This is a Commissioning Supplemental specification document for a Department of Veterans Affairs (VA) construction project. The document establishes requirements for a complete commissioning process as part of general construction work, which includes design, labor, materials, tools, equipment, supervision, and commissioning for project installation and delivery.

The Contractor is required to provide a CITP (Certified Instructor of Training Programs) CXP (Commissioning Professional) to execute the commissioning scope of work as detailed in Section 01 91 00 (Project General Commissioning Requirements). The commissioning team structure includes members appointed by both the Contractor and the VA. Contractor-appointed members consist of a CITP Commissioning Agent (CxP) acceptable to the VA and Contracting Officer's Representative (COR), a Commissioning Manager responsible for planning and coordinating commissioning activities, and Commissioning Representatives with authority to implement the commissioning process. VA-appointed members include a CITP-certified Commissioning Agent approved by the VA to oversee the commissioning process, User representatives from facility operations and maintenance, and an Architect/Engineering (A/E) representative from the design professionals. The commissioning team also includes the Project Superintendent, subcontractors, installers, schedulers, suppliers, and specialists as deemed appropriate by the VA and Commissioning Agent.

View the file

Other files

File Type Posted
S06 Attachment_Updated Price Cost Schedule 4-30-2026_1 Page.docx DOCX document
36C24826Q0453 0003.docx DOCX document
S06 Attachment_Updated Statement of Work_BB 548-CSI-139_04-30-2026_22 Pages.pdf PDF
S06 Attachment_Site Visit Sign In Sheet - 548-CSI-139 Renovate IR CathLab Walk-Through_1 Page.pdf PDF
36C24826Q0453 0002.docx DOCX document
S06 Attachment_548-CSI-139 WPB Renovate IR Cath Lab_Addendum 01_2026-04-24_28 Pages.pdf PDF
S06 Attachment_548-CSI-139 RFI_Responses_7 Pages.pdf PDF
S06 Attachment_Pneumatic Tube Stations Transfer Stations_2 Pages.pdf PDF
S06 Attachment_VA WPB Cath Lab 100 DWGS R1 - 11-17-20_17 Pages.pdf PDF
36C24826Q0453 0001.docx DOCX document
S02 Attachment 25_230923 Direct-Digital Control System for HVAC- rev041326_71 Pages.pdf PDF
S02 Attachment 26_BAS Facility Standards_16 Pages.pdf PDF
S02 Attachment 12_0124003 Medical Gas Pressure Drop Calcs_6 Pages.pdf PDF
S02 Attachment 11_EX 1-AHU-25 Ventilation Calc_1 Page.pdf PDF
S02 Attachment 19_WD FL20260220 dated 01-02-2026_5 pages.pdf PDF
S02 Attachment 05_CD Drawings_100 percent_dated 10.01.2025_548-CSI-139 WPB Renovate IR Cath Lab_71 Pages.pdf PDF
S02 Attachment 04_Cx Plan_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_55 Pages.pdf PDF
S02 Attachment 24_EMR_1 Page.pdf PDF
S02 Attachment 08_1-AHU-60 Load Calc_1 Page.pdf PDF
36C24826Q0453_1.docx DOCX document
S02 Attachment 18_SLD211033-1 West Palm Beach VA Hybrid_LAYOUT_Rev 4_2 Pages.pdf PDF
S02 Attachment 20_PPQ_4 Pages.pdf PDF
S02 Attachment 09_1-AHU-60 Ventilation Calc_1 Page.pdf PDF
S02 Attachment 10_EX 1-AHU-25 Load Calc_1 Page.pdf PDF
S02 Attachment 22_Base Offer Price Breakdown_1 Page_Excel Form.xlsx XLSX spreadsheet
S02 Attachment 23_VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_2 Pages.pdf PDF
S02 Attachment 06_Narrative_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_57 Pages.pdf PDF
S02 Attachment 14_2410-08-AVIP_6 Pages.pdf PDF
S02 Attachment 02_Asbestos Report - 548-CSI-139 WPB Renovate IR Cath Lab_36 Pages.pdf PDF
S02 Attachment 07_CD Specifications_100 percent_dated 10.01.2025_548-CSI-139 WPB Renovate IR Cath Lab_897 Pages.pdf PDF
S02 Attachment 21_Price Cost Schedule_1 Page.docx DOCX document
S02 Attachment 15_940537-Submittal-04_45 Pages.pdf PDF
S02 Attachment 13_0124003_100 percent CD Structural Calculations_38 Pages.pdf PDF
S02 Attachment 16_940537-Submittal-05_45 Pages.pdf PDF
S02 Attachment 01_Statement of Work_BB 548-CSI-139_03-31-2026_22 Pages.pdf PDF
S02 Attachment 17_N-SOU240607_3 Pages.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Commissioning Supplemental

ITEM I, GENERAL CONSTRUCTION: WORK INCLUDES DESIGN, LABOR, MATERIALS, TOOLS,

EQUIPMENT, SUPERVISION AND COMMISSIONING FOR THE INSTALLATION AND DELIVERY OF

A COMPLETE PROJECT AS DESCRIBED IN THE PROJECT DOCUMENTS AND SCOPE OF WORK

B. PROVIDE A CITP CXP TO CARRY OUT COMMISSIONING SCOPE OF WORK AS

DETAILED IN SECTION 01 91 00 (PROJECT GENERAL COMMISSIONING

REQUIREMENTS) OF THE SPECIFICATION SECTION. SYSTEMS TO BE

COMMISSIONED WILL BE DETAILED IN THE SECTION AS WELL AND DOCUMENTS

RELEVANT TO THE COMMISSIONING PROCESS ARE DETAILED IN COMMISSIONING

DESCRIPTION SECTION 1.1

1.8 COMMISSIONING TEAM

A. The commissioning team shall consist of, but not be limited to, representatives of Contractor, including Project Superintendent and subcontractors, installers, schedulers, suppliers, and specialists deemed appropriate by the Department of Veterans Affairs (VA) and

Commissioning Agent.

B. Members Appointed by Contractor:

1. The Contractor shall retain the services of a CITP Commissioning

Agent (CxP) that is acceptable to the VA and COR.

Contractor’ Commissioning Manager: The designated person, company, or entity that plans, schedules, and coordinates the commissioning activities for the construction team.

2. Contractor’s Commissioning Representative(s): Individual(s), each having authority to act on behalf of the entity he or she represents, explicitly organized to implement the commissioning process through coordinated actions.

C. Members Appointed by VA:

1. Commissioning Agent will be approved by the VA and the VA will provide a CITP to oversee the Commissioning Process.

2. User: Representatives of the facility user and operation and maintenance personnel.

3. A/E: Representative of the Architect and engineering design professionals.