BOOM JUNCTION BOX LOCATED WITHIN 36"[915] FROM BOOM, A

MINIMUM OF 12"[305] AND A MAXIMUM OF 18"[457] FROM

CEILING. C.C. TO PROVIDE CABLE PROTECTION BUSHINGS FOR A/V

CABLE EXIT, SAME SIZE AS ENTRY CONDUITS.

CONDUIT AS SCHEDULED

CEILING

A/V CABLES (WITH

SERVICE LOOP)

BOOM SHROUD

BOOM

BOOM

STRUCTURE

DET - BOOM TYPICAL REQUIREMENTS

SCALE: N.T.S

'4S

BACKBOX

'TR-1G'

TRIM RING-

1 GANG

'1G-BCP'

1 GANG- BLANK

COVER PLATE

ASSEMBLY

WALL

4S

1G-BCP

TR-1G

ASSEMBLY SIDE

WALL OPENING CUT

TO BOX OPENING

NOTE:

1. 4"[102] SQUARE BACK BOX MINIMUM DEPTH 3-1/2"[88].

3/4"[19] MIN. CONDUIT

DET - 4S BOX WITH 1G TRIM RING

SCALE: N.T.S

ASSEMBLY

NOTE:

1. 4"[102] SQUARE BACK BOX MINIMUM DEPTH 3-1/2"[88].

WALL

4S

'4S'

BACK BOX

2G-BCP

TR-2G

ASSEMBLY SIDE

'TR-2G'

TRIM RING-

2 GANG

4IN X 4IN BACKBOX

'2G-BCP'

2GANG-BLANK

COVER PLATE

WALL OPENING CUT

TO BOX OPENING

3/4"[19] MIN. CONDUIT

DET - 4S BOX WITH 2G TRIM RING

SCALE: N.T.S

FRONT VIEW

RACK J-BOXES

NOTE: C.C. TO PROVIDE GROUND TERMINALS INSIDE J-BOX FOR RACK &

OR1 NURSE STATION.

CABLE OUT OF CONDUIT

TO RACK

18"[457]

TYP.

NOTE:

C.C. TO PROVIDE FRONT COVER WITH 4"

CABLE 'MOUSE HOLE' CUT-OUT & BUSHING

FOR CABLES

FLOOR

J RACK J-BOX(J1.#)

1.#

DISPLAY PWR

RACK PWR

(A/V RACK)

LOCATE DATA DROP

INSIDE J1 IF POSSIBLE. D1

DET - RACK J-BOX ELEVATION (TYP.)

SCALE: N.T.S

5.2" [132]

CEILING

NON-FLEX CONDUIT

1/2"[13] FLEX CONDUIT:

PROVIDE MINIMUM 3'[915] LENGTH BELOW

CEILING (TO ALLOW FOR INSTALLATION/SERVICE)

MAXIMUM 25'[7620] TOTAL FLEX LENGTH

SPEAKER AND GRILLE (PROVIDED AND

INSTALLED BY STORZ)

SIDE VIEW

S1

9.32" [237]

NOTES:

1. EACH SPEAKER WT. : 10.64 LBS. (AMP INCLUDED)

2. SPEAKER CUTOUT DIMENSIONS 9.32"[237] DIA.

3. C.C. (NOT STORZ) TO PROVIDE SPEAKER CUTOUT AND 4”[102] MINIMUM

AIRSPACE IN CEILING.

4. C.C. (NOT STORZ) TO PROVIDE SEISMIC WIRES TO SECURE SPEAKERS IN

ACCORDANCE WITH LOCAL CODE.

TCM-XA

SCALE: N.T.S

7 DET - CLG. SPEAKER/AMP (C-IC6PL)

FRONT VIEW

PLATE OVER TRIM

RING

LOW VOLTAGE

TRIM RING

'1G-BCP'

1 GANG- BLANK

COVER PLATE

SIDE VIEW

'LV-TR-1G'

LOW VOLTAGE

TRIM RING

NOTE: STUB CONDUIT 2" MIN. & 4" MAX. ABOVE TRIM RING.

