This document is a 100% Construction Documents set for the WPB VAMC – Upgrade Cath Lab Clean Core project located at West Palm Beach VA Medical Center, 7305 N Military Trail, Riviera Beach, FL 33410. The project, identified as VA Project #548-19-113, is being designed by Joseph, Lawrence & Co (JLC&O) Consulting Engineers and KMA Design Group, with mechanical, electrical, and plumbing (MEP) engineering provided by Lawrence M. Stoff, P.E. and Blake Lawrence Suddeth, P.E.

The construction documents include comprehensive architectural, electrical, and mechanical plans for renovation of the cardiac catheterization laboratory clean core area. Key architectural work includes demolition and renovation of the cath lab suite with new finishes, millwork, door and signage schedules, and life safety/reflected ceiling plans. Electrical work encompasses new lighting fixtures (LED panels and emergency exits), power distribution, receptacles, data drops, access control, and automatic door openers, with coordination of existing pneumatic tube station relocation and conversion of pneumatic controls to direct digital controls (DDC). Mechanical work includes replacement of air handling units (AHU-25 and AHU-60) with variable frequency drives (VFDs), rebalancing of existing variable air volume (VAV) terminal boxes, new diffusers and exhaust systems maintaining pressurization requirements, replacement of laminar flow diffusers, conversion of controls from pneumatic to DDC systems, and coordination with existing chilled water and heating hot water infrastructure. The submission date is November 17, 2020, and the documents are prepared for federal construction contracting with the U.S. Department of Veterans Affairs.

View the file

Other files

File Type Posted
S06 Attachment_Updated Price Cost Schedule 4-30-2026_1 Page.docx DOCX document
36C24826Q0453 0003.docx DOCX document
S06 Attachment_Updated Statement of Work_BB 548-CSI-139_04-30-2026_22 Pages.pdf PDF
S06 Attachment_Site Visit Sign In Sheet - 548-CSI-139 Renovate IR CathLab Walk-Through_1 Page.pdf PDF
36C24826Q0453 0002.docx DOCX document
S06 Attachment_548-CSI-139 WPB Renovate IR Cath Lab_Addendum 01_2026-04-24_28 Pages.pdf PDF
S06 Attachment_548-CSI-139 RFI_Responses_7 Pages.pdf PDF
S06 Attachment_Pneumatic Tube Stations Transfer Stations_2 Pages.pdf PDF
36C24826Q0453 0001.docx DOCX document
S02 Attachment 25_230923 Direct-Digital Control System for HVAC- rev041326_71 Pages.pdf PDF
S02 Attachment 26_BAS Facility Standards_16 Pages.pdf PDF
S02 Attachment 12_0124003 Medical Gas Pressure Drop Calcs_6 Pages.pdf PDF
S02 Attachment 11_EX 1-AHU-25 Ventilation Calc_1 Page.pdf PDF
S02 Attachment 19_WD FL20260220 dated 01-02-2026_5 pages.pdf PDF
S02 Attachment 05_CD Drawings_100 percent_dated 10.01.2025_548-CSI-139 WPB Renovate IR Cath Lab_71 Pages.pdf PDF
S02 Attachment 04_Cx Plan_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_55 Pages.pdf PDF
S02 Attachment 24_EMR_1 Page.pdf PDF
S02 Attachment 08_1-AHU-60 Load Calc_1 Page.pdf PDF
36C24826Q0453_1.docx DOCX document
S02 Attachment 18_SLD211033-1 West Palm Beach VA Hybrid_LAYOUT_Rev 4_2 Pages.pdf PDF
S02 Attachment 20_PPQ_4 Pages.pdf PDF
S02 Attachment 09_1-AHU-60 Ventilation Calc_1 Page.pdf PDF
S02 Attachment 10_EX 1-AHU-25 Load Calc_1 Page.pdf PDF
S02 Attachment 22_Base Offer Price Breakdown_1 Page_Excel Form.xlsx XLSX spreadsheet
S02 Attachment 23_VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_2 Pages.pdf PDF
S02 Attachment 06_Narrative_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_57 Pages.pdf PDF
S02 Attachment 03_Cx Procurement_100 percent - 548-CSI-139 WPB Renovate IR Cath Lab_1 Page.pdf PDF
S02 Attachment 14_2410-08-AVIP_6 Pages.pdf PDF
S02 Attachment 02_Asbestos Report - 548-CSI-139 WPB Renovate IR Cath Lab_36 Pages.pdf PDF
S02 Attachment 07_CD Specifications_100 percent_dated 10.01.2025_548-CSI-139 WPB Renovate IR Cath Lab_897 Pages.pdf PDF
S02 Attachment 21_Price Cost Schedule_1 Page.docx DOCX document
S02 Attachment 15_940537-Submittal-04_45 Pages.pdf PDF
S02 Attachment 13_0124003_100 percent CD Structural Calculations_38 Pages.pdf PDF
S02 Attachment 16_940537-Submittal-05_45 Pages.pdf PDF
S02 Attachment 01_Statement of Work_BB 548-CSI-139_03-31-2026_22 Pages.pdf PDF
S02 Attachment 17_N-SOU240607_3 Pages.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION:

BY:

SUBMISSION / DATE:

JL

C&O

JRVHSK��LDZUHQFH�&�CR

CRQVXOWLQJ�(QJLQHHUV

317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922

Tel: 321.972.4466 . www.jlceng.com . CA No. 32770

6SDFH�CRDVW

voice 407.697.0336 www.kmadg.net

AA 26002557

DRAWING

NUMBER DRAWING TITLE

--- COVER SHEET

ARCHITECTURAL INFORMATION

A001

SHEET 1 OF 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Z S h a r e d K

M A

P r o j e c t s A c t i v e

V

A

W

P B

O

R

E n v i r o n m e n t f o r

C a r d i a c

C a t h

L a b J L C

C a d A

A

R C

H I T

E C

T U

R A

L

I N

F O

R M

A T

I O

N W

V

A d w g

A

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

JAMES L. MOORE

AR #: 95890

JLM JLM

voice 407.697.0336 www.kmadg.net

AA 26002557

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Nov. 17, 2020

100% CONSTRUCTION

DOCUMENTS

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

SS

S

CORR.

2B-C7

FEMALE

TOILET

2B-312A

F. LOCKER/

LOUNGE

2B-312

M. LOCKER/

LOUNGE

2B-314

HAC

2B-322

CORR.

2B-C9

CONSULT/

ON CALL

2B-327

STAFF

TOILET

2B-327A

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

S S

S

S S S S S S S S S S S S S S S S S S S S S S

S S

S S

S

S S S

S

S S

S S S S S S S S S S S

S S S

S S

S S

S S S

S S S

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

EKG

2B-251A

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

SCRUB

2B-221

CARDIO

STATION

2B-250

AMBU

ARRHYTHMIA

2B-248

CARDIOLOGIST

2B-246

PACEMAKER

2B-244

DOCTORS

CARDIOLOGY

2B-242

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

NURSE

STATION

S S

S S

S S

S

S S

S

S

S S

S S

S S

S

2B-234

2B-230B

2B-232A

2B-204A

ANTE RM.

2B-204

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

SS

S

CORR.

2B-C7

FEMALE

TOILET

2B-312A

F. LOCKER/

LOUNGE

2B-312

M. LOCKER/

LOUNGE

2B-314

HAC

2B-322

CORR.

2B-C9

CONSULT/

ON CALL

2B-327

STAFF

TOILET

2B-327A

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

S S

S

S S S S S S S S S S S S S S S S S S S S S S

S S

S S

S

S S S

S

S S

S S S S S S S S S S S

S S S

S S

S S

S S S

S S S

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

EKG

2B-251A

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

2B-221

CARDIO

STATION

2B-250

AMBU

ARRHYTHMIA

2B-248

CARDIOLOGIST

2B-246

PACEMAKER

2B-244

DOCTORS

CARDIOLOGY

2B-242

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

NURSE

STATION

S S

S S

S S

S

S S

S

S

S S

S S

S S

S

2B-234

2B-230B

2B-232A

2B-204A

ANTE RM.

2B-204

DEMOLITION - FLOOR PLAN AND

REFLECTED CEILING PLAN

AD101

SHEET 2 OF 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Z S h a r e d K

M A

P r o j e c t s A c t i v e

V

A

W

E n v i r o n m e n t f o r

C a r d i a c

C a t h

L a b J L C

C a d A

D D

E M

O

F

L O

L A

N

A

N D

E M

O

R

C P

W

C

A T

H

L A

B d w g

A

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

JAMES L. MOORE

AR #: 95890

JLM JLM

voice 407.697.0336 www.kmadg.net

AA 26002557

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Nov. 17, 2020

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

SS

S

CORR.

2B-C7

FEMALE

TOILET

2B-312A

F. LOCKER/

LOUNGE

2B-312

M. LOCKER/

LOUNGE

2B-314

HAC

2B-322

CORR.

2B-C9

CONSULT/

ON CALL

2B-327

STAFF

TOILET

2B-327A

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

S S

S

S S S S S S S S S S S S S S S S S S S S S S

S S

S S

S

S S S

S

S S

S S S S S S S S S S S

S S S

S S

S S

S S S

S S S

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

EKG

2B-251A

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

SCRUB

2B-221

CARDIO

STATION

2B-250

AMBU

ARRHYTHMIA

2B-248

CARDIOLOGIST

2B-246

PACEMAKER

2B-244

DOCTORS

CARDIOLOGY

2B-242

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

CARDIAC

CATH LAB

NURSE

STATION

S S

S S

S S

S

S S

S

S

S S

S S

S S

S

2B-234

2B-230B

2B-230

2B-232A

2B-204A

ANTE RM.

2B-204

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

SS

S

CORR.

2B-C7

FEMALE

TOILET

2B-312A

F. LOCKER/

LOUNGE

2B-312

M. LOCKER/

LOUNGE

2B-314

HAC

2B-322

CORR.

