This document is a 100% Construction Documents set for the WPB VAMC – Upgrade Cath Lab Clean Core project located at West Palm Beach VA Medical Center, 7305 N Military Trail, Riviera Beach, FL 33410. The project, identified as VA Project #548-19-113, is being designed by Joseph, Lawrence & Co (JLC&O) Consulting Engineers and KMA Design Group, with mechanical, electrical, and plumbing (MEP) engineering provided by Lawrence M. Stoff, P.E. and Blake Lawrence Suddeth, P.E.
The construction documents include comprehensive architectural, electrical, and mechanical plans for renovation of the cardiac catheterization laboratory clean core area. Key architectural work includes demolition and renovation of the cath lab suite with new finishes, millwork, door and signage schedules, and life safety/reflected ceiling plans. Electrical work encompasses new lighting fixtures (LED panels and emergency exits), power distribution, receptacles, data drops, access control, and automatic door openers, with coordination of existing pneumatic tube station relocation and conversion of pneumatic controls to direct digital controls (DDC). Mechanical work includes replacement of air handling units (AHU-25 and AHU-60) with variable frequency drives (VFDs), rebalancing of existing variable air volume (VAV) terminal boxes, new diffusers and exhaust systems maintaining pressurization requirements, replacement of laminar flow diffusers, conversion of controls from pneumatic to DDC systems, and coordination with existing chilled water and heating hot water infrastructure. The submission date is November 17, 2020, and the documents are prepared for federal construction contracting with the U.S. Department of Veterans Affairs.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION:
BY:
SUBMISSION / DATE:
JL
C&O
JRVHSK��LDZUHQFH�&�CR
CRQVXOWLQJ�(QJLQHHUV
317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922
Tel: 321.972.4466 . www.jlceng.com . CA No. 32770
6SDFH�CRDVW
voice 407.697.0336 www.kmadg.net
AA 26002557
DRAWING
NUMBER DRAWING TITLE
--- COVER SHEET
ARCHITECTURAL INFORMATION
A001
SHEET 1 OF 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Z S h a r e d K
M A
P r o j e c t s A c t i v e
V
A
W
P B
O
R
E n v i r o n m e n t f o r
C a r d i a c
C a t h
L a b J L C
C a d A
A
R C
H I T
E C
T U
R A
L
I N
F O
R M
A T
I O
N W
V
A d w g
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
JAMES L. MOORE
AR #: 95890
JLM JLM
voice 407.697.0336 www.kmadg.net
AA 26002557
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Nov. 17, 2020
100% CONSTRUCTION
DOCUMENTS
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
SS
S
CORR.
2B-C7
FEMALE
TOILET
2B-312A
F. LOCKER/
LOUNGE
2B-312
M. LOCKER/
LOUNGE
2B-314
HAC
2B-322
CORR.
2B-C9
CONSULT/
ON CALL
2B-327
STAFF
TOILET
2B-327A
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
S S
S
S S S S S S S S S S S S S S S S S S S S S S
S S
S S
S
S S S
S
S S
S S S S S S S S S S S
S S S
S S
S S
S S S
S S S
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
EKG
2B-251A
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
SCRUB
2B-221
CARDIO
STATION
2B-250
AMBU
ARRHYTHMIA
2B-248
CARDIOLOGIST
2B-246
PACEMAKER
2B-244
DOCTORS
CARDIOLOGY
2B-242
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
NURSE
STATION
S S
S S
S S
S
S S
S
S
S S
S S
S S
S
2B-234
2B-230B
2B-232A
2B-204A
ANTE RM.
2B-204
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
SS
S
CORR.
2B-C7
FEMALE
TOILET
2B-312A
F. LOCKER/
LOUNGE
2B-312
M. LOCKER/
LOUNGE
2B-314
HAC
2B-322
CORR.
2B-C9
CONSULT/
ON CALL
2B-327
STAFF
TOILET
2B-327A
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
S S
S
S S S S S S S S S S S S S S S S S S S S S S
S S
S S
S
S S S
S
S S
S S S S S S S S S S S
S S S
S S
S S
S S S
S S S
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
EKG
2B-251A
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
2B-221
CARDIO
STATION
2B-250
AMBU
ARRHYTHMIA
2B-248
CARDIOLOGIST
2B-246
PACEMAKER
2B-244
DOCTORS
CARDIOLOGY
2B-242
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
NURSE
STATION
S S
S S
S S
S
S S
S
S
S S
S S
S S
S
2B-234
2B-230B
2B-232A
2B-204A
ANTE RM.
2B-204
DEMOLITION - FLOOR PLAN AND
REFLECTED CEILING PLAN
AD101
SHEET 2 OF 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Z S h a r e d K
M A
P r o j e c t s A c t i v e
V
A
W
E n v i r o n m e n t f o r
C a r d i a c
C a t h
L a b J L C
C a d A
D D
E M
O
F
L O
L A
N
A
N D
E M
O
R
C P
W
C
A T
H
L A
B d w g
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
JAMES L. MOORE
AR #: 95890
JLM JLM
voice 407.697.0336 www.kmadg.net
AA 26002557
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Nov. 17, 2020
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
SS
S
CORR.
2B-C7
FEMALE
TOILET
2B-312A
F. LOCKER/
LOUNGE
2B-312
M. LOCKER/
LOUNGE
2B-314
HAC
2B-322
CORR.
2B-C9
CONSULT/
ON CALL
2B-327
STAFF
TOILET
2B-327A
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
S S
S
S S S S S S S S S S S S S S S S S S S S S S
S S
S S
S
S S S
S
S S
S S S S S S S S S S S
S S S
S S
S S
S S S
S S S
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
EKG
2B-251A
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
SCRUB
2B-221
CARDIO
STATION
2B-250
AMBU
ARRHYTHMIA
2B-248
CARDIOLOGIST
2B-246
PACEMAKER
2B-244
DOCTORS
CARDIOLOGY
2B-242
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
CARDIAC
CATH LAB
NURSE
STATION
S S
S S
S S
S
S S
S
S
S S
S S
S S
S
2B-234
2B-230B
2B-230
2B-232A
2B-204A
ANTE RM.
2B-204
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
SS
S
CORR.
2B-C7
FEMALE
TOILET
2B-312A
F. LOCKER/
LOUNGE
2B-312
M. LOCKER/
LOUNGE
2B-314
HAC
2B-322
CORR.
2B-C9
CONSULT/
ON CALL
2B-327
STAFF
TOILET
2B-327A
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
S S
S
S S S S S S S S S S S S S S S S S S S S S S
S S
S S
S
S S S
S
S S
S S S S S S S S S S S
S S S
S S
S S
S S S
S S S
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
EKG
2B-251A
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
2B-221
CARDIO
STATION
2B-250
AMBU
ARRHYTHMIA
2B-248
CARDIOLOGIST
2B-246
PACEMAKER
2B-244
DOCTORS
CARDIOLOGY
2B-242
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
CARDIAC
CATH LAB
NURSE
STATION
S S
S S
S S
S
S S
S
S
S S
S S
S S
S
2B-234
2B-230B
2B-230
2B-232A
2B-204A
ANTE RM.
2B-204
LIFE SAFETY/FLOOR PLAN AND
REFLECTED CEILING PLAN
A101
SHEET 3 OF 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Z S h a r e d K
M A
P r o j e c t s A c t i v e
V
A
W
E n v i r o n m e n t f o r
C a r d i a c
C a t h
L a b J L C
C a d A
L I F
E
S
A F
E T
Y F
L O
A
N
A
C P
W
C
A T
H
L A
B d w g
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
JAMES L. MOORE
AR #: 95890
JLM JLM
voice 407.697.0336 www.kmadg.net
AA 26002557
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Nov. 17, 2020
100% CONSTRUCTION
S S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
SS
S
CORR.
2B-C7
FEMALE
TOILET
2B-312A
F. LOCKER/
LOUNGE
2B-312
M. LOCKER/
LOUNGE
2B-314
HAC
2B-322
CORR.
2B-C9
CONSULT/
ON CALL
2B-327
STAFF
TOILET
2B-327A
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
S S
S
S S S S S S S S S S S S S S S S S S S S S S
S S
S S
S
S S S
S
S S
S S S S S S S S S S S
S S S
S S
S S
S S S
S S S
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
EKG
2B-251A
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
SCRUB
2B-221
CARDIO
STATION
2B-250
AMBU
ARRHYTHMIA
2B-248
CARDIOLOGIST
2B-246
PACEMAKER
2B-244
DOCTORS
CARDIOLOGY
2B-242
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
CARDIAC
CATH LAB
NURSE
STATION
S S
S S
S S
S
S S
S
S
S S
S S
S S
S 2B-234
2B-230B
2B-230
2B-232A
2B-204A
ANTE RM.
2B-204
MILLWORK DETAILS AND FINISH
SCHEDULE
A201
SHEET 4 OF 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Z S h a r e d K
M A
P r o j e c t s A c t i v e
V
A
W
E n v i r o n m e n t f o r
C a r d i a c
C a t h
L a b J L C
C a d A
M
I L L W
O R
K
D
E T
A I
F
I N
I S
H
S
C H
E D
U L E
W
C
A T
H
L A
B d w g
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
JAMES L. MOORE
AR #: 95890
JLM JLM
voice 407.697.0336 www.kmadg.net
AA 26002557
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Nov. 17, 2020
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
SS
S
CORR.
2B-C7
FEMALE
TOILET
2B-312A
F. LOCKER/
LOUNGE
2B-312
M. LOCKER/
LOUNGE
2B-314
HAC
2B-322
CORR.