WALL OPENING CUT TO

OPENING SIZE OF TRIM RING

WALL

TRIM RING

CONDUIT STUB IN

PLATE

PROTECTIVE

BUSHING

DET - LV TRIM RING AND PLATE

SCALE: N.T.S

NOTES:

1. UL APPROVED 1G/4S PLASTIC BOX W/1G-TR/1G-BCP

'4S'

BACK BOX

(PLASTIC)

'TR-1G'

TRIM RING-

1 GANG

(PLASTIC)

'1G-BCP'

1 GANG- BLANK

COVER PLATE

(PLASTIC)

ASSEMBLY

WALL

4S

1G-BCP

TR-1G

ASSEMBLY SIDE

WALL OPENING CUT

TO BOX OPENING

3/4" MIN. CONDUIT

SCALE: N.T.S

DET - 4S BOX WITH 1G TRIM RING (PLASTIC)

EN/DECODER RACK KIT

MAX. WT.: 13 LBS

ERK

FRONT VIEW SIDE VIEW

TOP VIEW

18.9" [481] 4.9"

[124]

7" [177]

R

ST

C O

N F

PW

R

VID

TX

R X

LIN

K

NEO IP-D

R

ST

C O

N F

PW

R

VID

TX

R X

LIN

K

NEO IP-D

R

ST

C O

N F

PW

R

VID

TX

R X

LIN

K

NEO IP-D

R

ST

C O

N F

PW

R

VID

TX

R X

LIN

K

NEO IP-D

R

ST

C O

N F

PW

R

VID

TX

R X

LIN

K

NEO IP-D

R

ST

C O

N F

PW

R

VID

TX

R X

LIN

K

NEO IP-D

R

ST

C O

N F

PW

R

VID

TX

R X

LIN

K

NEO IP-D

R

ST

C O

N F

PW

R

VID

TX

R X

LIN

K

NEO IP-D

DET - ENDCODER RACK KIT

SCALE: N.T.S

RST CONF

PWR VID TX RX

LINK

NEO IP-D

ENC

FRONT SIDE

(WxHxD): 6.2"[158] x 1.6"[41] x 5.2"[132]

MAX. WT. (LOADED) : 1.4 LBS

DET - 10G Encoders & Decoders

SCALE: N.T.S

SIDE VIEW

'D'

'H'

32" (TM343) DISPLAY

(WxHxD): 30"[762] x 18.3"[462] x 3.6"[91] DISPLAY WT.: 29.1 LBS(34.6 lbs with bracket & decoder) HEAT LOAD: 569.8 BTU/hr

DISP

NOTES:

1. VESA STANDARD 100 x 100 mm

'W'

FRONT VIEW

EIZO EX3242 (TM343)

PRESET INPUT MENU

F1 F2 F3 F4

ENTER

DET - 32" (TM343) BOOM DISPLAY

SCALE: N.T.S

'H'

FRONT VIEW

'W'

SIDE VIEW

XP POWER P/N: AHM250PS48T for (EIZO 32" TM343 DISPLAY)

'D'

TM343 POWER SUPPLY

(WxHxD): 1.5"[38] x 3.5"[89] x 8.8"[224]

HEAT LOAD: 167W - 569.8 BTU/HR

PWR

NOTES:

1. CLASS 1 DEVICE.

2. ATTACHED CORD 35"[889] LONG.

3. PLACE AT A/V RACK LOCATION.

DET - TM343 DISPLAY PWR SUPPLY

SCALE: N.T.S

FRONT

4N1

SIDE

'H'

'W'

(WxHxD): 2.85"[72] x 3.82"[97] x 4.63"[117.49]

'D'

POWER

LINK

IR

DVI

COMPOSITE

VGA

S-VIDEO

4 N 1

DET - 4N1 INTERFACE (1G) WPLT

SCALE: N.T.S

FRONT

2N1

SIDE

'H'

'W' 'D'

2 N 1

POWER

VIDEO

DISPLAY

PORT

HDMI

(WxHxD): 3"[76] x 4.6"[117] x 3.6"[92]

SCALE: N.T.S

DET - 2N1 INTERFACE (1G) WPLT

FRONT

BT/AUD

SIDE

(WxHxD): 2.8"[71] x 4.5"[114] x 1.8"[46]

NOTE:

1. UN/CSA APPROVED 18CI PLASTIC

BOX/1G-TR/1G-BCP

AUDIO

RECEIVER

AUDIO IN

4”

KBSOUND

SCALE: N.T.S

DET - BLUETOOTH/AUDIO WPLT RECIEVER

FRONT SIDE

GROM

(HxWxD): 4.5"[114] x 2.8"[71] x .5"[13]

SCALE: N.T.S

DET - FLEX GROMMET 1G PLATE

FRONT SIDE

GROM

(HxWxD): 4.5"[114] x 4.5"[114] x .5"[13]

SCALE: N.T.S

DET - FLEX GROMMET 2G PLATE

DISPLAY POWER

J-BOX

1" FLEX CONDUIT (BY E.C.)

