Request for SF330 OR1_Atch 2 - AE IDIQ MATOC SOW FINAL 05 2024.docx

DOCX document 70 KB Posted

Attached to
C1DA--Amendment 0001 - Responses to Technical Questions National AE IDIQ MATOC On-Ramping Opportunity 1
Solicitation number
36C77626R0013
Issued by

About this file

This document is a Statement of Work (SOW) for a Veterans Health Administration (VHA) Architect-Engineer (A-E) Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) covering nationwide professional design and engineering services. The contract spans five regions encompassing all 18 Veteran Integrated Service Networks across 50 states, U.S. territories, and the Philippines, with services including project site investigations, data analysis, design development, construction management, and specialized engineering disciplines such as architectural, mechanical, electrical, environmental, and infrastructure assessment.

The SOW outlines comprehensive A-E services across multiple project phases, including pre-design surveys, schematic and design development, construction documents, and construction period services. Key service areas include facility condition assessments, design for medical and commercial facilities, interior design, signage, seismic studies, and comprehensive support for VA healthcare facility improvements. The contract emphasizes sustainable design practices, energy efficiency, environmental compliance, and adherence to VA design standards, with specific requirements for project documentation, certification, and delivery of electronic and hard copy submissions across various design phases.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECT - ENGINEER (A-E), INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)

STATEMENT OF WORK

1. INTRODUCTION: Nationwide consists of five Regions (1-5) encompassing all 18 Veteran Integrated Service Networks (VISNs) which includes all 50 States, Virgin Islands, Puerto Rico, Guam, American Samoa, and the Philippines. The professional services provided under this IDIQ contract are of an architect or engineering nature, as defined by State law, as applicable, which are required to be performed or approved by a person licensed, registered, or certified to provide such services.

Architect/Engineer (A-E) services are required to provide project site investigation; data input and analysis; project scoping and cost estimating; development of Requests for Proposal technical requirements; complete detailed designs for maintenance, repair, alteration, and new construction projects; third party design reviews; procurement support; construction period services, including submittal reviews; commissioning; project management; and construction management. These projects will require multi-disciplinary planning, designing and A-E service for institutional, commercial, and industrial type facilities.

2. SCOPE: The A-E firm shall provide to the Government Part I (A & B) and/or Part II (C) Services.

a. Projects may include, but are not limited to, Architectural, Engineering, I.T. Infrastructure, Fiber and Cabling, Mechanical Engineering, Heating, Ventilation, and Air Conditioning, Electrical Engineering, Physical Security, Architectural Design, Buildings and Structures, Environmental Engineering and Compliance Permitting, Fire Protection Engineering, Geotechnical Engineering, National Environmental Policy Act (NEPA), Section 106 Compliance and Construction Permitting, Site Development, Surveying, Water and Wastewater Systems and Facilities, Construction Administration Services, Building Systems and New Building Design, Interior and Exterior Renovations, Medical Equipment Site Preparation, Landscape Design, Space Programming, Civil Engineering, Structural Engineering, and Fire Protection Engineering, and Commissioning.

b. Development of Design Programs; Schematic Design, Design Development; Construction Documents Peer Review; Specialty Consultant; Constructability Review; QA/QC; Construction Submittal Review; RFP for Design-Build; A-E Services to Support Design-Build; Facility Condition Assessments; Electrical Studies, Seismic Studies, Design Services for Minor and Non-Recurring Maintenance Projects, Value Engineering; Commercial office and Medical Facilities building design, Commercial interior space planning, furniture design and layouts and signage and wayfinding. Drawings as necessary for all project requests, construction period services for all design contracts leading to construction, cost estimates, schedules, digital models to communicate concepts to users, physical space mock-ups, and preparation of statement of work (SOW). A-E shall prepare site and architectural block or line plans, magnitude cost estimates, analytical, investigative and certification services & reports, attend site visits, validation of clinical program workloads and related data (VA provided or other healthcare market analysis) as necessary to provide applicable design and construction solutions.

c. Work shall include, but may not be limited to, field survey; site and facility investigation; preparation of special technical studies; analyses of structural systems; feasibility and concept studies; material investigation and color studies; preparation of engineering studies and/or investigation and preparation of A-E documents and reports for projects with associated structural, civil, landscaping, mechanical, electrical, environmental subsurface soil investigations and incidental work; preparation of design documents to include building and ground alteration, maintenance, repair and minor construction; cost and schedule estimates; and monitoring and evaluating the construction progress for conformance to plans and specifications including review of required submittals by the contractor.

d. Other A-E Services: Although these services are design and construction related, they are not necessarily connected with a specific construction project. The services consist of developing design criteria, fact finding studies, surveys, investigations, third party design reviews, independent fire protection review by registered fire protection engineer, commissioning, compliance, and restoration by registered architects and/or engineers. Additionally, work may include project management, construction management, procurement support and construction period services.

e. Construction Time: The A-E firm shall provide a recommended construction performance period for the complete and useable project(s). Recommendations will be based on the designer’s experience, knowledge of the industry, local market forces, weather conditions and availability of resources. Specific references shall be made to equipment/material items that may have a long lead item and could pose a problem to the performance period.

