RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_20240731.xlsx
XLSX spreadsheet 129 KB Posted
- Solicitation number
- 47PJ0024R0108
About this file
This document is a Request for Proposal (RFP) for the Montana Interstate Facilities Engineering and Full Facilities Services contract. The General Services Administration (GSA), Public Buildings Service (PBS) Region 8 has a requirement for facilities engineering, operations and maintenance, snow removal, landscaping, custodial, and other facilities-related services for three federal buildings located along the Interstate 90 corridor in Montana.
The contract includes a base year, three one-year options, a five-month option term, and an option to extend services up to six months, for a total potential contract duration of four years and ten months. The solicitation is a 100% small business set-aside under NAICS code 561210, with a size standard of $47 million. The Government anticipates awarding one indefinite-delivery, indefinite-quantity (IDIQ) contract. Offerors must submit their price proposals using the provided pricing sheet. The evaluation criteria include the offeror's quality management system, staffing plan, relevant experience, past performance, energy optimization approach, and socioeconomic status. The proposal deadline and details on the preproposal conference are provided in the solicitation documents.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions to Offerors
| Pricing Sheet | |
| Supplies or Services and Prices |
The Contractor shall provide all management, supervision, parts, components, materials, labor, subcontracts, supplies, tools, equipment, and other items for all of the services described in the Specification.
This Contract includes:
| One (1) | base year |
| Three (3) | one-year follow on period(s) |
| One (1) | five-month follow on period(s) |
| Six (6) | month option for extension of services |
| Four (4) years and ten (10) months | potential contract period total |
| Offerors must use this Pricing Sheet to document the proposed price(s) to the Government for the required services. Prices are required for all line items contained on this Pricing Sheet. |
| This Pricing Sheet is in electronic version, a paper copy will not be provided. Offerors should include a price in every yellow shaded area of the Unit Price Column (column L) of each worksheet. Do not insert prices of more than two decimal places (i.e. $2.339), as this will result in rounding errors. Ensure that all monthly rates are evenly divisible by 12. Extended amounts should calculate automatically throughout the worksheet. Please be advised that there are worksheets (tabs) at the bottom of this Excel workbook, one worksheet for each category under this solicitation. Ensure you click on each tab and complete all line items that comprise the pricing sheet. |
Offerors may expand or make adjustments to the presented pricing structure in this pricing sheet, but the pricing should be provided in this format or similar. Do not include any escalations for direct labor rates (base wage rates, fringes, other benefits) for performance periods that are beyond the effective date of the applicable collective bargaining agreement. The wage rates and fringe benefits effective the last day of the applicable collective bargaining agreement establishes the minimum rates and fringe benefits for any future periods in the price proposal. If the fully burdened labor rates vary during any performance period (e.g., base period and options) because of changes to the effective collective bargaining agreement, then the offeror should clearly show the details of both or, if more than two, all fully burdened rates for the labor categories in its price proposal. Do not blend labor rates.
All fields highlighted in yellow on each tab within this Excel pricing sheet workbook need to be populated or are available for population (for example, "Labor Category" fields in the "Labor" tab). The Costs Summary Tab is intended to pull the information provided in the Labor and the ODCs tabs for the Base Year and Option Year I; all other option amounts need to be supplied. All proposed costs for each category should align throughout the entire pricing sheet. Offerors are cautioned to avoid applying G&A expenses, overhead, profit, or other expenses to any labor rates that are fully burdened.
Fields in gray are intended for formulas. Offerors are responsible for verifying the accuracy of any formulas already present in the cell. Many of the gray fields do not have formulas because the calculations may depend on unique circumstances. Offerors may use these fields to provide the appropriate formulas to perform the calculation or manually enter the information.
| General Services Administration | |
| Montana Interstate Facilities Engineering and Full Facilities Services |
Offeror Name:
Offeror Address:
Authorized Signature:
Costs Summary Montana Interstate Facilities Engineering and Full Facilities Services
| Option to Extend Services up to Six Months | Total Price | ||||||||||
| Basic Services | |||||||||||
| Base Year | Option Year I | Option Year II | Option Year III | Option Period IV | Total | ||||||
| 02/01/2025 - 01/31/2026 | 02/01/2026 - 01/31/2027 | 02/01/2027 - 01/31/2028 | 02/01/2028 - 01/31/2029 | 02/01/2029 - 06/30/2029 | 07/01/2029 - 12/31/2029 | ||||||
| O&M Labor (with labor burdens do not apply G&A and profit) | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| O&M ODCs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Miscellaneous Work | Annual Hrs | Annual Materials | $/Hr | ||||||||
| for Misc. Hrs. | $/Hr | ||||||||||
| for Misc. Hrs. | $/Hr | ||||||||||
| for Misc. Hrs. | $/Hr | ||||||||||
| for Misc. Hrs. | $/Hr | ||||||||||
| for Misc. Hrs. | $/Hr |
for Misc. Hrs.