CLASS 1 POWER CABLES

4#10 THHN STRANDED (BY STORZ)

I" CONDUIT W/BUSHING (BY E.C.)

FACTORY PWR SUPPLY 95" CABLE & CONNECTOR

DISPLAY POWER

SUPPLY

AV RACK / NURSE STATION

1 GANG DISPLAY POWER

PLATE WITH MATING

CONNECTOR FOR DISPLAY

POWER SUPPLY FACTORY

CABLE (BY STORZ)

STORZ

DISPLAY

LEAD WIRE HOOK UP

PIN # COLOR FUCTION

RED +24VDC

WHITE +24VDC

BLACK RETURN

GREEN RETURN

1 DRAIN GROUND

4# 10 THHN STRANDED

COLOR FUCTION

RED +24VDC

BLACK GROUND

GREEN EARTH

WHITE EARTH-SHIELD

FRONT

2 1

SIDE

DISPLAY POWER

24VDC

AVR

FDP

DP.#J

1G 1.#

DET - FLORIDA DISPLAY POWER (AHCA)

SCALE: N.T.S

PLOT STAMP:SATRE, SHAUN |DATE: 5/21/2025 10:32 AM

R E

Q U

IR

E

M E

N T S

D E

T A

IL

S

WARNING:

KARL STORZ OR INTEGRATION EQUIPMENT MUST OPERATE BETWEEN 32°F TO 104°F. THE AIR TEMPERATURE AROUND THE EQUIPMENT (CABINET/ENCLOSURE) SHOULD NOT EXCEED 90°F TO ENSURE THAT THE EQUIPMENT DOES NOT EXCEED THE 104°F MAXIMUM OPERATING TEMPERATURE.

DATE:

PLT SC

DATE:REVISIONS:

us ed fo r t he p ro je ct a nd s ite s pe ci fic al ly

Id en tif ie d he re in a nd is n ot to b e us ed o n an y ot he r p ro je ct

It is to b e re tu rn ed u po n re qu es t.

Th is d ra w in g is th e pr op er ty o f K A

R L

S

TO

R Z

E N

D O

S C

O P

Y, a nd is n ot to b e re pr od uc ed o r c op ie d in w ho le o r i n pa rt.

I t i s on ly to b e

C O

N

FI

D E

N

TI

A L

- N O

T

TO

B E

D

IS

TR

IB

U

TE

D O

U

TS

ID

E

O F

K A

R L

S

TO

R Z

AVIP_20180502

The designs shown on these drawings are planning concept designs only, are not drawn to scale, are not drawn as architectural plans or detailed engineering drawings, do not represent full detail working designs, and do not represent or incorporate detail structural or engineering analysis. These drawings are provided "as-is" and are intended to be used only as planning concept guides, and not for any other purpose. All warranties and representations of any kind, whether expressed, implied or statutory, including warranties of merchantability and fitness for a particular purpose, with regard to the designs or drawings by a recipient in any manner other than as herein intended. Any recipient of these drawings hereby agrees to indemnify KARL STORZ against any and all claims, liability, damages and costs (including attorneys' fees) arising out of, or resulting from, any use of these designs or drawings other than as herein intended.

DRAWING NUMBER

CHK. BY:

OF

DATE:

JOB NO.

STAFFORD, TX 77477-5753

13803 N. PROMENADE

FX. 281.566.4109

PH. 281.566.4100

ENG. BY:

DRAWN BY:

FILE NAME:

0 REV. 0 2024/11/06

1 REV. 1 2024/12/03

2 REV. 2 2025/05/21

VA

M ed ic al C en te r - W es t P al m

B ea ch , F

L

2024/11/06

2410-08-AVIP

KS-2410-08

O

O

I P

S E

R

IE

S S

Y S

T E

M F A

C

IL

IT

Y

R E

Q U

IR

E

M E

N T S

N.T.S

SSatre

6.2.1F O

R C

O O

R D

IN

A

T

IO

N O

N L Y

N

O T F

O R

C O

N S

T R

U C

T

IO

N

AV.IP.

