Summary: A/E Design Narrative - 100% Submittal for IR Cath Lab Renovation
This document is an Architect/Engineer (A/E) Design Narrative for a federal construction project involving the renovation of an Interventional Radiology (IR) Catheterization Lab at the West Palm Beach VA Medical Center (VAMC). The project, designated 548-CSI-139, encompasses approximately 2,000 square feet on the Second Floor of Building 1 and includes enlargement of the existing IR Cath Lab to accommodate new Philips monoplane procedural equipment and Baxter ceiling-mounted booms, along with supporting spaces including a semi-restricted supply room, enlarged control room, equipment alcove, scrub sink alcove, and a new ICR equipment room. The design follows the VA Design Guide PG 18-12 specifications for a Monoplane Hybrid Operating Room (ORHY1) and incorporates lead shielding per VA physicist requirements.
The project will be completed in three sequential phases to maintain operations of the adjacent Cardiac Lab throughout construction. Phase 1 involves modifications to the Cardiac Lab entrance and creation of new semi-restricted access areas, Phase 2 encompasses demolition and renovation of the IR Cath Lab space, and Phase 3 includes final finishes and systems installation. Key specifications include: VA-approved HVAC systems requiring replacement of existing AHU-60 with increased capacity for epidemic mode operation; fire protection modifications compliant with NFPA 13 and 72 (2022); plumbing extensions for medical gas, domestic water, and sanitary systems; electrical distribution from existing panels with new isolated power panels for imaging equipment; structural reinforcement for C-Arm mounting; and communications infrastructure including Cat6A UTP cabling for Voice over IP systems. An environmental assessment confirmed no asbestos-containing materials or water damage in the scope area, though presumed lead-containing materials may exist in perimeter wall interiors. Construction requires strict coordination with the VA Contracting Officer regarding scheduling, phasing, and infection control protocols (ICRA/PCRA), with temporary 1-hour fire-rated barriers and negative air pressure maintenance mandatory during all work phases.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
548-CSI-139
Renovate IR Cath Lab
West Palm Beach VAMC
7305 North Military Trail
West Palm Beach, Fl. 33410
3131 Newmark Drive
Suite 200
Miamisburg, OH 45342
ABOVE GROUP, INC.
305 East Drive, Suite H
Melbourne, FL 32904
A/E Design Narrative - 100% Submittal
RDC/JPA Project: #23093.00
August 15, 2025
Design Narrative Table of Contents
• Architectural ……………………………………. 3
• Structural ………………………………………… 6
• Fire Protection ………………………………….. 9
• Plumbing ………………………………………… 11
• Mechanical …………………………………….. 13
• Electrical ………………………………………… 17
• Communications ………………………………. 20
• Electronic Safety and Security ……………… 21
• Environmental ………………………………….. 22
ARCHITECTURAL SUMMARY
West Palm Beach VAMC
Relocate IR Cath Lab
VA project number: 548-CSI-139
Project Scope:
The project will renovate approximately 2,000 SF of the existing IR Cath Lab (Hybrid OR) space located in the 2B area on the Second Floor of Building 1. The size of the new IR Cath Lab will be enlarged to accommodate the new OR procedural table and overhead boom equipment. A new Semi-Restricted room for supplies will be added for the IR Cath Lab and will allow direct access to the procedure room. An enlarged Control Room along with an Equipment Alcove within will provide additional equipment storage outside the procedure room. A Scrub Sink
Alcove and lead vest storage located in the Clean Core is designed for more efficient staff use.
The new IR Cath Lab will also feature a Transition Area off the existing non-restricted corridor leading to a new Control Room, Clean Core and IR Cath Lab. A new ICR equipment room will be located and sized appropriately to house the new IR Cath Lab system component equipment and UPS.
The entrance into the existing adjacent Cardiac Lab will be relocated as well to allow for the reconfiguration of the new IR Cath lab. A Semi-Restricted room will be added off the non-restricted corridor that will lead to new entry doors to the existing Cardiac Lab.
Lead shielding shall be provided in the appropriate IR Cath Lab walls, doors and windows. The required thickness of shielding has been provided by the VA physicist and integrated into the design. The design of the new IR Cath Lab is considered a Monoplane Hybrid Operating Room
(ORHY1) and shall follow the recommendation set forth int the VA Design Guide PG 18-12
Surgical & Endovascular Services (2023).
Construction Logistics:
The renovation of the IR Cath Lab is intended to be completed in phases to minimize the disruption of the surrounding departments’ standard daily operations. Temporary construction partitions with negative air monitors are to be implemented. Project ICRA AND PCRA requirements must be strictly followed during construction. Contractor requirements for personnel access and parking deliveries shall be coordinated with the VA COR.
The adjacent Cardiac Lab is to remain operational throughout the duration of the construction of IR Cath Lab renovation except for work that directly affects the existing Cardiac Lab (i.e.
entrance doors). The Cardiac Lab will perform procedures in the existing IR Cath Lab during
Phase 1 while new work required for the Cardiac Lab is being completed. Construction during normal business hours shall not interfere with the Cardiac Lab’s ability to conduct patient services. All work producing excessive noise and vibrations along with any prolonged down time shall be scheduled in advance and coordinated with the VA COR and End User. All construction work hours and requirements to complete the renovation shall be coordinated with the VA COR.
All construction barriers shall be 1 hour fire rated temporary walls with 45-minute fire rated doors where required. Provide and maintain negative air pressure during construction. Contractor requirements for personnel access, parking, deliveries, & debris removal shall be coordinated with the COR. Coordinate phase completion and start up with requirements as set forth by the
COR to maintain daily hospital operations
The new Philips monoplane procedural table and Baxter ceiling mounted equipment booms for the renovation of the Cath Lab (Hybrid OR) shall be purchased and installed by the VA. The contractor shall be responsible for procuring and installing the laminar flow integrated ceiling system. All other procedure room ‘loose’ equipment will be provided by the VA.
Phasing:
The project will be divided into the following proposed 3 sequential phases.
Phase 1:
• Demo existing Toilet Room 2B-214 & Supply Room 2B-230A for new Semi-Restricted Area
2B-223.