2B-C9
CONSULT/
ON CALL
2B-327
STAFF
TOILET
2B-327A
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
S S
S
S S S S S S S S S S S S S S S S S S S S S S
S S
S S
S
S S S
S
S S
S S S S S S S S S S S
S S S
S S
S S
S S S
S S S
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
EKG
2B-251A
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
SCRUB
2B-221
CARDIO
STATION
2B-250
AMBU
ARRHYTHMIA
2B-248
CARDIOLOGIST
2B-246
PACEMAKER
2B-244
DOCTORS
CARDIOLOGY
2B-242
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
CARDIAC
CATH LAB
NURSE
STATION
S S
S S
S S
S
S S
S
S
S S
S S
S S
S
2B-234
2B-230B
2B-230
2B-232A
2B-204A
ANTE RM.
2B-204
SIGNAGE SCHEDULE AND
DOOR SCHEDULE AND DETAILS
A301
SHEET 5 OF 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Z S h a r e d K
M A
P r o j e c t s A c t i v e
V
A
W
E n v i r o n m e n t f o r
C a r d i a c
C a t h
L a b J L C
C a d A
S
I G
N A
G
C H
E D
U
O
R
S
C H
E D
U
T
A I L S
W
P B
V A d w g
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
JAMES L. MOORE
AR #: 95890
JLM JLM
voice 407.697.0336 www.kmadg.net
AA 26002557
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Nov. 17, 2020
ELECTRICAL LEGEND
E-000
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
M P r o j e c t
S e r v e r P r o j e c t s J L S
C
V e n e r g y
G r o u p
V
A
W
U p g r a d e
C a t h
L a b
C l e a n
C o r e
W e s t
P a l m a c h
F
L D r a w i n g s E l e c t r i c a l E d w g
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
LAWRENCE M. STOFF
P.E. #: 78586
Blake Lawrence Suddeth
P.E. #: 69060
Blake Lawrence Suddeth
P.E. #: 69060
BLS \ PJRLMS NMO \ Nov. 17, 2020
SHEET # OF 16
voice 407.697.0336 www.kmadg.net
AA 26002557
JL
C&O
JRVHSK��LDZUHQFH�&�CR
CRQVXOWLQJ�(QJLQHHUV
317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922
Tel: 321.972.4466 . www.jlceng.com . CA No. 32770
6SDFH�CRDVW
100% CONSTRUCTION
DOCUMENTS
GENERAL NOTES
DESCRIPTIONSYMBOL
ABBREVIATIONS
DESCRIPTIONSYMBOL
CH COUNTER HEIGHT
ELECTRIC WATER COOLEREWC
H.I.D.
COMPACT FLUORESCENT LAMPCFL
A
A/C
AC
AFF
AFG
AHU
AWG
C
CONC
COND
CU
DISC
ELEC
EM
EMS
EMT
EF
EX
FA
AMPERES
AIR CONDITIONING
ALTERNATING CURRENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AMERICAN WIRE GAUGE
CONDUIT
CONCRETE
CONDUIT
COPPER
DISCONNECT
ELECTRICAL
EMERGENCY
ENERGY MANAGEMENT SYSTEM
ELECTRICAL METALLIC TUBING
EXHAUST FAN
EXISTING
FIRE ALARM
G
GFI
GND
J
KAIC
KVA
KW
NL
NEMA
NFPA
GROUND
GROUND FAULT INTERRUPTER
GROUND
O.C.
P
PNL
PVC
RM
RGS
SPEC
SS
TYP
UON
V
W
WP
FIRE ALARM ANNUNCIATOR PANELFAAP
ENCLOSED CIRCUIT BREAKERECB
I.G.
TVSS
ETR
HIGH INTENSITY DISCHARGE
GRC
HVAC
LTG
MCM
MCU
MH
N
NA
NF
NEC
NIC
GALVANIZED RIGID CONDUIT
JUNCTION
KILOVOLT-AMPERES
KILOWATT
LIGHTING
THOUSANDS OF CIRCULAR MILS
MASTER CONTROL UNIT
METAL HALIDE
NEUTRAL
NOT APPLICABLE
NON-FUSED
NATIONAL ELECTRICAL CODE
NOT IN CONTRACT
NIGHT LIGHT
NATIONAL FIRE PROTECTION ASSOCIATION
ON CENTER
POLE
PANELBOARD
POLYVINYL CHLORIDE
ROOM
RIGID GALVANIZED STEEL
SPECIFICATION
STAINLESS STEEL
TYPICAL
UNLESS OTHERWISE NOTED
VOLTS
WIRE
WEATHERPROOF
MOTOR CIRCUIT PROTECTIONMCP
ISOLATED GROUND
TRANSIENT VOLTAGE SURGE SUPPRESSION
O.F.C.I. OWNER FURNISHED CONTRACTOR INSTALLED
FIRE ALARM CONTROL PANELFACP -
NATIONAL ELECTRIC MANUFACTURERS ASSOCIATION
HEATING, VENTILATING, AND AIR CONDITIONING
(THOUSAND) AMPERE INTERRUPTING CAPACITY
EXISTING TO REMAIN
SYMBOLS SHOWN ON THIS ELECTRICAL LEGEND ARE FOR
REFERENCE PURPOSES ONLY. ALL OF THESE SYMBOLS MAY NOT BE
USED FOR THIS PROJECT.
NOTE:
PANELS
DESCRIPTIONSYMBOL
DESCRIPTIONSYMBOL
WIRING AND POWER
XXX
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
SECURITY ALARM CONTROL PANEL
MASTER CLOCK CONTROL PANEL
PUBLIC ADDRESS CONTROL PANEL
FAAP
FACP
SACP
PA
MC
MAIN DISTRIBUTION PANEL (SEE PANEL SCHEDULE)
AUTOMATIC TRANSFER SWITCH
NEW ELECTRICAL PANEL
ELECTRICAL SYSTEMS PANEL
SURGE PROTECTION DEVICESPD
MDP
SPD
TYPE X (SEE RECEPTACLE SCHEDULE)X
POWER LEG ONLY (NO SWITCH LEG BETWEEN ROOMS)
DISCONNECT SWITCH - WEATHERPROOF (NEMA 3R)
COMBINATION VARIABLE SPEED DRIVE AND DISCONNECT
WATER HEATER
HVP1-6
MAGNETIC MOTOR STARTER
COMBINATION FUSED DISCONNECT/
MOTOR WITH DESIGNATOR
MAGNETIC STARTER SWITCH
TIME CLOCK
MANUAL STARTER
START/STOP
HAND/OFF/AUTO
FUSED DISCONNECT SWITCH
VARIABLE SPEED DRIVE
SS
EF-1
M
WP
HOA
POWER POLE
PLUG MOLD
DISCONNECT SWITCH
JUNCTION BOX
COUNTER HEIGHT
COUNTER HEIGHTC
C
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT CIRCUIT INTERRUPTER
OCCUPANCY SENSOR SWITCH
SINGLE POLE WEATHERPROOF SWITCH
COUNTER HEIGHT (ABOVE COUNTER OR 42" AFF)
COUNTER HEIGHT (ABOVE COUNTER OR 42" AFF)
COUNTER HEIGHT (ABOVE COUNTER OR 42" AFF)
ISOLATED GROUNDIG
SPECIAL RECEPTACLE
QUADRAPLEX RECEPTACLE
ISOLATED GROUND
WEATHERPROOF
C
IG
WP
GFI
EWC
C
WEATHERPROOF
ISOLATED GROUND
WEATHERPROOF
DUPLEX RECEPTACLE
SINGLE RECEPTACLE
GFI
WP
C
IG
WP
GFI
SINGLE POLE KEYED SWITCH
THREE WAY TOGGLE SWITCH
TWO POLE TOGGLE SWITCH
SINGLE POLE TOGGLE SWITCH
OS
K
(NONE)
WP
SWITCH
MANUAL MOTOR CONTROLLER W/O OVERLOADSM
RECESSED FLOOR MOUNTED DUPLEX RECEPTACLE
SURFACE-MOUNTED FLOOR DUPLEX RECEPTACLE
CEILING-MOUNTED DUPLEX RECEPTACLE
LOWER CASE LETTERS INDICATES SWITCHING DESIGNATIONS, QUANTITY OF LETTERS EQUAL
QUANTITY OF GANGED SWITCHES
ELECTRIC WATER COOLER, COORDINATE LOCATION WITH PLUMBING CONTRACTOR
BRANCH CIRCUIT HOME RUN WITH PANEL NAME AND CIRCUIT NUMBER, QUANTITY OF
ARROWHEADS DENOTES QUANTITY OF BRANCH CIRCUITS
BRANCH CIRCUIT WIRING, PROVIDE QUANTITIES OF CONDUCTORS REQUIRED FOR CIRCUITING
AND SWITCHING INDICATED
S abcS
J
HALF SWITCHED DUPLEX RECEPTACLE
(FURNISHED UNDER DIV 15 UNLESS NOTED OTHERWISE)
ELECTRIC UNIT HEATER
TYPE "K" TRANSFORMER
MUSHROOM HEAD PUSH BUTTON
RELAY
GROUND ROD
TRANSFORMER
(EMERGENCY STOP)
WIRE IN CONDUIT CONCEALED BELOW SLAB OR GRADE
1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE LATEST ADOPTED EDITION (BY THE VA) OF THE NATIONAL ELECTRICAL CODE (NFPA 70), THE LATEST ADOPTED EDITION OF THE INTERNATIONAL BUILDING CODE AND
CURRENT VA STANDARDS AND SPECIFICATIONS.
2. CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND COORDINATE WITH ALL EQUIPMENT
MANUFACTURER/INSTALLERS PRIOR TO BIDDING.
3. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED
THIRD-PARTY TESTING AGENCY.
