This document is a Request for Proposal (RFP) for the Montana Interstate Facilities Engineering and Full Facilities Services contract. The General Services Administration (GSA), Public Buildings Service (PBS) Region 8 has a requirement for facilities engineering, operations and maintenance, snow removal, landscaping, custodial, and other facilities-related services for three federal buildings located along the Interstate 90 corridor in Montana.

The contract includes a base year, three one-year options, a five-month option term, and an option to extend services up to six months, for a total potential contract duration of four years and ten months. The solicitation is a 100% small business set-aside under NAICS code 561210, with a size standard of $47 million. The Government anticipates awarding one indefinite-delivery, indefinite-quantity (IDIQ) contract. Offerors must submit their price proposals using the provided pricing sheet. The evaluation criteria include the offeror's quality management system, staffing plan, relevant experience, past performance, energy optimization approach, and socioeconomic status. The proposal deadline and details on the preproposal conference are provided in the solicitation documents.

View the file

Other files

File Type Posted
Amendment 47PJ0024R0108_0016.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_as amended 20241010.xlsx XLSX spreadsheet
SF30 47PJ0024R0108_0012.pdf PDF
SF30 47PJ0024R0108_0011.pdf PDF
SF30 47PJ0024R0108_0010.pdf PDF
Solicitation Montana Interstate Full Facilities Services_as amended 20241007.pdf PDF
Region 8 MT FE_FFS_as amended 20240924.pdf PDF
SF30 47PJ0024R0108_0009.pdf PDF
Solicitation Montana Interstate Full Facilities Services_as amended 20241003.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_as amended 20241003.xlsx XLSX spreadsheet
SF30 47PJ0024R0108_0008.pdf PDF
SF30 47PJ0024R0108_0007.pdf PDF
SF30 47PJ0024R0108_0006.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_as amended 20240926.xlsx XLSX spreadsheet
SF30_47PJ0024R0108_0005.pdf PDF
SF30_47PJ0024R0108_0004.pdf PDF
SF30_47PJ0024R0108_0003.pdf PDF
RFP Attch 1 - Relevant Experience - MT Interstate FFS_20240917.docx DOCX document
RFP Attch 1 - Relevant Experience - MT Interstate FFS_Revision 1_20240917.pdf PDF
SF30_47PJ0024R0108_0002.pdf PDF
Solicitation Montana Interstate Full Facilities Services_as amended 20240917.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_as amended 20240913.xlsx XLSX spreadsheet
PWS Region 8 MT FE_FSS.pdf PDF
RFP Attch 5 - WD Yellowstone_Gallatin_Silver Bow_amended 20240913.pdf PDF
SF30_47PJ0024R0108_0001.pdf PDF
RFP Attch 1 - Relevant Experience - MT Interstate FFS.pdf PDF
RFP Attch 3 - Self Cert QMS.pdf PDF
PWS Region 8 MT Interstate FE_FSS.pdf PDF
Billings CH Boundary for Snow Removal and Grounds Maintenance.pdf PDF
RFP Attch 5 - WD Yellowstone_Gallatin_Silver Bow.pdf PDF
Butte FOB and CH Boundary for Snow Removal and Grounds Maintennace.pdf PDF
Exhibit_1_Butte_BIS - MT0004ZZ - Mansfield FB and USCH.docx DOCX document
RFP Attch 7 - CUI Request Form MT FE_FSS.pdf PDF
Bozeman FOB and PO Boundary for Snow Removal and Grounds Maintenance.pdf PDF
Exhibit_1_Billings_BIS - MT0050ZZ - James F Battin Building.docx DOCX document
Exhibit_1_Bozeman_BIS -MT0046ZZ - Federal Building_U.S. Post Office (FB).docx DOCX document
Solicitation 47PJ0024R0108 MT Interstate FE_FFS.pdf PDF
RFP Attch 2 - PPQ_MT Interstate FFS.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions to Offerors

Pricing Sheet
Supplies or Services and Prices

The Contractor shall provide all management, supervision, parts, components, materials, labor, subcontracts, supplies, tools, equipment, and other items for all of the services described in the Specification.