• Install new door off corridor to access Cardiac Lab Semi-Restricted Area 2B-223.
• Remove existing door to Cardiac Lab Supply Room 2B-222 & infill wall opening.
• Work shall be scheduled overnight (2 & 3 Shifts). Coordinate with COR.
• Relocate existing Med Gas controls & alarm monitors for new door opening into Cardiac
Lab.
• Demo existing Cardia Lab low air return duct chase for new door opening. Construct new duct chase to relocate low air return duct.
• Modify ductwork to AHU-25.
• Create new entry door access to Cardiac Lab from new Semi-Restricted Area 2B-223.
• Demo existing Cardiac Lab entry doors and infill wall opening.
• Repair floor, wall & ceiling finishes inside Cardiac Lab to match existing room finishes.
Phase 2:
• Work shall be scheduled overnight (2 & 3 Shifts). Coordinate with COR.
• Demo existing IR Cath Lab & adjacent supporting rooms defined in project scope.
• Work shall be completed during normal hours - high impact/loud noise work to be completed after hours. Coordinate with COR.
• Demo existing IR Cath Lab & adjacent supporting rooms defined in project scope.
• Renovate new Cath Lab per construction documents.
Budget:
There will be no deducts included in the project, as all components are vital to the operation of the new IR Cath Lab (Hybrid OR).
Interior Design:
Finishes will aim to remain consistent with the buildings dedicated color scheme and maintain the standards established by the West Palm Beach VA. All materials will be evaluated for durability and performance to meet the demands for safety, infection control and ease of maintenance.
Security:
This project shall comply with the VA’s Physical Security and Resiliency Design Manual (Revised
2024) and VA Handbook 0730 (2000) and subsequent 0730 Handbook directives and appendixes.
Fire Protection:
Modifications to existing fire alarm & sprinkler systems shall comply with NFPA 72 (2022) & NFPA 13
(2022).
Asbestos / Lead Paint:
The existing building was construction post the Toxic Substances Control Act of 1976 and is assumed to be asbestos and lead free. For confirmation, a pre-renovation survey was conducted of the project scope area and samples tested by a 3rd party to verify that no existing materials contain asbestos or lead based paint. Environmental Consultant, OHC’s ‘Asbestos &
Water Damage Assessment Report’ dated 2/28/2024 is attached for reference.
Life Safety Code:
The life safety aspects of this project was designed according to NFPA 101 (2024). The project has been reviewed by a third-party code consultant, for code compliance.
STRUCTURAL – DIVISION 5
Applicable Codes, Guidelines, and Standards:
1. VA PG-18-3 Design and Construction Procedures (Nov 1, 2023)
2. VA Handbook H-18-8 VA Seismic Design Requirements for VA Hospital Facilities (Nov 1, 2024)
3. VA PG-18-10 Structural Design Manual (Oct 1, 2022 Rev July 1, 2023)
4. VA PG-18-12 Imaging Services Design Guide (Sep 1, 2020 Rev Aug 1, 2023)
5. VA Physical Security and Resiliency Design Manual (PSRDM) (Oct 1, 2020 Rev May 1, 2024)
6. 2024 International Building Code (IBC)
7. 2024 International Existing Building Code (IEBC)
8. ASCE 7-22 Minimum Design Loads for Buildings and Other Structures
9. ACI 318-19 Building Code Requirements for Reinforced Concrete
10. AISC 360-16 Specification for Structural Steel Buildings
Existing Building Construction:
The West Palm Beach Veterans Affairs Medical Center opened in 1995. Existing contract documents for the structure dated August 20, 1990, prepared by Wolfberg, Alvarez and Associates were provided to Above Group for review. The structural set is Volume 3, which includes sheets 1-
S1 through 1-S128.
The existing structure is a concrete column and beam frame with a concrete joist and slab with topping deck. The structure is a proprietary system combination of both cast-in-place and prestressed precast concrete. The concrete joists and the bottom of the concrete beams
(referred to as “soffit” beams) are both prestressed precast concrete, which then has a cast-in place remainder of the beam and/or deck poured on top. Typical slab construction is a 3” concrete topping on 3” concrete deck with 16” deep precast concrete joists spaced at 4’-6” o.c.
A typical bay is 27’-0”x27’-0” with 24” wide x 28” deep beams including the precast soffit at the bottom. Columns are typically 24”x24”.
Due to the nature of the existing structure, the capacity of the existing beams and joists cannot be determined by the original structural contract documents. The delegated design precast soffit beam and joist shop drawings are required. A portion of the existing precast concrete shop drawings were located and scanned as part of another project, but the beams and joists specifically for those in the area of work have not yet been found. Structural capacity is based on limited data for the design loads for the existing precast concrete joists and design moments and shears for soffit beams.
Design Loads:
• Dead Loads: Refer to calculations in Appendix.
• Live Load:
o Support Area Floor: 100 psf o Interstitial: 25 psf (15 psf when combined with floor live load)
• Seismic Load o Assumed Site Class ‘D’ o Seismic Design Category A
• Risk Category IV (Critical Facility)
2nd Floor Monoplane Hybrid Operating Room (ORHY1):
The proposed monoplane hybrid operating room will include the removal and replacement of catheterization lab (cath lab) equipment in replacement of the existing in room 2B-234 and associated support spaces. The cath lab table and other floor mounted equipment will be supported directly by the 2nd floor, while the C-arm and other ceiling hung equipment will be hung from the ceiling system. Due to the weight of the C-Arm, structural steel framing will be required to span between columns to support it. The combined weight of the C-Arm with the additional hanging equipment exceeds the design capacity of the existing precast concrete joists and steel subframe will need to be provided. The subframe is located at the lowest elevation possible to avoid conflict with major existing utilities and will need to be spliced at several locations to permit installation in the interstitial space. Some minor utilities will need to be rerouted to permit installation of the steel framing. Final ceiling system support loads need to be provided in construction and final design of the steel structure will need to be performed by the Contractor.
Some medical equipment manufacturers have specific vibration requirements. Once the vibration requirements for the C-Arm equipment have been determined, a vibration consultant can be hired to determine if the existing space is capable of meeting the requirements. The vibration consultant will perform testing in the existing space and provide the vibrations present under normal working conditions. If the existing space does not meet the manufacturer’s vibrations requirements, structural reinforcement/remediation will be required, or a different space will need to be selected.