BUILDING:
4. INSTALLATION HEIGHT OF EQUIPMENT (TO CENTERLINE) ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE SHALL
BE:
RECEPTACLE = 18"
CLOCK = 7'-6"
SWITCH = 44"
MODULAR JACK FOR WALL MOUNTED TELEPHONE = 48"
MODULAR TELEPHONE JACK = 18"
TELEVISION OUTLET = 84"
COMPUTER OUTLET = 18"
CALL SWITCH = 44"
REMOTE TEST STATION FOR DUCT DETECTOR = 52"
C = ABOVE COUNTER, COORDINATE WITH ARCHITECTURAL ELEVATIONS AND MILLWORK.
5. ALL CONDUIT AND WIRING SHALL BE CONCEALED IN WALLS OR ABOVE CEILINGS UNLESS NOTED OTHERWISE OR APPROVED BY THE ARCHITECT/ENGINEER. ALL DEVICE OUTLET BOXES SHALL BE RECESSED UNLESS NOTED OTHERWISE OR APPROVED BY THE ARCHITECT/ENGINEER. WHERE APPROVED OR NOTED SURFACE METAL RACEWAY AND DEVICE BOXES SHALL BE USED IN LIEU OF CONDUIT AND CONCEALED BOXES AT NO EXTRA COST TO THE
OWNER.
6. ALL CONDUIT ROUTING SHOWN IS APPROXIMATE ONLY. CONTRACTOR SHALL FIELD VERIFY FINAL ROUTE WITH ALL
OTHER TRADES AND CONDITIONS IN FIELD PRIOR TO ROUGH-IN.
7. CONDUIT RUNS SHOWN ARE SCHEMATIC AND DO NOT INDICATE THE NECESSARY FITTINGS AND JUNCTION BOXES
THAT ARE INCLUDED IN THE SCOPE OF THE WORK.
8. CONTRACTOR SHALL PERMANENTLY IDENTIFY ALL WIRING WITH THE SOURCE AND CIRCUIT AT ALL ELECTRICAL EQUIPMENT, PULL AND JUNCTION BOXES AND ELECTRICAL TERMINATIONS PROVIDED OR ASSOCIATED WITH THIS
CONSTRUCTION.
9. COORDINATE EXACT LOCATION OF LIGHTING FIXTURES IN MECH. ROOMS/SPACES WITH DUCTWORK INSTALLER PRIOR TO ROUGH-IN. LOCATE BELOW DUCTWORK(8'-0" AFF MINIMUM) CENTERED IN ROOM AS MUCH AS POSSIBLE.
10. VERIFY EXACT LOCATION OF ALL MECHANICAL EQUIPMENT WITH MECHANICAL INSTALLER PRIOR TO ROUGH-IN.
11. PROVIDE NYLON PULLSTRINGS IN ALL EMPTY CONDUITS.
12. COORDINATE THE EXACT LOCATION OF ALL ELECTRICAL EQUIPMENT LOCATED IN ELEVATOR MACHINE ROOMS, SHAFTS AND PITS. LOCATE EQUIPMENT AS REQUIRED TO MEET APPLICABLE CODES.PROVIDE AUTOMATIC DISCONNECTION OF THE ELEVATOR MAIN POWER SUPPLY (PER ANSI A17.1, RULE 102.2 1987 ED.) PRIOR TO ACTIVATION OF AUTOMATIC SPRINKLERS LOCATED WITHIN THE ELEVATOR MACHINE ROOM, PIT OR SHAFT.
COORDINATE WITH FIRE PROTECTION AND FIRE ALARM INSTALLER.
13. COORDINATE THE REQUIRED SIZE OF ALL CIRCUIT BREAKERS FEEDING EQUIPMENT, (I.E. MOTORS, HVAC, KITCHEN EQUIPMENT, SPECIAL PURPOSE OUTLETS, ELEVATORS, OWNER FURNISHED EQUIPMENT ETC. ) WITH APPROVED EQUIPMENT SHOP DRAWINGS AND OWNER REPRESENTATIVES PRIOR TO ORDERING PANELBOARDS. BREAKERS SHALL BE SIZED PER THE NEC, THE EQUIPMENT NAME PLATE AND MANUFACTURERS RECOMMENDATIONS.
14. VISIT THE EXISTING FACILITY AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSALS, SO AS TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS
REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED.
15. CONTRACTOR SHALL INCLUDE IN HIS BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL RULES, REGULATIONS AND GUIDELINES APPLICABLE.
16. PANEL SCHEDULES INDICATE CIRCUIT DESIGNATIONS ONLY. CONTRACTOR TO PROVIDE MATERIALS AS REQUIRED WHEN NEUTRALS ARE SHARED TO COMPLY WITH NEC REQUIREMENTS. ALL SINGLE PHASE MULTIWIRE BRANCH CIRCUITS SHALL BE FED VIA A TWO POLE BREAKER OR TWO SINGLE POLE BREAKERS WITH AN IDENTIFIED HANDLE TIE. ALL THREE PHASE MULTIWIRE BRANCH CIRCUITS SHALL BE FED VIA A THREE POLE BREAKER OR THREE SINGLE
POLE BREAKERS WITH AN IDENTIFIED HANDLE TIE (PER NEC 210.4B).
17. PER NEC 110.22; PROVIDE PERMANENT LABELING FOR ALL SERIES RATED PANEL ENCLOSURES TO READ AS FOLLOWS: CAUTION - SERIES COMBINATION SYSTEM RATED ______ AMPERES. IDENTIFIED REPLACEMENT
COMPONENTS REQUIRED.
GROUNDING:
18. ALL METAL RACEWAYS, INCLUDING CONDUIT, WIRE TROUGHS, WIREMOLD, ETC., SHALL BE GROUNDED. ALL CONNECTIONS IN METAL RACEWAYS SHALL BE COMPLETED IN SUCH A MANNER AS TO MAINTAIN A CONTINUOUS PATH
TO GROUND THROUGHOUT THE ENTIRE LENGTH OF THE RACEWAY.
WIRING:
19. UNLESS NOTED OTHERWISE ON THE DRAWINGS OR ON THE EQUIPMENT WIRING SCHEDULE, EACH BRANCH CIRCUIT HOME RUN SHALL BE THREE (3) #12 AWG THHN/THWN (1 HOT, 1 NEUTRAL & 1 EQUIPMENT GROUND) IN 3/4" EMT CONDUIT. PROTECT EACH CIRCUIT WITH A 20 AMPERE, 1-POLE OVERCURRENT DEVICE UNLESS NOTED OTHERWISE.
COMBINED NEUTRALS ARE NOT PERMITTED.
SUITE 7
CORR.
2B - C7
CORR.
2B - C4
2B - C7
2B-C7
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
SCRUB
2B-221
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
CARDIAC
CATH LAB
NURSE
STATION
2B-234
2B-230B
2B-230
2B-232A
2B-204A
ANTE RM.
2B-204
25-13 25-7
J
J
CL2E-23
CL2E-23
J
J
SUITE 7
CORR.
2B - C7
CORR.
2B - C4
CORR.
2B - C7
2B-C7
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
SCRUB
2B-221
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
CARDIAC
CATH LAB
NURSE
STATION
2B-234
2B-230B
2B-230
2B-232A
2B-204A
ANTE RM.
2B-204
(TYP.)
(TYP.)
A A
AA
A A
AA
A A
A
A
AA
A
A
A
(TYP.)
(TYP.)
(TYP.)
(TYP.)
6 6
3S
3S
3S
3S
(TYP.)
X1
X1
X1
ELECTRICAL FLOOR PLANS
E-101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
M P r o j e c t
S e r v e r P r o j e c t s J L S
C
V e n e r g y
G r o u p
V
A
W g r a d e
C a t h
L a b
C l e a n
C o e s t
P a a c h
F
L D r a w i n g s E l e c t r i c a l E d w g
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
LAWRENCE M. STOFF
P.E. #: 78586
Blake Lawrence Suddeth
P.E. #: 69060
Blake Lawrence Suddeth
P.E. #: 69060
BLS \ PJRLMS NMO \ Nov. 17, 2020
SHEET # OF 16
voice 407.697.0336 www.kmadg.net
AA 26002557
JL
C&O
JRVHSK��LDZUHQFH�&�CR
CRQVXOWLQJ�(QJLQHHUV
317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922
Tel: 321.972.4466 . www.jlceng.com . CA No. 32770
6SDFH�CRDVW
100% CONSTRUCTION
DOCUMENTS
KEY NOTES:
1. EXISTING VAV UNITS SHALL RETAIN EXISTING CIRCUITING, CONDUITS AND CONDUCTORS. VERIFY
REPLACEMENT OF UNITS AND ELECTRICAL NEEDS WITH MECHANICAL CONTRACTOR.
2. EXISTING LOCATION OF PNEUMATIC TUBE STATION TO BE RELOCATED. COORDINATE EXACT NEW LOCATION WITHIN NURSE'S STATION WITH OWNER. RELOCATE CRITICAL POWER CIRCUIT AND ASSOCIATED DATA TO
NEW LOCATIONS AS REQUIRED.
3. NEW LOCATION OF PNEUMATIC TUBE STATION. COORDINATE EXACT LOCATION WITHIN NURSE'S STATION WITH OWNER. RELOCATE CRITICAL POWER CIRCUIT AND ASSOCIATED DATA TO NEW LOCATIONS AS REQUIRED. THE EXACT SAME CIRCUIT AND DATA DROP SHALL BE USED TO ENSURE PROPER FUNCTIONALITY
OF TUBE STATION IN NEW LOCATION.