3. STATEMENT OF SERVICES: The A-E firm shall perform all or part of the following services as more specifically identified in each task order.

a. Part I (Type “A” Services). The A-E firm shall perform all work required to investigate existing conditions (Pre-Design). This work includes pre-scope field investigations (site visits) and surveys (topographic, geotechnical, chemical, site utilities, existing mechanical etc.), energy modeling/analysis, programming, commissioning, and similar fact-finding surveys of the site to provide reports of existing conditions on which to base proper design; and similar services not involved in the preparation of designs, plans, drawings, and specifications.

b. Part I (Type “B”) Services: The A-E firm shall perform those items normally furnished by an A-E in the actual preparation of the design documents (plans, drawings, estimates, specifications, submittal register, Comprehensive Interior Design, etc.) in the Schematic, Design Development and Construction Document phases. The A-E shall perform all work required to produce documents describing the work required to accomplish the project as specifically identified in each Task Order (TO). Unless otherwise specifically provided therein, the A-E shall perform these services as follows.

1. Field Survey and Investigation: The A-E firm shall visually inspect the site and/or facility for familiarization with the scope of work and general conditions of the facility. Coordinate with the using activities to obtain their operational activities for the development of functional relationships and detailed requirements. The A-E shall visit the project site for investigation of the existing physical conditions and to ensure the accuracy of the drawings, as available, furnished to the A-E by the Government.

1. Cost Estimates: The A-E firm shall design each project to provide a complete and usable facility within a given target construction cost provided by the Government. The target construction cost will be provided to the contractor in our requests for proposal and on the executed contractual document, the Standard Form 252. The A-E cost estimates shall be based on labor and material prices prevailing in the project’s locality. Cost estimates shall be descriptive, detailed, and includes all operations of work required including quantities and unit costs. Additionally, the construction cost estimate shall include Government Furnished Equipment (GFE) and contractor furnished equipment when applicable. The A-E cost estimate shall summarize all cost by material, labor, other direct costs, overhead, profit, and bonding costs. Cost estimates shall be prepared on an electronic version of a CO and COR pre-approved electronic spreadsheet that provides the information specified above.

1. Project Costs: The A-E shall be required to conduct the field survey and investigations, prepare the preliminary drawings, data, reports, etc., and design the full scope of the work as outlined above and as agreed upon during review of study data and recommendations. If the estimated costs exceed the amount indicated on the project description sheets for each project (based on current anticipated scope and subject to adjustment to approved scope), sufficient alternates to the construction contract should be determined at the time of the preliminary review conference to reduce the cost below this amount, if deemed necessary by the Government. Cost estimates, and computation sheets prepared by the A-E shall be marked “FOR OFFICIAL USE ONLY”.

1. Phasing Plans, Impact Mitigation, and Energy. Construction work will be in occupied Medical Centers and every effort will be made to interface construction with Medical Center operations. To minimize impact this means the preparation of detailed phasing plans including associated moves. Phasing plans will show exact areas of work along with specific outage times, infection control risk assessment (ICRA) mitigation measures (including specific dust, noise, debris control), interim life safety measures (ILSM) which provide for specific measures to mitigate any reduction in fire protection features (i.e., exits out of service, fire sprinkler removal, etc). Utility outages will be carefully planned and described in the Construction Documents to allow all OSHA required safety measures to be maintained while continuing Medical Center operations. (For example, outages must provide means to shut off and lock out / tag out equipment while still allowing for Medical Center to continue operations). Project must meet all legal requirements and executive orders including Energy Policy Act (EPAC) 2005, Energy Independence and Security Act (EISA) 2007, Executive Order (EO) 13514, and EO13423 all dealing with environmental, energy, and water as specifically applied to Federal Buildings. This requires up front analysis and planning.

c. Part II (Type “C” Services): Provide Construction Period Services, Project Management, Construction Management, and/or Commissioning services to support the VA design and construction delivery process. Services include those items involving inspecting, monitoring, commissioning, and evaluating design and/or construction activities to validate conformance to scope of work, plans and specifications. These services include reviewing, evaluating and testing product submittals and shop drawing, preparation of construction contract modifications and drafting of Request for Information (RFI) responses. The A-E shall provide commissioning services as outlined in “OCFM Whole Building Commissioning Process Manual.” (https://www.cfm.va.gov/til/spclRqmts.asp#Cx)