This Contract includes:

One (1)base year
Three (3)one-year follow on period(s)
One (1)five-month follow on period(s)
Six (6)month option for extension of services
Four (4) years and ten (10) monthspotential contract period total
Offerors must use this Pricing Sheet to document the proposed price(s) to the Government for the required services. Prices are required for all line items contained on this Pricing Sheet.
This Pricing Sheet is in electronic version, a paper copy will not be provided. Offerors should include a price in every yellow shaded area of the Unit Price Column (column L) of each worksheet. Do not insert prices of more than two decimal places (i.e. $2.339), as this will result in rounding errors. Ensure that all monthly rates are evenly divisible by 12. Extended amounts should calculate automatically throughout the worksheet. Please be advised that there are worksheets (tabs) at the bottom of this Excel workbook, one worksheet for each category under this solicitation. Ensure you click on each tab and complete all line items that comprise the pricing sheet.

Offerors may expand or make adjustments to the presented pricing structure in this pricing sheet, but the pricing should be provided in this format or similar. Do not include any escalations for direct labor rates (base wage rates, fringes, other benefits) for performance periods that are beyond the effective date of the applicable collective bargaining agreement. The wage rates and fringe benefits effective the last day of the applicable collective bargaining agreement establishes the minimum rates and fringe benefits for any future periods in the price proposal. If the fully burdened labor rates vary during any performance period (e.g., base period and options) because of changes to the effective collective bargaining agreement, then the offeror should clearly show the details of both or, if more than two, all fully burdened rates for the labor categories in its price proposal. Do not blend labor rates.

All fields highlighted in yellow on each tab within this Excel pricing sheet workbook need to be populated or are available for population (for example, "Labor Category" fields in the "Labor" tab). The Costs Summary Tab is intended to pull the information provided in the Labor and the ODCs tabs for the Base Year and Option Year I; all other option amounts need to be supplied. All proposed costs for each category should align throughout the entire pricing sheet. Offerors are cautioned to avoid applying G&A expenses, overhead, profit, or other expenses to any labor rates that are fully burdened.

Fields in gray are intended for formulas. Offerors are responsible for verifying the accuracy of any formulas already present in the cell. Many of the gray fields do not have formulas because the calculations may depend on unique circumstances. Offerors may use these fields to provide the appropriate formulas to perform the calculation or manually enter the information.

General Services Administration
Montana Interstate Facilities Engineering and Full Facilities Services

Offeror Name:

Offeror Address:

Authorized Signature:

Costs Summary Montana Interstate Facilities Engineering and Full Facilities Services

Option to Extend Services up to Six MonthsTotal Price
Basic Services
Base YearOption Year IOption Year IIOption Year IIIOption Period IVTotal
02/01/2025 - 01/31/202602/01/2026 - 01/31/202702/01/2027 - 01/31/202802/01/2028 - 01/31/202902/01/2029 - 06/30/202907/01/2029 - 12/31/2029
O&M Labor (with labor burdens do not apply G&A and profit)$0.00$0.00$0.00$0.00
O&M ODCs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Miscellaneous WorkAnnual HrsAnnual Materials$/Hr
for Misc. Hrs.$/Hr
for Misc. Hrs.$/Hr
for Misc. Hrs.$/Hr
for Misc. Hrs.$/Hr
for Misc. Hrs.$/Hr

for Misc. Hrs.

Misc Hours/Materials300$6,000.00$2,500.00$6,000.00$6,000.00$6,000.00$6,000.00$26,500.00$3,000.00$29,500.00
Emergency Call Back (Beyond Core Coverage Hours)Annual Hrs$/Hr$/Hr for
Emerg. Callback$/Hr for
Emerg. Callback$/Hr for
Emerg. Callback$/Hr for
Emerg. Callback$/Hr for
Emerg. Callback$/Hr for