2 REMOVE ROOM CAMERA

11.8

11.8

12 13 14

DD

EE

FF

GG

C.8C.8

E.8E.8

F

C 1350

MD 26+

C 15

C

L 21

C 1800

L 21

C 1950

A

B

C

D

C us to m er 's

P hy si o

(P H

Y)

O pt io na l ( U

PS

C oo rd in at e fin al lo ca tio n w ith cu st om er if or de re d

STERILE

SUPPLIES

2B-234

CONTROL

ROOM

2B-238

Corridor 2B-C7

Corridor 2B-C4

HYBRID OR

2B-237

TRANSITION

AREA

2B-236

TRANSITION

AREA

2B-223

SEMI-RESTRICTED

AREA

2B-235

ICR

2B-239

EQPT.

ALCOVE

2B-238A

PLOT STAMP:SATRE, SHAUN |DATE: 5/21/2025 10:31 AM

O V

E R

A L L F

L O

O R

P L A

N

L

P a rt ia l

1 OVERALL FLOOR PLAN - L - PARTIAL

SCALE: 1/8" = 1'-0"

BACKGROUND REF.: WPB VA RENOVATE IR CATH LAB_FLOOR PLAN 2024-11-12.DWG RECEIVED 2024/11/12

SEE AV.EN.6. .4 01

DATE:

PLT SC

DATE:REVISIONS:

us ed fo r t he p ro je ct a nd s ite s pe ci fic al ly

Id en tif ie d he re in a nd is n ot to b e us ed o n an y ot he r p ro je ct

It is to b e re tu rn ed u po n re qu es t.

Th is d ra w in g is th e pr op er ty o f K A

R L

S

TO

R Z

E N

D O

S C

O P

Y, a nd is n ot to b e re pr od uc ed o r c op ie d in w ho le o r i n pa rt.

I t i s on ly to b e

C O

N

FI

D E

N

TI

A L

- N O

T

TO

B E

D

IS

TR

IB

U

TE

D O

U

TS

ID

E

O F

K A

R L

S

TO

R Z

AVIP_20180502

The designs shown on these drawings are planning concept designs only, are not drawn to scale, are not drawn as architectural plans or detailed engineering drawings, do not represent full detail working designs, and do not represent or incorporate detail structural or engineering analysis. These drawings are provided "as-is" and are intended to be used only as planning concept guides, and not for any other purpose. All warranties and representations of any kind, whether expressed, implied or statutory, including warranties of merchantability and fitness for a particular purpose, with regard to the designs or drawings by a recipient in any manner other than as herein intended. Any recipient of these drawings hereby agrees to indemnify KARL STORZ against any and all claims, liability, damages and costs (including attorneys' fees) arising out of, or resulting from, any use of these designs or drawings other than as herein intended.

DRAWING NUMBER

CHK. BY:

OF

DATE:

JOB NO.

STAFFORD, TX 77477-5753

13803 N. PROMENADE

FX. 281.566.4109

PH. 281.566.4100

ENG. BY:

DRAWN BY:

FILE NAME:

0 REV. 0 2024/11/06

1 REV. 1 2024/12/03

2 REV. 2 2025/05/21

VA

M ed ic al C en te r - W es t P al m

B ea ch , F

L

2024/11/06

2410-08-AVIP

KS-2410-08

O

O

I P

S E

R

IE

S S

Y S

T E

M F A

C

IL

IT

Y

R E

Q U

IR

E

M E

N T S

N.T.S

SSatre

6.3.1F O

R C

O O

R D

IN

A

T

IO

N O

N L Y

N

O T F

O R

C O

N S

T R

U C

T

IO

A/V EQUIPMENT SCHEDULE NOTES:

1. EQUIPMENT LISTED IS FOR COORDINATION PURPOSES ONLY. (BASED ON STORZ'S UNDERSTANDING OF EQUIPMENT & LOCATIONS). REFER TO CONTRACT SPECIFICATIONS

FOR ACTUAL REQUIREMENTS.