| Misc Hours/Materials | 300 | $6,000.00 | $2,500.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $26,500.00 | $3,000.00 | $29,500.00 | |
| Emergency Call Back (Beyond Core Coverage Hours) | Annual Hrs | $/Hr | $/Hr for | ||||||||
| Emerg. Callback | $/Hr for | ||||||||||
| Emerg. Callback | $/Hr for | ||||||||||
| Emerg. Callback | $/Hr for | ||||||||||
| Emerg. Callback | $/Hr for | ||||||||||
| Emerg. Callback | $/Hr for |
Emerg. Callback
| Emergency Call Back Hours | 180 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| SUBTOTAL | $2,500.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $26,500.00 | $3,000.00 | $29,500.00 |
| G&A Percent (%) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Profit Percent (%) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| GRAND TOTAL | $2,500.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $26,500.00 | $3,000.00 | $29,500.00 |
| FAR 52.219-14 Limitations on Subcontracting | ||||||
| Base Year | Option Year I | Option Year II | Option Year III | Option Period IV | Six-Month |
Extension to Services
| 02/01/2025 - 01/31/2026 | 02/01/2026 - 01/31/2027 | 02/01/2027 - 01/31/2028 | 02/01/2028 - 01/31/2029 | 02/01/2029 - 06/30/2029 | 07/01/2029 - 12/31/2029 | |
| Subcontracted Labor Total | ||||||
| Self-Performed Labor Total | ||||||
| Total Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Percent Subcontracted |
Labor Base Year
| Base Period (Five-Months) Labor |
| 02/01/2025 - 01/31/2026 |
| Manpower / Labor Costs Matrix |
Labor Categories and Other Details Labor Costs
| Labor Categories | ||||||||||||||
| (Use one row per proposed employee) | Location(s) | FTE (Do fill cells in this column) | Annual Hours | Fully Burdened Straight Rate | ||||||||||
| (inclusive of G&A and Profit) | Base Wage Rate ($/hr) | Labor Cost | FICA | FUTA | SUI | Workers Comp Insurance | Health and Welfare * | 401k / Pension | Other Union Benefits: Tuition Reimbursement | Total of Labor Burdens | Total Burdened Labor Cost |
| Sub-Total Labor Expense | 0 | 0.00 | $0.00 | $0.0000 | $0.00 | $0.00 | $0.000000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| *Assumes mix of family and single for purposes of Health and Welfare Benefits |
Labor Opt Yr I
| Option Year I Labor |
| 02/01/2026 - 01/31/2027 |
| Manpower / Labor Costs Matrix |
Labor Categories and Other Details Labor Costs
| Labor Categories | ||||||||||||||
| (Use one row per proposed employee) | Location(s) | FTE (Do fill cells in this column) | Annual Hours | Fully Burdened Straight Rate | ||||||||||
| (inclusive of G&A and Profit) | Base Wage Rate ($/hr) | Labor Cost | FICA | FUTA | SUI | Workers Comp Insurance | Health and Welfare * | 401k / Pension | Other Union Benefits: Tuition Reimbursement | Total of Labor Burdens | Total Burdened Labor Cost |
| Sub-Total Labor Expense | 0 | 0.00 | $0.00 | $0.0000 | $0.00 | $0.00 | $0.000000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| *Assumes mix of family and single for purposes of Health and Welfare Benefits |
Base Year ODCs
| Base Period (Five-Months) Other Direct Costs |
| 02/01/2025 - 01/31/2026 |
| O&M |
Cost Centers
Important Instructions
| This list of cost centers is not comprehensive. Update accordingly. | LOCATIONS | |||||
| Billings-Bozeman--Butte, MT | ||||||
| MT0050ZZ | MT0046ZZ | MT0004ZZ | Formula Totals | |||
| James F. Battin U.S. Courthouse | Bozeman Federal Building & U.S. Post Office | Mike Mansfield Federal Building and U.S. Courthouse | ||||
| Facility Size GSF | 0.00 | |||||
| Tools and Equipment | ||||||
| Vehicle(s) [identify type(s) in rows below] | ||||||
| $0.00 | ||||||
| $0.00 | ||||||
| Tool Rental Allowance | $0.00 | |||||
| Tool Replacement | $0.00 |
Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00
| Parts and Materials | |
| Repair parts, minor | $0.00 |