4. ALL EXISTING LIGHTING AND ELECTRICAL DEVICES OUTSIDE OF THOSE SPECIFICALLY NOTED SHALL REMAIN
IN USE AND AS IS.
5. NEW STERILE FIELD AIR DISTRIBUTION DEVICES ARE BEING PLACED IN THE IR CATH LAB. AS SUCH, CONTRACTOR SHALL RELOCATE EXISTING LIGHTING AS REQUIRED TO ACCOMMODATE THE NEW AIR
DIFFUSERS. COORDINATE WITH MECHANICAL DOCUMENTS.
6. CONTRACTOR SHALL REPLACE THE LIGHTING WITHIN THE NURSE'S STATION AND THE CLEAN CORE SPACE ONE FOR ONE. RETAIN EXISTING CIRCUITING. COORDINATE NEW SWITCH LOCATIONS WITH OWNER.
7. TIE NEW EMERGENCY LIGHT FIXTURES TO EXISTING EMERGENCY CIRCUIT THAT WAS SERVING EXISTING
EMERGENCY LIGHT FIXTURES.
8. TIE NEW LIGHT FIXTURES INTO EXISTING CIRCUIT THAT WAS SERVING EXISTING LIGHT FIXTURES.
9. POWER FOR AUTOMATIC DOOR OPENER. COORDINATE WITH EXISTING CONDITIONS AND ARCHITECTURAL
DOOR HARDWARE DOCUMENTS AND HARDWARE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
10. POWER FOR ACCESS CONTROL DEVICE. COORDINATE WITH DOOR HARDWARE AND LOW VOLTAGE
INSTALLER.
11. PROVIDE NEW DUPLEX RECEPTACLE AND DATA DROP FOR NEW MILLWORK. COORDINATE EXACT LOCATION
WITH ARCHITECTURAL PLANS.
12. TIE 120V CIRCUITING INTO NEAREST RECEPTACLE CIRCUIT. CONTRACTOR SHALL DOCUMENT CIRCUITING COMPLETED IN THE FILED AND SUBMIT FOR THE ENGINEER TO RECORD DURING RECORD DOCUMENTS.
GENERAL NOTES:
A. DO NOT SCALE ELECTRICAL DRAWING FOR ANY DIMENSIONS.
B. ALL WORK SHALL COMPLY WITH THE LATEST ADOPTED EDITION (BY THE VA) OF THE NATIONAL ELECTRIC CODE, NATIONAL, STATE AND LOCAL CODES AND VA SPECIFICATIONS AND GUIDELINES. PROVIDE
GROUNDING AND BONDING PER NEC 250.
C. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF ALL DEVICES AND EQUIPMENT PRIOR TO ROUGH
IN.
D. ALL ELECTRICAL AND LIGHTING DEVICES, EQUIPMENT AND ACCESSORIES SHALL REMAIN AS IS UNLESS
EXPLICITLY NOTED WITHIN THESE DOCUMENTS.
E. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT FIXTURE LOCATIONS AND ORIENTATIONS.
F. REFER TO ARCHITECTURAL ELEVATIONS AND SECTIONS FOR ADDITIONAL LIGHTING FIXTURE MOUNTING
DETAILS AND INFORMATION.
G. ALL EMERGENCY LIGHTING FIXTURES AND EXIT SIGNS SHALL BE CONNECTED "HOT" TO THE INDICATED
LOCAL LIGHTING CIRCUIT.
H. VERIFY ALL MOUNTING HEIGHTS AND PENDANT LENGTHS WITH ARCHITECT AND ENGINEER PRIOR TO
ORDERING FIXTURES.
I. REFER TO GENERAL DEMOLITION NOTES ON LEGEND SHEET FOR FURTHER INFORMATION.
J. CONTRACTOR SHALL FIELD INVESTIGATE THE EXISTING SWITCHING LIGHTING CONTROLS. CONTRACTOR SHALL REUSE EXISTING SWITCHING CONTROL IF FOUND EXISTING. WHERE EXISTING CONTRACTOR SHALL VERIFY THE WORKING CONDITION OF THE DEVICE TO BE REUSED. IF A SWITCHING CONTROL IS NOT FOUND, CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING CONTROL UNIT PHILLIPS BODINE #BLCD-20B OR APPROVED EQUAL BY OWNER. PROVIDE ADDITIONAL SENSORS, RELAYS, POWER PACKS, ETC. AS REQUIRED FOR COMPLETE COVERAGE OF SPACE. PROVIDE ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED.
COORDINATE APPROVAL AND ALL SWITCHING REQUIREMENTS WITH OWNER PRIOR PURCHASE.
WIRE SIZE 20A/1Ø/VOLTAGE DROP
ASSUMPTION:
- 20A/1Ø, 120 OR 277V CIRCUIT
- COPPER CONDUCTORS
- 75° RATING AND CIRCUIT LOADED TO 80% OF
OVER-CURRENT DEVICE RATING
- "L" IS THE ACTUAL "ONE-WAY" LENGTH OF THE BRANCH
CIRCUIT.
OPTIONALLY, THE CONTRACTOR MAY CALCULATE THE WIRE SIZE TO
MAINTAIN A VOLTAGE DROP BELOW 3% FOR EACH 20A/1Ø
BRANCH CIRCUITS BASED ON THE ACTUAL/NEC LOAD
CONNECTED.
120 VOLT:
- #12 AWG FOR L>55'
- #10 AWG FOR 55'<L<90'
- #8 AWG FOR 55'<L<140'
- #6 AWG FOR 140'<L<225'
- #4 AWG FOR 225<L<350'
- #3 AWG FOR 350'<L<450'
- #2 AWG FOR 450'<L<580'
277 VOLT:
- #12 AWG FOR L>125'
- #10 AWG FOR 125'<L<215'
- #8 AWG FOR 215'<L<330'
- #6 AWG FOR 330'<L<525'
FOR L>500', THE BRANCH CIRCUIT WIRING SHALL BE SIZED TO LIMIT
THE VOLTAGE DROP TO 3%
MODELQTY WATTS
VOLTSMODEL
LAMP
MARK DESCRIPTION MANUFACTURER
LIGHTING FIXTURE SCHEDULE
FIXTURE
WATTS
A
X1
2' X 2' LED FLAT PANEL, RECESSED INTO GRID CEILING 1 30 LED120/277 30METALUX
EMERGENCY EXIT SIGN. TO COORDINATE IN FIELD TO MATCH
EXISTING. 1 4 LED120/277 4TO BE DEFINEDTBD
22FP3240C
NOTES:
DIVISION 16 CONTRACTOR SHALL VERIFY ALL FIXTURE TYPES AND FINISHES WITH OWNER PRIOR TO ORDERING.
DA.
DB.
DC.
GENERAL DEMOLITION NOTES:
FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE
DEVICE AND REMOVE WIRING COMPLETELY FROM THE ABANDONED CONDUITS.
DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE DEVICE.
COMPLETELY REMOVE ALL ABANDONED WIRING.
MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH
RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
MECHANICAL
2B - 304A
PATIENT
SERVICE
LOBBY
2B - 306
F. TLT
2B - 312A
F. LOCKER
/ LOUNGE
2B - 312
M. LOCKER
LOUNGE
2B - 314
M. TLT
/ SHOWER
2B - 314A
ELEV. S - 1
ELEV. S - 2
ELEV. S - 3
FEMALE
TOILET
F. LOCKER/
LOUNGE
M. LOCKER/
LOUNGE
AHU-25
AHU-60
AHU-24
NH2A-13:15:19
QDP2A1-7:9:11
VF
D
AH
U-
VF
D
AH
U-
VF
D R
AF
AH
U-
ELECTRICAL FLOOR PLANS
E-101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
M P r o j e c t
S e r v e r P r o j e c t s J L S
C
V e n e r g y
G r o u p
V
A
W g r a d e
C a t h
L a b
C l e a n
C o e s t
P a a c h
F
L D r a w i n g s E l e c t r i c a l E d w g
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
LAWRENCE M. STOFF
P.E. #: 78586
Blake Lawrence Suddeth
P.E. #: 69060
Blake Lawrence Suddeth
P.E. #: 69060
BLS \ PJRLMS NMO \ Nov. 17, 2020
SHEET # OF 16
voice 407.697.0336 www.kmadg.net
AA 26002557
JL
C&O
JRVHSK��LDZUHQFH�&�CR
CRQVXOWLQJ�(QJLQHHUV
317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922
Tel: 321.972.4466 . www.jlceng.com . CA No. 32770
6SDFH�CRDVW
100% CONSTRUCTION
DOCUMENTS
KEY NOTES:
1. EXISTING MECHANICAL AIR HANDLING UNITS AND VFD'S ARE BEING REPLACED ONE FOR ONE. CONTRACTOR
SHALL REUSE EXISTING ELECTRICAL CIRCUITING, CONDUCTORS AND CONDUIT. ELECTRICAL CONTRACTOR SHALL COORDINATE DISCONNECT AND FUSE REQUIREMENTS FOR MECHANICAL UNIT WITH MECHANICAL CONTRACTOR AND EQUIPMENT MANUFACTURER PRIOR TO ROUGH-IN AND PROVIDE AS REQUIRED. LOCATE
AS REQUIRED TO MAINTAIN NEC CLEARANCES.
GENERAL NOTES:
A. DO NOT SCALE ELECTRICAL DRAWING FOR ANY DIMENSIONS.
B. ALL WORK SHALL COMPLY WITH THE LATEST ADOPTED EDITION (BY THE VA) OF THE NATIONAL ELECTRIC CODE, NATIONAL, STATE AND LOCAL CODES AND VA SPECIFICATIONS AND GUIDELINES. PROVIDE
GROUNDING AND BONDING PER NEC 250.
C. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF ALL DEVICES AND EQUIPMENT PRIOR TO ROUGH
IN.
D. ALL ELECTRICAL AND LIGHTING DEVICES, EQUIPMENT AND ACCESSORIES SHALL REMAIN AS IS UNLESS
EXPLICITLY NOTED WITHIN THESE DOCUMENTS.
WIRE SIZE 20A/1Ø/VOLTAGE DROP
ASSUMPTION:
- 20A/1Ø, 120 OR 277V CIRCUIT
- COPPER CONDUCTORS
- 75° RATING AND CIRCUIT LOADED TO 80% OF
OVER-CURRENT DEVICE RATING
- "L" IS THE ACTUAL "ONE-WAY" LENGTH OF THE BRANCH
CIRCUIT.
OPTIONALLY, THE CONTRACTOR MAY CALCULATE THE WIRE SIZE TO
MAINTAIN A VOLTAGE DROP BELOW 3% FOR EACH 20A/1Ø
BRANCH CIRCUITS BASED ON THE ACTUAL/NEC LOAD
CONNECTED.
120 VOLT:
- #12 AWG FOR L>55'
- #10 AWG FOR 55'<L<90'
- #8 AWG FOR 55'<L<140'
- #6 AWG FOR 140'<L<225'
- #4 AWG FOR 225<L<350'
- #3 AWG FOR 350'<L<450'
- #2 AWG FOR 450'<L<580'
277 VOLT:
- #12 AWG FOR L>125'
- #10 AWG FOR 125'<L<215'
- #8 AWG FOR 215'<L<330'
- #6 AWG FOR 330'<L<525'
FOR L>500', THE BRANCH CIRCUIT WIRING SHALL BE SIZED TO LIMIT
THE VOLTAGE DROP TO 3%
ELECTRICAL DETAILS
E-300
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
M P r o j e c t
S e r v e r P r o j e c t s J L S
C
V e n e r g y
G r o u p
V
A
W g r a d e
C a t h
L a b
C l e a n
C o e s t
P a a c h
F
L D r a w i n g s E l e c t r i c a l E d w g
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
LAWRENCE M. STOFF
P.E. #: 78586
Blake Lawrence Suddeth
P.E. #: 69060
Blake Lawrence Suddeth
P.E. #: 69060
BLS \ PJRLMS NMO \ Nov. 17, 2020
SHEET # OF 16
voice 407.697.0336 www.kmadg.net
AA 26002557
JL
C&O
JRVHSK��LDZUHQFH�&�CR
CRQVXOWLQJ�(QJLQHHUV
317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922
Tel: 321.972.4466 . www.jlceng.com . CA No. 32770
6SDFH�CRDVW
MECHANICAL LEGEND
M-000
ZONE DAMPER
WETBULB
WITHOUT
WITH
WATTS
VARIABLE AIR VOLUME
TYPICAL
THERMOSTAT
TRANSFER OPENING ABOVE CEILING
TRANSFER GRILLE
TEMPERATURE
TOTALLY ENCLOSED FAN COOLED
SINGLE ZONE
SQUARE FOOT
SMOKE DAMPER
SMOKE DETECTOR
SUPPLY FAN
SUPPLY AIR
ROOFTOP UNIT
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
REQUIRED
RETURN AIR
PLUMBING
PRESSURE DROP
PROPELLER
OPEN DRIP PROOF
OUTSIDE AIR
NOT TO SCALE
MULTI-ZONE
MANUAL VOLUME DAMPER
MINIMUM
1000 X BTUH
MAXIMUM
LEAVING WATER TEMPERATURE
LEAVING AIR TEMPERATURE
KILOWATTS
INCHES WATER GAGE
HEATING VENTILATING AND AIR CONDITIONING
HOT WATER
HIGH HOT WATER SUPPLY
HIGH HOT WATER RETURN
HORSEPOWER
GALLONS PER MINUTE
GALVANIZED
GALLON
GAUGE
DEGREES FAHRENHEIT
FEET WATER GAUGE
COMBINATION FIRE AND SMOKE DAMPER
FEET PER MINUTE
FLEXIBLE CONNECTOR OR DUCT
FLOOR
FIRE DAMPER
FAN COIL UNIT
FORWARD CURVED
ENTERING WATER TEMPERATURE
ENTERING
ENERGY EFFICIENCY RATIO
ENTERING AIR TEMPERATURE
EACH
EXHAUST
EXHAUST FAN
DIRECT EXPANSION
DRAWINGS
DRYBULB
CONDENSING UNIT
COEFFICIENT OF PERFORMANCE
CONDENSATE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHILLED WATER
CUBIC FEET PER MINUTE
CONDENSATE DRAIN
BRITISH THERMAL UNIT PER HOUR
BRAKE HORSEPOWER
BUILDING
BACKWARD INCLINE
BUILDING AUTOMATION SYSTEM
AIR HANDLING UNIT
AIR CONDITIONER
ABOVE FINISHED FLOOR
ADJUSTABLE
ABOVE
ZD
WB
W/O W/ W
VAV
VFD
TYP
T'STAT
T/O
TG
TEMP
TEFC
SZ
SQ.FT.
SDMP
SD
SF
SA
RTU
RPM
RH
REQ'D
RA
PSIG
PSIA
PLBG
PD
PROP
OPD
OA
N.T.S.
MZ
MVD
MIN
MBH
MAX
LWT
LAT
KW
IN.WG
HVAC
HW
HHWS
HHWR
HP
GPM
GALV
GAL
GA
F
FT. H 0
F/S
FPM
FLEX
FL
FD
FCU
FC
EWT
ENT
EER
EAT
EA
EXH
EF
DX
DWGS
DB
CU
COP
COND
CWS
CWR
CW
CFM
CD
BTUH
BHP
BLDG
BI
BAS
AHU
AC
AFF
ADJ
ABV
VARIABLE FREQUENCY DRIVE
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH ABSOLUTE
RADIATION DAMPERRD
CARBON MONOXIDECO
THREE WAY MOTORIZED CONTROL VALVE
BALL VALVE FOR PIPING 2-INCHES AND SMALLER,
STRAINER
HAVE NAMEPLATE INDICATING WATER FLOW RATE VERSUS
AUTOMATIC FLOW CONTROL VALVE WITH INTEGRAL
PRESSURE RELIEF VALVE
OPENING IN WALL ABOVE CEILING
ELBOW (PLAN, UP, DOWN)
UNION
PRESSURE AND/OR TEMPERATURE PORT
TEE (PLAN, UP, DOWN)
VALVE
TWO WAY MOTORIZED CONTROL VALVE
PRESSURE REDUCING VALVE
FLOW CONTROL VALVE
BUTTERFLY VALVE FOR PIPING 2-1/2 INCHES AND
LARGER
CHECK VALVE
BALANCE VALVE WITH INTEGRAL TAPS FOR CONNECTION
OF DIFFERENTIAL PRESSURE METER. VALVE SHALL
VALVE PRESSURE DROP
TEMPERATURE AND PRESSURE TEST PORTS
VENTURI FLOW METER
THERMOMETER
PRESSURE GAUGE WITH GAUGE COCK
FLEXIBLE CONNECTION
MOTORIZED ACTUATOR
EQUIPMENT TAG
HEATING WATER SUPPLY PIPING
RECTANGULAR BRANCH DUCT CONNECTION.
HEATING WATER RETURN PIPING
CONDENSATE DRAIN PIPING
FLOW SENSOR
CHILLED WATER RETURN PIPING
REFERENCE NOTE - MULTI-DISCIPLINE SHEETS
AND EXISTING
INDICATES POINT OF CONNECTION BETWEEN NEW
STATIC PRESSURE TRANSMITTER ASSEMBLY
CONDENSER WATER SUPPLY PIPING
CONDENSER WATER RETURN PIPING
BUILDING CONDENSER WATER SUPPLY PIPING
BUILDING CONDENSER WATER RETURN PIPING
REFERENCE NOTES
POINT OF DISCONNECT
CHILLED WATER SUPPLY PIPING
1" DOOR UNDER CUT. ARROW INDICATES DIRECTION
OF FLOW
REFRIGERANT PIPING
FLOW DIRECTION
SP
FS
45° W
L
MIN. 4"
L=1/4W, UC
R
CD
HWR
HWS
CHWR
CHWS
BCWR
BCWS
CWR
CWS
EQUIPMENT
MARK
TYPE
SYMBOLS SHOWN ON THIS MECHANICAL LEGEND ARE FOR
REFERENCE PURPOSES ONLY. ALL OF THESE SYMBOLS MAY
NOT BE USED FOR THIS PROJECT.
NOTE:
RD RADIATION DAMPER INSTALLED IN DUCT.
RD RADIATION DAMPER INSTALLED IN AIR DEVICE
CONICAL FITTING WITH DAMPER ON BRANCH
B = SHEET NUMBER ON WHICH DETAIL IS LOCATED
SUPPLY DIFFUSER (4-WAY)
RETURN OR OUTDOOR AIR GRILLE
SUPPLY DUCT UP SECTION (ROUND)
ROUND DUCTWORK
ELBOW WITH TURNING VANES
CONNECTION TO RECTANGULAR MAIN
(PROVIDE DAMPER IN LOW PRESSURE DUCTWORK ONLY)
BACKDRAFT DAMPER
FLEXIBLE DUCT CONNECTION
FIRE DAMPER WITH ACCESS PANEL
COMBINATION FIRE/SMOKE DAMPER WITH ACCESS PANEL
AIR FLOW MONITORING STATION
MOTORIZED CONTROL DAMPER
EXISTING DUCTWORK TO BE REMOVED (HATCHED AND/OR DASHED)
DUCT MOUNTED SMOKE DETECTOR PROVIDED AND WIRED BY
ELECTRICAL CONTRACTOR AND INSTALLED IN DUCT BY
MECHANICAL CONTRACTOR. REFER TO SPECIFICATIONS FOR
CONTROL REQUIREMENTS.