4.DESCRIPTION OF PART II – TYPE C SERVICES
a.CONSTRUCTION PERIOD SERVICES (CPS): The A-E design team identified for each Task Order shall provide Construction Period Services if that option CLIN of the Task Order is exercised. Scope of services shall include procurement support for pre-bid site visits during design-bid-build or design-build procurements, Request for Information (RFI) responses, submittal reviews, scheduling review, site inspections, testing oversight, modification definition and development and final inspections. Attend pre-bid walk-throughs, assist with interpreting, researching, and answering Requests for Information during procurement process. Deliverables shall include pre-bid site walk agendas, RFI register, and written responses to RFIs. CPS may include submittal reviews, including review of project schedules with an emphasis on sequencing, milestone completion dates, phasing requirements, workflow, material deliveries, and test dates. Provide field verification of as-built drawings, creation and updates of as-built drawings. Perform inspections of construction as work proceeds, taking action to identify work to the COR that does not conform to the contract requirements, and notifying the COR when work is thought to require correction, and troubleshooting. Compile, through site inspections, lists of defects and omissions related to the work performed and provide these lists to the COR for determination of the need for correction. Deliverables shall include observation reports, lists of defects and omissions, modification narratives, sketches, and drawings, as required.
b.PROJECT MANAGEMENT (PM): Scope of services shall include project management of all professional and technical services related to the VA design and construction delivery process. The services are to be performed in cooperation with the VISN, Health Care System, building occupants, architect-engineers (VHA hired designers), and construction contractors (VHA hired constructors). The PM shall represent VHA in a professional manner and provide sound management advice regarding work performed on assigned projects. For each project, the goal shall be to achieve the best value in the work being performed by controlling schedule and budget. The PM shall also be proactive in helping to resolve problems and minimize claims taking all reasonable measures to anticipate problems and delays and to minimize or eliminate their adverse impact on project completion. The PM must take the initiative and act to mitigate circumstances that could lead to claims, resolve conflicts promptly, and keep the Government advised of any potential disputes. The PM shall exercise all due diligence, utilizing competent personnel within authorized limitations, to make certain that work is performed in conformity with applicable requirements (codes, regulations, standards, construction contract plans and specifications). The PM shall continuously review schedules and adjust based on the progress of work and make specific recommendations for prioritizing and accelerating critical path items. The PM shall facilitate, manage and document all project meetings to keep stakeholders and integrated project team members informed. The PM shall manage construction and construction administration documents, correspondence, and as-builts. The PM will not be held responsible for design defects and does not assume any of the contractual responsibilities or duties of the architect-engineers. The PM also does not assume any of the contractual responsibilities or duties of the construction contractors. The construction contractors are solely responsible for construction means, methods, sequences and procedures used in the construction of the projects, and for related performance in accordance with their contracts with the Government. PM deliverables include a project management plan, including the communication plan, schedule management plan, quality assurance plan, risk management plan, and Project Tracking Reports in the VHA Capital Assets database.
c.CONSTRUCTION MANAGEMENT (CM): Provide construction period services that may include coordination of submittal reviews and management of the submittal process including maintenance of submittal register. Review and monitor project schedules with an emphasis on milestone completion dates, phasing requirements, workflow, material deliveries, and test dates. Provide field verification of as-built drawings, creation and updates of as-built drawings. Perform inspections of construction as work proceeds, taking action to identify work to the COR that does not conform to the contract requirements, and notifying the COR when work is thought to require correction, and troubleshooting. Compile, through site inspections, lists of defects and omissions related to the work performed and provide these lists to the COR for determination of the need for correction. Deliverables shall include observation reports, lists of defects and omissions, modification narratives, sketches, and drawings, as required.
d.COMMISSIONING: Provide Commissioning Agent services and deliverables in accordance with the reference document, “OCFM Whole Building Commissioning Process Manual.” See “Commissioning Agent Tasks” in each section of the reference document. The Commissioning Agent shall be involved in all phases of the project, including both design and construction. It is anticipated that the Commissioning Agent will participate in the following: design reviews, owner’s requirements updates, design phase commissioning planning (facilitate), commissioning specification reviews (facilitate), construction project meetings, construction observation visits, equipment startup and testing, Testing Adjusting and Balancing (TAB) verification, and project commissioning (facilitate in coordination with General Contractor). The commissioning process shall be adapted to the size and complexity of the project. Deliverables shall be as described in the reference document.
5.APPLICABLE STANDARDS, MANUALS, AND DIRECTIVES: Applicable Standards, Manuals, and Pamphlets: The A-E shall design projects in accordance with Veterans Health Administration (VHA) (http://www.cfm.va.gov/til/dManual.asp).
a.The current version of each standard at date of task order award shall apply.
b.Each Task Order shall identify specific standards applicable to the required work.
c.Guide Specifications: The A-E shall use VHA guide specifications as the basis for producing specifications under this contract. The specifications shall be tailored to suit the specific work requirements of the individual items contained in the Task Order. Extraneous material that does not apply shall be deleted. An overall table of contents will be provided for all design specifications utilized for each project design accomplished.
1)While the A-E should cover relevant items in full scope to assure quality construction and compliance, the use of notes on the drawings either to accentuate important items in the specifications, or to take the place of lengthy written specifications for routine or simple items is encouraged.
2)Entire specifications for simple projects of low monetary value may be by notes on the drawings.
3)The A-E is permitted to use specific manufacturer’s part or model numbers to describe a specified item, however, in all such cases, at least two other approved manufacturer’s part or model numbers shall be specified in an “or equal” statement which shall be included unless the government wishes to sole source an item.
d.Local, State and National Standards which apply, including but not limited to: UFC, NFPA, NFC, ANSI, OSHA, ASTM, NEC, ICC, etc.
e.Cost estimations shall be based upon RS Means), the VA’s Electronic Technical Information Library (TIL) Cost Estimating - Office of Construction & Facilities Management (va.gov) or Contracting Officer Representative (COR) approved equal.
f.VA/VHA has a series of design guides and space planning tools in addition to VA Master Specifications. These will generally be minimum standards but may be adjusted to meet other requirements such as energy and environmental compliance. Modifications are to be approved by the VA COR/CO.