2B-C9

CONSULT/

ON CALL

2B-327

STAFF

TOILET

2B-327A

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

S S

S

S S S S S S S S S S S S S S S S S S S S S S

S S

S S

S

S S S

S

S S

S S S S S S S S S S S

S S S

S S

S S

S S S

S S S

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

EKG

2B-251A

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

2B-221

CARDIO

STATION

2B-250

AMBU

ARRHYTHMIA

2B-248

CARDIOLOGIST

2B-246

PACEMAKER

2B-244

DOCTORS

CARDIOLOGY

2B-242

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

CARDIAC

CATH LAB

NURSE

STATION

S S

S S

S S

S

S S

S

S

S S

S S

S S

S

2B-234

2B-230B

2B-230

2B-232A

2B-204A

ANTE RM.

2B-204

LIFE SAFETY/FLOOR PLAN AND

REFLECTED CEILING PLAN

A101

SHEET 3 OF 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Z S h a r e d K

M A

P r o j e c t s A c t i v e

V

A

W

E n v i r o n m e n t f o r

C a r d i a c

C a t h

L a b J L C

C a d A

L I F

E

S

A F

E T

Y F

L O

A

N

A

C P

W

C

A T

H

L A

B d w g

A

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

JAMES L. MOORE

AR #: 95890

JLM JLM

voice 407.697.0336 www.kmadg.net

AA 26002557

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Nov. 17, 2020

100% CONSTRUCTION

S S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

SS

S

CORR.

2B-C7

FEMALE

TOILET

2B-312A

F. LOCKER/

LOUNGE

2B-312

M. LOCKER/

LOUNGE

2B-314

HAC

2B-322

CORR.

2B-C9

CONSULT/

ON CALL

2B-327

STAFF

TOILET

2B-327A

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

S S

S

S S S S S S S S S S S S S S S S S S S S S S

S S

S S

S

S S S

S

S S

S S S S S S S S S S S

S S S

S S

S S

S S S

S S S

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

EKG

2B-251A

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

SCRUB

2B-221

CARDIO

STATION

2B-250

AMBU

ARRHYTHMIA

2B-248

CARDIOLOGIST

2B-246

PACEMAKER

2B-244

DOCTORS

CARDIOLOGY

2B-242

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

CARDIAC

CATH LAB

NURSE

STATION

S S

S S

S S

S

S S

S

S

S S

S S

S S

S 2B-234

2B-230B

2B-230

2B-232A

2B-204A

ANTE RM.

2B-204

MILLWORK DETAILS AND FINISH

SCHEDULE

A201

SHEET 4 OF 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Z S h a r e d K

M A

P r o j e c t s A c t i v e

V

A

W

E n v i r o n m e n t f o r

C a r d i a c

C a t h

L a b J L C

C a d A

M

I L L W

O R

K

D

E T

A I

F

I N

I S

H

S

C H

E D

U L E

W

C

A T

H

L A

B d w g

A

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

JAMES L. MOORE

AR #: 95890

JLM JLM

voice 407.697.0336 www.kmadg.net

AA 26002557

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Nov. 17, 2020

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

SS

S

CORR.

2B-C7

FEMALE

TOILET

2B-312A

F. LOCKER/

LOUNGE

2B-312

M. LOCKER/

LOUNGE

2B-314

HAC

2B-322

CORR.

2B-C9

CONSULT/

ON CALL

2B-327

STAFF

TOILET

2B-327A

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

S S

S

S S S S S S S S S S S S S S S S S S S S S S

S S

S S

S

S S S

S

S S

S S S S S S S S S S S

S S S

S S

S S

S S S

S S S

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

EKG

2B-251A

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

SCRUB

2B-221

CARDIO

STATION

2B-250

AMBU

ARRHYTHMIA

2B-248

CARDIOLOGIST

2B-246

PACEMAKER

2B-244

DOCTORS

CARDIOLOGY

2B-242

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

CARDIAC

CATH LAB

NURSE

STATION

S S

S S

S S

S

S S

S

S

S S

S S

S S

S

2B-234

2B-230B

2B-230

2B-232A

2B-204A

ANTE RM.

2B-204

SIGNAGE SCHEDULE AND

DOOR SCHEDULE AND DETAILS

A301

SHEET 5 OF 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Z S h a r e d K

M A

P r o j e c t s A c t i v e

V

A

W

E n v i r o n m e n t f o r

C a r d i a c

C a t h

L a b J L C

C a d A

S

I G

N A

G

C H

E D

U

O

R

S

C H

E D

U

T

A I L S

W

P B

V A d w g

A

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

JAMES L. MOORE

AR #: 95890

JLM JLM

voice 407.697.0336 www.kmadg.net

AA 26002557

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Nov. 17, 2020

ELECTRICAL LEGEND

E-000

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

M P r o j e c t

S e r v e r P r o j e c t s J L S

C

V e n e r g y

G r o u p

V

A

W

U p g r a d e

C a t h

L a b

C l e a n

C o r e

W e s t

P a l m a c h

F

L D r a w i n g s E l e c t r i c a l E d w g

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

LAWRENCE M. STOFF

P.E. #: 78586

Blake Lawrence Suddeth

P.E. #: 69060

Blake Lawrence Suddeth

P.E. #: 69060

BLS \ PJRLMS NMO \ Nov. 17, 2020

SHEET # OF 16

voice 407.697.0336 www.kmadg.net

AA 26002557

JL

C&O

JRVHSK��LDZUHQFH�&�CR

CRQVXOWLQJ�(QJLQHHUV

317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922

Tel: 321.972.4466 . www.jlceng.com . CA No. 32770

6SDFH�CRDVW

100% CONSTRUCTION

DOCUMENTS

GENERAL NOTES

DESCRIPTIONSYMBOL

ABBREVIATIONS

DESCRIPTIONSYMBOL

CH COUNTER HEIGHT

ELECTRIC WATER COOLEREWC

H.I.D.

COMPACT FLUORESCENT LAMPCFL

A

A/C

AC

AFF

AFG

AHU

AWG

C

CONC

COND

CU

DISC

ELEC

EM

EMS

EMT

EF

EX

FA

AMPERES

AIR CONDITIONING

ALTERNATING CURRENT

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AIR HANDLING UNIT

AMERICAN WIRE GAUGE

CONDUIT

CONCRETE

CONDUIT

COPPER

DISCONNECT

ELECTRICAL

EMERGENCY

ENERGY MANAGEMENT SYSTEM

ELECTRICAL METALLIC TUBING

EXHAUST FAN

EXISTING

FIRE ALARM

G

GFI

GND

J

KAIC

KVA

KW

NL

NEMA

NFPA

GROUND

GROUND FAULT INTERRUPTER

GROUND

O.C.

P

PNL

PVC

RM

RGS

SPEC

SS

TYP

UON

V

W

WP

FIRE ALARM ANNUNCIATOR PANELFAAP

ENCLOSED CIRCUIT BREAKERECB

I.G.

TVSS

ETR

HIGH INTENSITY DISCHARGE

GRC

HVAC

LTG

MCM

MCU

MH

N

NA

NF

NEC

NIC

GALVANIZED RIGID CONDUIT

JUNCTION

KILOVOLT-AMPERES

KILOWATT

LIGHTING

THOUSANDS OF CIRCULAR MILS

MASTER CONTROL UNIT

METAL HALIDE

NEUTRAL

NOT APPLICABLE

NON-FUSED

NATIONAL ELECTRICAL CODE

NOT IN CONTRACT

NIGHT LIGHT

NATIONAL FIRE PROTECTION ASSOCIATION

ON CENTER

POLE

PANELBOARD

POLYVINYL CHLORIDE

ROOM

RIGID GALVANIZED STEEL

SPECIFICATION

STAINLESS STEEL

TYPICAL

UNLESS OTHERWISE NOTED

VOLTS

WIRE

WEATHERPROOF

MOTOR CIRCUIT PROTECTIONMCP

ISOLATED GROUND

TRANSIENT VOLTAGE SURGE SUPPRESSION

O.F.C.I. OWNER FURNISHED CONTRACTOR INSTALLED

FIRE ALARM CONTROL PANELFACP -

NATIONAL ELECTRIC MANUFACTURERS ASSOCIATION

HEATING, VENTILATING, AND AIR CONDITIONING

(THOUSAND) AMPERE INTERRUPTING CAPACITY

EXISTING TO REMAIN

SYMBOLS SHOWN ON THIS ELECTRICAL LEGEND ARE FOR

REFERENCE PURPOSES ONLY. ALL OF THESE SYMBOLS MAY NOT BE

USED FOR THIS PROJECT.

NOTE:

PANELS

DESCRIPTIONSYMBOL

DESCRIPTIONSYMBOL

WIRING AND POWER

XXX

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

SECURITY ALARM CONTROL PANEL

MASTER CLOCK CONTROL PANEL

PUBLIC ADDRESS CONTROL PANEL

FAAP

FACP

SACP

PA

MC

MAIN DISTRIBUTION PANEL (SEE PANEL SCHEDULE)

AUTOMATIC TRANSFER SWITCH

NEW ELECTRICAL PANEL

ELECTRICAL SYSTEMS PANEL

SURGE PROTECTION DEVICESPD

MDP

SPD

TYPE X (SEE RECEPTACLE SCHEDULE)X

POWER LEG ONLY (NO SWITCH LEG BETWEEN ROOMS)

DISCONNECT SWITCH - WEATHERPROOF (NEMA 3R)

COMBINATION VARIABLE SPEED DRIVE AND DISCONNECT

WATER HEATER

HVP1-6

MAGNETIC MOTOR STARTER

COMBINATION FUSED DISCONNECT/

MOTOR WITH DESIGNATOR

MAGNETIC STARTER SWITCH

TIME CLOCK

MANUAL STARTER

START/STOP

HAND/OFF/AUTO

FUSED DISCONNECT SWITCH

VARIABLE SPEED DRIVE

SS

EF-1

M

WP

HOA

POWER POLE

PLUG MOLD

DISCONNECT SWITCH

JUNCTION BOX

COUNTER HEIGHT

COUNTER HEIGHTC

C

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT CIRCUIT INTERRUPTER

OCCUPANCY SENSOR SWITCH

SINGLE POLE WEATHERPROOF SWITCH

COUNTER HEIGHT (ABOVE COUNTER OR 42" AFF)

COUNTER HEIGHT (ABOVE COUNTER OR 42" AFF)