| Shop supplies, PM Materials | $0.00 |
| Total Parts and Materials Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontract Costs | ||||
| Water Treatment | $0.00 | |||
| Electrical Switchgear Testing | $0.00 | |||
| Non Destructive Tube Analysis | $0.00 | |||
| Fired/Unfired Pressure Vessels | $0.00 | |||
| Fire Pump / Extinguisher Testing | $0.00 | |||
| Backflow Preventer Testing | $0.00 | |||
| Potable Water Testing | $0.00 | |||
| Universal Waste Recycling | $0.00 | |||
| BAS Support | $0.00 | |||
| Life / Safety System Maint (fire) | $0.00 | |||
| Chiller/Boiler Support | $0.00 | |||
| Emergency Generator Testing | $0.00 | |||
| UST | $0.00 | |||
| Pop Up Barriers | $0.00 | |||
| Irrigation System | $0.00 | |||
| Air Quality Mgmt Permits | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow Removal | $0.00 | |||
| Pest Control | $0.00 | |||
| Exterior Window Cleaning | $0.00 | |||
| Custodial Material and Equipment | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Other Costs | ||||
| Communications | $0.00 | |||
| Uniforms | $0.00 | |||
| Employee Training | $0.00 | |||
| Vehicle Fuel / Maintenance | $0.00 | |||
| Vehicle Insurance | $0.00 | |||
| Software Purchase | $0.00 | |||
| Software Maintenance | ||||
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
Total Other Direct Costs $0.00 $0.00 $0.00 $0.00
Opt Yr I ODCs
| Option Year I Other Direct Costs |
| 02/01/2026 - 01/31/2027 |
| O&M |
Cost Centers
Important Instructions
| This list of cost centers is not comprehensive. Update accordingly. | LOCATIONS | |||||
| Billings-Bozeman--Butte, MT | ||||||
| MT0050ZZ | MT0046ZZ | MT0004ZZ | Formula Totals | |||
| James F. Battin U.S. Courthouse | Bozeman Federal Building & U.S. Post Office | Mike Mansfield Federal Building and U.S. Courthouse | ||||
| Facility Size GSF | 0.00 | |||||
| Tools and Equipment | ||||||
| Vehicle(s) [identify type(s) in rows below] | ||||||
| $0.00 | ||||||
| $0.00 | ||||||
| Tool Rental Allowance | $0.00 | |||||
| Tool Replacement | $0.00 |
Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00
| Parts and Materials | |
| Repair parts, minor | $0.00 |
| Shop supplies, PM Materials | $0.00 |
| Total Parts and Materials Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontract Costs | ||||
| Water Treatment | $0.00 | |||
| Electrical Switchgear Testing | $0.00 | |||
| Non Destructive Tube Analysis | $0.00 | |||
| Fired/Unfired Pressure Vessels | $0.00 | |||
| Fire Pump / Extinguisher Testing | $0.00 | |||
| Backflow Preventer Testing | $0.00 | |||
| Potable Water Testing | $0.00 | |||
| Universal Waste Recycling | $0.00 | |||
| BAS Support | $0.00 | |||
| Life / Safety System Maint (fire) | $0.00 | |||
| Chiller/Boiler Support | $0.00 | |||
| Emergency Generator Testing | $0.00 | |||
| UST | $0.00 | |||
| Pop Up Barriers | $0.00 | |||
| Irrigation System | $0.00 | |||
| Air Quality Mgmt Permits | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow Removal | $0.00 | |||
| Pest Control | $0.00 | |||
| Exterior Window Cleaning | $0.00 | |||
| Custodial Material and Equipment | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Other Costs | ||||
| Communications | $0.00 | |||
| Uniforms | $0.00 | |||
| Employee Training | $0.00 | |||
| Vehicle Fuel / Maintenance | $0.00 | |||
| Vehicle Insurance | $0.00 | |||
| Software Purchase | $0.00 | |||
| Software Maintenance | ||||
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
Total Other Direct Costs $0.00 $0.00 $0.00 $0.00
Opt Yr II ODCs
| Option Year II Other Direct Costs |
| 02/01/2027 - 01/31/2028 |
| O&M |
Cost Centers
Important Instructions
| This list of cost centers is not comprehensive. Update accordingly. | LOCATIONS | |||||
| Billings-Bozeman--Butte, MT | ||||||
| MT0050ZZ | MT0046ZZ | MT0004ZZ | Formula Totals | |||