g. Public Laws and Executive Orders with specific reference to EPAC 2005, EISA 2007, Environmental Policy, EO 13423, EO 13514, etc., shall apply.

h.Environmental impacts must be evaluated and either meet categorical exclusion or have a full environmental assessment performed. Many VA buildings are considered historic and this will need to be considered throughout the design. Reference sources are available upon request by either websites or government furnished.
6.SPECIFIC SERVICE DESCRIPTIONS:
a.Seismic Studies: Description of work to be performed: Perform seismic research on the locations identified to indicate current seismic zones; analyze existing building structure for compliance with current seismic criteria. Determine needed improvements to meet current requirements and estimate cost of compliance. See guidance on the VA TIL website: http://www.cfm.va.gov/til/seismic.asp
b.Economic Studies: In preparing designs the A-E shall make a comparative cost analysis to justify the selection of type and source of utilities, major items of equipment, building components, materials, method of construction, siting, plumbing, lighting, heating, air conditioning, building configuration, electrical systems, column spacing, roads, story heights, structural system, and selection of interior and exterior finishes. The analysis will include cost of operation and maintenance over the expected life of the project. This cost analysis shall include consideration of the life cycle cost of the facility. Major decisions shall be documented in the design analysis.
c.Infrastructure Assessment: Description of work to be performed: Perform analysis of existing or proposed infrastructure on medical center complexes to including defining and documenting: utility capacities, physical security elements in place, fencing, pedestrian and vehicular roads, sidewalks and amenities, all associated elements of the built environment composing the medical center campus. The intent of the studies is to identify supporting facilities and conditions to accommodate proposed future expansions, renovations, and new construction. See the TIL for guidance regarding Physical Security studies: http://www.cfm.va.gov/til/dManual.asp
7.PHASES OF COMPLETION: Unless specifically defined otherwise in the TO, the A-E firm shall accomplish the design of a project in phases which consist of the following:
a.Phase I (Pre-Design)

1) Survey of existing facilities

2) Study of requirements

3) Conceptual Floor Plans and Elevations

4) Energy Modeling and Analysis

5) Commissioning Agent Input

6) Phasing and other mitigation factors including ICRA and ILSM.

During Phase I, the A-E shall conduct a survey investigation and study based on broad guidance furnished herein, and as may be supplemented by other Government-furnished material, will determine the recommended scope, materials, quantities, etc., and proceed to Phase II. Conferences or site visits will be conducted (if required).

b. Phase II for accomplishing design work (Schematic and Design Development):

1) Schematic Documents - 35% Drawings (half size)

2) Schematic Documents - 35% Specifications

3) Schematic Documents - 35% Cost Estimate

4) Design Analysis

5) Energy, ICRA, ILSM and Phasing

6) Conference at the Contracting Office (unless specifically omitted)

7) Design Development - 65% Drawings (half size)

8) Design Development - 65% Specifications

9) Design Development - 65% Cost Estimate

10) Design Analysis

11) Energy, ICRA, ILSM and Phasing

12) Conference at the Contracting Office (unless specifically omitted)

c. Phase III Completion of design (unless specifically omitted) shall include all review comments from Phase II (Construction Document):

1) Construction Document Drawings- 95% (half size & full size)

2) Construction Document Specifications - 95%

3) Construction Document Cost Estimates - 95%

4) Construction Document Design Analysis (95%)

5) Final analysis and approval of Phasing, Energy Analysis including Measurement and Verification plan, ICRA plan, ILSM plan and detailed phasing plan.

6) Conference at the Contracting Office (unless specifically omitted)

7) Final Bid Documents (100%) as listed below shall be delivered to the office of the CO incorporating all review comments from the 95% review.

a. Final Bid Drawings (half size &full size)

b. Final Bid Specifications

c. Final Bid Cost Estimate

d. Final Bid Design Analysis

8. GOVERNMENT FURNISHED INFORMATION: The Government, through the CO, within a reasonable amount of time after issuance of a TO, will provide access to applicable data and information (as available) for the execution of the described work. Data shall be returned to the COR upon completion of the individual TO. This data is on file in the Station Facility Management (FMS) Office and may be obtained for review by the A-E. All data from the Government shall be treated with care and is classified “FOR OFFICIAL USE ONLY”, unless told otherwise. All data cannot be distributed, retransmitted, or reproduced without written permission from the Government. The data will include where applicable and available:

a. General Site Plan.

b. Small scale layout drawing or sketch showing possible arrangement of space (to serve as a guide).

c. Basic floor plan showing location of project (unless specifically omitted).

d. Existing record drawings as available.

e. Design criteria applicable to required Task Order.

f. Special requirements for preparation of drawings, reports, specifications, cost estimates, and design analysis.

g. Government-furnished equipment list, if applicable.

