Exhibit_1_Bozeman_BIS -MT0046ZZ - Federal Building_U.S. Post Office (FB).docx

DOCX document 11 KB Posted

Attached to
Montana Interstate Facilities Engineering and Full Facilities Services
Solicitation number
47PJ0024R0108
Issued by

About this file

This document appears to be an exhibit providing information about the Bozeman Federal Building & U.S. Post Office, which is part of a federal contract opportunity for Montana Interstate Facilities Engineering and Full Facilities Services. The exhibit contains building statistics and details such as the facility manager contact information, building size, age, occupants, environmental information, building systems, and historical repair data.

The related federal contract opportunity is a solicitation for facilities engineering and full facilities services, including operations and maintenance, snow removal, landscaping, custodial services, and waste management for three federal properties located along the Interstate 90 corridor in Montana. The anticipated period of performance is a base year and up to four option years. This is a 100% small business set-aside solicitation under NAICS 561210, with a total estimated square footage of 314,000 gross square feet. The solicitation includes performance-based service requirements and evaluation factors focused on the offeror's quality management system, staffing plan, relevant experience, past performance, energy optimization approach, and socioeconomic status.

View the file

Other files

File Type Posted
Amendment 47PJ0024R0108_0016.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_as amended 20241010.xlsx XLSX spreadsheet
SF30 47PJ0024R0108_0012.pdf PDF
SF30 47PJ0024R0108_0011.pdf PDF
SF30 47PJ0024R0108_0010.pdf PDF
Solicitation Montana Interstate Full Facilities Services_as amended 20241007.pdf PDF
SF30 47PJ0024R0108_0009.pdf PDF
Solicitation Montana Interstate Full Facilities Services_as amended 20241003.pdf PDF
Region 8 MT FE_FFS_as amended 20240924.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_as amended 20241003.xlsx XLSX spreadsheet
SF30 47PJ0024R0108_0008.pdf PDF
SF30 47PJ0024R0108_0007.pdf PDF
SF30 47PJ0024R0108_0006.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_as amended 20240926.xlsx XLSX spreadsheet
SF30_47PJ0024R0108_0005.pdf PDF
SF30_47PJ0024R0108_0004.pdf PDF
SF30_47PJ0024R0108_0003.pdf PDF
RFP Attch 1 - Relevant Experience - MT Interstate FFS_Revision 1_20240917.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_as amended 20240913.xlsx XLSX spreadsheet
SF30_47PJ0024R0108_0002.pdf PDF
RFP Attch 1 - Relevant Experience - MT Interstate FFS_20240917.docx DOCX document
Solicitation Montana Interstate Full Facilities Services_as amended 20240917.pdf PDF
PWS Region 8 MT FE_FSS.pdf PDF
SF30_47PJ0024R0108_0001.pdf PDF
RFP Attch 5 - WD Yellowstone_Gallatin_Silver Bow_amended 20240913.pdf PDF
RFP Attch 6 Pricing Sheet Montana Interstate FE_FFS_20240731.xlsx XLSX spreadsheet
RFP Attch 1 - Relevant Experience - MT Interstate FFS.pdf PDF
Bozeman FOB and PO Boundary for Snow Removal and Grounds Maintenance.pdf PDF
Exhibit_1_Butte_BIS - MT0004ZZ - Mansfield FB and USCH.docx DOCX document
RFP Attch 5 - WD Yellowstone_Gallatin_Silver Bow.pdf PDF
Butte FOB and CH Boundary for Snow Removal and Grounds Maintennace.pdf PDF
PWS Region 8 MT Interstate FE_FSS.pdf PDF
RFP Attch 3 - Self Cert QMS.pdf PDF
Billings CH Boundary for Snow Removal and Grounds Maintenance.pdf PDF
Exhibit_1_Billings_BIS - MT0050ZZ - James F Battin Building.docx DOCX document
RFP Attch 7 - CUI Request Form MT FE_FSS.pdf PDF
Solicitation 47PJ0024R0108 MT Interstate FE_FFS.pdf PDF
RFP Attch 2 - PPQ_MT Interstate FFS.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 1 Building Information Sheets The following are building statistics for informational purposes only. The CO or their designee will complete a Building Information Sheet for every building. The figures below are estimates only. When necessary, the CO or their designee will provide access to assignment drawings and blueprints.

1.BUILDING DATA:
Facility Manager Contact information:_____________________
Contract Specialist Contact Information:_____________________
O&M Contractor contact information:_____________________

Name of Building: Bozeman Federal Building & U.S. Post Office Location: 10 East Babcock Street Bozeman, MT 59715 Quantity of floors: 5 above ground, 1 below grade, Mechanical Penthouse Square footage (Building total) 96,535 Quantity of elevators:

Judges:_____________________
Passenger’s:_____________________

Sally Port/Prisoner

Freight:_____________________
Age of Building:1966

Normal Building Operating Hours: 8:00 a.m. to 5:00 p.m.