2nd Floor Penetrations/Anchor Bolts:
The existing precast concrete joists and soffit beams utilize prestressed strand reinforcement. If a prestressed strand is cut, the force in the strand is released and serious hazards and damage to the existing building can result. Therefore, it is critical that coordination of any new holes and anchors through the structural floor slab be coordinated to avoid cutting through the joist and girders. Notes are included on the drawings to this effect and the Contractor is to perform GPR scanning to show any reinforcement prior to cutting any holes in the existing slab.
3rd Floor Anchor Bolts:
The existing structural system is the same as the 2nd floor, however, GPR scanning can be avoided by attaching anchors for equipment to the side of the precast concrete joists and beams in lieu of the bottom of beams where strands might exist.
2nd Floor Air Handling Unit (AHU) Platform:
Due to the increase in size of the space being served, the AHU serving the space will need to be replaced, refer to Mechanical. The existing unit is supported on an elevated steel platform in the 2A-304A Mechanical Room. As a result of the change in AHU, the platform will be extended to accommodate a longer or wider unit.
1st Floor Roof Exhaust Fan Penetration:
The new exhaust fan penetration is to be located such that it fits between existing precast concrete joists. The ductwork to the fan will need to be anchored down for hurricane wind resistance through threaded rods with eyebolts through bolted to the existing roof slab as the existing 4” thick concrete slab is too thin for use of post-installed anchors.
FIRE PROTECTION NARRATIVE - DIVISION 21
Applicable Codes:
1. VA Fire Protection Design Manual, Ninth Edition
2. NFPA 13 – 2022
3. NFPA 14 – 2024
4. NFPA 25 - 2023
5. NFPA 101 - 2024
General Overview:
The hospital Second Floor catheterization lab is currently served by an existing 6-inch combination wet standpipe and fire suppression system designed in accordance with NFPA 13 and NFPA 14. The zone is served by 2-inch Zone Valve, located in Stair #6. Existing sprinkler heads will be removed, new sprinkler heads will be provided, and branch piping altered as required in all renovated areas. The total renovated area is approximately 2,000 sq.ft.
Sprinklers:
All renovated spaces will receive new quick response sprinkler heads based on the space function and new ceiling grid, except where specifically prohibited or noted elsewhere per
NFPA 13 and the VA FPDM. For instance, computer and telecommunication spaces shall be provided with standard response sprinklers with protective cages. Sprinklers shall be Factory
Mutual (FM) approved. Recessed pendant sprinkler heads will be used in all spaces with new ceilings and upright or sidewall sprinkler heads will be used where they are exposed. Concealed sprinkler heads should be discussed with the VA if desired to be used for the Catheterization laboratory room only.
Sprinkler heads will not be required in casework per NFPA 13 9.2.9.1.
Material:
Piping shall be of black steel material. Piping 2-inches or less will be Schedule 40 with threaded fittings. Piping larger than 2-inches will be schedule 10 with grooved fittings.
System testing:
Sprinkler systems shall be hydraulically calculated for all new construction and renovated spaces by any design approach allowed by NFPA 13, except that the Special Design Approach shall not be used in health care. Sprinkler densities shall comply with NFPA 13, except in rooms containing moveable/mobile shelving (high density storage) where the density shall be Ordinary
Hazard (Group 2) per the VA FPDM.
Newly installed sprinklers shall be hydrostatically tested in accordance with NFPA 13 in the presence of the contract officer’s representative (COR).
The sprinkler system shall undergo an acceptance test performed by an approved testing company. The sprinkler system will be tested in accordance with NFPA 25 2023. Documentation shall be submitted to the engineering department. Upon sprinkler system impairment, NFPA 25,
15.5.2 shall be followed during sprinkler system downtime. Approved personnel shall coordinate requirements per NFPA 25, such as an approved fire watch if required.
PLUMBING NARRATIVE - DIVISION 22
1. VA Plumbing Design Manual (PDM) Latest Edition
2. International Plumbing Code (IPC) - 2024
3. International Energy Conservation Code (IECC) - 2024
General:
The existing catheterization lab on the Second Floor is currently served by existing medical gas piping, vent, drainage, domestic cold water, domestic hot water, and a domestic hot water recirculation system. All existing plumbing fixtures shall be disconnected and removed in the renovated spaces. Existing piping shall be removed and capped back at the mains to eliminate any dead-end piping. A new surgical scrub sink shall be provided to serve the new Hybrid OR area.
Domestic water:
Extend all cold and hot water piping from the nearest existing water mains located in the
Second Floor Interstitial space. A complete hot water, cold water, and hot water recirculation system shall be routed to all new plumbing fixtures.
Sanitary drainage and vent systems:
Extend all sanitary piping to the existing sanitary mains located in the existing First Floor Interstitial space. All new vent lines shall be extended to the nearest existing vent line in the Second Floor
Interstitial space. A complete sanitary drainage and vent system shall be routed to all new plumbing fixtures.
Medical Gas Systems:
Extend new Medical Air, Oxygen, Medical Vacuum, WAGD, and Nitrous Oxide Medical Gas piping from the relocated zone valve box to new outlet locations in the OR booms. New
Nitrogen supply will be provided to the hybrid OR, piping shall extend from the main in the adjacent mechanical room to the Hybrid OR.
The existing zone valve box serving the Hybrid OR shall be relocated to a new approved location. (2) Zone valve boxes and area alarm switches will be provided for each catheterization lab. The zone valve boxes, and alarm panel shall be located in the control room. Zone valve boxes shall be installed outside each operating room and a minimum of one zone valve box for each 18-outlet set per the VA Specification 22 62 00 and 22 63 00.
Plumbing Fixtures:
Plumbing fixtures shall be high efficiency (low flow type) per the VA PDM and are dependent on architectural layout. Fixtures shall be provided complete with trim, accessories, and piping connections.
Below are general fixture specifications:
• P-520: Surgeon Scrub sinks shall be wall hung, stainless steel, goose neck faucet and hard-wired sensor operation.