WALL MOUNTED WIRELESS MICROPHONE RECEIVER INPUT

WALL MOUNTED PUSH TO TALK MICROPHONE INPUT

WALL MOUNTED REMOTE (DP)COMPUTER INPUT PACS COMPUTER & DATA DROP

NURSE'S TOUCH PANEL A/V TOUCH PANEL/KEYBOARD/MOUSE

WALL MOUNTED REMOTE (DP)COMPUTER INPUT HIS COMPUTER, POWER & DATA DROP

WALL MOUNTED LARGE FORMAT FLAT PANEL DISPLAY BRACKET ANCHORAGE BY C.C. (NOT STORZ)

WALL MOUNTED (FOR DATA TELECOM CONNECTION) SEE DATA / TELECOM SCHEDULE

CEILING MOUNTED (6) CEILING SPEAKER ASSEMBLY,

CEILING SPEAKER HOLE TEMPLATE

HOLE CUT IN SHEETROCK BY C.C. (NOT STORZ).

CUTOUT TEM1G PLATE PROVIDED BY STORZ.

A/V EQUIPMENT RACK A/V EQUIPMENT RACK (NEO - IP) ,

UPS / ISOLATION TRANSFORMER,

10G NETWORK (24/48 PORT) SWITCHER,

NEO-PS16+ POWER SUPPLY,

(8) NEO ENCODER/DECODER

WALL MOUNTED BLUETOOTH AUDIO RECEIVER INPUT 1G PLATE PLASTIC BOX & TRIM RING

WALL MOUNTED AIDA BELLA (AIDA/PRINTER) DATA DROP

EQUIPMENT BOOM AUX INPUT (ACC/FAILSAFE) 1G PLATE (ENDO),

(2) AUX INPUT 2N1 (DisplayPort/HDMI) 1G PLATE (ENDO/AUX), AUX INPUT 4N1 (CV/SV/VGA/DVI) 1G PLATE, AUX INPUT (HD/3G/12G-SDI) 1G PLATE

DISPLAY MOUNT & SURGICAL LIGHT

IMAGING

DISPLAY/LIGHT/SHIELD BOOM

AUX INPUT 2N1 (DisplayPort/HDMI) 1G PLATE, AUX INPUT 4N1 (CV/SV/VGA/DVI) 1G PLATE, BOOM MICROPHONE

DISPLAY MOUNT & SURGICAL LIGHT

IMAGING

DISPLAY/LIGHT/SHIELD BOOM

AUX INPUT 2N1 (DisplayPort/HDMI) 1G PLATE, AUX INPUT 4N1 (CV/SV/VGA/DVI) 1G PLATE, BOOM MICROPHONE

DISPLAY MOUNT & SURGICAL LIGHT

ANESTHESIA BOOM AUX INPUT 2N1 (DisplayPort/HDMI) 1G PLATE, AUX INPUT 4N1 (CV/SV/VGA/DVI) 1G PLATE, AUX INPUT (HD/3G/12G-SDI) 1G PLATE

VITALS COMPUTER

SYMBOL LOCATION/DEVICE EQUIPMENT BY STORZ EQUIPMENT BY OTHERS

A/V EQUIPMENT SCHEDULE

WMR

PTT

PACS

NSTP

HIS

DISP

DAT

CSPK

AVR

AUD-R

AIDA

D

C

B

A

11.8

11.8

C 1350

MD 26+

C 15

C

L 21

C 1800

L 21

C 1950

A

B

C

D

J .

NEO IP

DISP PWR

RACK PWR

1 01

D1

AVR

DAT

1G

-D

DI

SP

HI

S

1G

1G

-D

DI

SP 55

1G

NS

TP

1G -P

AU

D-

R

PACS

0141G

HIS

0141G

PTT

0111G-36

WMR

0121G-36

IMG

0161G

IMAGING VENDER

CABLE DUCTING MAYBE

USED IN LIEU OF SPEC.

DA

T

AI

DA

D2 1G

. 0181G 0171G

FDP

C us to m er 's

P hy si o

(P H

Y)

O pt io na l ( U

PS

C oo rd in at e fin al lo ca tio n w ith cu st om er if or de re d

STERILE

SUPPLIES

2B-234

CONTROL

ROOM

2B-238

HYBRID OR

2B-237

TRANSITION

AREA

2B-236

SEMI-RESTRICTED

AREA

2B-235

ICR

2B-239

EQPT.

ALCOVE

2B-238A

11.8

11.8

C 1350

MD 26+

C 15

C

L 21

C 1800

L 21

C 1950

JJ

.DP 01BM 01

A

J

BM 02

B

J

BM 03

C

JJ

.DP 02BM 04

D

(TYP. 4X)

CSPK S1

S1 S1

S1

(TYP. 4X)

CSPK

S1

S1

C us to m er 's

P hy si o

(P H

Y)

O pt io na l ( U

PS

C oo rd in at e fin al lo ca tio n w ith cu st om er if or de re d

STERILE

SUPPLIES

2B-234

CONTROL

ROOM

2B-238

HYBRID OR

2B-237

TRANSITION

AREA

2B-236

SEMI-RESTRICTED

AREA

2B-235

ICR

2B-239

EQPT.