WALL MOUNTED DDC TEMPERATURE SENSOR
MOUNT 4'-0" ABOVE FINISHED FLOOR
WALL MOUNTED DDC HUMIDITY SENSOR
MOUNT 4'-0" ABOVE FINISHED FLOOR
PHOTO DETAIL OR SECTION IDENTIFICATION TARGET
A = DETAIL NUMBER
EXHAUST GRILLE
WALL MOUNTED THERMOSTAT
MOUNT 4'-0" ABOVE FINISHED FLOOR
SUPPLY DUCT UP SECTION (RECTANGULAR)
RETURN DUCT UP SECTION (RECTANGULAR)
EXHAUST DUCT UP SECTION (RECTANGULAR)
RECTANGULAR DUCTWORK WITH TAKE-OFF, BALANCING
DAMPER AND INSULATED FLEXIBLE ROUND DUCT. SAME SIZE
AS DIFFUSER INLET UNLESS NOTED OTHERWISE. FIRST
DIMENSION IS THAT OF SIDE SHOWN
MARK-CFM
AIR DEVICE TAG
SIDEWALL TRANSFER GRILLE
SIDEWALL RETURN GRILLE OR OUTSIDE AIR LOUVER
SIDEWALL SUPPLY REGISTER
SIDEWALL EXHAUST GRILLE
WALL MOUNTED CO SENSOR
MOUNT 4'-0" ABOVE FINISHED FLOOR
WALL MOUNTED HUMIDISTAT SENSOR
MOUNT 4'-0" ABOVE FINISHED FLOOR
SUPPLY DUCT DOWN SECTION (RECTANGULAR)
RETURN DUCT DOWN SECTION (RECTANGULAR)
EXHAUST DUCT DOWN SECTION (RECTANGULAR)
EXISTING DUCTWORK TO REMAIN (LIGHT LINETYPE)
EXISTING LINEAR SLOT DIFFUSER (LIGHT LINETYPE)
LINEAR SLOT DIFFUSER
SUPPLY DUCT DOWN SECTION (ROUND)
A/B
M
A-100
S
C
A Ø
H
H
TS
(PROVIDE BALANCING DAMPER AT ALL BRANCH
CONNECTIONS)
MANUAL DAMPER
BUTTERFLY VALVE
1. INSTALL EQUIPMENT AND MATERIALS IN COMPLIANCE WITH MANUFACTURER'S MINIMUM CLEARANCE REQUIREMENTS AND RECOMMENDATIONS.
2. ALL EQUIPMENT AND INSTALLATION SHALL COMPLY WITH THE LATEST ADOPTED EDITIONS OF NFPA, THE INTERNATIONAL BUILDING CODE AND VA
STANDARDS.
3. ALL MATERIALS SHALL FIT THE SPACE AVAILABLE. VERIFY DIMENSIONS AND CLEARANCES ON BUILDING PLANS PRIOR TO COMMENCING WORK.
4. CONTRACTOR SHALL PERFORM TESTING AND BALANCING OF AIR SYSTEMS IN ACCORDANCE WITH AABC GUIDELINES. A TEST AND BALANCE REPORT
SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER FOR APPROVAL.
5. PROVIDE 45 DEGREE BRANCH TAKE-OFF PER SMACNA FIG. 2-8 ON ALL RECTANGULAR DUCT TAKE-OFFS.
6. ALL DUCTWORK TAKE-OFFS AND/OR BRANCH DUCTWORK SHALL BE PROVIDED WITH A BALANCING DAMPER.
7. PROVIDE AND INSTALL DUCT MOUNTED HINGED ACCESS DOORS FOR ALL SMOKE AND/OR FIRE DAMPERS, NOT OTHERWISE ACCESSIBLE.
8. CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING AND SHALL COORDINATE WITH ALL OTHER TRADES PRIOR TO OR INSTALLING EQUIPMENT AND MATERIALS.
9. COORDINATE ALL HVAC SYSTEM DRAWINGS WITH THE BUILDING STRUCTURE TO AVOID INTERFERENCE BETWEEN MECHANICAL SYSTEMS AND ROOF STRUCTURE. DUCT SIZES MAY BE REVISED, BASED ON ENGINEER APPROVAL, TO FIT TRUSS SYSTEM SO LONG AS THE EQUIVALENT INSIDE CROSS
SECTIONAL AREA IS NOT DECREASED.
10. GAUGES AND CONSTRUCTION FOR DUCTWORK SHALL CONFORM TO THE LATEST EDITION OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS.
11. TRANSITION RECTANGULAR DUCTWORK ON BOTTOM AND SIDES. MAINTAIN TOP OF DUCTWORK LEVEL AND HIGH AS POSSIBLE. FLEXIBLE DUCT RUN-OUTS TO CEILING DIFFUSERS SHALL BE AS STRAIGHT AS POSSIBLE AND FREE OF SAGS & KINKS. FLEX DUCT SHALL BE THE SAME SIZE AS THE
DIFFUSER NECK IT SERVES.
12. ALL DUCT TRANSITIONS FROM SQUARE TO ROUND SHALL BE SMOOTH SQUARE TO ROUND TRANSITIONS. SPIN-IN FITTINGS AT THE END OF CAPPED
DUCTS ARE NOT ACCEPTABLE. DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSIONS.
13. THE CONTRACTOR SHALL FULFILL ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS AND SHALL COMPLETE THE WORK SHOWN ON THESE DRAWINGS.
ALL SYSTEMS SHALL BE FINISHED, TESTED AND BALANCED, ADJUSTED, AND PROVEN TO BE FULLY OPERATIONAL AND USEABLE.
14. ADJUST ALL DIFFUSERS IN CORRIDORS OR WITHIN THREE (3) FEET OF A WALL TO PROVIDE 2-WAY OR 3-WAY BLOW AWAY FROM OR DIRECTLY INTO
WALLS. ALL DIFFUSERS SHALL HAVE 4-WAY BLOW UNLESS NOTED OTHERWISE.
15. PORTIONS OF DUCTWORK VISIBLE THROUGH GRILLES AND REGISTERS IN FINISHED AREAS SHALL BE PAINTED FLAT BLACK.
16. ALL DAMPERS IN AND ABOVE CEILINGS SHALL BE ACCESSIBLE. CONTRACTOR SHALL COORDINATE ALL ACCESS PANELS IN CEILINGS OR WALLS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND/OR INTERIOR DRAWINGS FOR PROPER LOCATION.
17. MOUNT THERMOSTATS WHERE INDICATED ON PLANS 48" A.F.F. UNLESS NOTED OTHERWISE. COORDINATE ALL THERMOSTAT LOCATION TO NOT BE MOUNTING WHERE MILLWORK, ARTWORK AND/OR ANY HEAT PRODUCING EQUIPMENT WILL BE PLACED.
18. COORDINATE DUCTWORK AND PIPING WITH PLUMBING, FIRE PROTECTION AND ELECTRICAL. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH
OTHER TRADES WITHOUT ANY ADDITIONAL EXPENSE TO THE CONTRACT.
19. SEAL ALL TRANSVERSE JOINTS AND FITTINGS WITH DUCT SEALER.
20. TRAP AND ROUTE CONDENSATE DRAINS LINES, FULL SIZE OF UNIT CONNECTION, AS INDICATED. SLOPE 1/8" PER FOOT.
21. ALTERNATE MANUFACTURERS AND MODELS WILL BE REVIEWED. THERE MAY BE ARCHITECTURAL, STRUCTURAL AND ELECTRICAL CHANGES RESULTING FROM THE ALTERNATES. THE COST OF IMPLEMENTING AND ENGINEERING THESE CHANGES SHALL BE BORNE BY THE MECHANICAL SUBCONTRACTOR.
22. PIPE AND DUCT ROUTING SHOWN IS SCHEMATIC. PROVIDE ANY ADDITIONAL OFFSETS AND FITTINGS, INCLUDING DIVIDED DUCTS, REQUIRED FOR PROPER
INSTALLATION AND TO MAINTAIN CLEARANCES AS ENCOUNTERED IN THE FIELD.
23. COORDINATE CEILING MOUNTED AIR DEVICE LOCATION WITH THE ARCHITECTURAL REFLECTED CEILING PLAN AND OTHER TRADES.
24. ALL CONTROL WIRING AND CONDUIT SHALL COMPLY WITH NEC DIVISION 16 SPECIFICATIONS.
25. PROVIDE MATERIALS WHICH HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED RATING OF 50 OR LESS WHEN TESTED IN ACCORD
WITH ASTM E84.
26. SLEEVE AND FIRE STOP PENETRATIONS THROUGH FIRE RATED SYSTEMS TO MAINTAIN RATING OF SYSTEM. USE MINIMUM GALVANIZED STEEL GAUGE
DUCT AS REQUIRED TO MAINTAIN RATING OF SYSTEM.
27. WHERE THE EXHAUST DUCT IS CONCEALED WITHIN THE BUILDING CONSTRUCTION, THE EQUIVALENT LENGTH OF THE DUCT SHALL BE IDENTIFIED ON A PERMANENT LABEL OR TAG. THE LABEL OR TAG SHALL BE LOCATED WITHIN 6 FEET OF THE EXHAUST DUCT CONNECTION.