COUNTER HEIGHT (ABOVE COUNTER OR 42" AFF)

ISOLATED GROUNDIG

SPECIAL RECEPTACLE

QUADRAPLEX RECEPTACLE

ISOLATED GROUND

WEATHERPROOF

C

IG

WP

GFI

EWC

C

WEATHERPROOF

ISOLATED GROUND

WEATHERPROOF

DUPLEX RECEPTACLE

SINGLE RECEPTACLE

GFI

WP

C

IG

WP

GFI

SINGLE POLE KEYED SWITCH

THREE WAY TOGGLE SWITCH

TWO POLE TOGGLE SWITCH

SINGLE POLE TOGGLE SWITCH

OS

K

(NONE)

WP

SWITCH

MANUAL MOTOR CONTROLLER W/O OVERLOADSM

RECESSED FLOOR MOUNTED DUPLEX RECEPTACLE

SURFACE-MOUNTED FLOOR DUPLEX RECEPTACLE

CEILING-MOUNTED DUPLEX RECEPTACLE

LOWER CASE LETTERS INDICATES SWITCHING DESIGNATIONS, QUANTITY OF LETTERS EQUAL

QUANTITY OF GANGED SWITCHES

ELECTRIC WATER COOLER, COORDINATE LOCATION WITH PLUMBING CONTRACTOR

BRANCH CIRCUIT HOME RUN WITH PANEL NAME AND CIRCUIT NUMBER, QUANTITY OF

ARROWHEADS DENOTES QUANTITY OF BRANCH CIRCUITS

BRANCH CIRCUIT WIRING, PROVIDE QUANTITIES OF CONDUCTORS REQUIRED FOR CIRCUITING

AND SWITCHING INDICATED

S abcS

J

HALF SWITCHED DUPLEX RECEPTACLE

(FURNISHED UNDER DIV 15 UNLESS NOTED OTHERWISE)

ELECTRIC UNIT HEATER

TYPE "K" TRANSFORMER

MUSHROOM HEAD PUSH BUTTON

RELAY

GROUND ROD

TRANSFORMER

(EMERGENCY STOP)

WIRE IN CONDUIT CONCEALED BELOW SLAB OR GRADE

1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE LATEST ADOPTED EDITION (BY THE VA) OF THE NATIONAL ELECTRICAL CODE (NFPA 70), THE LATEST ADOPTED EDITION OF THE INTERNATIONAL BUILDING CODE AND

CURRENT VA STANDARDS AND SPECIFICATIONS.

2. CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND COORDINATE WITH ALL EQUIPMENT

MANUFACTURER/INSTALLERS PRIOR TO BIDDING.

3. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED

THIRD-PARTY TESTING AGENCY.

BUILDING:

4. INSTALLATION HEIGHT OF EQUIPMENT (TO CENTERLINE) ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE SHALL

BE:

RECEPTACLE = 18"

CLOCK = 7'-6"

SWITCH = 44"

MODULAR JACK FOR WALL MOUNTED TELEPHONE = 48"

MODULAR TELEPHONE JACK = 18"

TELEVISION OUTLET = 84"

COMPUTER OUTLET = 18"

CALL SWITCH = 44"

REMOTE TEST STATION FOR DUCT DETECTOR = 52"

C = ABOVE COUNTER, COORDINATE WITH ARCHITECTURAL ELEVATIONS AND MILLWORK.

5. ALL CONDUIT AND WIRING SHALL BE CONCEALED IN WALLS OR ABOVE CEILINGS UNLESS NOTED OTHERWISE OR APPROVED BY THE ARCHITECT/ENGINEER. ALL DEVICE OUTLET BOXES SHALL BE RECESSED UNLESS NOTED OTHERWISE OR APPROVED BY THE ARCHITECT/ENGINEER. WHERE APPROVED OR NOTED SURFACE METAL RACEWAY AND DEVICE BOXES SHALL BE USED IN LIEU OF CONDUIT AND CONCEALED BOXES AT NO EXTRA COST TO THE

OWNER.

6. ALL CONDUIT ROUTING SHOWN IS APPROXIMATE ONLY. CONTRACTOR SHALL FIELD VERIFY FINAL ROUTE WITH ALL

OTHER TRADES AND CONDITIONS IN FIELD PRIOR TO ROUGH-IN.

7. CONDUIT RUNS SHOWN ARE SCHEMATIC AND DO NOT INDICATE THE NECESSARY FITTINGS AND JUNCTION BOXES

THAT ARE INCLUDED IN THE SCOPE OF THE WORK.

8. CONTRACTOR SHALL PERMANENTLY IDENTIFY ALL WIRING WITH THE SOURCE AND CIRCUIT AT ALL ELECTRICAL EQUIPMENT, PULL AND JUNCTION BOXES AND ELECTRICAL TERMINATIONS PROVIDED OR ASSOCIATED WITH THIS

CONSTRUCTION.

9. COORDINATE EXACT LOCATION OF LIGHTING FIXTURES IN MECH. ROOMS/SPACES WITH DUCTWORK INSTALLER PRIOR TO ROUGH-IN. LOCATE BELOW DUCTWORK(8'-0" AFF MINIMUM) CENTERED IN ROOM AS MUCH AS POSSIBLE.

10. VERIFY EXACT LOCATION OF ALL MECHANICAL EQUIPMENT WITH MECHANICAL INSTALLER PRIOR TO ROUGH-IN.

11. PROVIDE NYLON PULLSTRINGS IN ALL EMPTY CONDUITS.

12. COORDINATE THE EXACT LOCATION OF ALL ELECTRICAL EQUIPMENT LOCATED IN ELEVATOR MACHINE ROOMS, SHAFTS AND PITS. LOCATE EQUIPMENT AS REQUIRED TO MEET APPLICABLE CODES.PROVIDE AUTOMATIC DISCONNECTION OF THE ELEVATOR MAIN POWER SUPPLY (PER ANSI A17.1, RULE 102.2 1987 ED.) PRIOR TO ACTIVATION OF AUTOMATIC SPRINKLERS LOCATED WITHIN THE ELEVATOR MACHINE ROOM, PIT OR SHAFT.

COORDINATE WITH FIRE PROTECTION AND FIRE ALARM INSTALLER.

13. COORDINATE THE REQUIRED SIZE OF ALL CIRCUIT BREAKERS FEEDING EQUIPMENT, (I.E. MOTORS, HVAC, KITCHEN EQUIPMENT, SPECIAL PURPOSE OUTLETS, ELEVATORS, OWNER FURNISHED EQUIPMENT ETC. ) WITH APPROVED EQUIPMENT SHOP DRAWINGS AND OWNER REPRESENTATIVES PRIOR TO ORDERING PANELBOARDS. BREAKERS SHALL BE SIZED PER THE NEC, THE EQUIPMENT NAME PLATE AND MANUFACTURERS RECOMMENDATIONS.

14. VISIT THE EXISTING FACILITY AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSALS, SO AS TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS

REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED.

15. CONTRACTOR SHALL INCLUDE IN HIS BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL RULES, REGULATIONS AND GUIDELINES APPLICABLE.

16. PANEL SCHEDULES INDICATE CIRCUIT DESIGNATIONS ONLY. CONTRACTOR TO PROVIDE MATERIALS AS REQUIRED WHEN NEUTRALS ARE SHARED TO COMPLY WITH NEC REQUIREMENTS. ALL SINGLE PHASE MULTIWIRE BRANCH CIRCUITS SHALL BE FED VIA A TWO POLE BREAKER OR TWO SINGLE POLE BREAKERS WITH AN IDENTIFIED HANDLE TIE. ALL THREE PHASE MULTIWIRE BRANCH CIRCUITS SHALL BE FED VIA A THREE POLE BREAKER OR THREE SINGLE

POLE BREAKERS WITH AN IDENTIFIED HANDLE TIE (PER NEC 210.4B).

17. PER NEC 110.22; PROVIDE PERMANENT LABELING FOR ALL SERIES RATED PANEL ENCLOSURES TO READ AS FOLLOWS: CAUTION - SERIES COMBINATION SYSTEM RATED ______ AMPERES. IDENTIFIED REPLACEMENT

COMPONENTS REQUIRED.

GROUNDING:

18. ALL METAL RACEWAYS, INCLUDING CONDUIT, WIRE TROUGHS, WIREMOLD, ETC., SHALL BE GROUNDED. ALL CONNECTIONS IN METAL RACEWAYS SHALL BE COMPLETED IN SUCH A MANNER AS TO MAINTAIN A CONTINUOUS PATH

TO GROUND THROUGHOUT THE ENTIRE LENGTH OF THE RACEWAY.

WIRING:

19. UNLESS NOTED OTHERWISE ON THE DRAWINGS OR ON THE EQUIPMENT WIRING SCHEDULE, EACH BRANCH CIRCUIT HOME RUN SHALL BE THREE (3) #12 AWG THHN/THWN (1 HOT, 1 NEUTRAL & 1 EQUIPMENT GROUND) IN 3/4" EMT CONDUIT. PROTECT EACH CIRCUIT WITH A 20 AMPERE, 1-POLE OVERCURRENT DEVICE UNLESS NOTED OTHERWISE.

COMBINED NEUTRALS ARE NOT PERMITTED.

SUITE 7

CORR.

2B - C7

CORR.

2B - C4

2B - C7

2B-C7

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

SCRUB

2B-221

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

CARDIAC

CATH LAB

NURSE

STATION

2B-234

2B-230B

2B-230

2B-232A

2B-204A

ANTE RM.

2B-204

25-13 25-7

J

J

CL2E-23

CL2E-23

J

J

SUITE 7

CORR.

2B - C7

CORR.

2B - C4

CORR.

2B - C7

2B-C7

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

SCRUB

2B-221

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

CARDIAC

CATH LAB

NURSE

STATION

2B-234

2B-230B

2B-230

2B-232A

2B-204A

ANTE RM.

2B-204

(TYP.)

(TYP.)

A A

AA

A A

AA

A A

A

A

AA

A

A

A

(TYP.)

(TYP.)

(TYP.)

(TYP.)

6 6

3S

3S

3S

3S

(TYP.)