Pipe Materials:
• Domestic water piping shall be ASTM B88, Type K or L copper, hard drawn, soldered fittings.
• Sanitary and vent piping shall be CISPI 301, ASTM A888, or ASTM A74 cast iron, no-hub.
• Medical gas piping shall be Type K ASTM B819 seamless copper tube, hard drawn temper, with wrought copper fittings conforming to ASME B16.22.
• Insulation shall be provided on all hot water, cold water, and hot water return piping.
MECHANICAL NARRATIVE – DIVISION 23
1. VA HVAC Design Manual (HVACDM) Latest Edition
2. International Mechanical Code (IMC) – 2024
3. International Energy Conservation Code (IECC) – 2024
4. ASHRAE 90.1 -
5. ASHRAE 170 - 2024
General Overview:
The hospital Second Floor existing catheterization lab is currently served by 1-AHU-60 and 1-EF-60.
Support spaces serving the catheterization lab are served by 1-AHU-25. Both units are located in
2A-105-S Mechanical Room and associated supply and exhaust ductwork is routed through the second floor interstitial space. 1-AHU-60 is suspended above 1-AHU-25 within the existing mechanical room. The existing HVAC serving the renovated spaces shall be replaced for the new VA room data sheet requirements. New air devices will be installed in the new ceilings.
Increased ventilation air and supply air will be provided according to the requirements of the VA
HVAC Design Manual (HVACDM), the International Mechanical Code 2021, and ASHRAE 170.
Chilled Water System:
The existing 1-AHU-60 is a single zone VAV chilled water unit with supply fan, remote exhaust fan and heating hot water preheat coil. The unit provides 2,100 CFM of conditioned air to the existing catheterization lab. The unit is insufficiently sized for the renovated space due to the increased ventilation air requirements and the requirement for epidemic mode operation.
Figure 1: Existing 1-AHU-60
The renovation of the catheterization lab will require 1-AHU-60 to be replaced due to increased air change rate requirements and emergency epidemic mode. The unit shall be sized for 100% outside air during epidemic mode per the VA HVACDM. The new chilled water supply and return piping shall connect into the existing critical chilled water loop located in 2A-105-S
Mechanical Room and extended to serve 1-AHU-60.
The existing chilled water piping serving the removed CRAC unit shall be reused and extended to serve
Heating Hot Water System:
The primary heating source for the HVAC systems serving the renovation area is the existing heating hot water system. It is understood that the existing heating hot water system is operating with an entering water temperature (EWT) of 180 degrees at a 20-degree delta.
The existing heating hot water branch piping serving the renovated space will be reused where possible, demolished back to the main when no longer needed, and new branch piping will be extended to new terminal units as required.
New heating hot water branch piping shall be connected into the existing mains in the mechanical room and extended to serve 1-AHU-60. A minimum flow coil pump shall be provided on the unit preheat coil to prevent coil freezing.
Building Automation System:
All MEP systems shall be monitored and controlled for optimal energy efficiency and performance by a direct digital control building automation system with network-based distribution integrating with the building’s low voltage backbone. Controls shall be an expansion of the existing hospital JCI controls system. All new control points shall be fully monitorable and adjustable from the existing BAS front end. The BAS system shall modulate runtime for redundant components to equalize wear on equipment.
Climactic Design Conditions:
The below conditions are from the VA HVAC Design Manual Climatic Data for West Palm Beach, FL:
• Summer (cooling): 91.4°F dry-bulb (0.4% Cooling) / 77.6°F wet-bulb (0.4% Evaporation)
• Winter (heating): 43.9°F (99.6% Heating)
• Dehumidification (high humidity location): 80.0°F dry-bulb (0.4% Cooling) / 79.5°F dew-point (0.4% Evaporation)
Air Distribution Systems:
The existing air handling unit 1-AHU-60 is located in the Second Floor mechanical room and mounted on structural steel above existing to remain 1-AHU-25. 1-AHU-60 is served by a remote mounted inline exhaust fan that direct exhausts to the building exterior. The existing inline exhaust fan shall be replaced due to increased airflow requirements. New Supply air and exhaust ductwork shall be installed in the second floor interstitial space to serve the Hybrid OR area.
The new Hybrid OR equipment room shall be provided with new chilled water computer room air conditioning unit (CRAC). The unit shall have a capacity of 2 tons and located in the second floor interstitial space and ducted to diffusers in the equipment room.
Central Air Handling Units:
1-AHU-60 shall be designed to meet all the requirements outlined by the VA HVACDM. Above
Group anticipates that the new air handling unit will include the following modular sections. The existing structural steel shall be modified as needed to accommodate the new AHU dimensions and weight.
Surgical Suite Air Handling Unit Sections:
• OA Connection with integral damper
• Access Section
• Pre-Heat Coil
• Access Section
• Pre-Filter #1 – 2-inch MERV 8
• Pre-Filter #2 – 4-inch MERV 11
• Access Section
• Cooling Coil 1
• UV Lights
• Fan w/ Access Section o Minimum (N+1) Redundancy
• Final Filter – 12-inch MERV 14
• Discharge Plenum
• 8” Rail
Emergency Epidemic System:
The new air handling unit will be equipped with emergency epidemic mode per the VA
HVACDM. The normal exhaust damper shall close, the epidemic mode exhaust air damper shall open to discharge to the epidemic mode exhaust duct stack. The epidemic exhaust system shall discharge at a discharge nozzle located above the low roof level at least 10’-0” at 3,500 fpm per the VA HVACDM.
Terminal Units:
Temperature control for the Hybrid OR and support spaces shall be accomplished by terminal units with heating hot water reheat. Terminal units may be constant or variable air volume depending on the VA HVACDM requirements.
• Max Air Pressure Drop: 0.5 in. wc. including hot water coil
• Max Water Pressure Drop: 2.0 ft. hd.
• Maximum Airflow: 3,000 CFM (Defined by VA HVACDM)
• Entering Water Temperature: 180°F Max
• Leaving Water Temperature: 160°F
• Leaving Air Temperature: Interior spaces will have a LAT of 75°F. Exterior spaces will be evaluated individually but are anticipated to have LAT between 80-90°F. Maximum LAT will be 95°F per the VA HVACDM.