Emerg. Callback

Emergency Call Back Hours180$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SUBTOTAL$2,500.00$6,000.00$6,000.00$6,000.00$6,000.00$26,500.00$3,000.00$29,500.00
G&A Percent (%)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Profit Percent (%)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
GRAND TOTAL$2,500.00$6,000.00$6,000.00$6,000.00$6,000.00$26,500.00$3,000.00$29,500.00
FAR 52.219-14 Limitations on Subcontracting
Base YearOption Year IOption Year IIOption Year IIIOption Period IVSix-Month

Extension to Services

02/01/2025 - 01/31/202602/01/2026 - 01/31/202702/01/2027 - 01/31/202802/01/2028 - 01/31/202902/01/2029 - 06/30/202907/01/2029 - 12/31/2029
Subcontracted Labor Total
Self-Performed Labor Total
Total Labor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Percent Subcontracted

Labor Base Year

Base Period (Five-Months) Labor
02/01/2025 - 01/31/2026
Manpower / Labor Costs Matrix

Labor Categories and Other Details Labor Costs

Labor Categories
(Use one row per proposed employee)Location(s)FTE (Do fill cells in this column)Annual HoursFully Burdened Straight Rate
(inclusive of G&A and Profit)Base Wage Rate ($/hr)Labor CostFICAFUTASUIWorkers Comp InsuranceHealth and Welfare *401k / PensionOther Union Benefits: Tuition ReimbursementTotal of Labor BurdensTotal Burdened Labor Cost
Sub-Total Labor Expense00.00$0.00$0.0000$0.00$0.00$0.000000$0.00$0.00$0.00$0.00$0.00
*Assumes mix of family and single for purposes of Health and Welfare Benefits

Labor Opt Yr I

Option Year I Labor
02/01/2026 - 01/31/2027
Manpower / Labor Costs Matrix

Labor Categories and Other Details Labor Costs

Labor Categories
(Use one row per proposed employee)Location(s)FTE (Do fill cells in this column)Annual HoursFully Burdened Straight Rate
(inclusive of G&A and Profit)Base Wage Rate ($/hr)Labor CostFICAFUTASUIWorkers Comp InsuranceHealth and Welfare *401k / PensionOther Union Benefits: Tuition ReimbursementTotal of Labor BurdensTotal Burdened Labor Cost
Sub-Total Labor Expense00.00$0.00$0.0000$0.00$0.00$0.000000$0.00$0.00$0.00$0.00$0.00
*Assumes mix of family and single for purposes of Health and Welfare Benefits

Base Year ODCs

Base Period (Five-Months) Other Direct Costs
02/01/2025 - 01/31/2026
O&M

Cost Centers

Important Instructions

This list of cost centers is not comprehensive. Update accordingly.LOCATIONS
Billings-Bozeman--Butte, MT
MT0050ZZMT0046ZZMT0004ZZFormula Totals
James F. Battin U.S. CourthouseBozeman Federal Building & U.S. Post OfficeMike Mansfield Federal Building and U.S. Courthouse
Facility Size GSF0.00
Tools and Equipment
Vehicle(s) [identify type(s) in rows below]
$0.00
$0.00
Tool Rental Allowance$0.00
Tool Replacement$0.00

Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00

Parts and Materials
Repair parts, minor$0.00
Shop supplies, PM Materials$0.00
Total Parts and Materials Cost$0.00$0.00$0.00$0.00
Subcontract Costs
Water Treatment$0.00
Electrical Switchgear Testing$0.00
Non Destructive Tube Analysis$0.00
Fired/Unfired Pressure Vessels$0.00
Fire Pump / Extinguisher Testing$0.00
Backflow Preventer Testing$0.00
Potable Water Testing$0.00
Universal Waste Recycling$0.00
BAS Support$0.00
Life / Safety System Maint (fire)$0.00
Chiller/Boiler Support$0.00
Emergency Generator Testing$0.00
UST$0.00
Pop Up Barriers$0.00
Irrigation System$0.00
Air Quality Mgmt Permits$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Snow Removal$0.00
Pest Control$0.00
Exterior Window Cleaning$0.00
Custodial Material and Equipment$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Other Costs
Communications$0.00
Uniforms$0.00
Employee Training$0.00
Vehicle Fuel / Maintenance$0.00
Vehicle Insurance$0.00
Software Purchase$0.00
Software Maintenance
Total Other Costs$0.00$0.00$0.00$0.00