X1

X1

X1

ELECTRICAL FLOOR PLANS

E-101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

M P r o j e c t

S e r v e r P r o j e c t s J L S

C

V e n e r g y

G r o u p

V

A

W g r a d e

C a t h

L a b

C l e a n

C o e s t

P a a c h

F

L D r a w i n g s E l e c t r i c a l E d w g

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

LAWRENCE M. STOFF

P.E. #: 78586

Blake Lawrence Suddeth

P.E. #: 69060

Blake Lawrence Suddeth

P.E. #: 69060

BLS \ PJRLMS NMO \ Nov. 17, 2020

SHEET # OF 16

voice 407.697.0336 www.kmadg.net

AA 26002557

JL

C&O

JRVHSK��LDZUHQFH�&�CR

CRQVXOWLQJ�(QJLQHHUV

317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922

Tel: 321.972.4466 . www.jlceng.com . CA No. 32770

6SDFH�CRDVW

100% CONSTRUCTION

DOCUMENTS

KEY NOTES:

1. EXISTING VAV UNITS SHALL RETAIN EXISTING CIRCUITING, CONDUITS AND CONDUCTORS. VERIFY

REPLACEMENT OF UNITS AND ELECTRICAL NEEDS WITH MECHANICAL CONTRACTOR.

2. EXISTING LOCATION OF PNEUMATIC TUBE STATION TO BE RELOCATED. COORDINATE EXACT NEW LOCATION WITHIN NURSE'S STATION WITH OWNER. RELOCATE CRITICAL POWER CIRCUIT AND ASSOCIATED DATA TO

NEW LOCATIONS AS REQUIRED.

3. NEW LOCATION OF PNEUMATIC TUBE STATION. COORDINATE EXACT LOCATION WITHIN NURSE'S STATION WITH OWNER. RELOCATE CRITICAL POWER CIRCUIT AND ASSOCIATED DATA TO NEW LOCATIONS AS REQUIRED. THE EXACT SAME CIRCUIT AND DATA DROP SHALL BE USED TO ENSURE PROPER FUNCTIONALITY

OF TUBE STATION IN NEW LOCATION.

4. ALL EXISTING LIGHTING AND ELECTRICAL DEVICES OUTSIDE OF THOSE SPECIFICALLY NOTED SHALL REMAIN

IN USE AND AS IS.

5. NEW STERILE FIELD AIR DISTRIBUTION DEVICES ARE BEING PLACED IN THE IR CATH LAB. AS SUCH, CONTRACTOR SHALL RELOCATE EXISTING LIGHTING AS REQUIRED TO ACCOMMODATE THE NEW AIR

DIFFUSERS. COORDINATE WITH MECHANICAL DOCUMENTS.

6. CONTRACTOR SHALL REPLACE THE LIGHTING WITHIN THE NURSE'S STATION AND THE CLEAN CORE SPACE ONE FOR ONE. RETAIN EXISTING CIRCUITING. COORDINATE NEW SWITCH LOCATIONS WITH OWNER.

7. TIE NEW EMERGENCY LIGHT FIXTURES TO EXISTING EMERGENCY CIRCUIT THAT WAS SERVING EXISTING

EMERGENCY LIGHT FIXTURES.

8. TIE NEW LIGHT FIXTURES INTO EXISTING CIRCUIT THAT WAS SERVING EXISTING LIGHT FIXTURES.

9. POWER FOR AUTOMATIC DOOR OPENER. COORDINATE WITH EXISTING CONDITIONS AND ARCHITECTURAL

DOOR HARDWARE DOCUMENTS AND HARDWARE MANUFACTURER'S INSTALLATION INSTRUCTIONS.

10. POWER FOR ACCESS CONTROL DEVICE. COORDINATE WITH DOOR HARDWARE AND LOW VOLTAGE

INSTALLER.

11. PROVIDE NEW DUPLEX RECEPTACLE AND DATA DROP FOR NEW MILLWORK. COORDINATE EXACT LOCATION

WITH ARCHITECTURAL PLANS.

12. TIE 120V CIRCUITING INTO NEAREST RECEPTACLE CIRCUIT. CONTRACTOR SHALL DOCUMENT CIRCUITING COMPLETED IN THE FILED AND SUBMIT FOR THE ENGINEER TO RECORD DURING RECORD DOCUMENTS.

GENERAL NOTES:

A. DO NOT SCALE ELECTRICAL DRAWING FOR ANY DIMENSIONS.

B. ALL WORK SHALL COMPLY WITH THE LATEST ADOPTED EDITION (BY THE VA) OF THE NATIONAL ELECTRIC CODE, NATIONAL, STATE AND LOCAL CODES AND VA SPECIFICATIONS AND GUIDELINES. PROVIDE

GROUNDING AND BONDING PER NEC 250.

C. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF ALL DEVICES AND EQUIPMENT PRIOR TO ROUGH

IN.

D. ALL ELECTRICAL AND LIGHTING DEVICES, EQUIPMENT AND ACCESSORIES SHALL REMAIN AS IS UNLESS

EXPLICITLY NOTED WITHIN THESE DOCUMENTS.

E. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT FIXTURE LOCATIONS AND ORIENTATIONS.

F. REFER TO ARCHITECTURAL ELEVATIONS AND SECTIONS FOR ADDITIONAL LIGHTING FIXTURE MOUNTING

DETAILS AND INFORMATION.

G. ALL EMERGENCY LIGHTING FIXTURES AND EXIT SIGNS SHALL BE CONNECTED "HOT" TO THE INDICATED

LOCAL LIGHTING CIRCUIT.

H. VERIFY ALL MOUNTING HEIGHTS AND PENDANT LENGTHS WITH ARCHITECT AND ENGINEER PRIOR TO

ORDERING FIXTURES.

I. REFER TO GENERAL DEMOLITION NOTES ON LEGEND SHEET FOR FURTHER INFORMATION.

J. CONTRACTOR SHALL FIELD INVESTIGATE THE EXISTING SWITCHING LIGHTING CONTROLS. CONTRACTOR SHALL REUSE EXISTING SWITCHING CONTROL IF FOUND EXISTING. WHERE EXISTING CONTRACTOR SHALL VERIFY THE WORKING CONDITION OF THE DEVICE TO BE REUSED. IF A SWITCHING CONTROL IS NOT FOUND, CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING CONTROL UNIT PHILLIPS BODINE #BLCD-20B OR APPROVED EQUAL BY OWNER. PROVIDE ADDITIONAL SENSORS, RELAYS, POWER PACKS, ETC. AS REQUIRED FOR COMPLETE COVERAGE OF SPACE. PROVIDE ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED.

COORDINATE APPROVAL AND ALL SWITCHING REQUIREMENTS WITH OWNER PRIOR PURCHASE.

WIRE SIZE 20A/1Ø/VOLTAGE DROP

ASSUMPTION:

- 20A/1Ø, 120 OR 277V CIRCUIT

- COPPER CONDUCTORS

- 75° RATING AND CIRCUIT LOADED TO 80% OF

OVER-CURRENT DEVICE RATING

- "L" IS THE ACTUAL "ONE-WAY" LENGTH OF THE BRANCH

CIRCUIT.

OPTIONALLY, THE CONTRACTOR MAY CALCULATE THE WIRE SIZE TO

MAINTAIN A VOLTAGE DROP BELOW 3% FOR EACH 20A/1Ø

BRANCH CIRCUITS BASED ON THE ACTUAL/NEC LOAD

CONNECTED.

120 VOLT:

- #12 AWG FOR L>55'

- #10 AWG FOR 55'<L<90'

- #8 AWG FOR 55'<L<140'

- #6 AWG FOR 140'<L<225'

- #4 AWG FOR 225<L<350'

- #3 AWG FOR 350'<L<450'

- #2 AWG FOR 450'<L<580'

277 VOLT:

- #12 AWG FOR L>125'

- #10 AWG FOR 125'<L<215'

- #8 AWG FOR 215'<L<330'

- #6 AWG FOR 330'<L<525'

FOR L>500', THE BRANCH CIRCUIT WIRING SHALL BE SIZED TO LIMIT

THE VOLTAGE DROP TO 3%

MODELQTY WATTS

VOLTSMODEL

LAMP

MARK DESCRIPTION MANUFACTURER

LIGHTING FIXTURE SCHEDULE

FIXTURE

WATTS

A

X1

2' X 2' LED FLAT PANEL, RECESSED INTO GRID CEILING 1 30 LED120/277 30METALUX

EMERGENCY EXIT SIGN. TO COORDINATE IN FIELD TO MATCH

EXISTING. 1 4 LED120/277 4TO BE DEFINEDTBD

22FP3240C

NOTES:

DIVISION 16 CONTRACTOR SHALL VERIFY ALL FIXTURE TYPES AND FINISHES WITH OWNER PRIOR TO ORDERING.

DA.

DB.

DC.

GENERAL DEMOLITION NOTES:

FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE

DEVICE AND REMOVE WIRING COMPLETELY FROM THE ABANDONED CONDUITS.

DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE DEVICE.

COMPLETELY REMOVE ALL ABANDONED WIRING.

MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH

RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.