9.CHANNELS FOR OBTAINING INFORMATION:
a.Except as specified herein, all requests for information necessary for the execution of this work shall be made through the COR and or CO.
b.The A-E shall appoint a Project Manager for each project to serve as the single point of contact and liaison between the A-E and the Government. Upon execution of the individual TO, the A-E shall advise the CO in writing of the name of the individual so designated. The A-E Project Manager shall be responsible for the complete coordination of all work required for the project. This Project Manager shall not be released from this responsibility unless the CO approves of the intended replacement Project Manager.
10.SITE ANALYSIS AND FIELD WORK: The A-E shall perform all field work necessary to determine the existing conditions at the site of the work.
11.DRAWINGS & SPECIFICATIONS
a.General: Final drawings shall be submitted on hard copy and in electronic format as outlined by the VHA standards (http://www.cfm.va.gov/til/projReq.asp) and IAW VA A-E Design Submissions Requirements (PG-18-15) (https://www.cfm.va.gov/til/aeDesSubReq.asp).

1) Cover Sheet/Location Plan: The A-E shall prepare a cover sheet with a location plan on the first sheet of the project drawings. This location plan will be the base map or a portion thereof which covers the general project location and base location relative to metro area. The cover sheet containing the latest signature format shall be used.

2) Code Data Sheet: The A-E shall prepare a separate sheet showing all code calculations, life safety requirements, energy modeling/analysis and design conditions/assumptions. As a minimum, the following information shall be provided: Applicable Codes used on the drawing; Building Description; Occupancy Classification; Type of Construction; Exit Requirements; Allowable Floor Area; Hazard Classification, Design Loads and Conditions.

b. The Task Order may require any portion of a design in accordance with PG-18-15: Schematics, Design Development, Construction Documents, or a combination of these.

1) For projects where the VA is contracting for Schematics Documents only, Schematics and Design Development Documents only, or Schematics, Design Development, and Construction Documents, the VA will provide the Design Program (if available), Facility Development Plans (if available), and VA design standards to accompany the Scope of Work for the project.

2)For projects where the VA is contracting for Design Development and Construction Documents only, the VA will provide the Schematics Plans and VA design standards to accompany the Scope of Work for the project.
3)For projects where the VA is contracting for Construction Documents only, the VA will provide the Design Development Plans and VA design standards to accompany the Scope of Work for the project.
c.Schematic Documents: Schematic Documents shall be prepared at working drawings scale and will present sufficient detail in accordance with PG-18-15 to permit an adequate review. These details will include those listed in PG-18-15, unless not applicable to awarded Task Order or specifically omitted:
d.Design Development: Design Development drawings shall include changes as identified during Schematic Document review and will present sufficient detail in accordance with PG-18-15 to permit an adequate Design Development review. These details will include those listed in PG-18-15 unless not applicable to awarded Task Order or specifically omitted:
e.Construction Documents: Construction Documents shall include changes as identified during Design Development review and will present sufficient detail in accordance with PG-18-15 to solicit the project for construction. These details will include those listed in PG-18-15 unless not applicable to awarded Task Order or specifically omitted.
f.Final Bid Documents: The A-E shall not proceed with the final bid documents until approval of Construction Documents by COR. Construction Documents shall be submitted for review by the COR for necessary revision, corrections, or additions before final approval and application of the required signatures of Government personnel. After approval of Construction Documents by COR, the AE shall place the seal of the Registered Architect, Registered Landscape Architect, and Professional Engineer responsible for the design on the Final Bid Documents.
g.Specifications: The project specifications shall be prepared as a separate document or shall be included on the drawing sheets (when specifically approved by the COR). The specifications shall be prepared in accordance with PG-18-15 and paragraph 4.e of this Scope of Work (Guide Specifications). In all cases where the responsible government official is referenced (inspector, engineer, architect, etc.), the specifications shall refer to the COR. The A-E shall be responsible for judging whether testing is required for a work item. Do not require tests which are not economically appropriate for the size of the job.

12. CONSTRUCTION COST ESTIMATE: Cost estimates shall be prepared using the VA standard: https://www.cfm.va.gov/cost/index.asp. The top and bottom of each sheet of the cost estimate shall be marked “FOR OFFICIAL USE ONLY”. Each work class (i.e., Maintenance, Repair, and Minor Construction) shall require a separate cost estimate that will have its own separate bid line item as detailed by VA Cost Estimating procedures.

13.DESIGN INFORMATION: In general, the requirements presented are design objectives and the A-E is encouraged to suggest changes where they would not seriously deviate from the overall requirements and would result in substantial economic savings, time savings or improved performance in arriving at the end results. Design of structure will comply, where applicable, with such regulations and criteria that exist for the VHA, and objectives of the project as furnished by the CO.
14.DESIGN ANALYSIS: The Design Analysis shall be submitted with the preliminary and final drawings. The design analysis shall support the design recommendations pertaining to the major technical sections of the work such as structural, architectural, heating, plumbing, electrical, and mechanical for any project which requires the calculation of size and strength, or the rendering of engineering decisions, regardless of the cost or size of the projects. This analysis will be on 8 1/2 x 11-inch paper capable of reproduction and in electronic format. The design analysis shall have a standard heading to indicate the project number, project name, the type of computation, the name of the designer and the checker, and dated. The analysis shall include but will not be limited to the following:

a. A short description of the work involved.

b. The designer’s assumptions for the design.