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00

Opt Yr I ODCs

Option Year I Other Direct Costs
02/01/2026 - 01/31/2027
O&M

Cost Centers

Important Instructions

This list of cost centers is not comprehensive. Update accordingly.LOCATIONS
Billings-Bozeman--Butte, MT
MT0050ZZMT0046ZZMT0004ZZFormula Totals
James F. Battin U.S. CourthouseBozeman Federal Building & U.S. Post OfficeMike Mansfield Federal Building and U.S. Courthouse
Facility Size GSF0.00
Tools and Equipment
Vehicle(s) [identify type(s) in rows below]
$0.00
$0.00
Tool Rental Allowance$0.00
Tool Replacement$0.00

Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00

Parts and Materials
Repair parts, minor$0.00
Shop supplies, PM Materials$0.00
Total Parts and Materials Cost$0.00$0.00$0.00$0.00
Subcontract Costs
Water Treatment$0.00
Electrical Switchgear Testing$0.00
Non Destructive Tube Analysis$0.00
Fired/Unfired Pressure Vessels$0.00
Fire Pump / Extinguisher Testing$0.00
Backflow Preventer Testing$0.00
Potable Water Testing$0.00
Universal Waste Recycling$0.00
BAS Support$0.00
Life / Safety System Maint (fire)$0.00
Chiller/Boiler Support$0.00
Emergency Generator Testing$0.00
UST$0.00
Pop Up Barriers$0.00
Irrigation System$0.00
Air Quality Mgmt Permits$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Snow Removal$0.00
Pest Control$0.00
Exterior Window Cleaning$0.00
Custodial Material and Equipment$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Other Costs
Communications$0.00
Uniforms$0.00
Employee Training$0.00
Vehicle Fuel / Maintenance$0.00
Vehicle Insurance$0.00
Software Purchase$0.00
Software Maintenance
Total Other Costs$0.00$0.00$0.00$0.00

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00

Opt Yr II ODCs

Option Year II Other Direct Costs
02/01/2027 - 01/31/2028
O&M

Cost Centers

Important Instructions

This list of cost centers is not comprehensive. Update accordingly.LOCATIONS
Billings-Bozeman--Butte, MT
MT0050ZZMT0046ZZMT0004ZZFormula Totals
James F. Battin U.S. CourthouseBozeman Federal Building & U.S. Post OfficeMike Mansfield Federal Building and U.S. Courthouse
Facility Size GSF0.00
Tools and Equipment
Vehicle(s) [identify type(s) in rows below]
$0.00
$0.00
Tool Rental Allowance$0.00
Tool Replacement$0.00

Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00

Parts and Materials
Repair parts, minor$0.00
Shop supplies, PM Materials$0.00
Total Parts and Materials Cost$0.00$0.00$0.00$0.00
Subcontract Costs
Water Treatment$0.00
Electrical Switchgear Testing$0.00
Non Destructive Tube Analysis$0.00
Fired/Unfired Pressure Vessels$0.00
Fire Pump / Extinguisher Testing$0.00
Backflow Preventer Testing$0.00
Potable Water Testing$0.00
Universal Waste Recycling$0.00
BAS Support$0.00
Life / Safety System Maint (fire)$0.00
Chiller/Boiler Support$0.00
Emergency Generator Testing$0.00
UST$0.00
Pop Up Barriers$0.00
Irrigation System$0.00
Air Quality Mgmt Permits$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Snow Removal$0.00
Pest Control$0.00
Exterior Window Cleaning$0.00
Custodial Material and Equipment$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Other Costs
Communications$0.00
Uniforms$0.00
Employee Training$0.00
Vehicle Fuel / Maintenance$0.00
Vehicle Insurance$0.00
Software Purchase$0.00
Software Maintenance
Total Other Costs$0.00$0.00$0.00$0.00