MECHANICAL

2B - 304A

PATIENT

SERVICE

LOBBY

2B - 306

F. TLT

2B - 312A

F. LOCKER

/ LOUNGE

2B - 312

M. LOCKER

LOUNGE

2B - 314

M. TLT

/ SHOWER

2B - 314A

ELEV. S - 1

ELEV. S - 2

ELEV. S - 3

FEMALE

TOILET

F. LOCKER/

LOUNGE

M. LOCKER/

LOUNGE

AHU-25

AHU-60

AHU-24

NH2A-13:15:19

QDP2A1-7:9:11

VF

D

AH

U-

VF

D

AH

U-

VF

D R

AF

AH

U-

ELECTRICAL FLOOR PLANS

E-101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

M P r o j e c t

S e r v e r P r o j e c t s J L S

C

V e n e r g y

G r o u p

V

A

W g r a d e

C a t h

L a b

C l e a n

C o e s t

P a a c h

F

L D r a w i n g s E l e c t r i c a l E d w g

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

LAWRENCE M. STOFF

P.E. #: 78586

Blake Lawrence Suddeth

P.E. #: 69060

Blake Lawrence Suddeth

P.E. #: 69060

BLS \ PJRLMS NMO \ Nov. 17, 2020

SHEET # OF 16

voice 407.697.0336 www.kmadg.net

AA 26002557

JL

C&O

JRVHSK��LDZUHQFH�&�CR

CRQVXOWLQJ�(QJLQHHUV

317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922

Tel: 321.972.4466 . www.jlceng.com . CA No. 32770

6SDFH�CRDVW

100% CONSTRUCTION

DOCUMENTS

KEY NOTES:

1. EXISTING MECHANICAL AIR HANDLING UNITS AND VFD'S ARE BEING REPLACED ONE FOR ONE. CONTRACTOR

SHALL REUSE EXISTING ELECTRICAL CIRCUITING, CONDUCTORS AND CONDUIT. ELECTRICAL CONTRACTOR SHALL COORDINATE DISCONNECT AND FUSE REQUIREMENTS FOR MECHANICAL UNIT WITH MECHANICAL CONTRACTOR AND EQUIPMENT MANUFACTURER PRIOR TO ROUGH-IN AND PROVIDE AS REQUIRED. LOCATE

AS REQUIRED TO MAINTAIN NEC CLEARANCES.

GENERAL NOTES:

A. DO NOT SCALE ELECTRICAL DRAWING FOR ANY DIMENSIONS.

B. ALL WORK SHALL COMPLY WITH THE LATEST ADOPTED EDITION (BY THE VA) OF THE NATIONAL ELECTRIC CODE, NATIONAL, STATE AND LOCAL CODES AND VA SPECIFICATIONS AND GUIDELINES. PROVIDE

GROUNDING AND BONDING PER NEC 250.

C. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF ALL DEVICES AND EQUIPMENT PRIOR TO ROUGH

IN.

D. ALL ELECTRICAL AND LIGHTING DEVICES, EQUIPMENT AND ACCESSORIES SHALL REMAIN AS IS UNLESS

EXPLICITLY NOTED WITHIN THESE DOCUMENTS.

WIRE SIZE 20A/1Ø/VOLTAGE DROP

ASSUMPTION:

- 20A/1Ø, 120 OR 277V CIRCUIT

- COPPER CONDUCTORS

- 75° RATING AND CIRCUIT LOADED TO 80% OF

OVER-CURRENT DEVICE RATING

- "L" IS THE ACTUAL "ONE-WAY" LENGTH OF THE BRANCH

CIRCUIT.

OPTIONALLY, THE CONTRACTOR MAY CALCULATE THE WIRE SIZE TO

MAINTAIN A VOLTAGE DROP BELOW 3% FOR EACH 20A/1Ø

BRANCH CIRCUITS BASED ON THE ACTUAL/NEC LOAD

CONNECTED.

120 VOLT:

- #12 AWG FOR L>55'

- #10 AWG FOR 55'<L<90'

- #8 AWG FOR 55'<L<140'

- #6 AWG FOR 140'<L<225'

- #4 AWG FOR 225<L<350'

- #3 AWG FOR 350'<L<450'

- #2 AWG FOR 450'<L<580'

277 VOLT:

- #12 AWG FOR L>125'

- #10 AWG FOR 125'<L<215'

- #8 AWG FOR 215'<L<330'

- #6 AWG FOR 330'<L<525'

FOR L>500', THE BRANCH CIRCUIT WIRING SHALL BE SIZED TO LIMIT

THE VOLTAGE DROP TO 3%

ELECTRICAL DETAILS

E-300

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

M P r o j e c t

S e r v e r P r o j e c t s J L S

C

V e n e r g y

G r o u p

V

A

W g r a d e

C a t h

L a b

C l e a n

C o e s t

P a a c h

F

L D r a w i n g s E l e c t r i c a l E d w g

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

LAWRENCE M. STOFF

P.E. #: 78586

Blake Lawrence Suddeth

P.E. #: 69060

Blake Lawrence Suddeth

P.E. #: 69060

BLS \ PJRLMS NMO \ Nov. 17, 2020

SHEET # OF 16

voice 407.697.0336 www.kmadg.net

AA 26002557

JL

C&O

JRVHSK��LDZUHQFH�&�CR

CRQVXOWLQJ�(QJLQHHUV

317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922

Tel: 321.972.4466 . www.jlceng.com . CA No. 32770

6SDFH�CRDVW

MECHANICAL LEGEND

M-000

ZONE DAMPER

WETBULB

WITHOUT

WITH

WATTS

VARIABLE AIR VOLUME

TYPICAL

THERMOSTAT

TRANSFER OPENING ABOVE CEILING

TRANSFER GRILLE

TEMPERATURE

TOTALLY ENCLOSED FAN COOLED

SINGLE ZONE

SQUARE FOOT

SMOKE DAMPER

SMOKE DETECTOR

SUPPLY FAN

SUPPLY AIR

ROOFTOP UNIT

REVOLUTIONS PER MINUTE

RELATIVE HUMIDITY

REQUIRED

RETURN AIR

PLUMBING

PRESSURE DROP

PROPELLER

OPEN DRIP PROOF

OUTSIDE AIR

NOT TO SCALE

MULTI-ZONE

MANUAL VOLUME DAMPER

MINIMUM

1000 X BTUH

MAXIMUM

LEAVING WATER TEMPERATURE

LEAVING AIR TEMPERATURE

KILOWATTS

INCHES WATER GAGE

HEATING VENTILATING AND AIR CONDITIONING

HOT WATER

HIGH HOT WATER SUPPLY

HIGH HOT WATER RETURN

HORSEPOWER

GALLONS PER MINUTE

GALVANIZED

GALLON

GAUGE

DEGREES FAHRENHEIT

FEET WATER GAUGE

COMBINATION FIRE AND SMOKE DAMPER

FEET PER MINUTE

FLEXIBLE CONNECTOR OR DUCT

FLOOR

FIRE DAMPER

FAN COIL UNIT

FORWARD CURVED

ENTERING WATER TEMPERATURE

ENTERING

ENERGY EFFICIENCY RATIO

ENTERING AIR TEMPERATURE

EACH

EXHAUST

EXHAUST FAN

DIRECT EXPANSION

DRAWINGS

DRYBULB

CONDENSING UNIT

COEFFICIENT OF PERFORMANCE

CONDENSATE

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CHILLED WATER

CUBIC FEET PER MINUTE

CONDENSATE DRAIN

BRITISH THERMAL UNIT PER HOUR

BRAKE HORSEPOWER

BUILDING

BACKWARD INCLINE

BUILDING AUTOMATION SYSTEM

AIR HANDLING UNIT

AIR CONDITIONER

ABOVE FINISHED FLOOR

ADJUSTABLE

ABOVE

ZD

WB

W/O W/ W

VAV

VFD

TYP

T'STAT

T/O

TG

TEMP

TEFC

SZ

SQ.FT.

SDMP

SD

SF

SA

RTU

RPM

RH

REQ'D

RA

PSIG

PSIA

PLBG

PD

PROP

OPD

OA

N.T.S.

MZ

MVD

MIN

MBH

MAX

LWT

LAT

KW

IN.WG

HVAC

HW

HHWS

HHWR

HP

GPM

GALV

GAL

GA

F

FT. H 0

F/S

FPM

FLEX

FL

FD

FCU

FC

EWT

ENT

EER

EAT

EA

EXH

EF

DX

DWGS

DB

CU

COP

COND

CWS

CWR

CW

CFM

CD

BTUH

BHP

BLDG

BI

BAS

AHU

AC

AFF

ADJ

ABV

VARIABLE FREQUENCY DRIVE

POUNDS PER SQUARE INCH GAUGE

POUNDS PER SQUARE INCH ABSOLUTE

RADIATION DAMPERRD

CARBON MONOXIDECO

THREE WAY MOTORIZED CONTROL VALVE

BALL VALVE FOR PIPING 2-INCHES AND SMALLER,

STRAINER

HAVE NAMEPLATE INDICATING WATER FLOW RATE VERSUS

AUTOMATIC FLOW CONTROL VALVE WITH INTEGRAL

PRESSURE RELIEF VALVE

OPENING IN WALL ABOVE CEILING

ELBOW (PLAN, UP, DOWN)

UNION

PRESSURE AND/OR TEMPERATURE PORT

TEE (PLAN, UP, DOWN)

VALVE

TWO WAY MOTORIZED CONTROL VALVE

PRESSURE REDUCING VALVE

FLOW CONTROL VALVE

BUTTERFLY VALVE FOR PIPING 2-1/2 INCHES AND

LARGER

CHECK VALVE

BALANCE VALVE WITH INTEGRAL TAPS FOR CONNECTION

OF DIFFERENTIAL PRESSURE METER. VALVE SHALL

VALVE PRESSURE DROP

TEMPERATURE AND PRESSURE TEST PORTS

VENTURI FLOW METER

THERMOMETER

PRESSURE GAUGE WITH GAUGE COCK

FLEXIBLE CONNECTION

MOTORIZED ACTUATOR

EQUIPMENT TAG

HEATING WATER SUPPLY PIPING

RECTANGULAR BRANCH DUCT CONNECTION.

HEATING WATER RETURN PIPING

CONDENSATE DRAIN PIPING

FLOW SENSOR

CHILLED WATER RETURN PIPING

REFERENCE NOTE - MULTI-DISCIPLINE SHEETS

AND EXISTING

INDICATES POINT OF CONNECTION BETWEEN NEW

STATIC PRESSURE TRANSMITTER ASSEMBLY

CONDENSER WATER SUPPLY PIPING

CONDENSER WATER RETURN PIPING

BUILDING CONDENSER WATER SUPPLY PIPING

BUILDING CONDENSER WATER RETURN PIPING

REFERENCE NOTES

POINT OF DISCONNECT

CHILLED WATER SUPPLY PIPING

1" DOOR UNDER CUT. ARROW INDICATES DIRECTION

OF FLOW

REFRIGERANT PIPING

FLOW DIRECTION

SP

FS

45° W

L

MIN. 4"

L=1/4W, UC

R

CD

HWR

HWS

CHWR

CHWS

BCWR

BCWS

CWR

CWS

EQUIPMENT

MARK

TYPE

SYMBOLS SHOWN ON THIS MECHANICAL LEGEND ARE FOR

REFERENCE PURPOSES ONLY. ALL OF THESE SYMBOLS MAY

NOT BE USED FOR THIS PROJECT.