Air Distribution System Design Criteria:
Supply Ductwork (Main / Upstream of Terminal Units):
• Externally insulated single wall ductwork
• Material: Galvanized Steel
• Sizing Criteria:
o Max Velocity = 2,500 FPM o Max Pressure = 0.20 in. wc. / 100 ft.
Supply Ductwork (Downstream of Terminal Units):
• Externally insulated single wall ductwork
• Material: Galvanized Steel.
• Sizing Criteria:
o Max Velocity = 1,500 FPM o Max Pressure = 0.08 in. wc. / 100 ft.
Supply Ductwork (Downstream of HEPA Filter Unit):
• Externally insulated single wall ductwork
• Material: Stainless Steel.
• Sizing Criteria:
o Max Velocity = 1,500 FPM o Max Pressure = 0.08 in. wc. / 100 ft.
Return Ductwork:
• Insulated single wall ductwork
• Material: Galvanized Steel.
• Sizing Criteria:
o Max Velocity = 1,500 FPM o Max Pressure = 0.08 in. wc. / 100 ft.
Air Outlets and Inlets:
All Spaces:
• Hybrid OR Ceiling System with Laminar Flow Diffusers and Lighting – SLD Technologies
• Ceiling Square Plaque Supply Diffuser
• Ceiling Square Return Diffuser
• Sidewall Supply Double Deflection Diffuser
• Sidewall Return Fixed Blade Grille
Hydronic Distribution System Design Criteria:
Chilled Water & Heating Hot Water:
• Schedule 40 Steel, ASTM A53/A53M Grade B
• Sizing Criteria:
o Max Pressure Drop: 1 – 4 ft per 100 ft o Max Velocity (2 inch or less): 4 FPS o Max Velocity (greater than 2 inch): 10 FPS
Cooling Coil Condensate:
• Copper, ASTM B88, Type M or Schedule 40 PVC
ELECTRICAL NARRATIVE – DIVISION 26
Electrical Distribution:
The existing spaces are fed from the following existing panelboards:
CH2E (Critical; 250A MLO, 480Y/277V, 3 Phase, 4 wire)
NH2E (Normal, 225A MLO, 208Y/120V, 3 Phase, 4 wire)
CL2E (Normal, 100A MLO, 208Y/120V, 3 Phase, 4 Wire)
NL2E (3 section) (Normal; 100A MLO, 480Y/277V, 3 Phase, 4 Wire)
NH2A (Normal, 100A MLO, 480Y/277V, 3 Phase, 4 Wire)
The panels serving the existing space are in the electrical closet, 2B-212.
All existing lab equipment, lighting and receptacles will be disconnected and removed during the demolition phase. All equipment not connected to circuits outside our area of work will be removed back to the source panel. Power outside of the area of work will remain energized during demolition and new construction phase.
The existing panelboards will be reused to serve the renovated spaces. New panel directories will be provided after construction is complete. Three (3) new isolated power panels will be added to serve the imaging equipment required in the cardiology suite and additional branch circuit loads.
One (1) of the three (3) isolated panels will be fed from existing panel NH2E, which serves the normal branch of the electrical distribution system. The remaining two (2) isolated panels will be fed for existing panel CH2E, which serves the Critical Branch of the Essential Electrical System, in accordance with NEC 517. All three panels will be recess mounted in opposite corners of the lab space. Panels will be specified at 30A, 480v, 1ph, 3w with integral 480/208V step down transformer and isolated 208V panel.
The existing 480V, 3p, 5 hp, AHU-60 servicing this space will be replaced with new. The new unit is currently fed from circuit #13, 15, 17 in existing panel NH2A. Panel NH2A is in electrical closet 2B-
302B. To serve the new AHU, sized at 7.5 hp, the feeder ampere rating will need to be upsized as needed to accommodate the additional load requirements. A new equipment branch, 480V, 100A, 3 phase, 4 wire panel, will be placed to feed the new AHU and chillers. A new 45kVA transformer, and equipment branch 208V, 150A, 3 phase, 4 wire panel will be placed to feed the new CRAC unit. The new equipment will be placed in mechanical room
Wiring Configurations and Methods:
In general, the basis of design for all building feeder and branch circuit wiring shall be installed in metal non-flexible raceway systems with copper wiring within, excluding lighting fixture whips and connection to vibrating equipment. All branch circuit wiring shall be installed overhead. All fittings shall be compression type; set screw fittings are not acceptable.
Type MC cable is not acceptable for use.
Miscellaneous Branch Power Requirements:
Receptacles - Layouts will be provided which will comply with NFPA-70, as well as meet the needs of all end-user requirements. Receptacle devices will be ivory, 20 amp. Lighting devices will be ivory. Each wiring device (light switches and receptacles) will have stainless steel engraved cover plates (via laser etching) to indicate the circuit and panel from which it is served. Receptacles shall be mounted with ground pin in the up position.
Occupancy control for receptacles will not be provided.
Branch circuiting for receptacles shall comply with the more stringent requirements of either NFPA
70 (National Electrical Code) or VA PG 18-10. No more than six receptacles shall be installed on a single branch circuit for general use.
Wet or damp areas will have ground fault protection type devices.
Direct connections to equipment will be provided when specifically required by the manufacturer.
Feeders and branch circuits shall be sized so that branch circuit voltage drop is limited to 3% and feeder circuit voltage drop is limited to 2% at full load. All 120V circuits shall be supplied with dedicated neutrals.
Lighting:
New lighting shall be provided throughout the project area. General area lighting will be designed with LED sources. General area lighting will operate at 277 volts. Luminaires will have a CCT of
3500 degrees Kelvin and a minimum CRI of 80. Lighting in the Hybrid OR will have a CCT of 4000 degrees Kelvin.
Egress lighting throughout the project area will be powered from the existing building life safety branch distribution. A new lighting inverter will be installed in ICR Room 2B-239. This will serve 50% of the lighting in the SLD integrated ceiling system.
Overall, the renovation area lighting design shall be based on a maximum of 0.96 watts per square foot over the entire building’s square footage to comply with the ASHRAE 90.1. To achieve this level of efficiency, extensive use of LED lighting will be required.