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00

Opt Yr III ODCs

Option Year III Other Direct Costs
02/01/2028 - 01/31/2029
O&M

Cost Centers

Important Instructions

This list of cost centers is not comprehensive. Update accordingly.LOCATIONS
Billings-Bozeman--Butte, MT
MT0050ZZMT0046ZZMT0004ZZFormula Totals
James F. Battin U.S. CourthouseBozeman Federal Building & U.S. Post OfficeMike Mansfield Federal Building and U.S. Courthouse
Facility Size GSF0.00
Tools and Equipment
Vehicle(s) [identify type(s) in rows below]
$0.00
$0.00
Tool Rental Allowance$0.00
Tool Replacement$0.00

Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00

Parts and Materials
Repair parts, minor$0.00
Shop supplies, PM Materials$0.00
Total Parts and Materials Cost$0.00$0.00$0.00$0.00
Subcontract Costs
Water Treatment$0.00
Electrical Switchgear Testing$0.00
Non Destructive Tube Analysis$0.00
Fired/Unfired Pressure Vessels$0.00
Fire Pump / Extinguisher Testing$0.00
Backflow Preventer Testing$0.00
Potable Water Testing$0.00
Universal Waste Recycling$0.00
BAS Support$0.00
Life / Safety System Maint (fire)$0.00
Chiller/Boiler Support$0.00
Emergency Generator Testing$0.00
UST$0.00
Pop Up Barriers$0.00
Irrigation System$0.00
Air Quality Mgmt Permits$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Snow Removal$0.00
Pest Control$0.00
Exterior Window Cleaning$0.00
Custodial Material and Equipment$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Other Costs
Communications$0.00
Uniforms$0.00
Employee Training$0.00
Vehicle Fuel / Maintenance$0.00
Vehicle Insurance$0.00
Software Purchase$0.00
Software Maintenance
Total Other Costs$0.00$0.00$0.00$0.00

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00

Opt Period IV ODCs

Option Year IV Other Direct Costs
02/01/2029 - 06/30/2029
O&M

Cost Centers

Important Instructions

This list of cost centers is not comprehensive. Update accordingly.LOCATIONS
Billings-Bozeman--Butte, MT
MT0050ZZMT0046ZZMT0004ZZFormula Totals
James F. Battin U.S. CourthouseBozeman Federal Building & U.S. Post OfficeMike Mansfield Federal Building and U.S. Courthouse
Facility Size GSF0.00
Tools and Equipment
Vehicle(s) [identify type(s) in rows below]
$0.00
$0.00
Tool Rental Allowance$0.00
Tool Replacement$0.00

Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00

Parts and Materials
Repair parts, minor$0.00
Shop supplies, PM Materials$0.00
Total Parts and Materials Cost$0.00$0.00$0.00$0.00
Subcontract Costs
Water Treatment$0.00
Electrical Switchgear Testing$0.00
Non Destructive Tube Analysis$0.00
Fired/Unfired Pressure Vessels$0.00
Fire Pump / Extinguisher Testing$0.00
Backflow Preventer Testing$0.00
Potable Water Testing$0.00
Universal Waste Recycling$0.00
BAS Support$0.00
Life / Safety System Maint (fire)$0.00
Chiller/Boiler Support$0.00
Emergency Generator Testing$0.00
UST$0.00
Pop Up Barriers$0.00
Irrigation System$0.00
Air Quality Mgmt Permits$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Snow Removal$0.00
Pest Control$0.00
Exterior Window Cleaning$0.00
Custodial Material and Equipment$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Other Costs
Communications$0.00
Uniforms$0.00
Employee Training$0.00
Vehicle Fuel / Maintenance$0.00
Vehicle Insurance$0.00
Software Purchase$0.00
Software Maintenance
Total Other Costs$0.00$0.00$0.00$0.00

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00

Six-Month Ext Option

Option to Extend Services (Six Months)
07/01/2029 - 12/31/2029
O&M

Cost Centers

Important Instructions

This list of cost centers is not comprehensive. Update accordingly.LOCATIONS
Billings-Bozeman--Butte, MT
MT0050ZZMT0046ZZMT0004ZZFormula Totals
James F. Battin U.S. CourthouseBozeman Federal Building & U.S. Post OfficeMike Mansfield Federal Building and U.S. Courthouse
Facility Size GSF0.00
Tools and Equipment
Vehicle(s) [identify type(s) in rows below]
$0.00
$0.00
Tool Rental Allowance$0.00
Tool Replacement$0.00

Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00

Parts and Materials
Repair parts, minor$0.00
Shop supplies, PM Materials$0.00
Total Parts and Materials Cost$0.00$0.00$0.00$0.00
Subcontract Costs
Water Treatment$0.00
Electrical Switchgear Testing$0.00
Non Destructive Tube Analysis$0.00
Fired/Unfired Pressure Vessels$0.00
Fire Pump / Extinguisher Testing$0.00
Backflow Preventer Testing$0.00
Potable Water Testing$0.00
Universal Waste Recycling$0.00
BAS Support$0.00
Life / Safety System Maint (fire)$0.00
Chiller/Boiler Support$0.00
Emergency Generator Testing$0.00
UST$0.00
Pop Up Barriers$0.00
Irrigation System$0.00
Air Quality Mgmt Permits$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Snow Removal$0.00
Pest Control$0.00
Exterior Window Cleaning$0.00
Custodial Material and Equipment$0.00
Total Subcontract Cost$0.00$0.00$0.00$0.00
Other Costs
Communications$0.00
Uniforms$0.00
Employee Training$0.00
Vehicle Fuel / Maintenance$0.00
Vehicle Insurance$0.00
Software Purchase$0.00
Software Maintenance
Total Other Costs$0.00$0.00$0.00$0.00

Total Other Direct Costs $0.00 $0.00 $0.00 $0.00

Rates, Misc. & Emergency Hrs.

Labor Rates and Misc. Utility Hours and Emergency Callback Hours
Project:Montana Interstate Facilities Engineering and Full Facilities Services
Location:Billings--Bozeman--Butte, Montana
Markup Notes
Markup Rates Note 1: The materials markups below includes any parts, equipment, components, supplies, assemblies, materials, consumables, and other items incorporated directly into the work as part of the provided services.
Markup Rates Note 2: The markups below will be the same for regular and overtime. The below indicated markups have been factored into the price proposal for Basic Services (recurring services) and the prices for such services are offered at or less than the above indicated rates.
Materials Markup%
Subcontract Markup%
Labor Rate Notes
Labor Rates Note 1: Unless otherwise agreed by the parties through through written modification to this Contract, the rates below are maximums for any Additional Work / Additional Services (non-recurring scope for Basic Services), including any modifications to task orders for Additional Work / Additional Services.
Labor Rates Note 2: Unless otherwise agreed by the parties through through written modification to this Contract, the rates below are the applicable unit prices to any modifications (whether an increase in price or decrease in price) to the Basic Services (recurring services).
DescriptionLabor CategoryQuantityUnit of IssueBase Year
02/01/2025 - 01/31/2026Option Year I
02/01/2026 - 01/31/2027Option Year II
02/01/2027 - 01/31/2028Option Year III
02/01/2028 - 01/31/2029Option Period IV
02/01/2029 - 06/30/2029Six-Month Extension to Services Option

07/01/2029 - 12/31/2029 Unit Price Total Contract Amount Unit Price Total Contract Amount Unit Price Total Contract Amount Unit Price Total Contract Amount Unit Price Total Contract Amount Unit Price Total Contract Amount

Regular Hours - Fully burdened rates (except overtime) for any work within the scope of the Montana Interstate Facilities Engineering and Full Facilities Services.

Note: These rates should correspond with the unit prices shown in the "Labor" worksheet, less overtime.1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour

Overtime Hours - Fully burdened rates (includes overtime premium) for any work within the scope of the Montana Interstate Facilities Engineering and Full Faculties Services.

Note: These rates should correspond with the unit prices shown in the "Labor" worksheet.1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour

Hourly price for Miscellaneous Utility Hours

Note: Do not use a blended rate. The total hours should total to 1,080.

1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
Materials (monthly amount)
Total

Emergency Callback Hours

Note: Do not use a blended rate. The total hours should total to 180.1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour
1Hour

image1.jpg

File details come from the government source that posted it. Updated .