NOTE:

RD RADIATION DAMPER INSTALLED IN DUCT.

RD RADIATION DAMPER INSTALLED IN AIR DEVICE

CONICAL FITTING WITH DAMPER ON BRANCH

B = SHEET NUMBER ON WHICH DETAIL IS LOCATED

SUPPLY DIFFUSER (4-WAY)

RETURN OR OUTDOOR AIR GRILLE

SUPPLY DUCT UP SECTION (ROUND)

ROUND DUCTWORK

ELBOW WITH TURNING VANES

CONNECTION TO RECTANGULAR MAIN

(PROVIDE DAMPER IN LOW PRESSURE DUCTWORK ONLY)

BACKDRAFT DAMPER

FLEXIBLE DUCT CONNECTION

FIRE DAMPER WITH ACCESS PANEL

COMBINATION FIRE/SMOKE DAMPER WITH ACCESS PANEL

AIR FLOW MONITORING STATION

MOTORIZED CONTROL DAMPER

EXISTING DUCTWORK TO BE REMOVED (HATCHED AND/OR DASHED)

DUCT MOUNTED SMOKE DETECTOR PROVIDED AND WIRED BY

ELECTRICAL CONTRACTOR AND INSTALLED IN DUCT BY

MECHANICAL CONTRACTOR. REFER TO SPECIFICATIONS FOR

CONTROL REQUIREMENTS.

WALL MOUNTED DDC TEMPERATURE SENSOR

MOUNT 4'-0" ABOVE FINISHED FLOOR

WALL MOUNTED DDC HUMIDITY SENSOR

MOUNT 4'-0" ABOVE FINISHED FLOOR

PHOTO DETAIL OR SECTION IDENTIFICATION TARGET

A = DETAIL NUMBER

EXHAUST GRILLE

WALL MOUNTED THERMOSTAT

MOUNT 4'-0" ABOVE FINISHED FLOOR

SUPPLY DUCT UP SECTION (RECTANGULAR)

RETURN DUCT UP SECTION (RECTANGULAR)

EXHAUST DUCT UP SECTION (RECTANGULAR)

RECTANGULAR DUCTWORK WITH TAKE-OFF, BALANCING

DAMPER AND INSULATED FLEXIBLE ROUND DUCT. SAME SIZE

AS DIFFUSER INLET UNLESS NOTED OTHERWISE. FIRST

DIMENSION IS THAT OF SIDE SHOWN

MARK-CFM

AIR DEVICE TAG

SIDEWALL TRANSFER GRILLE

SIDEWALL RETURN GRILLE OR OUTSIDE AIR LOUVER

SIDEWALL SUPPLY REGISTER

SIDEWALL EXHAUST GRILLE

WALL MOUNTED CO SENSOR

MOUNT 4'-0" ABOVE FINISHED FLOOR

WALL MOUNTED HUMIDISTAT SENSOR

MOUNT 4'-0" ABOVE FINISHED FLOOR

SUPPLY DUCT DOWN SECTION (RECTANGULAR)

RETURN DUCT DOWN SECTION (RECTANGULAR)

EXHAUST DUCT DOWN SECTION (RECTANGULAR)

EXISTING DUCTWORK TO REMAIN (LIGHT LINETYPE)

EXISTING LINEAR SLOT DIFFUSER (LIGHT LINETYPE)

LINEAR SLOT DIFFUSER

SUPPLY DUCT DOWN SECTION (ROUND)

A/B

M

A-100

S

C

A Ø

H

H

TS

(PROVIDE BALANCING DAMPER AT ALL BRANCH

CONNECTIONS)

MANUAL DAMPER

BUTTERFLY VALVE

1. INSTALL EQUIPMENT AND MATERIALS IN COMPLIANCE WITH MANUFACTURER'S MINIMUM CLEARANCE REQUIREMENTS AND RECOMMENDATIONS.

2. ALL EQUIPMENT AND INSTALLATION SHALL COMPLY WITH THE LATEST ADOPTED EDITIONS OF NFPA, THE INTERNATIONAL BUILDING CODE AND VA

STANDARDS.

3. ALL MATERIALS SHALL FIT THE SPACE AVAILABLE. VERIFY DIMENSIONS AND CLEARANCES ON BUILDING PLANS PRIOR TO COMMENCING WORK.

4. CONTRACTOR SHALL PERFORM TESTING AND BALANCING OF AIR SYSTEMS IN ACCORDANCE WITH AABC GUIDELINES. A TEST AND BALANCE REPORT

SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER FOR APPROVAL.

5. PROVIDE 45 DEGREE BRANCH TAKE-OFF PER SMACNA FIG. 2-8 ON ALL RECTANGULAR DUCT TAKE-OFFS.

6. ALL DUCTWORK TAKE-OFFS AND/OR BRANCH DUCTWORK SHALL BE PROVIDED WITH A BALANCING DAMPER.

7. PROVIDE AND INSTALL DUCT MOUNTED HINGED ACCESS DOORS FOR ALL SMOKE AND/OR FIRE DAMPERS, NOT OTHERWISE ACCESSIBLE.

8. CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING AND SHALL COORDINATE WITH ALL OTHER TRADES PRIOR TO OR INSTALLING EQUIPMENT AND MATERIALS.

9. COORDINATE ALL HVAC SYSTEM DRAWINGS WITH THE BUILDING STRUCTURE TO AVOID INTERFERENCE BETWEEN MECHANICAL SYSTEMS AND ROOF STRUCTURE. DUCT SIZES MAY BE REVISED, BASED ON ENGINEER APPROVAL, TO FIT TRUSS SYSTEM SO LONG AS THE EQUIVALENT INSIDE CROSS

SECTIONAL AREA IS NOT DECREASED.

10. GAUGES AND CONSTRUCTION FOR DUCTWORK SHALL CONFORM TO THE LATEST EDITION OF SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS.

11. TRANSITION RECTANGULAR DUCTWORK ON BOTTOM AND SIDES. MAINTAIN TOP OF DUCTWORK LEVEL AND HIGH AS POSSIBLE. FLEXIBLE DUCT RUN-OUTS TO CEILING DIFFUSERS SHALL BE AS STRAIGHT AS POSSIBLE AND FREE OF SAGS & KINKS. FLEX DUCT SHALL BE THE SAME SIZE AS THE

DIFFUSER NECK IT SERVES.

12. ALL DUCT TRANSITIONS FROM SQUARE TO ROUND SHALL BE SMOOTH SQUARE TO ROUND TRANSITIONS. SPIN-IN FITTINGS AT THE END OF CAPPED

DUCTS ARE NOT ACCEPTABLE. DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSIONS.

13. THE CONTRACTOR SHALL FULFILL ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS AND SHALL COMPLETE THE WORK SHOWN ON THESE DRAWINGS.

ALL SYSTEMS SHALL BE FINISHED, TESTED AND BALANCED, ADJUSTED, AND PROVEN TO BE FULLY OPERATIONAL AND USEABLE.

14. ADJUST ALL DIFFUSERS IN CORRIDORS OR WITHIN THREE (3) FEET OF A WALL TO PROVIDE 2-WAY OR 3-WAY BLOW AWAY FROM OR DIRECTLY INTO

WALLS. ALL DIFFUSERS SHALL HAVE 4-WAY BLOW UNLESS NOTED OTHERWISE.

15. PORTIONS OF DUCTWORK VISIBLE THROUGH GRILLES AND REGISTERS IN FINISHED AREAS SHALL BE PAINTED FLAT BLACK.

16. ALL DAMPERS IN AND ABOVE CEILINGS SHALL BE ACCESSIBLE. CONTRACTOR SHALL COORDINATE ALL ACCESS PANELS IN CEILINGS OR WALLS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND/OR INTERIOR DRAWINGS FOR PROPER LOCATION.

17. MOUNT THERMOSTATS WHERE INDICATED ON PLANS 48" A.F.F. UNLESS NOTED OTHERWISE. COORDINATE ALL THERMOSTAT LOCATION TO NOT BE MOUNTING WHERE MILLWORK, ARTWORK AND/OR ANY HEAT PRODUCING EQUIPMENT WILL BE PLACED.

18. COORDINATE DUCTWORK AND PIPING WITH PLUMBING, FIRE PROTECTION AND ELECTRICAL. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH

OTHER TRADES WITHOUT ANY ADDITIONAL EXPENSE TO THE CONTRACT.

19. SEAL ALL TRANSVERSE JOINTS AND FITTINGS WITH DUCT SEALER.

20. TRAP AND ROUTE CONDENSATE DRAINS LINES, FULL SIZE OF UNIT CONNECTION, AS INDICATED. SLOPE 1/8" PER FOOT.

21. ALTERNATE MANUFACTURERS AND MODELS WILL BE REVIEWED. THERE MAY BE ARCHITECTURAL, STRUCTURAL AND ELECTRICAL CHANGES RESULTING FROM THE ALTERNATES. THE COST OF IMPLEMENTING AND ENGINEERING THESE CHANGES SHALL BE BORNE BY THE MECHANICAL SUBCONTRACTOR.

22. PIPE AND DUCT ROUTING SHOWN IS SCHEMATIC. PROVIDE ANY ADDITIONAL OFFSETS AND FITTINGS, INCLUDING DIVIDED DUCTS, REQUIRED FOR PROPER

INSTALLATION AND TO MAINTAIN CLEARANCES AS ENCOUNTERED IN THE FIELD.

23. COORDINATE CEILING MOUNTED AIR DEVICE LOCATION WITH THE ARCHITECTURAL REFLECTED CEILING PLAN AND OTHER TRADES.

24. ALL CONTROL WIRING AND CONDUIT SHALL COMPLY WITH NEC DIVISION 16 SPECIFICATIONS.

25. PROVIDE MATERIALS WHICH HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED RATING OF 50 OR LESS WHEN TESTED IN ACCORD

WITH ASTM E84.