ALCOVE

2B-238A

PLOT STAMP:SATRE, SHAUN |DATE: 5/21/2025 10:32 AM

F L O

O R

P L A

N

R C

P

I R

L A

B

1 FLOOR PLAN - IR LAB #1

SCALE: N.T.S

BACKGROUND REF.: N-SOU240607.DWG.DWG RECEIVED 2024/12/03

2 REFLECTED CEILING PLAN - IR LAB #1

SCALE: N.T.S

BACKGROUND REF.: 940537-1-05.DWG.DWG RECEIVED 2024/12/03

DATE:

PLT SC

DATE:REVISIONS:

us ed fo r t he p ro je ct a nd s ite s pe ci fic al ly

Id en tif ie d he re in a nd is n ot to b e us ed o n an y ot he r p ro je ct

It is to b e re tu rn ed u po n re qu es t.

Th is d ra w in g is th e pr op er ty o f K A

R L

S

TO

R Z

E N

D O

S C

O P

Y, a nd is n ot to b e re pr od uc ed o r c op ie d in w ho le o r i n pa rt.

I t i s on ly to b e

C O

N

FI

D E

N

TI

A L

- N O

T

TO

B E

D

IS

TR

IB

U

TE

D O

U

TS

ID

E

O F

K A

R L

S

TO

R Z

AVIP_20180502

The designs shown on these drawings are planning concept designs only, are not drawn to scale, are not drawn as architectural plans or detailed engineering drawings, do not represent full detail working designs, and do not represent or incorporate detail structural or engineering analysis. These drawings are provided "as-is" and are intended to be used only as planning concept guides, and not for any other purpose. All warranties and representations of any kind, whether expressed, implied or statutory, including warranties of merchantability and fitness for a particular purpose, with regard to the designs or drawings by a recipient in any manner other than as herein intended. Any recipient of these drawings hereby agrees to indemnify KARL STORZ against any and all claims, liability, damages and costs (including attorneys' fees) arising out of, or resulting from, any use of these designs or drawings other than as herein intended.

DRAWING NUMBER

CHK. BY:

OF

DATE:

JOB NO.

STAFFORD, TX 77477-5753

13803 N. PROMENADE

FX. 281.566.4109

PH. 281.566.4100

ENG. BY:

DRAWN BY:

FILE NAME:

0 REV. 0 2024/11/06

1 REV. 1 2024/12/03

2 REV. 2 2025/05/21

VA

M ed ic al C en te r - W es t P al m

B ea ch , F

L

2024/11/06

2410-08-AVIP

KS-2410-08

O

O

I P

S E

R

IE

S S

Y S

T E

M F A

C

IL

IT

Y

R E

Q U

IR

E

M E

N T S

N.T.S

SSatre

6.4.01F O

R C

O O

R D

IN

A

T

IO

N O

N L Y

N

O T F

O R

C O

N S

T R

U C

T

IO

N

AV.IP.

2 REMOVE ROOM CAMERA

KARL STORZ SITE READINESS CHECKLIST

OVERALL SITE STATE:

Upon KARL STORZ’S arrival at the facility, the site must be clean with all site prep work completed, the boom equipment installed, and the nurse station millwork complete. All owner furnished equipment must be available for installation and testing.

Although other trades may work in the same space, priority must be given to the floor space requirements of staging equipment and materials and the ability of the crew to maintain their workflow.

GENERAL SITE PREP WORK:

□ All required conduits must be marked and installed with pull strings.

□ All facility provided network cables must be installed and tested.

□ All electrical outlets on equipment handlers, nurse millwork and a/v rack location must have power.

□ Permanent power must be energized.

□ Ceiling speaker cutouts must be prepared.

□ Wall mounts for flat panel displays and touch panels must be installed.

□ All network data drops need to be installed.

□ Equipment locations must be well ventilated as per the BTU specification provided.

MILLWORK:

□ Millwork must be installed with proper venting for calculated heat loads per the KARL STORZ drawings.

□ Cover plate of large junction box behind a/v rack has mouse hole cut in proper location.