Lighting will be designed in accordance with the VA’s Lighting Design Manual PG-18-10 and will achieve the minimum lighting levels listed therein. Selected target lighting levels are below:
Toilets – 20fc
General / Corridors – 20fc
Waiting Area – 20fc
Storage – 20fc
Offices – 30fc (50fc at desktop)
Cath Lab – 50fc (Medical Task – 1000fc)
Exam – 50fc (100fc at table)
Control Room – 30fc
Break Room – 10fc (30fc at countertop)
Housekeeping – 10fc
Lighting Controls:
Low voltage lighting controls shall be utilized in all spaces. Lighting controls shall be manual on/off in the Hybrid OR, Control Room, and Transition areas in accordance with the VA Lighting Design
Manual and ASHRAE 90.1.
Occupancy/vacancy sensors with Manual-ON functionality shall be provided in the Equipment and Sterile Supply Rooms.
Full range 1% 0-10V dimming shall be provided in Echo / Vascular Lab and patient recovery/holding spaces.
Special Systems:
Grounding – An extension of the existing building-wide grounding system will be provided to assure that all equipment is properly grounded in accordance with the NEC and other applicable codes, as well as to limit the possibility of potential-differences between systems. A copper grounding conductor shall be provided in all branch circuits, to form a complete building wide grounding system.
The Cath labs will be provided with an integrated ceiling system that will condense mechanical, med gas, and electrical systems into a single system. The lighting and power for booms will be provided through this system. The electrical contractor will provide single point power connections to this system and will need to coordinate with the manufacturer to provide the proper raceway for low voltage cabling from this system to the associated wall panels. This will be shown in future submissions. This system will be similar to Steris CleanSuite.
Contract Specifications and Drawings:
All articles, products, materials, fixtures, forms or types of construction covered in the specifications will be required to meet or exceed all applicable standards of manufacture, testing, performance, capabilities, procedures and installation according to the requirements of ANSI, NEMA, IEEE, and
NEC referenced documents where indicated and the manufacturer's recommended practices.
Listing by an Accepted Listing Agency:
All materials and equipment will be listed by an accepted listing agency as conforming to its standards in every case where such a standard has been established for that particular type of material or equipment.
Maintenance and Operating Instructions:
The contract documents will require that the electrical contractor prepare a complete manual of maintenance and operating instructions for delivery to the owner covering all electrical equipment and systems furnished and installed by him on the project, including a listing of local service representatives/contacts.
COMMUNICATIONS NARRATIVE – DIVISION 27
Telephone and Data Systems:
New network outlets and access control device locations will be designed based on space layout, VA design standards and specific user requirements to be coordinated as part of the design development user group meeting.
New network, and access control horizontal cables will be Cat6A UTP. New cabling will be routed overhead by use of new J-hook systems. All phones in the newly renovated area will be Voice over IP (VoIP). Wireless access points and cabling are provided under a separate national contract with the VA and will not be identified on the contract drawings.
ELECTRONIC SAFETY AND SECURITY NARRATIVE – DIVISION 28
Electronic Safety and Security System:
Card reader access will be in place for the control room, ICR room, and scrub area at a minimum, and as coordinated with the Security consultant. These must be compatible with and an extension of the existing Lenel access control system. Additional security panels will be located as required to support the extra connection points and provide closer proximity to the new devices.
Nurse Call System:
New nurse call devices will be provided by contractor for coverage of the building renovation area as part of an extension of the existing Tektone nurse call system.
Fire Alarm System:
The West Palm Beach VAMC has an existing Siemens networked addressable voice evacuation fire alarm system installed in accordance with NFPA 72 and the VA Fire Protection Design Manual.
The extension to the existing fire alarm system will be an addressable design in accordance with
NFPA-72 and NFPA –101 and provide coverage for the entire renovation area. All devices will be
ADA compliant. Fire alarm system wiring will be run entirely in conduit.
System will be wired as “Class B” with a dedicated conduit loops for all initiation circuit (SLC) wiring and separate conduit loops for all indication (notification) type devices.
Visual flashing lights will be provided throughout and comply to ADA requirements. Pull stations will be provided at all means of egress.
Sequence of Operation: The existing fire alarm system sequence of operation shall be maintained.
PROJECT INFORMATION
ASBESTOS & WATER DAMAGE
ASSESSMENT REPORT
Performed at:
IR Cath Lab
West Palm Beach VA Hospital
7305 N Military Trail
West Palm Beach, FL 33410
Report Prepared For:
RDC – John Poe
Report Prepared By:
OHC Environmental Engineering, Inc.
101 South Hoover Blvd, Suite 101
Tampa, Florida 33609
OHC Project #240064-AS
February 28, 2024
Limited Asbestos & Water Damage Survey
West Palm Beach VA – IR Cath Lab
OHC Project No. 240064-AS
PROJECT INFORMATION
OHC PROJECT NO. 240064-AS
CLIENT NAME: RDC John Poe Architecture
CLIENT CONTACT:
Mr. Chad Vaughn
PROJECT LOCATION: IR Cath Lab
West Palm Beach VA Hospital
SERVICES PERFORMED: Water Damage Assessment & Asbestos NESHAP
Survey
DATES OF SERVICES: 02/28/2024
CONSULTING FIRM: OHC Environmental Engineering, Inc.