c. The references used for computations as they occur.

d. The equations, tables, or curves used or developed, with references cited where they are taken from non-standard sources.

e. The detailed computations as necessary to establish the design.

f. Suitable free-hand sketches to illustrate the designer’s intent such as steel sizing and arrangement, pipe arrangement, beam layout, etc.

g. Size selection of equipment even where computations are not required. This may consist, for example, of a single statement such as, “use a 60 HP Westinghouse piston compressor model XYZ”. Where necessary, include statements that show the basis for selections that are to be included. Calculations and information source shall be shown in an orderly and logical manner to permit review and checking. The design analysis shall be furnished to the CO as indicated on the design schedule.

h. Phasing Plans, Outage Plans, ICRA, ILSM, Energy/ Water, Environmental Considerations.

i. The following statement shall be in each design analysis: “This design has been reviewed from a value engineering standpoint and has been planned to achieve the required function at the lowest overall cost, not merely the lowest initial cost.”

15. REQUIRED COPIES OF DELIVERABLE MATERIAL: The deliverables and delivery schedule shall be determined and established in each Task Order. All delivery charges shall be prepaid by the A-E firm. The Contracting Officer reserves the right to establish the order (sequence) in which the services are performed. If deliverables are not specifically addressed in the Task Order, the A-E shall furnish the required materials to the COR with one copy to the CO, in the number of copies indicated below for each phase.

Phase II of Contract:

3. Schematic Documents:

1) Schematic Documents Working Drawings (hard copy and electronic file) - Two (2) sets of hard copy prints (half size); electronic files in AutoCAD and Portable Document Format (PDF); one compact disk (CD), packaged so drawings can be viewed logically and independently using a preloaded viewer (i.e. TruView for AutoCAD and Adobe for PDF).

2) Schematic Documents Specifications (hard copy and electronic file) - Two (2) sets of hard copy. Electronic file in Portable Document Format (PDF); one CD, packaged so the specifications can be viewed logically and independently using a preloaded viewer (i.e. TruView for AutoCAD and Adobe for PDF).

3) Schematic Documents Design Analysis (hard copy and electronic file) - Two (2) sets of hard copy; electronic file in Portable Document Format (PDF); one CD packaged so the design analysis can be viewed logically and independently using a preloaded viewer (i.e. TruView for AutoCAD and Adobe for PDF).

4) Schematic Documents Contract Cost Estimate (hard copy and electronic file) - Two (2) sets of hard copy; electronic file in Portable Document Format (PDF); one CD, packaged so cost estimate sheets can be viewed logically and independently using a preloaded viewer (i.e. TruView for AutoCAD and Adobe for PDF).

3. Design Development:

1) Design Development Working Drawings (hard copy and electronic file) - Two (2) sets of hard copy prints (half size); electronic files in AutoCAD and Portable Document Format (PDF); one CD, packaged so drawings can be viewed logically and independently using a preloaded viewer (i.e., TruView for AutoCAD and Adobe for PDF).

2) Design Development Specifications (hard copy and electronic file) - Two (2) sets of hard copy. Electronic files in Portable Document Format (PDF), one CD, packaged so specification sheets can be viewed logically and independently using a preloaded viewer (i.e. TruView for AutoCAD and Adobe for PDF).

3) Design Development Design Analysis (hard copy and electronic file) - Two (2) sets of hard copy. Electronic files in Portable Document Format (PDF), one CD, packaged so design analysis sheets can be viewed logically and independently using a preloaded viewer (i.e. TruView for AutoCAD and Adobe for PDF).

4) Design Development Contract Cost Estimate (hard copy and electronic file) - Two (2) sets of hard copy. Electronic file in Portable Document Format (PDF), one CD, packaged so cost estimate sheets can be viewed logically and independently using a preloaded viewer (i.e. TruView for AutoCAD and Adobe for PDF).

5) Design Development Comprehensive Interior Design (CID) – Two (2) sets of Furniture, Fixtures and Equipment (FF&E) submittals and two (2) sets of Structural Interior Design (SID) submittals as defined in UFC 3-120-10 Interior Design.

Phase III of Contract:

c. Construction Documents:

1) Construction Documents: Three (3) sets of hard copy prints (one (1) set full size, two (2) sets half size). Electronic files in AutoCAD and Portable Document Format (PDF); one CD, packaged so drawings can be viewed logically and independently using a preloaded viewer (i.e., TruView for AutoCAD and Adobe for PDF).

2) Construction Documents: Two (2) hard copy sets. Electronic files Portable Document Format (PDF), one CD, packaged so specification sheets can be viewed logically and independently using a preloaded viewer (i.e., TruView for AutoCAD and Adobe for PDF).

3) Construction Documents: Two (2) hard copy sets. Electronic files in Portable Document Format (PDF), one CD, packaged so design analysis sheets can be viewed logically and independently using a preloaded viewer (i.e., TruView for AutoCAD and Adobe for PDF).

4) Construction Documents: Two (2) hard copy sets. Electronic file in Portable Document Format (PDF), one CD, packaged so cost estimate sheets can be viewed logically and independently using a preloaded viewer (i.e., TruView for AutoCAD and Adobe for PDF).