□ Facility provided carpenter must be available for any grommet placement.

BOOM EQUIPMENT:

□ Boom equipment must be installed and available for cabling by the KARL STORZ team.

□ Boom equipment must be powered.

□ In-Light Camera boxes must be available.

OWNER FURNISHED EQUIPMENT:

□ OR equipment such as C-Arms, Ultrasound, CT Machines and Microscopes must be available for testing and integration.

□ Computers and workstations must be available for cable integration and testing.

□ Videoconference telephone or network connections must be live.

□ If applicable, all lighting control equipment must be installed and tested by the facility.

ENVIRONMENTAL CONDITIONS:

□ Site is safe to work.

□ If site has specific attire requirements and/or PPE requirements, the customer must provide access to appropriate attire and PPE for the crew.

□ The OR must be clean and dust free.

□ Delivery access must be available.

□ Area to store all KARL STORZ materials for duration of installation identified.

□ Trash disposal must be available.

□ All safety training must be scheduled prior to arrival.

□ Any sub-contractor conflicts need to be addressed and conflicting schedules need to be addressed to minimize KARL STORZ downtime.

□ Adequate working hours must be available to the product deployment crew.

Use this document to ensure that all teams and spaces are aligned for the deployment of your KARL STORZ integrated operating room.

Failure to meet readiness can impact your installation schedule.

Thank you for your partnership, KARL STORZ

97208100 OR1 1 2.0 us 11/2022/SE-E-US

PLOT STAMP:SATRE, SHAUN |DATE: 5/21/2025 10:32 AM

K A

R L S

T O

R Z

P R

O

JE

C T M

A N

A G

E M

E N

T R

E Q

U

IR

E M

E N

T S

DATE:

PLT SC

DATE:REVISIONS:

us ed fo r t he p ro je ct a nd s ite s pe ci fic al ly

Id en tif ie d he re in a nd is n ot to b e us ed o n an y ot he r p ro je ct

It is to b e re tu rn ed u po n re qu es t.

Th is d ra w in g is th e pr op er ty o f K A

R L

S

TO

R Z

E N

D O

S C

O P

Y, a nd is n ot to b e re pr od uc ed o r c op ie d in w ho le o r i n pa rt.

I t i s on ly to b e

C O

N

FI

D E

N

TI

A L

- N O

T

TO

B E

D

IS

TR

IB

U

TE

D O

U

TS

ID

E

O F

K A

R L

S

TO

R Z

AVIP_20180502

The designs shown on these drawings are planning concept designs only, are not drawn to scale, are not drawn as architectural plans or detailed engineering drawings, do not represent full detail working designs, and do not represent or incorporate detail structural or engineering analysis. These drawings are provided "as-is" and are intended to be used only as planning concept guides, and not for any other purpose. All warranties and representations of any kind, whether expressed, implied or statutory, including warranties of merchantability and fitness for a particular purpose, with regard to the designs or drawings by a recipient in any manner other than as herein intended. Any recipient of these drawings hereby agrees to indemnify KARL STORZ against any and all claims, liability, damages and costs (including attorneys' fees) arising out of, or resulting from, any use of these designs or drawings other than as herein intended.

DRAWING NUMBER

CHK. BY:

OF

DATE:

JOB NO.

STAFFORD, TX 77477-5753

13803 N. PROMENADE

FX. 281.566.4109

PH. 281.566.4100

ENG. BY:

DRAWN BY:

FILE NAME:

0 REV. 0 2024/11/06

1 REV. 1 2024/12/03

2 REV. 2 2025/05/21

VA

M ed ic al C en te r - W es t P al m

B ea ch , F

L

2024/11/06

2410-08-AVIP

KS-2410-08

O

O

I P

S E

R

IE

S S

Y S

T E

M F A

C

IL

IT

Y

R E

Q U

IR

E

M E

N T S

N.T.S

SSatre

6.5.01F O

R C

O O

R D

IN

A

T

IO

N O

N L Y

N

O T F

O R

C O

N S

T R

U C

T

IO

Sheets and Views
01 2410-08-AVIP - 6.0.0
02 2410-08-AVIP - 6.1.1
03 2410-08-AVIP - 6.2.1
04 2410-08-AVIP - 6.3.1
05 2410-08-AVIP - 6.4.01
06 2410-08-AVIP - 6.5.01

File details come from the government source that posted it. Updated .