26. SLEEVE AND FIRE STOP PENETRATIONS THROUGH FIRE RATED SYSTEMS TO MAINTAIN RATING OF SYSTEM. USE MINIMUM GALVANIZED STEEL GAUGE

DUCT AS REQUIRED TO MAINTAIN RATING OF SYSTEM.

27. WHERE THE EXHAUST DUCT IS CONCEALED WITHIN THE BUILDING CONSTRUCTION, THE EQUIVALENT LENGTH OF THE DUCT SHALL BE IDENTIFIED ON A PERMANENT LABEL OR TAG. THE LABEL OR TAG SHALL BE LOCATED WITHIN 6 FEET OF THE EXHAUST DUCT CONNECTION.

28. CONTRACTOR TO ORDER ALL FIRE/SMOKE DAMPERS WITH INTEGRAL SMOKE DETECTORS AND END STOP INDICATOR OPTIONS. VERIFY VOLTAGE WITH ELECTRICAL DRAWINGS. IF BUILDING IS EQUIPPED WITH FIRE ALARM SYSTEM ALL FIRE/SMOKE DAMPERS WILL BE CONNECTED TO BUILDING FIRE ALARM

SYSTEM.

29. ALL MECHANICAL EQUIPMENT SHALL BE THOROUGHLY CLEANED OF ALL DIRT, OIL, CONCRETE, ETC. ANY DENTS, SCRATCHES OR OTHER VISIBLE BLEMISHES SHALL BE CORRECTED AND THE APPEARANCE OF THE EQUIPMENT MADE "LIKE NEW" AND TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. UPON COMPLETION, AND BEFORE FINAL ACCEPTANCE OF THE WORK, ALL DEBRIS, RUBBISH, LEFTOVER MATERIALS, TOOLS AND EQUIPMENT SHALL BE REMOVED FROM THE SITE. PROTECTION OF WORK UNTIL FINAL ACCEPTANCE: PROTECT ALL MATERIALS AND EQUIPMENT FROM DAMAGE, ENTRANCE OF DIRT AND CONSTRUCTION DEBRIS FROM THE TIME OF INSTALLATION UNTIL FINAL ACCEPTANCE. ANY MATERIALS AND EQUIPMENT WHICH ARE DAMAGED SHALL BE REPAIRED TO "AS NEW" CONDITION OR REPLACED AT THE DIRECTION OF THE ARCHITECT/ENGINEER.

WHERE FACTORY FINISHES OCCUR AND DAMAGE IS MINOR, FINISHES MAY BE TOUCHED UP. IF, IN THE OPINION OF THE ARCHITECT/ENGINEER THE

DAMAGE IS EXCESSIVE, FACTORY FINISH SHALL BE REPLACED TO "NEW" CONDITION.

30. DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT AND EXTENT OF WORK. EXACT LOCATIONS AND ARRANGEMENT OF MATERIALS AND EQUIPMENT SHALL BE DETERMINED, WITH THE ACCEPTANCE OF THE ARCHITECT/ENGINEER, AS WORK PROGRESSES TO CONFORM IN THE BEST POSSIBLE MANNER WITH THE SURROUNDINGS AND WITH THE ADJOINING WORK OF OTHER TRADES. WHERE LOCATIONS OF EQUIPMENT, DEVICES OR FIXTURES ARE CONTROLLED BY ARCHITECTURAL FEATURES, ESTABLISH SUCH LOCATIONS BY REFERRING TO DIMENSIONS ON

ARCHITECTURAL DRAWINGS AND NOT BY SCALING DRAWINGS.

31. IN CASE OF DIFFERENCES BETWEEN DRAWINGS AND SPECIFICATIONS, OR WHERE DRAWINGS AND SPECIFICATIONS ARE NOT CLEAR OR DEFINITE, THE SUBJECT SHALL BE REFERRED TO ARCHITECT/ENGINEER FOR CLARIFICATION AND INSTRUCTIONS.

32. ANY INTERRUPTION OF EXISTING MECHANICAL AND ELECTRICAL SERVICES SHALL BE COORDINATED IN ADVANCE WITH THE OWNER'S REPRESENTATIVE.

THIS INCLUDES, BUT IS NOT LIMITED TO, SERVICES PROVIDING CHILLED WATER, ELECTRICITY, OR OTHER CRITICAL SYSTEMS AS MAY BE PERTINENT TO THIS PARTICULAR PROJECT. SERVICE INTERRUPTION TIMES AND DURATION OF INTERRUPTION OF SERVICES SHALL BE DECIDED BY THE OWNER.

PROVIDE APPROPRIATE PROVISIONS (E.G., ISOLATION SHUT-OFF VALVES, DAMPERS, END CAPS, AND SIMILAR ITEMS) AS NECESSARY TO ACCOMMODATE THE REQUIRED SERVICE INTERRUPTIONS. IF SHUTDOWNS CANNOT BE ACCOMMODATED, PROVIDE MEANS FOR "WET" TAPPING OR "HOT" TAPPING OF

PIPING SYSTEMS.

33. ALL ELECTRICAL DEVICES SHALL BE U.L. APPROVED.

FLEX DUCT

GENERAL LEGEND

COMMISSIONING

1. THE CONTRACTOR SHALL DEMONSTRATE TO THE REGISTERED DESIGN PROFESSIONAL REPRESENTATIVE BY WAY OF FUNCTIONAL PERFORMANCE TESTING OF ALL

MECHANICAL SYSTEMS EFFECTED IN THIS RENOVATION. DEMONSTRATE THE PERFORMANCE OF SYSTEMS DESCRIBED HERE IN, INCLUDING: SEQUENCE OF OPERATIONS, AUTOMATIC MODES, ALARMS, MODES OF OPERATION UPON A LOSS OF POWER AND OPERATING IN WINTER AND SUMMER MODES. IF REQUIRED BY THE AHJ OR OWNER, THE COMMISSIONING AGENT SHALL PROVIDE THE COMMISSIONING REPORT AND FUNCTIONAL TESTING RESULTS TO THE AHJ FOR REVIEW AND PROOF OF COMMISSIONING. THE COMMISSIONING EFFORT SHALL MEET THE MINIMUM COMMISSIONING REQUIRES LISTED IN THE 2017 FLORIDA ENERGY CODE -ENERGY

CONSERVATION.

GENERAL NOTESABBREVIATIONS

AF

BD

NOTE: GENERAL NOTES , ABBREVIATIONS AND SYMBOLS ON THIS

MECHANICAL SHEET ARE FOR GENERAL REFERENCE PURPOSES

ONLY. ALL OF THESE MAY NOT BE USED FOR THIS PROJECT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

M P r o j e c t

S e r v e r P r o j e c t s J L S

C

V e n e r g y

G r o u p

V

A

W g r a d e

C a t h

L a b

C l e a n

C o e s t

P a a c h

F

L D r a w i n g s M e c h a n i c a l M d w g

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ARCHITECT:

STAMPCONTRACTOR

321 4 5 6 7 8 9 10

WPB VAMC - UPGRADE CATH LAB

CLEAN CORE

7305 N Military trl, Riviera Beach, FL 33410

548-19-113

Project Director

Revisions: Date:

MECHANICAL, ELECTRICAL AND PLUMBING (MEP) ENGINEERS:

LAWRENCE M. STOFF

P.E. #: 78586

Blake Lawrence Suddeth

P.E. #: 69060

Blake Lawrence Suddeth

P.E. #: 69060

BLS \ PJRLMS NMO \ Nov. 17, 2020

SHEET # OF 16

voice 407.697.0336 www.kmadg.net

AA 26002557

JL

C&O

JRVHSK��LDZUHQFH�&�CR

CRQVXOWLQJ�(QJLQHHUV

317 RIVEREDGE BLVD. SUITE 110. COCOA, Florida 32922

Tel: 321.972.4466 . www.jlceng.com . CA No. 32770

6SDFH�CRDVW

CORR.

2B - C7

WAITING

2B - C1

CORR.

2B - C4

BED

CUBICLE

2B - 234

BED

CUBICLE

2B - 232

2B-225

MED

PREP.

2B - 223

CARDIAC.

LAB

2B - 224

CONSULT/

MEDITAT.

2B-206

ELEC.

CLOS.

2B - 212

T/S

2B - 206

EQUIPMENT

2B-215

HEAD NURSE

2B-227

IR

CATH-LAB

SUPPLY

HAV

2B-214

2B - 221

CONSULT

2B - 234

EQUIPMENT

CONTROL

CONTROL

SCRUB RM.

2B-224

2B - C7

EX.-525

"Ø

25-3 25-13

25-2

25-1

25-7

25-6

25-10 25-11

25-5

"Ø

E A

"Ø

E A

"Ø

E A

14"Ø EA

x1

2 S A

24x12 SA

EA

EA

EA

7" Ø

EA

EAEAEA

EA

"Ø

R A

"Ø

R A

"Ø

R A

8"Ø RA

"Ø

R A

"Ø

S A

10"Ø SA

10"Ø SA

8" Ø

SA

SA

EX.-525

EX.-525

EX.-525

EX.-50

EX.-120 EX.-120

EX.-120

EX.-120

EX.-120

EX.-120

EX.-120

EX.-50

EX.-150

EX.-50

EX.-200

8"Ø SA 7"Ø SA

"Ø

S A

"Ø

S A

"Ø

S A

EX.250

EX.-325

EX.-50

EX.-50

EX.-325

EX.-200

CRAC-1

(670SQFT)

353SQFT

EX.-210

SA

25-4

8" Ø

SA

EX.-120

SA

"Ø

S A

12"Ø SA 10x8 SA

8"Ø SA

"Ø

S A

14"Ø RA

10x6

10x6

10x6

"Ø

R A

"Ø

S A

8" Ø

8" Ø

4" Ø x1

2 S A

840CFM

840CFM

EX. 590CFM

EX. 590CFM

EX.-360

EX.-50

EX.-75

EX.-75

(TYP.)

(TYP.)

(TYP.)

(TYP.)

22x11 RA

AC-10

x1

1 R A

"Ø

E A

"Ø

S A

"Ø

E A

SUITE 7

CORR.

2B - C7

CORR.