5) Construction Documents: – Two (2) sets of CID binders which include Furniture, Fixtures and Equipment (FF&E) submittals and Structural Interior Design (SID) submittals.

d. Final Bid Documents:

1. Final Bid Drawings: One (1) set of full-size prints and two (2) sets of half size prints. Final drawings shall also be submitted in AutoCAD format and in Portable Document Format (PDF). Additional sets may be negotiated as required.

1. Final Bid Specifications: One (1) original signed set on bond paper plus two (2) bound sets. Final specifications shall also be submitted on CD in Portable Document Format (PDF) and Microsoft Word formats. The submittal register may be in Excel format instead of Microsoft Word format. Additional sets will be negotiated as necessary.

1. Final Bid Cost Estimate: Two (2) sets of copies and one set of originals plus electronic version in Portable Document Format (PDF), and Excel or Word formats.

1. Final Bid Design Analysis: Two (2) sets of copies and one set of originals plus electronic version in Portable Document Format (PDF), and Excel or Word formats. A statement or listing of recovered materials to show that these items have been addressed shall appear in the design analysis.

1. Final Bid Comprehensive Interior Design (CID): Two (2) sets of CID binders which include Furniture, Fixtures and Equipment (FF&E) submittals and Structural Interior Design (SID) submittals as defined by VHA standards.

Recovered Materials Determination Form that the A-E shall complete as part of the 100% submission of every project.

16. DESIGN SCHEDULE: The A-E firm shall complete all work and services under this contract within the period specified in the TOs to be issued and shall deliver the submittals to the COR and CO in accordance with the following schedule. The performance period for each phase will be a point of negotiation for each project TO:

a. Phase I of Task Order

1) Concept Submittal (Design approximately 10% complete).

2) Government Review Period.

b. Phase II of Task Order

1) Schematic Documents (Design approximately 35% complete).

2) Government Review Period.

3) Design Development (Design approximately 65% complete)

4) Government Review Period.

c. Phase III of Order

1) Construction Documents (Design approximately 95% complete).

2) Government Review Period.

3) Final Bid Documents (Design 100% complete).

d. The time required by the Government to review submissions made by the A-E under this contract will vary according to the specific workload. The review periods established in the completion schedules set forth in TOs are the maximum anticipated periods required. Every effort will be made to accomplish reviews within a shorter period.

e. The A-E shall make corrections to the drawings, specifications, contract cost estimate, and design analysis as required by the FMS Office, the VISN CAMS/Regional Engineer or the VISN Regional Contract Management Office.

17.MARKED-UP COMMENTS: The A-E firm shall provide a copy of the marked-up comments with each subsequent submittal. The A-E shall insure that the copy of marked-up comments reflects changes that were made. The A-E’s replies to Government comments shall be submitted electronically in the same format as submitted to the A-E. Annotations shall include specific references where applicable. For example, if the comment was “Where is the stair detail?” the annotation could be “Stair Detail added on Dwg A-4”. Most responses can be handled in this brief manner. Occasionally, a separate written response may be required, especially when the A-E non-concurs with a comment.
18.COMPREHENSIVE INTERIOR DESIGN (CID): CID includes Furnishings, Fixtures and Equipment (FF&E) and SID. When required by the TO, CID will be accomplished by the A-E in accordance with VHA standards or CO direction.

a. The FF&E submittal is used for procurement of furnishings for new or renovated facilities. It includes anything not permanently attached to the building. FF&E information and samples are submitted in 8 ½” x 11” format using three ring binders with pockets on the inside of the covers. The design submittal requirement will include but is not limited to the following: Narrative of Interior Design Objectives, Point of Contact List, Itemized Furnishings Cost Estimate, Best Value Determination, Item Code Legend, Item Installation List, Furnishings Order Forms, Furnishings Illustration Materials, Manufacturers List, and Furniture Plans.

b. Due to the project construction timing, furniture order data sheets shall be updated to verify product availability and current cost approximately three to six months before the construction completion date. The exact schedule will be determined for each individual task order.