101 South Hoover Blvd, Suite 101
Tampa, FL 33609
SURVEYOR:
Mr. Nick Foster
REPORT REVIEWED BY:
James F. Rizk, CIH, FLAC
LICENSED CONSULTANT:
James F. Rizk, CIH
FLAC #IA0000022
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 BUILDING DESCRIPTION
3.0 EXECUTIVE SUMMARY
3.1 Asbestos Survey Results
3.2 Lead Survey Results
• Table 1: Presumed Lead Containing Materials
3.3 Mold and Water Damage Material Assessment
4.0 ASBESTOS SURVEY
4.1 Asbestos Survey Results
• Table 2: Materials Sampled for Asbestos
4.2 Asbestos Sampling & Analytical Methods
4.3 Regulatory Requirements
4.4 Statutory Requirements
5.0 LEAD SURVEY
6.0 OBSERVATIONS
7.0 CONCLUSIONS
8.0 LIMITATIONS
9.0 DOCUMENT CONTENT
List of Tables
Table 1: Presumed Lead Containing Materials
Table 2: Materials Sampled for Asbestos
APPENDIX A: Asbestos and Lead Sampling Locations
APPENDIX B: Asbestos Laboratory Analytical Results
APPENDIX C: Water Damage Assessment Table
APPENDIX D: Consultant Credentials
List of Abbreviations:
A/C Air Condition
A/H Air Handler Unit
CIH Certified Industrial Hygienist
CMU Concrete Masonry Unit
CT Ceiling Tile
GWBS Gypsum Wallboard System
IH Industrial Hygienist
IR Infra-Red Spectrophotometry
LF Linear Feet
LM Linoleum
RB Red Brick
SF Square Feet
TSI Thermal System Insulation
UV Ultra-Violet Light
VBB Vinyl Baseboard
VPFG Visible Presumptive Fungal Growth
VCT Vinyl Composite Tile
1.0 INTRODUCTION
OHC Environmental Engineering, Inc., (OHC), was contracted by RDC/JPA Architecture, to perform a comprehensive asbestos and water damage/mold assessment on IR Cath Lab at the West Palm Beach VA Hospital. The survey was performed on 02/28/2024 at the location described above.
2.0 BUILDING DESCRIPTION
The West Palm Beach VA Hospital is a multi-level building with a basement and interstitial spaces. The IR Cath Lab, interstitial space above the lab area, and mechanical room housing the A/H units supplying the area encompassed the scope of this survey. The walls of the lab area are drywall with a dropdown non-suspect cellulose ceiling tiles above. The flooring of the lab area is VCT and sheet flooring with yellow mastic underneath. The interstitial space has concrete walls, columns, and flooring. A/C duct work, water lines with TSI, and electrical cable trays comprised the interstitial space above the IR Cath Lab area. The mechanical room had two separate A/H units which supplied the area, both were inspected and deemed to be clean and in proper working order.
3.0 EXECUTIVE SUMMARY
3.1 Asbestos Survey Results
Based on the results of the Polarized Light Microscopy (PLM) laboratory analysis, asbestos-containing materials (ACM) are not present within the scope of the survey.
3.2 Lead Survey Results
No suspect lead paint was found within the scope of the survey; however, it is possible that the interior of the walls around the perimeter of the Angio Lab contain a lead lining to protect against radiation, because of this the interior of the walls are considered presumed lead containing material (PLCM) as indicated in
Table 1 below.
3.3 Mold and Water Damaged Material Assessment
A visual assessment was conducted throughout the IR Cath Lab area which included a nurse’s station, holding rooms 1 through 3, a storage room, a restroom, a control room, the Angio Lab, an Angio Lab storage room and scrub room, and the corridor connecting all these separate rooms. A moisture meter was used to assess the moisture content of surfaces and an IR camera was used to scan all surfaces in the area to determine if any moisture could be detected within the walls, flooring, or ceiling. No readings of high moisture were detected with the moisture meter and no abnormal readings were found with the IR camera. Note that no core sampling was done on the walls in the IR Cath Lab area to eliminate any dust created which would have compromised the sterile environment.
TABLE 1: PRESUMED LEAD CONTAINING MATERIALS
Sample ID Material
Locations Material
Description Quantity Lab Results Picture
N/A Interior of
Angio Lab
Perimeter Walls
Possible Lead
Lining in Walls
~750 SF PLCM
4.0 ASBESTOS SURVEY
Based on the observations and the laboratory analysis of the samples collected from the site, asbestos-containing materials (ACM) do not exist within the scope of this survey. The
Environmental Protection Agency defines asbestos-containing material (ACM) as any material or product that contains more than one percent (1%) asbestos.
4.1 Asbestos Survey Results
Table 2 below summarizes the samples of all the suspect ACM collected from the site. The table describes the homogenous sampling area (HSA), sample ID, sample location, material description, quantity, condition, friability, and the laboratory analytical result. Note that samples in RED indicate that the material contains asbestos and will require compliance with NESHAP and OSHA. Please refer to the Appendices at the end of this report for photographs of the materials sampled and official laboratory analytical results.
TABLE 2: MATERIALS SAMPLED FOR ASBESTOS
HSA
Sample
ID
Sample
Location
Material
Description
Quantity, Condition, Friability
Lab Results
Picture
064-1A
Nurse Station
North
2B-230B
GWBS
TBD
Good
Non-Friable
NAD
064-1B
Nurse Station
South
2B-230B
064-1C Storage Room
2B-230A
064-2A
North Nurse
Station
Cabinet 2B-230B
Bathroom Sink and
Cabinet Caulking
~18 LF
Good
064-2B
South Nurse
Station
Cabinet 2B-230B
064-2C Restroom Sink
064-3A
Nurse Station
Holding
Room 2 Entryway
Door Caulking
~10 Doors
Good
064-3B Restroom Door
064-3C
Control Room
Door
2B-232A
064-4A Restroom Flooring
Restroom Flooring
(2 Layers) –
Layer 1: White And
Blue Speckled Vinyl
Sheet Flooring with
White Master
Layer 2:
Possible Linoleum Flooring
TBD
Good
064-4B Storage Room
064-4C Nurse Station
5 064-5A Restroom Walls
Pink Unglazed
2"x2"
Wall Tile with Tan
Grout And White
Mastic
~88 SF
Good
064-6A
Blue Wall Paneling
Outside Control
Room 2B-232A
White
Adhesive Behind
Blue
Wall Paneling
TBD
Good
064-6B
Nurse Station
Holding
Room 1
7 064-7A
Angio Lab
Equipment
Room Flooring 2B-234A
White
12"x12" VCT With
Blue And Pink
Specks With Yellow Mastic
~98 SF
Good
064-8A Nurse Station
2B-230B
Beige Cove Base
Mastic
~75 LF
Good
064-8B
Angio Lab
Equipment
Room Flooring
2B-234A
064-9A
Interstitial Space
Above IR Cath Lab Area
White Mastic
On Silver Paper
Wrapping Over Fiberglass Duct
Insulation
TBD
Good
064-9B
064-9C
064-10A
Interstitial Space
Above IR Cath Lab
Area
Grey Mastic
On Metal Ducts
Underneath Duct
Insulation
TBD
Good
064-10B
064-10C
064-11A
Interstitial Space
Above IR Cath Lab
Area
TSI: White
Wrap And
Fiberglass
Insulation Over
Water
Supply / Return And
Domestic Water
Lines
TBD
Good
064-11B
064-11C
12 064-12A
Interstitial Space
Above IR Cath Lab
Area
TSI: Black
Foam Glass With
White Wrapping
~5 LF
Good
064-13A
Interstitial Space
Above IR Cath Lab
Area Concrete
TBD
Good
064-13B
064-13C
4.2 Asbestos Sampling & Analytical Methods
Asbestos sampling was conducted in accordance with NESHAP (40 CFR 61, Subpart
M) protocol for the commencement of demolition/renovation activities. The surveyor conducted a visual inspection of every safe and reasonably accessible room and space of the building. Materials sampled were grouped into Homogenous Sampling Areas
(HSA) based on the texture, color, use, age, condition, and every other visual appearance to identify suspect ACM. Materials containing asbestos are grouped into the following categories:
• Regulated ACM (RACM): Refers to friable manufactured ACM or a
Category I non-friable ACM that has become friable; or a Category I Non-
Friable ACM that will be or has been subjected to sanding, grinding, cutting or abrading; or a Category II Non-Friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations.