28. CONTRACTOR TO ORDER ALL FIRE/SMOKE DAMPERS WITH INTEGRAL SMOKE DETECTORS AND END STOP INDICATOR OPTIONS. VERIFY VOLTAGE WITH ELECTRICAL DRAWINGS. IF BUILDING IS EQUIPPED WITH FIRE ALARM SYSTEM ALL FIRE/SMOKE DAMPERS WILL BE CONNECTED TO BUILDING FIRE ALARM
SYSTEM.
29. ALL MECHANICAL EQUIPMENT SHALL BE THOROUGHLY CLEANED OF ALL DIRT, OIL, CONCRETE, ETC. ANY DENTS, SCRATCHES OR OTHER VISIBLE BLEMISHES SHALL BE CORRECTED AND THE APPEARANCE OF THE EQUIPMENT MADE "LIKE NEW" AND TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. UPON COMPLETION, AND BEFORE FINAL ACCEPTANCE OF THE WORK, ALL DEBRIS, RUBBISH, LEFTOVER MATERIALS, TOOLS AND EQUIPMENT SHALL BE REMOVED FROM THE SITE. PROTECTION OF WORK UNTIL FINAL ACCEPTANCE: PROTECT ALL MATERIALS AND EQUIPMENT FROM DAMAGE, ENTRANCE OF DIRT AND CONSTRUCTION DEBRIS FROM THE TIME OF INSTALLATION UNTIL FINAL ACCEPTANCE. ANY MATERIALS AND EQUIPMENT WHICH ARE DAMAGED SHALL BE REPAIRED TO "AS NEW" CONDITION OR REPLACED AT THE DIRECTION OF THE ARCHITECT/ENGINEER.
WHERE FACTORY FINISHES OCCUR AND DAMAGE IS MINOR, FINISHES MAY BE TOUCHED UP. IF, IN THE OPINION OF THE ARCHITECT/ENGINEER THE
DAMAGE IS EXCESSIVE, FACTORY FINISH SHALL BE REPLACED TO "NEW" CONDITION.
30. DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT AND EXTENT OF WORK. EXACT LOCATIONS AND ARRANGEMENT OF MATERIALS AND EQUIPMENT SHALL BE DETERMINED, WITH THE ACCEPTANCE OF THE ARCHITECT/ENGINEER, AS WORK PROGRESSES TO CONFORM IN THE BEST POSSIBLE MANNER WITH THE SURROUNDINGS AND WITH THE ADJOINING WORK OF OTHER TRADES. WHERE LOCATIONS OF EQUIPMENT, DEVICES OR FIXTURES ARE CONTROLLED BY ARCHITECTURAL FEATURES, ESTABLISH SUCH LOCATIONS BY REFERRING TO DIMENSIONS ON
ARCHITECTURAL DRAWINGS AND NOT BY SCALING DRAWINGS.
31. IN CASE OF DIFFERENCES BETWEEN DRAWINGS AND SPECIFICATIONS, OR WHERE DRAWINGS AND SPECIFICATIONS ARE NOT CLEAR OR DEFINITE, THE SUBJECT SHALL BE REFERRED TO ARCHITECT/ENGINEER FOR CLARIFICATION AND INSTRUCTIONS.
32. ANY INTERRUPTION OF EXISTING MECHANICAL AND ELECTRICAL SERVICES SHALL BE COORDINATED IN ADVANCE WITH THE OWNER'S REPRESENTATIVE.
THIS INCLUDES, BUT IS NOT LIMITED TO, SERVICES PROVIDING CHILLED WATER, ELECTRICITY, OR OTHER CRITICAL SYSTEMS AS MAY BE PERTINENT TO THIS PARTICULAR PROJECT. SERVICE INTERRUPTION TIMES AND DURATION OF INTERRUPTION OF SERVICES SHALL BE DECIDED BY THE OWNER.
PROVIDE APPROPRIATE PROVISIONS (E.G., ISOLATION SHUT-OFF VALVES, DAMPERS, END CAPS, AND SIMILAR ITEMS) AS NECESSARY TO ACCOMMODATE THE REQUIRED SERVICE INTERRUPTIONS. IF SHUTDOWNS CANNOT BE ACCOMMODATED, PROVIDE MEANS FOR "WET" TAPPING OR "HOT" TAPPING OF
PIPING SYSTEMS.
33. ALL ELECTRICAL DEVICES SHALL BE U.L. APPROVED.
FLEX DUCT
GENERAL LEGEND
COMMISSIONING
1. THE CONTRACTOR SHALL DEMONSTRATE TO THE REGISTERED DESIGN PROFESSIONAL REPRESENTATIVE BY WAY OF FUNCTIONAL PERFORMANCE TESTING OF ALL
MECHANICAL SYSTEMS EFFECTED IN THIS RENOVATION. DEMONSTRATE THE PERFORMANCE OF SYSTEMS DESCRIBED HERE IN, INCLUDING: SEQUENCE OF OPERATIONS, AUTOMATIC MODES, ALARMS, MODES OF OPERATION UPON A LOSS OF POWER AND OPERATING IN WINTER AND SUMMER MODES. IF REQUIRED BY THE AHJ OR OWNER, THE COMMISSIONING AGENT SHALL PROVIDE THE COMMISSIONING REPORT AND FUNCTIONAL TESTING RESULTS TO THE AHJ FOR REVIEW AND PROOF OF COMMISSIONING. THE COMMISSIONING EFFORT SHALL MEET THE MINIMUM COMMISSIONING REQUIRES LISTED IN THE 2017 FLORIDA ENERGY CODE -ENERGY
CONSERVATION.
GENERAL NOTESABBREVIATIONS
AF
BD
NOTE: GENERAL NOTES , ABBREVIATIONS AND SYMBOLS ON THIS
MECHANICAL SHEET ARE FOR GENERAL REFERENCE PURPOSES
ONLY. ALL OF THESE MAY NOT BE USED FOR THIS PROJECT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
M P r o j e c t
S e r v e r P r o j e c t s J L S
C
V e n e r g y
G r o u p
V
A
W g r a d e
C a t h
L a b
C l e a n
C o e s t
P a a c h
F
L D r a w i n g s M e c h a n i c a l M d w g
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ARCHITECT:
STAMPCONTRACTOR
321 4 5 6 7 8 9 10
WPB VAMC - UPGRADE CATH LAB
CLEAN CORE
7305 N Military trl, Riviera Beach, FL 33410
548-19-113
Project Director
Revisions: Date:
MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:
LAWRENCE M. STOFF
P.E. #: 78586
Blake Lawrence Suddeth
P.E. #: 69060
Blake Lawrence Suddeth
P.E. #: 69060
BLS \ PJRLMS NMO \ Nov. 17, 2020
SHEET # OF 16
voice 407.697.0336 www.kmadg.net
AA 26002557
JL
C&O
JRVHSK��LDZUHQFH�&�CR
CRQVXOWLQJ�(QJLQHHUV
317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922
Tel: 321.972.4466 . www.jlceng.com . CA No. 32770
6SDFH�CRDVW
CORR.
2B - C7
WAITING
2B - C1
CORR.
2B - C4
BED
CUBICLE
2B - 234
BED
CUBICLE
2B - 232
2B-225
MED
PREP.
2B - 223
CARDIAC.
LAB
2B - 224
CONSULT/
MEDITAT.
2B-206
ELEC.
CLOS.
2B - 212
T/S
2B - 206
EQUIPMENT
2B-215
HEAD NURSE
2B-227
IR
CATH-LAB
SUPPLY
HAV
2B-214
2B - 221
CONSULT
2B - 234
EQUIPMENT
CONTROL
CONTROL
SCRUB RM.
2B-224
2B - C7
EX.-525
"Ø
25-3 25-13
25-2
25-1
25-7
25-6
25-10 25-11
25-5
"Ø
E A
"Ø
E A
"Ø
E A
14"Ø EA
x1
2 S A
24x12 SA
EA
EA
EA
7" Ø
EA
EAEAEA
EA
"Ø
R A
"Ø
R A
"Ø
R A
8"Ø RA
"Ø
R A
"Ø
S A
10"Ø SA
10"Ø SA
8" Ø
SA
SA
EX.-525
EX.-525
EX.-525
EX.-50
EX.-120 EX.-120
EX.-120
EX.-120
EX.-120
EX.-120
EX.-120
EX.-50
EX.-150
EX.-50
EX.-200
8"Ø SA 7"Ø SA
"Ø
S A
"Ø
S A
"Ø
S A
EX.250
EX.-325
EX.-50
EX.-50
EX.-325
EX.-200
CRAC-1
(670SQFT)
353SQFT
EX.-210
SA
25-4
8" Ø
SA
EX.-120
SA
"Ø
S A
12"Ø SA 10x8 SA
8"Ø SA
"Ø
S A
14"Ø RA
10x6
10x6
10x6
"Ø
R A
"Ø
S A
8" Ø
8" Ø
4" Ø x1
2 S A
840CFM
840CFM
EX. 590CFM
EX. 590CFM
EX.-360
EX.-50
EX.-75
EX.-75
(TYP.)
(TYP.)
(TYP.)
(TYP.)
22x11 RA
AC-10
x1
1 R A
"Ø
E A
"Ø
S A
"Ø
E A
SUITE 7
CORR.
2B - C7
CORR.
2B - C4
2B - C7
2B-C7
CORR.
2B-C7
EQUIPMENT
ROOM
2B-234A
SCRUB
ROOM
2B-224
CONSULT/
SCHEDULING
2B-238
HOLDING
ROOM #2
HOLDING
ROOM #3
IR
CATH-LAB
CONTROL
PATIENT
TOILET
2B-229
SOILED
ROOM
2B-230A
STERILE
SUPPLY
2B-222
EQUIPMENT
CORR.