19.INTERIOR SIGNAGE: Include in any project in which a large portion of a facility is being renovated, or a large addition constructed. Interior signage is a part of the construction contract. Signage shall be in accordance with VHA standards. Samples shall be included in the SID submittal.
20.CERTIFICATION OF DRAWINGS AND OTHER DOCUMENTS: The A-E firm, or their authorized representative, shall sign the original Mylar of all drawings and the first page of all specifications, estimates or similar documents under the A-E’s printed name and over the affixed professional seal (or his registration certificate number and including the state of issuance). In addition, as part of the 100% submittal, the A-E must certify in writing that the plans and specifications follow VHA directives and all applicable criteria. Reassignment of A-E design responsibilities to construction contractors will be highly discouraged by the Government. This includes but not limited to the following: structural steel detailing, fire sprinkler design, stair systems, retaining wall systems, and structural framing systems. This practice in no way relieves the A-E of their responsibility for these items. The A-E will be asked to approve and shall certify all “delegated” designs for conformance to the project design analysis.
21.RESPONSIBILITY OF THE A-E: The A-E firm shall be responsible for the professional and technical quality of all designs, drawings, specifications, and other material produced under this contract. The A-E shall also be responsible for the professional quality and adequacy of the service and materials furnished and for compliance with design criteria specified by the Government for use under this contract.
22.SAFETY: The services to be supplied shall meet all applicable safety requirements of the Occupational Safety and Health Act (OSHA) and VHA Center for Engineering & Occupational Safety and Health (CEOSH) Standards (http://vaww.ceosh.med.va.gov/). The construction specifications and drawings provided by the individual TO shall specify the OSHA standards in detail or by explicit reference, e.g., (1) Handrails and guardrails will be provided as required by OSHA standards 1910.23 or (2) Ladders will be constructed in accordance with OSHA Standard 1910.27.
23.SECURITY INFORMATION: VA Security and Information Security Directives (VHA Directive 6500 (https://www.va.gov/vapubs/viewPublication.asp?Pub_ID=542&FType=2 and VHA Directive 6500.6, or the most current versions) will be followed by all members of the A-E firm who are working on this project. Precautions shall be taken, and every effort shall be made to prevent public disclosure of any information made available to the A-E during the performance of this contract. All data shall be FOR OFFICIAL USE ONLY and be treated as privileged information.
24.OTHER MANDATORY CONSIDERATIONS: To comply with the affirmative procurement requirements of Section 6002 of RCRA, Section 9002 of the Farm Security and Rural Investment Act of 2002, and Executive Order 13101, the Government strongly promotes the use of recycled-content [and bio-based] products. Recycled-content products are identified in the Environmental Protection Agency’s Comprehensive Procurement Guidelines (CPG) [Bio-based products are designated by the USDA]. These materials and products shall meet the requirements of the specifications, shall not delay the progress of the work, and shall not be cost prohibitive. CPG items, and USDA designated bio-based products, are the minimum that should be considered when evaluating environmentally preferable materials. Other materials and products commonly used in industry should also be considered. Material and product submittals for all recycled-content items shall list the recycled and recovered materials used and the percent content (by weight). Submittals for bio-based products shall describe the bio-based materials used, and the percent content (by weight). A Recovered Materials Determination Form shall be submitted as part of the 100% submission of every project in accordance with VA Handbook 0058.

a. The Government’s policy is to acquire supplies and services that promote energy and water efficiency, advance the use of renewable energy products, and help foster markets for emerging technologies. The specifications shall require that the contractor provide ENERGY STAR or other energy-efficient products.

b. The A-E shall be alert to methods and products that will contribute to waste minimization and reduction and incorporate them into the project design to the greatest extent practicable. A statement or listing of recovered materials to show that these items have been addressed shall appear in the design analysis.

c. The A-E shall incorporate green building and sustainable design practices and elements into project designs to the greatest extent practicable. Project designs shall meet the guiding principles and all energy/water/environmental requirements established by EPACT 2005, EISA 2007, EO 13514, and EO 13423.

25. OZONE-DEPLETING SUBSTANCES

a. Definitions:

1) “Class I Substance” means any substance designated as Class I by the USEPA (40 CFR Part 82), including but not limited to chlorofluorocarbons, halons, carbon tetrachloride and methyl chloroform.

2) “Class II Substance” means any substance designated as Class II by the USEPA (40 CFR part 82), including but not limited to hydro chlorofluorocarbons.

b. The A-E firm shall not specify, require, or in any way incorporate the use of a Class I substance. To the maximum extent practicable, the A-E firm shall avoid specifying, requiring, or incorporating the use of a Class II substances in a design document prepared under this contact. Such substances will be considered acceptable when no non-ozone depleting alternatives are available.

c. The A-E firm shall document that any alternatives to Class I substances or Class II substances, which the A-E specifies, requires, or in any way incorporates into a design document, are identified within USEPA’s “Significant New Alternatives Policy Program” as an “acceptable substitute.”

d. State-specific ODS Air Permitting Requirements - depending on state implementation of federal Clean Air Act (i.e., California, New Mexico, Arizona, Washington, Oregon, Idaho, Nevada, Hawaii, Alaska, Guam, Philippines and American Samoa) the A-E shall determine whether an air pollution emission notice (APEN) or air permit is required before initiating procurement/testing/operation of a new or replacement CFC/HCFC charged chiller systems.

26. STORMWATER, SOIL, AND EROSION CONTROL: The A-E firm shall include in the design soil and erosion control measures in accordance with local jurisdictions as required by that specific locations laws and shall provide the following in terms of storm water, soil, and erosion control for all projects:

a. The definition of disturbed area on a project includes all areas disturbed, including lay down and staging areas, site access, etc., not just the project site footprint.

b. For projects disturbing greater than 5000 sf but less than 1 acre, develop a stand-alone soil and erosion control plan.

c. For projects disturbing greater than one acre develop a stand-alone soil and erosion control plan and have it approved by the applicable local authoritative governments as required by local and/or state authority.

d. The A-E shall include the calculation of project area used to determine soil and erosion control requirement in the design analysis. The A-E shall be responsible for any “processing” and “expediting”, etc. fees. The design will not be considered complete until the approved plan and approval documentation are provided to the Government. Three copies of each shall be submitted as part of the 100 percent submittal.

This is the start of the file's text. The full file is on GovTribe.