Building Operating Plan (BOP) (yes or no): Yes Quantity of Occupants: 115 (approximate) Quantity of Agencies: 3 List Agencies (Of special note are law enforcement and agencies with 24 hour operations):

U.S. Department of Agriculture U.S. Post Office General Services Administration

2. CHILD CARE CENTERS

Interior: special equipment (identify) No Playground: No

3.ENVIRONMENTAL (quantity)
Fuel Tanks (GSA Owned)No
Underground/Above ground/CapacityNo
Generators: (GSA Owned)Yes
Firing RangeNo
Asbestos: Yes or NoYes
Lead Based Paint: Yes or NoYes
PCB’s: Yes or NoNo
Copy of all environmental permits (Air, UST, etc.)______

NOTE TO CONTRACTOR: Asbestos, Lead, or any other hazardous material may be in the building (particularly older ones) and has not been discovered yet so all suspicious material found should be treated assuming it is.

4. MAJOR ALTERATION PROJECTS

Build-outs/Prospectus/Agencies moving In/Out (possible impact)

5. BUILDING AUTOMATION SYSTEMS and OTHER CRITICAL EQUIPMENT (Include # of equipment, manufacturer names, model #s, serial #s, tonnage KW, etc.

EMS/BAS/SMART Technologies:___________
Type of System and Frontend___________
For BAS not on GSA network, when was the last software update?___________

What is the current version?

CHILLERS:___________
UPS SYSTEMS:___________
GENERATORS:___________
BOILERS (Steam or Hot water):___________
WATER TREATMENT___________
Open Loop (coupon racks)___________
Closed Loop (coupon racks)___________
Glycol Loops (type ethylene or propylene)___________
Chemical Free Systems (type/which loops)___________
Roof Anchorage Points and Systems (Quantity):___________
Roof Anchorage Point and System Certification (Weight Test Date)___________

6. HISTORICAL REPAIR AND SERVICE REQUEST INFORMATION

Quantity of Service Request Monthly:___________
Quantity and amount of Repairs over threshold for the past 2 years:___________

7. ANNIVERSARY DATES OF THE LAST TESTING OF MAJOR

MAINTENANCE ITEMS:

Eddy Current:___________
Evaporator:___________
Condenser:___________
Infrared testing:___________
Switchgear:___________
Boiler:___________
Pressure vessels:___________
Steam traps:___________

8. HISTORICAL AND AESTHETIC ATTRIBUTES

Care should be taken to protect historical elements and artwork when performing work and maintenance around those items.

Yes or No Location

Artwork:________ __________
Statues:________ __________
Artifacts:__________________

9. CAFETERIAS/CONCESSIONS

Yes or No___________
Grease Traps (Yes or No):___________
Grease Trap Capacity:___________

10. FIRE ALARM SYSTEM

Is Central Station monitoring phone lines currently being handled by GSA or the O&M Contractor? ___________ Historically has the Fire Alarm, Sprinkler testing been performed during normal or after hours? ___________ Device count for each building for the fire alarm system:

Smoke Detector (Quantity):___________
Heat Detector (Quantity):___________
Duct Detector (Quantity):___________
Pull Stations (Quantity):___________
Water Flows (Quantity):___________
Tampers (Quantity):___________
Dry Pipe Systems (low air):___________
Strobes (Quantity):___________
Speakers (Quantity):___________
Combination Speaker/Strobe (Quantity):___________
Quantity Batteries (Quantity):___________
Fire Extinguishers (Quantity by type):___________

How many require 12-year Hydrostatic test per calendar year?

FY-20xx___________
FY-20xx___________
FY-20xx___________
FY-20xx___________
FY-20xx___________
How may require 6-year test are due per calendar year?___________
FY-20xx___________
FY-20xx___________
FY-20xx___________
FY-20xx___________
FY-20xx___________
When was the last generator load bank test performed?___________
What is the building load on the generator(s)?___________
Natural Gas or Diesel?___________
How many battery operated emergency lights (exit, stairwell, or other)___________
11. FILTERS (Size/MERV Rating/Type)___________

12. SECURITY SYSTEMS

Quantity of card readers for perimeter access and types

(readers or keypads):___________
Pop-up bollards/Wedges/Plates:___________
Sally Port garage doors:___________
Judges garage doors/gates:___________

13. PLUMBING

Quantity of automatic soap dispensers (quantity and type of batteries per dispenser) __________ Quantity of automatic towel dispenser (quantity and type of batteries

per dispenser)__________
Quantity of automatic flush valves (quantity and type of batteries per valve)__________
Quantity of automatic faucets (quantity and type of batteries per unit)__________

Quantity of waterless urinals requiring cartridge replacement (i.e. Sloan,

Falcon, etc.):__________
Quantity Backflow Prevention Devices__________

14. MISCELLANEOUS

Is any equipment currently under warranty? If so, when do they expire?____________
What are the ages of the building roofs?____________

File details come from the government source that posted it. Updated .