| James F. Battin U.S. Courthouse | Bozeman Federal Building & U.S. Post Office | Mike Mansfield Federal Building and U.S. Courthouse | ||||
| Facility Size GSF | 0.00 | |||||
| Tools and Equipment | ||||||
| Vehicle(s) [identify type(s) in rows below] | ||||||
| $0.00 | ||||||
| $0.00 | ||||||
| Tool Rental Allowance | $0.00 | |||||
| Tool Replacement | $0.00 |
Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00
| Parts and Materials | |
| Repair parts, minor | $0.00 |
| Shop supplies, PM Materials | $0.00 |
| Total Parts and Materials Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontract Costs | ||||
| Water Treatment | $0.00 | |||
| Electrical Switchgear Testing | $0.00 | |||
| Non Destructive Tube Analysis | $0.00 | |||
| Fired/Unfired Pressure Vessels | $0.00 | |||
| Fire Pump / Extinguisher Testing | $0.00 | |||
| Backflow Preventer Testing | $0.00 | |||
| Potable Water Testing | $0.00 | |||
| Universal Waste Recycling | $0.00 | |||
| BAS Support | $0.00 | |||
| Life / Safety System Maint (fire) | $0.00 | |||
| Chiller/Boiler Support | $0.00 | |||
| Emergency Generator Testing | $0.00 | |||
| UST | $0.00 | |||
| Pop Up Barriers | $0.00 | |||
| Irrigation System | $0.00 | |||
| Air Quality Mgmt Permits | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow Removal | $0.00 | |||
| Pest Control | $0.00 | |||
| Exterior Window Cleaning | $0.00 | |||
| Custodial Material and Equipment | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Other Costs | ||||
| Communications | $0.00 | |||
| Uniforms | $0.00 | |||
| Employee Training | $0.00 | |||
| Vehicle Fuel / Maintenance | $0.00 | |||
| Vehicle Insurance | $0.00 | |||
| Software Purchase | $0.00 | |||
| Software Maintenance | ||||
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
Total Other Direct Costs $0.00 $0.00 $0.00 $0.00
Opt Yr III ODCs
| Option Year III Other Direct Costs |
| 02/01/2028 - 01/31/2029 |
| O&M |
Cost Centers
Important Instructions
| This list of cost centers is not comprehensive. Update accordingly. | LOCATIONS | |||||
| Billings-Bozeman--Butte, MT | ||||||
| MT0050ZZ | MT0046ZZ | MT0004ZZ | Formula Totals | |||
| James F. Battin U.S. Courthouse | Bozeman Federal Building & U.S. Post Office | Mike Mansfield Federal Building and U.S. Courthouse | ||||
| Facility Size GSF | 0.00 | |||||
| Tools and Equipment | ||||||
| Vehicle(s) [identify type(s) in rows below] | ||||||
| $0.00 | ||||||
| $0.00 | ||||||
| Tool Rental Allowance | $0.00 | |||||
| Tool Replacement | $0.00 |
Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00
| Parts and Materials | |
| Repair parts, minor | $0.00 |
| Shop supplies, PM Materials | $0.00 |
| Total Parts and Materials Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontract Costs | ||||
| Water Treatment | $0.00 | |||
| Electrical Switchgear Testing | $0.00 | |||
| Non Destructive Tube Analysis | $0.00 | |||
| Fired/Unfired Pressure Vessels | $0.00 | |||
| Fire Pump / Extinguisher Testing | $0.00 | |||
| Backflow Preventer Testing | $0.00 | |||
| Potable Water Testing | $0.00 | |||
| Universal Waste Recycling | $0.00 | |||
| BAS Support | $0.00 | |||
| Life / Safety System Maint (fire) | $0.00 | |||
| Chiller/Boiler Support | $0.00 | |||
| Emergency Generator Testing | $0.00 | |||
| UST | $0.00 | |||
| Pop Up Barriers | $0.00 | |||
| Irrigation System | $0.00 | |||
| Air Quality Mgmt Permits | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow Removal | $0.00 | |||
| Pest Control | $0.00 | |||
| Exterior Window Cleaning | $0.00 | |||
| Custodial Material and Equipment | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Other Costs | ||||
| Communications | $0.00 | |||
| Uniforms | $0.00 | |||
| Employee Training | $0.00 | |||
| Vehicle Fuel / Maintenance | $0.00 | |||
| Vehicle Insurance | $0.00 | |||
| Software Purchase | $0.00 | |||
| Software Maintenance | ||||
