S02 Attachment 10_EX 1-AHU-25 Load Calc_1 Page.pdf

PDF 151 KB Posted

Attached to
Z2DA--FY26: NRM (PROJ: 548-CSI-139) BB Construction Renovate IR Cath Lab
Solicitation number
36C24826Q0453
Issued by

About this file

This is an HVAC Load Calculations document for a federal construction project at the VA Medical Center (VAMC) in West Palm Beach, Florida. The project, identified as VA Project Number 548-CSI-139 and Above Group Project Number 0124003, involves the renovation of an Interventional Radiology Catheterization Laboratory. The document is currently in the 100% Construction Documents phase and was prepared by Above Group Engineering, Design & Consulting.

The calculations specify technical parameters for Air Handling Unit (AHU) EX 1-AHU-25, including exterior air temperature of 96.9°F dry bulb and 78°F wet bulb, with leaving air temperature of 51°F dry bulb and 50.5°F wet bulb, and total supply air of 200 cfm. Room 2B-223 (Transition Area) is configured with the following design criteria: 160 square feet, 9-foot ceiling height, 0 occupants, cooling temperature setpoint of 75°F, heating temperature setpoint of 70°F, cooling calculated airflow of 20 cfm, total minimum air changes per hour (ACH) of 8, minimum ACH airflow of 192 cfm, and design supply airflow of 200 cfm. These parameters establish the baseline HVAC requirements for the specified space within the catheterization laboratory renovation project.

View the file

Other files

File Type Posted
S06 Attachment_Updated Statement of Work_BB 548-CSI-139_04-30-2026_22 Pages.pdf PDF
36C24826Q0453 0003.docx DOCX document
S06 Attachment_Updated Price Cost Schedule 4-30-2026_1 Page.docx DOCX document
S06 Attachment_548-CSI-139 WPB Renovate IR Cath Lab_Addendum 01_2026-04-24_28 Pages.pdf PDF
36C24826Q0453 0002.docx DOCX document
S06 Attachment_Pneumatic Tube Stations Transfer Stations_2 Pages.pdf PDF
S06 Attachment_VA WPB Cath Lab 100 DWGS R1 - 11-17-20_17 Pages.pdf PDF
S06 Attachment_548-CSI-139 RFI_Responses_7 Pages.pdf PDF
S06 Attachment_Site Visit Sign In Sheet - 548-CSI-139 Renovate IR CathLab Walk-Through_1 Page.pdf PDF
S02 Attachment 25_230923 Direct-Digital Control System for HVAC- rev041326_71 Pages.pdf PDF
36C24826Q0453 0001.docx DOCX document
S02 Attachment 26_BAS Facility Standards_16 Pages.pdf PDF
S02 Attachment 24_EMR_1 Page.pdf PDF
S02 Attachment 21_Price Cost Schedule_1 Page.docx DOCX document
S02 Attachment 09_1-AHU-60 Ventilation Calc_1 Page.pdf PDF
S02 Attachment 08_1-AHU-60 Load Calc_1 Page.pdf PDF
S02 Attachment 20_PPQ_4 Pages.pdf PDF
S02 Attachment 14_2410-08-AVIP_6 Pages.pdf PDF
S02 Attachment 07_CD Specifications_100 percent_dated 10.01.2025_548-CSI-139 WPB Renovate IR Cath Lab_897 Pages.pdf PDF
36C24826Q0453_1.docx DOCX document
S02 Attachment 23_VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_2 Pages.pdf PDF
S02 Attachment 22_Base Offer Price Breakdown_1 Page_Excel Form.xlsx XLSX spreadsheet
S02 Attachment 18_SLD211033-1 West Palm Beach VA Hybrid_LAYOUT_Rev 4_2 Pages.pdf PDF
S02 Attachment 06_Narrative_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_57 Pages.pdf PDF
S02 Attachment 05_CD Drawings_100 percent_dated 10.01.2025_548-CSI-139 WPB Renovate IR Cath Lab_71 Pages.pdf PDF
S02 Attachment 04_Cx Plan_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_55 Pages.pdf PDF
S02 Attachment 03_Cx Procurement_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_1 Page.pdf PDF
S02 Attachment 02_Asbestos Report - 548-CSI-139 WPB Renovate IR Cath Lab_36 Pages.pdf PDF
S02 Attachment 19_WD FL20260220 dated 01-02-2026_5 pages.pdf PDF
S02 Attachment 17_N-SOU240607_3 Pages.pdf PDF
S02 Attachment 16_940537-Submittal-05_45 Pages.pdf PDF
S02 Attachment 15_940537-Submittal-04_45 Pages.pdf PDF
S02 Attachment 13_0124003_100 percent CD Structural Calculations_38 Pages.pdf PDF
S02 Attachment 12_0124003 Medical Gas Pressure Drop Calcs_6 Pages.pdf PDF
S02 Attachment 11_EX 1-AHU-25 Ventilation Calc_1 Page.pdf PDF
S02 Attachment 01_Statement of Work_BB 548-CSI-139_03-31-2026_22 Pages.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC Load Calculations

VA Project Number: 548-CSI-139

Above Group Project Number: 0124003

Project Name: VAMC WPB Renovate IR Cath Lab

Location: West Palm Beach

Current Phase: 100% Construction Documents

EX 1-AHU-25

EAT Temp

(°F DB)

96.9

EAT Temp

(°F WB)

LAT

(°F DB)

LAT

(°F WB)

50.5

Total SA

(cfm)

Unit and Room Name Number of

People

Area

(sq.ft.)

Ceiling

Height (ft)

Room

Cooling

Temp

(°F)

Heating

Temp (°F)

Cooling

Calculated

Airflow

(CFM)

Total Min.

ACH

Min. ACH

Airflow

(cfm)

Design SA

Airflow

(CFM)

2B-223

TRANSITION AREA

0 160 9 75 70 20 8 192 200

File details come from the government source that posted it. Updated .