• Category I Non-Friable ACM: Refers to asbestos containing packing, gaskets, resilient floor coverings (including mastics), Galbestos, and asphalt roofing products containing more than 1% asbestos.
• Category II Non-Friable ACM: Refers to any material that is not a
Category I Non-Friable ACM that contains greater than 1% asbestos.
Bulk samples of all friable and non-friable suspect ACM were collected, as well as a representative number of samples from each homogeneous area following the EPA's simplified random sampling method (EPA560/585-030a). Good Industrial Hygiene practices were followed when collecting bulk samples to minimize fiber release.
Every precaution was taken to prevent asbestos exposure to the surveyor, the building occupants, and the public. All sample locations were logged with an appropriate description and the locations were marked on any available drawings. A unique sequential numbering system was used to identify each area. Each bulk sample was placed in a labeled bag, which was immediately marked with its sample number. Strict
Chain-of-Custody protocols were followed and signed by the receiving laboratory personnel who handled the samples. The samples were analyzed via PLM EPA-600 by EMSL Analytical in Orlando, FL. Quality control samples were analyzed by
EMSL Analytical in Tampa, FL for Quality Control procedures confirming the analysis of asbestos content. The purpose is to monitor the performance of the laboratories where samples are being analyzed to provide competence and reliability assurance.
4.3 Regulatory Requirements
Demolition: According to NESHAP, 40CFR61 Subpart M, demolition is defined as the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility.
The final NESHAP Rule provides classification for regulated asbestos containing material as follows:
• Friable asbestos material.
• Category I non-friable ACM that has become friable.
• Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; or
• Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by forces expected to act upon the material during demolition or renovation operations.
If the total asbestos content is determined to be trace to 10%, the owner must either assume that the material contains greater than 1% asbestos and treat the material as regulated asbestos-containing material (RACM) or have the material verified/quantified by point counting. If after point counting, the material is quantified as 1% or less, it is not regulated by the NESHAP. The Occupational
Safety and Health Administration (OSHA) considers material that contains any amount of asbestos as asbestos-containing and requires compliance with OSHA regulations. The demolition of a structure with materials present that contain any amount of asbestos is considered by OSHA as an asbestos abatement, and all applicable OSHA rules must be complied with during the demolition.
Notification: Notification is required to the local regulatory agency:
1. Ten (10) working days prior to a demolition.
2. Ten (10) working days prior to a renovation operation, if the amount of asbestos material removed or impacted is greater than 160 SF on all building components (i.e. floor tile, mastic, GWBS, etc.) or 260 LF on pipes.
3. One (1) day prior to demolition if the building has been condemned and is structurally unsound as determined by the appropriate agency.
Notification must be sent by certified mail with return receipt or hand delivered to the Florida Department of Environmental Protection. The demolition contractor must wait ten (10) working days (Monday – Friday) from the postmarked date of mailing or the date of hand delivery to commencement of demolition. Any change to the start date of the demolition requires notification to the agency by phone, followed by a written revision to the Notification Form.
4.4 Statutory Requirements
The regulatory agency responsible for the oversight of the rules pertaining to asbestos-containing building materials (ACBM) is the Environmental Protection Agency
(EPA). The regulations require that prior to demolition or renovation a facility survey must be conducted in accordance with section 40 CFR 61-M National Emission
Standards for Hazardous Air Pollutants; Asbestos NESHAP Revisions, Final Rule.
Enforcement of these rules was passed on to the states. In the State of Louisiana, they are enforced by the Department of Environmental Protection (DEP). Some counties have developed an enforcement division to carry out the responsibilities of the DEP and have developed environmental and asbestos ordinances with which compliance is required.
5.0 LEAD SURVEY
No suspect lead paint was detected in the scope of the survey; however, it is possible that the interior of the walls around the perimeter of the Angio Lab contain a lead lining to protect against radiation, because of this the interior of the walls are considered presumed lead containing material (PLCM).
6.0 OBSERVATIONS
• Lead lining in walls of Angio Lab not sampled and are considered PLCM
• No suspect paint found in the scope of the survey therefore no samples for lead paint were collected
• No condensate coatings found on sinks
• No mirror mastic found behind mirrors
• No suspect electrical materials found
• Ceiling tiles not sampled due to the sterile environment however they all appear to be non-suspect cellulose tiles in the dropdown ceiling grid
• Sampling avoided as much as possible in Angio Lab 2B-234 due to the elevated sterile environment needs of the space
7.0 CONCLUSIONS
Based on the results of the PLM analysis, ACM is not present in the materials sampled.
No suspect paint was identified within the scope of the survey but the interior of the perimeter walls of the Angio Lab are considered presumed lead containing material
(PLCM) due to the potential for a protective lead lining.
No water damage or VPFG was idnetified in…