2B - C4

2B - C7

2B-C7

CORR.

2B-C7

EQUIPMENT

ROOM

2B-234A

SCRUB

ROOM

2B-224

CONSULT/

SCHEDULING

2B-238

HOLDING

ROOM #2

HOLDING

ROOM #3

IR

CATH-LAB

CONTROL

PATIENT

TOILET

2B-229

SOILED

ROOM

2B-230A

STERILE

SUPPLY

2B-222

EQUIPMENT

CORR.

2B-C4

SCRUB

2B-221

CONTROL

CARDIAC.

LAB

2B-224

WAITING

2B-C1

CONSULT/

MEDITAT.

2B-206

ELECT.

CLOSET

2B-212

T/S

2B-205

CARDIAC

CATH LAB

NURSE

STATION

2B-234

2B-230B

2B-230

2B-232A

2B-204A

ANTE RM.

2B-204

25-3 25-13

25-2

25-1

25-7

25-6

25-10 25-11

25-5

"Ø

E A

"Ø

E A

"Ø

E A

14"Ø EA

x1

2 S A

24x12 SA

EA

EA

EA

7" Ø

EA

EAEAEA

EA

"Ø

R A

"Ø

R A

"Ø

R A

8"Ø RA

"Ø

R A

8" Ø

RA

SA

EX.-50

EX.-120 EX.-120

EX.-120

EX.-120

EX.-120

EX.-120

A-325

EX.-50

EX.-150

EX.-50

EX.-200

8"Ø SA 7"Ø SA

"Ø

S A

"Ø

S A

"Ø

S A

EX.250

EX.-325

EX.-50

EX.-50

EX.-325

EX.-200

CRAC-1

EX.-50

SA

25-4

8" Ø

SA

SA

"Ø

S A

12"Ø SA 10x8 SA

8"Ø SA

"Ø

S A

14"Ø RA

10x6

10x6

10x6

"Ø

R A

"Ø

S A

8" Ø

8" Ø

4" Ø

1075CFM

C-825

DP

EX.-50

EX.-75

EX.-75

(TYP.)

B-360

14"Ø

B-575

(TYP.)

1075CFM

C-825 x1

A-325

DP

EX.-120

EX.-120

EX.-120

(750CFM)(2450CFM)

DP

22x11 RA x1

1 R A

"Ø

E A

"Ø

R A

"Ø

S A

"Ø

S A

"Ø

E A

12"Ø EA

x1

C-840

C-840

(TYP.)

(TYP.)

(TYP.)

T

T

T

T H

H

H

T

HT

H

T H

T H

H

"Ø

S A

(TYP.)VAV25-7

VAV25-3

VAV25-13

VAV25-11

VAV25-10

VAV25-4

VAV25-5AHU-60

MECHANICAL FLOOR PLANS

M-101

1. EXISTING CONDITIONS ARE DEPICTED ON THIS PLAN AS FOUND IN FIELD INVESTIGATIONS AND AS-BUILT DOCUMENTATION. PRIOR TO BID, THE CONTRACTOR SHALL VISIT THE SITE TO VERIFY ALL LOCATIONS, EQUIPMENT SIZES, QUANTITIES AND CONDITIONS. IF ANY DEVIATION IN EXISTING CONDITIONS ARE FOUND, THE CONTRACTOR SHALL CONTACT THE ENGINEER IN WRITING PRIOR TO THE COMMENCEMENT OF WORK.

2. CONTRACTOR SHALL VERIFY AND MAINTAIN ALL NEC REQUIRED CLEARANCE AND OTHER EQUIPMENT CLEARANCES. IF ANY EXISTING DEFICIENCIES EXIST, OR ARE CREATED WITH THE REMODEL, THE

CONTRACTOR SHALL MODIFY LOCATIONS TO ENSURE ALL NEC AND MANUFACTURER RECOMMENDED

CLEARANCES ARE MET.

3. PLANS ARE DIAGRAMMATIC IN NATURE. EXACT EQUIPMENT LOCATIONS, SHOWN EXISTING DUCTWORK LOCATIONS AND CONNECTION POINTS OF EXISTING TO NEW SYSTEMS SHALL BE CONFIRMED ON SITE PRIOR

TO CONSTRUCTION WORK COMMENCING.

4. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AND STATE CODES AND THE VA/OWNER

DESIGN GUIDELINES.

RENOVATION KEY NOTES :

1. ALL EXISTING EQUIPMENT (CRAC UNITS, DUCTWORK, VAV BOXES, AIR TERMINAL DEVICES...ETC.) SHALL

BE LEFT AS-IS UNLESS OTHERWISE NOTED.

2. CAP EXISTING RETURN AIR DUCTWORK AND SEAL AIR TIGHT.

3. PROVIDE NEW DIFFUSER AND BALANCE TO AIRFLOW SHOWN.

4. CONNECT NEW DUCTWORK TO EXISTING.

5. CONNECT NEW DUCTWORK TO EXISTING SUPPLY AIR DUCT MAIN IN PROCEDURE ROOM. CONNECT NEW

DUCTWORK INTO HUNTAIR CLEAN SUITE CEILING SYSTEM. REBALANCE AS REQUIRED FOR NEW

AIRLFOW.

6. REBALANCE SIDEWALL EXHAUST GRILLES TO NEW AIRFLOW SHOWN.

7. REBALANCE EXISTING VAV BOX TO NEW AIRFLOW SHOWN. PROVIDE NEW DDC CONTROLS CONVERSION KIT FROM PNEUMATIC CONTROLS. IF EXISTING VAV BOX CANNOT OPERATE AT NEW AIRFLOW, REPLACE

VAV BOX. SEE SCHEDULES.

8. PNEUMATIC TUBE STATION TO BE RELOCATED WITHIN NURSE'S STATION. COORDINATE EXACT NEW LOCATION ON WALL WITH OWNER. RELOCATE PNEUMATIC PIPING AS REQUIRED AND TIE INTO EXISTING

SYSTEM TO MAINTAIN ALL EXISTING FUNCTIONALITY.

9. PROVIDE NEW DP SENSORS ON WALL AND BALANCE AIRFLOW TO MAINTAIN 0.02"-0.05" WC ACROSS DOOR. SENSOR SHALL CONTINUOUSLY READ REAL TIME DP AND SHALL HAVE AN AUDIBLE AND VISIBLE

INDICATOR IF DP FALLS OUTSIDE OF ACCEPTABLE RANGE. TIE EACH DEVICE INTO THE BAS.

10. EXISTING PNEUMATIC THERMOSTAT AND HUMIDISTAT SHALL BE REPLACED WITH NEW. TIE NEW

THERMOSTAT INTO ASSOCIATED VAV AND NEW DDC SYSTEMS.

11. EXISTING OPERATING ROOM LAMINAR FLOW DIFFUSERS SHALL BE REPLACED ONE FOR ONE. NEW

DIFFUSERS SHALL BE EQUAL TO PRECISION AIR HEPA-VENT DS (HEP-DS-A).

12. NEW DIFFUSER MOUNTED IN NEW ACT SYSTEM. CONNECT TO EXISTING DUCTWORK AND BALANCE TO

EXISTING AIRFLOW.

13. ALL VAV BOXES (TERMINAL UNITS) SERVED BY AHU-25 SHALL BE CONVERTED FROM PNEUMATIC

CONTROLS TO DIRECT DIGITAL CONTROLS. CONTRACT SHALL EITHER PROVIDE A CONTROLS

CONVERSION KIT FOR EACH BOX, OR REPLACE EACH VAV BOX ONE FOR ONE WITH NEW VAV-BOXES

WITH INTEGRAL DDC CONTROLS/CONTROLLERS.

GENERAL NOTES:

DEMOLITION KEY NOTES :

1. EXISTTING VAV BOX'S SHALL REMAIN AS IS AT THE EXISTING AIRFLOWS UNLESS OTHERWISE

NOTED.

2. EXISTING VAV BOX SHALL BE FIELD INVESTIGATED TO IDENTIFY MAX OPERATING AIRFLOW. IF

VAV BOX IS ABLE TO ACHIEVE NEW DESIGN AIRFLOW, CONTRACTOR SHALL RETAIN AND

REBALANCE TO NEW AIRFLOW. IF NOT, THE CONTRACTOR SHALL REPLACE THE VAV BOX. SEE

RENO PLANS AND SCHEDULES.

3. CONTRACTOR SHALL PREPARE EXISTING DEVICE TO BE REBALANCED TO NEW AIRFLOW. SEE

RENOVATION PLANS.

4. EXISTING DUCT DROPS DOWN INTO HUNTAIR CLEAN SUITE CEILING SYSTEM. CONTRACTOR

SHALL DISCONNECT EXISTING DUCTWORK TO HUNTAIR CLEAN SUITE CEILING SYSTEM AND

SHALL PREPARE FOR NEW DUCTWORK TO PROVIDE INCREASED AIRFLOW. CONTRACTOR TO

VERIFY HUNTAIR CLEAN SUITE SYSTEM WILL OPERATE EFFECTIVELY AT NEW AIRFLOW.

5. EXISTING LOW EXHAUST GRILLES SHALL BE REBALANCED. SEE RENO PLANS.

6. REMOVE EXISTING RETURN AIR DUCTWORK BACK TO APPROXIMATE LOCATION SHOWN. CAP

DUCTWORK AND SEAL AIRTIGHT.

7. ALL EXISTING EQUIPMENT (CRAC UNITS, DUCTWORK, VAV BOXES, AIR TERMINAL

DEVICES...ETC.) SHALL BE LEFT AS-IS UNLESS OTHERWISE NOTED.

8. REMOVE EXISTING SUPPLY AIR DUCTWORK BACK TO APPROXIMATE LOCATION SHOWN.

PREPARE DUCTWORK FOR NEW CONNECTION. REFER TO RENOVATION PLAN FOR ADDITIONAL

REQUIREMENTS.

9. REMOVE EXISTING CEILING DIFFUSERS BUT RETAIN DUCTWORK DROP TO CONNECT NEW

DIFFUSER WITHIN NEW CEILING.

10. EXISTING PNEUMATIC TUBE STATION LOCATION TO BE RELOCATED.