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
Total Other Direct Costs $0.00 $0.00 $0.00 $0.00
Opt Period IV ODCs
| Option Year IV Other Direct Costs |
| 02/01/2029 - 06/30/2029 |
| O&M |
Cost Centers
Important Instructions
| This list of cost centers is not comprehensive. Update accordingly. | LOCATIONS | |||||
| Billings-Bozeman--Butte, MT | ||||||
| MT0050ZZ | MT0046ZZ | MT0004ZZ | Formula Totals | |||
| James F. Battin U.S. Courthouse | Bozeman Federal Building & U.S. Post Office | Mike Mansfield Federal Building and U.S. Courthouse | ||||
| Facility Size GSF | 0.00 | |||||
| Tools and Equipment | ||||||
| Vehicle(s) [identify type(s) in rows below] | ||||||
| $0.00 | ||||||
| $0.00 | ||||||
| Tool Rental Allowance | $0.00 | |||||
| Tool Replacement | $0.00 |
Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00
| Parts and Materials | |
| Repair parts, minor | $0.00 |
| Shop supplies, PM Materials | $0.00 |
| Total Parts and Materials Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontract Costs | ||||
| Water Treatment | $0.00 | |||
| Electrical Switchgear Testing | $0.00 | |||
| Non Destructive Tube Analysis | $0.00 | |||
| Fired/Unfired Pressure Vessels | $0.00 | |||
| Fire Pump / Extinguisher Testing | $0.00 | |||
| Backflow Preventer Testing | $0.00 | |||
| Potable Water Testing | $0.00 | |||
| Universal Waste Recycling | $0.00 | |||
| BAS Support | $0.00 | |||
| Life / Safety System Maint (fire) | $0.00 | |||
| Chiller/Boiler Support | $0.00 | |||
| Emergency Generator Testing | $0.00 | |||
| UST | $0.00 | |||
| Pop Up Barriers | $0.00 | |||
| Irrigation System | $0.00 | |||
| Air Quality Mgmt Permits | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow Removal | $0.00 | |||
| Pest Control | $0.00 | |||
| Exterior Window Cleaning | $0.00 | |||
| Custodial Material and Equipment | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Other Costs | ||||
| Communications | $0.00 | |||
| Uniforms | $0.00 | |||
| Employee Training | $0.00 | |||
| Vehicle Fuel / Maintenance | $0.00 | |||
| Vehicle Insurance | $0.00 | |||
| Software Purchase | $0.00 | |||
| Software Maintenance | ||||
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
Total Other Direct Costs $0.00 $0.00 $0.00 $0.00
Six-Month Ext Option
| Option to Extend Services (Six Months) |
| 07/01/2029 - 12/31/2029 |
| O&M |
Cost Centers
Important Instructions
| This list of cost centers is not comprehensive. Update accordingly. | LOCATIONS | |||||
| Billings-Bozeman--Butte, MT | ||||||
| MT0050ZZ | MT0046ZZ | MT0004ZZ | Formula Totals | |||
| James F. Battin U.S. Courthouse | Bozeman Federal Building & U.S. Post Office | Mike Mansfield Federal Building and U.S. Courthouse | ||||
| Facility Size GSF | 0.00 | |||||
| Tools and Equipment | ||||||
| Vehicle(s) [identify type(s) in rows below] | ||||||
| $0.00 | ||||||
| $0.00 | ||||||
| Tool Rental Allowance | $0.00 | |||||
| Tool Replacement | $0.00 |
Total Tools and Equipment Cost $0.00 $0.00 $0.00 $0.00
| Parts and Materials | |
| Repair parts, minor | $0.00 |
| Shop supplies, PM Materials | $0.00 |
| Total Parts and Materials Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontract Costs | ||||
| Water Treatment | $0.00 | |||
| Electrical Switchgear Testing | $0.00 | |||
| Non Destructive Tube Analysis | $0.00 | |||
| Fired/Unfired Pressure Vessels | $0.00 | |||
| Fire Pump / Extinguisher Testing | $0.00 | |||
| Backflow Preventer Testing | $0.00 | |||
| Potable Water Testing | $0.00 | |||
| Universal Waste Recycling | $0.00 | |||
| BAS Support | $0.00 | |||
| Life / Safety System Maint (fire) | $0.00 | |||
| Chiller/Boiler Support | $0.00 | |||
| Emergency Generator Testing | $0.00 | |||
| UST | $0.00 | |||
| Pop Up Barriers | $0.00 | |||
| Irrigation System | $0.00 | |||