2B-C4
SCRUB
2B-221
CONTROL
CARDIAC.
LAB
2B-224
WAITING
2B-C1
CONSULT/
MEDITAT.
2B-206
ELECT.
CLOSET
2B-212
T/S
2B-205
CARDIAC
CATH LAB
NURSE
STATION
2B-234
2B-230B
2B-230
2B-232A
2B-204A
ANTE RM.
2B-204
25-3 25-13
25-2
25-1
25-7
25-6
25-10 25-11
25-5
"Ø
E A
"Ø
E A
"Ø
E A
14"Ø EA
x1
2 S A
24x12 SA
EA
EA
EA
7" Ø
EA
EAEAEA
EA
"Ø
R A
"Ø
R A
"Ø
R A
8"Ø RA
"Ø
R A
8" Ø
RA
SA
EX.-50
EX.-120 EX.-120
EX.-120
EX.-120
EX.-120
EX.-120
A-325
EX.-50
EX.-150
EX.-50
EX.-200
8"Ø SA 7"Ø SA
"Ø
S A
"Ø
S A
"Ø
S A
EX.250
EX.-325
EX.-50
EX.-50
EX.-325
EX.-200
CRAC-1
EX.-50
SA
25-4
8" Ø
SA
SA
"Ø
S A
12"Ø SA 10x8 SA
8"Ø SA
"Ø
S A
14"Ø RA
10x6
10x6
10x6
"Ø
R A
"Ø
S A
8" Ø
8" Ø
4" Ø
1075CFM
C-825
DP
EX.-50
EX.-75
EX.-75
(TYP.)
B-360
14"Ø
B-575
(TYP.)
1075CFM
C-825 x1
A-325
DP
EX.-120
EX.-120
EX.-120
(750CFM)(2450CFM)
DP
22x11 RA x1
1 R A
"Ø
E A
"Ø
R A
"Ø
S A
"Ø
S A
"Ø
E A
12"Ø EA
x1
C-840
C-840
(TYP.)
(TYP.)
(TYP.)
T
T
T
T H
H
H
T
HT
H
T H
T H
H
"Ø
S A
(TYP.)VAV25-7
VAV25-3
VAV25-13
VAV25-11
VAV25-10
VAV25-4
VAV25-5AHU-60
MECHANICAL FLOOR PLANS
M-101
1. EXISTING CONDITIONS ARE DEPICTED ON THIS PLAN AS FOUND IN FIELD INVESTIGATIONS AND AS-BUILT DOCUMENTATION. PRIOR TO BID, THE CONTRACTOR SHALL VISIT THE SITE TO VERIFY ALL LOCATIONS, EQUIPMENT SIZES, QUANTITIES AND CONDITIONS. IF ANY DEVIATION IN EXISTING CONDITIONS ARE FOUND, THE CONTRACTOR SHALL CONTACT THE ENGINEER IN WRITING PRIOR TO THE COMMENCEMENT OF WORK.
2. CONTRACTOR SHALL VERIFY AND MAINTAIN ALL NEC REQUIRED CLEARANCE AND OTHER EQUIPMENT CLEARANCES. IF ANY EXISTING DEFICIENCIES EXIST, OR ARE CREATED WITH THE REMODEL, THE
CONTRACTOR SHALL MODIFY LOCATIONS TO ENSURE ALL NEC AND MANUFACTURER RECOMMENDED
CLEARANCES ARE MET.
3. PLANS ARE DIAGRAMMATIC IN NATURE. EXACT EQUIPMENT LOCATIONS, SHOWN EXISTING DUCTWORK LOCATIONS AND CONNECTION POINTS OF EXISTING TO NEW SYSTEMS SHALL BE CONFIRMED ON SITE PRIOR
TO CONSTRUCTION WORK COMMENCING.
4. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AND STATE CODES AND THE VA/OWNER
DESIGN GUIDELINES.
RENOVATION KEY NOTES :
1. ALL EXISTING EQUIPMENT (CRAC UNITS, DUCTWORK, VAV BOXES, AIR TERMINAL DEVICES...ETC.) SHALL
BE LEFT AS-IS UNLESS OTHERWISE NOTED.
2. CAP EXISTING RETURN AIR DUCTWORK AND SEAL AIR TIGHT.
3. PROVIDE NEW DIFFUSER AND BALANCE TO AIRFLOW SHOWN.
4. CONNECT NEW DUCTWORK TO EXISTING.
5. CONNECT NEW DUCTWORK TO EXISTING SUPPLY AIR DUCT MAIN IN PROCEDURE ROOM. CONNECT NEW
DUCTWORK INTO HUNTAIR CLEAN SUITE CEILING SYSTEM. REBALANCE AS REQUIRED FOR NEW
AIRLFOW.
6. REBALANCE SIDEWALL EXHAUST GRILLES TO NEW AIRFLOW SHOWN.
7. REBALANCE EXISTING VAV BOX TO NEW AIRFLOW SHOWN. PROVIDE NEW DDC CONTROLS CONVERSION KIT FROM PNEUMATIC CONTROLS. IF EXISTING VAV BOX CANNOT OPERATE AT NEW AIRFLOW, REPLACE
VAV BOX. SEE SCHEDULES.
8. PNEUMATIC TUBE STATION TO BE RELOCATED WITHIN NURSE'S STATION. COORDINATE EXACT NEW LOCATION ON WALL WITH OWNER. RELOCATE PNEUMATIC PIPING AS REQUIRED AND TIE INTO EXISTING
SYSTEM TO MAINTAIN ALL EXISTING FUNCTIONALITY.
9. PROVIDE NEW DP SENSORS ON WALL AND BALANCE AIRFLOW TO MAINTAIN 0.02"-0.05" WC ACROSS DOOR. SENSOR SHALL CONTINUOUSLY READ REAL TIME DP AND SHALL HAVE AN AUDIBLE AND VISIBLE
INDICATOR IF DP FALLS OUTSIDE OF ACCEPTABLE RANGE. TIE EACH DEVICE INTO THE BAS.
10. EXISTING PNEUMATIC THERMOSTAT AND HUMIDISTAT SHALL BE REPLACED WITH NEW. TIE NEW
THERMOSTAT INTO ASSOCIATED VAV AND NEW DDC SYSTEMS.
11. EXISTING OPERATING ROOM LAMINAR FLOW DIFFUSERS SHALL BE REPLACED ONE FOR ONE. NEW
DIFFUSERS SHALL BE EQUAL TO PRECISION AIR HEPA-VENT DS (HEP-DS-A).
12. NEW DIFFUSER MOUNTED IN NEW ACT SYSTEM. CONNECT TO EXISTING DUCTWORK AND BALANCE TO
EXISTING AIRFLOW.
13. ALL VAV BOXES (TERMINAL UNITS) SERVED BY AHU-25 SHALL BE CONVERTED FROM PNEUMATIC
CONTROLS TO DIRECT DIGITAL CONTROLS. CONTRACT SHALL EITHER PROVIDE A CONTROLS
CONVERSION KIT FOR EACH BOX, OR REPLACE EACH VAV BOX ONE FOR ONE WITH NEW VAV-BOXES
WITH INTEGRAL DDC CONTROLS/CONTROLLERS.
GENERAL NOTES:
DEMOLITION KEY NOTES :
1. EXISTTING VAV BOX'S SHALL REMAIN AS IS AT THE EXISTING AIRFLOWS UNLESS OTHERWISE
NOTED.
2. EXISTING VAV BOX SHALL BE FIELD INVESTIGATED TO IDENTIFY MAX OPERATING AIRFLOW. IF
VAV BOX IS ABLE TO ACHIEVE NEW DESIGN AIRFLOW, CONTRACTOR SHALL RETAIN AND
REBALANCE TO NEW AIRFLOW. IF NOT, THE CONTRACTOR SHALL REPLACE THE VAV BOX. SEE
RENO PLANS AND SCHEDULES.
3. CONTRACTOR SHALL PREPARE EXISTING DEVICE TO BE REBALANCED TO NEW AIRFLOW. SEE
RENOVATION PLANS.
4. EXISTING DUCT DROPS DOWN INTO HUNTAIR CLEAN SUITE CEILING SYSTEM. CONTRACTOR
SHALL DISCONNECT EXISTING DUCTWORK TO HUNTAIR CLEAN SUITE CEILING SYSTEM AND
SHALL PREPARE FOR NEW DUCTWORK TO PROVIDE INCREASED AIRFLOW. CONTRACTOR TO
VERIFY HUNTAIR CLEAN SUITE SYSTEM WILL OPERATE EFFECTIVELY AT NEW AIRFLOW.
5. EXISTING LOW EXHAUST GRILLES SHALL BE REBALANCED. SEE RENO PLANS.
6. REMOVE EXISTING RETURN AIR DUCTWORK BACK TO APPROXIMATE LOCATION SHOWN. CAP
DUCTWORK AND SEAL AIRTIGHT.
7. ALL EXISTING EQUIPMENT (CRAC UNITS, DUCTWORK, VAV BOXES, AIR TERMINAL
DEVICES...ETC.) SHALL BE LEFT AS-IS UNLESS OTHERWISE NOTED.
8. REMOVE EXISTING SUPPLY AIR DUCTWORK BACK TO APPROXIMATE LOCATION SHOWN.
PREPARE DUCTWORK FOR NEW CONNECTION. REFER TO RENOVATION PLAN FOR ADDITIONAL
REQUIREMENTS.
9. REMOVE EXISTING CEILING DIFFUSERS BUT RETAIN DUCTWORK DROP TO CONNECT NEW
DIFFUSER WITHIN NEW CEILING.
10. EXISTING PNEUMATIC TUBE STATION LOCATION TO BE RELOCATED.