| Air Quality Mgmt Permits | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow Removal | $0.00 | |||
| Pest Control | $0.00 | |||
| Exterior Window Cleaning | $0.00 | |||
| Custodial Material and Equipment | $0.00 | |||
| Total Subcontract Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Other Costs | ||||
| Communications | $0.00 | |||
| Uniforms | $0.00 | |||
| Employee Training | $0.00 | |||
| Vehicle Fuel / Maintenance | $0.00 | |||
| Vehicle Insurance | $0.00 | |||
| Software Purchase | $0.00 | |||
| Software Maintenance | ||||
| Total Other Costs | $0.00 | $0.00 | $0.00 | $0.00 |
Total Other Direct Costs $0.00 $0.00 $0.00 $0.00
Rates, Misc. & Emergency Hrs.
| Labor Rates and Misc. Utility Hours and Emergency Callback Hours | |
| Project: | Montana Interstate Facilities Engineering and Full Facilities Services |
| Location: | Billings--Bozeman--Butte, Montana |
| Markup Notes | |
| Markup Rates Note 1: The materials markups below includes any parts, equipment, components, supplies, assemblies, materials, consumables, and other items incorporated directly into the work as part of the provided services. | |
| Markup Rates Note 2: The markups below will be the same for regular and overtime. The below indicated markups have been factored into the price proposal for Basic Services (recurring services) and the prices for such services are offered at or less than the above indicated rates. |
| Materials Markup | % |
| Subcontract Markup | % |
| Labor Rate Notes |
| Labor Rates Note 1: Unless otherwise agreed by the parties through through written modification to this Contract, the rates below are maximums for any Additional Work / Additional Services (non-recurring scope for Basic Services), including any modifications to task orders for Additional Work / Additional Services. |
| Labor Rates Note 2: Unless otherwise agreed by the parties through through written modification to this Contract, the rates below are the applicable unit prices to any modifications (whether an increase in price or decrease in price) to the Basic Services (recurring services). |
| Description | Labor Category | Quantity | Unit of Issue | Base Year | ||
| 02/01/2025 - 01/31/2026 | Option Year I | |||||
| 02/01/2026 - 01/31/2027 | Option Year II | |||||
| 02/01/2027 - 01/31/2028 | Option Year III | |||||
| 02/01/2028 - 01/31/2029 | Option Period IV | |||||
| 02/01/2029 - 06/30/2029 | Six-Month Extension to Services Option |
07/01/2029 - 12/31/2029 Unit Price Total Contract Amount Unit Price Total Contract Amount Unit Price Total Contract Amount Unit Price Total Contract Amount Unit Price Total Contract Amount Unit Price Total Contract Amount
Regular Hours - Fully burdened rates (except overtime) for any work within the scope of the Montana Interstate Facilities Engineering and Full Facilities Services.
| Note: These rates should correspond with the unit prices shown in the "Labor" worksheet, less overtime. | 1 | Hour | ||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour |
Overtime Hours - Fully burdened rates (includes overtime premium) for any work within the scope of the Montana Interstate Facilities Engineering and Full Faculties Services.
| Note: These rates should correspond with the unit prices shown in the "Labor" worksheet. | 1 | Hour | ||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour |
Hourly price for Miscellaneous Utility Hours
Note: Do not use a blended rate. The total hours should total to 1,080.
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| 1 | Hour | ||
| Materials (monthly amount) | |||
| Total |
Emergency Callback Hours
| Note: Do not use a blended rate. The total hours should total to 180. | 1 | Hour | ||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour | |||
| 1 | Hour |
image1.jpg
File details come from the government source that posted it. Updated .